HomeMy WebLinkAboutContract 44782-CO5 CITY SECREfAlilf Q FORT WORTH. Ci of Fort Worth CONTRACT NO. q a' Change Order Request Project Name I W/S Replacement Contract 2010 STM-E and CAH Ashland Drainage City Sec# 1 44782 Client Project#(s)l 01494(DOE 6561)and 01918(DOE 6853) Project W/S Replacement Contract 2010 STM-E and CAH Ashland Drainage Description Contractorl Woody Contractors, Inc. Change Order# 0 Date City Project Mgr.1 Michael Owen/Robert Saucedo City Inspector E Don Watson Dept. TPW Water Sewer Totals Contract Time CD Original Contract Amount $1,334,413.55 $1,034,235.00 $628,236.00 $2,996,884.55 290 Extras to Date $5,000.00 $289,250.00 $127,990.00 $422,240.00 150 Credits to Date $27,600.00 $27,600.00 Pending Change Orders(in M&C Process) Contract Cost to Date $1311813.55 $1,323,485.00 $756,226,00 $3,391,524.55 440 Amount of Proposed Change Order $44168.00 $0.00 $0.00 $44,168.00 Revised Contract Amount $1,355,981.55 $1,323,485.00 $756,226.00 $3,435,692.55 440 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $22,600.00 $0.00 $0,00 $22,600.00 Additional Funding(if necessary) $21,568M $21,568.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 14.64% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) 1 $3,746,105.69 This change order shall furnish all labor and material to provide the following additional work:install subdrain system to drain groundwater;be subdrain system into understreet detention;and remove and replace driveways,sidewalk and pavement as necessary to intall subdrain system. Groundwater blocked by the new street subgrade was not able to drain away from parkway areas and water meter boxes causing standing water that could eventually become a west nile mosquito rn. 04 Attested b • �°8 0 o OFFICIAL RECORD Secretary °°O0 0,00 CITY SECRETARY S F11 WORTH, TR It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. � W*y Contractors, Inc. w. w m Irf rr n 00 M&C Number M&C Date Approved cu _ . _ _ GLl ° � DO $ . . . . 7 A o a 0 co Hk / # / LO * A Li 6 � � / ƒ E Q / CLO § A 2 2 / A § 020 70 L a 0O f � « k �0) "- 0 % U § § E / . 2 w LY U CO co LU U) o G o 0 0 k 16 » 8 Cc ƒ ca d CO 3 a 0 £ coR 0 E 2 E $. $ § cc 0 o 7a 0 I Lu / � \ CO 3 « o = k _ cu £ f (D # . i ¥ §E t5 7 ' / S $ a Co _ \ ƒ § k � 0 \ k o _/ A G 2 0 (D A a_ C) 0 0 00 0 0 co v v c 0 Q a76 ) m H 0 N O N OJ f0 d N C O tko Y Q 0 C L U -_- co G ° / # G \ g f 2 � \ / # 0 * / 6 r,4 & k ? k OL \ ® m 3 o � � / / g G \ w k 0 % %LL / % 0 / / 0) \ U § % % \ t LY g � U C.0 / \ / C � o \ 0c) C \ 7 S k G T Q — _ � d m » D CS 0 k k k \ ƒ § /2 \/ 0 o a o I « I � $ m $ m o k 7 k / \ (D # a \ + f o * /e I f � cn � C) 0CD 0 6 0 6 613, to3l 63 C= 0 a N 4- 0 O N tko N m a N C O A) a� O v O ai to c r U M/WBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO N/A Total $0.00 Previous Change Orders Co# DATE AMOUNT 1 1/30/2014 -$22,800.00 2 6126/2014 $68,850.00 3 9/25/2014 $261,040.00 4 12/28/2014 $87,550.00 Total $394,640.00