HomeMy WebLinkAboutContract 45627-FP2 Depart nt f TP&W Const.Sser ices
DOE# �S �'�� .Z Clt1 WQ)-.
Project anager T WO RT H 5w
Risk Management�•a�
D.O.E. Brotherton CITY SECRE 1i V1 q
CFA WestermanlScanneCONTRACT NO. (�
The Proceeding pie have been CO abed co corning the request for final
paymerrt 6 have released this project for such payment
TION AND PUBLIC WORKS ��,ysrP
Clearance Conducted By Shameka Kennedy PROJECT COMPLETION
D.O.E.Ns: 7076
Regarding contract 317076 for THE BAR C RANCH,PHASE4A STREET LIGHT as required by the
TRANSPORTATION&PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director
of the TRANSPORTATION&PUBLIC WORKS upon the recommendation of the Assistant Director of the
Transportation&Public Works Department has accepted the project as complete,
Original Contract Prices: $13,033.20
Amount of Approved Change Orders: Ne
Revised Contract Amount:
Total Cost Work Completed: $13,033.20
Less Deductions:
Liquidated Damages: Days @$210.00/Day
Pavement Deficiencies:
otal Deduction Amount:
Total Cost Work Completed: $13,033.20
Less Previous Payments: $0.00
Final Payment Due $13,033.20p
Recommended for Acceptance Date
Asst. Dir or, TPW - Infrastructure Design and Construction
Accepted Date
Director, TRANS ORTATION &PUBLICXORKS �1
City Manager Date
Comments: C205-541200-207760213083
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name THE BAR C RANCH,PHASE 4A
Contract Limits
Project Type STREET LIGHT
City Project Numbers 02130
DOE Number 7076
Estimate Number I Payment Number 1 For Period Ending 4/13/2015
W
City Secretary Contract Number 317076 Contract Time 36V
Contract Date Days Charged to Date 15
Project Manager JaaM Contract is 100.00 Complete
Contractor C do S UTILITY CONTRACTORS,INC.
6705 HIGHWAY 287
ARLINGTON, TX 76001
Inspectors LAYER / DOVERS
Monday,April 13,2015 Page 1 of 4
S
City Project Numbers 02130 DOE Number 7076
Contract Name THE BAR C RANCH,PHASE 4A Estimate Number 1
Contract Limits Payment Number 1
Project Type STREET LIGHT For Period Ending 4/13/2015
Project Funding
STREET LIGHTING
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 100W HPS PC LIGHTING FIXTURE 3 EA $400.00 $1,200.00 3 $1,200.00
2 RDWY ILLUM FOUNDATION TY 1,2&4 3 EA $1,200.00 $3,600.00 3 $3,600.00
3 RDWY ILLUM ASSMBLY TY 8,11 3 EA $1,700.00 $5,100.00 3 $5,100.00
4 GROUND BOX 3 EA $400.00 $1,200.00 3 $1,200.00
5 2"CONDT PVC SCH 40 179 LF $9.00 $1,611.00 179 $1,611.00
6 NO INSULATED ELEC CONDR 537 LF $0.60 $322.20 537 $322.20
Sub-Total of Previous Unit $13,033.20 $13,033.20
Monday,April 13,2015 Page 2 of 4
City Project Numbers 02130 DOE Number 7076
Contract Name THE BAR C RANCH,PHASE 4A Estimate Number 1
Contract Limits Payment Number I
Project Type STREET LIGHT For Period Ending 4AY2015
Project Funding
Contract Information Summary
Original Contract Amount $13,03320
Chanee Orders
Total Contract Price $13,03320
Date Z/0-VA- Total Cost of Work Completed $13,033.20
CoLess %Retained $0.00
n0
n' Net Earned $13,033.20
VV Date /
Inspection Earned This Period $13,03320
i-4. .}/2_7/i, ' Retainage This Period $0.00
L.� Date S'r Less Liquidated Damages
Project Man
Days(a3 /Day $0.00
Date LessPavement Deficiency $0.00
Ass rectodC/PW'-1-fros�tructure Design and/Construction Less Penalty $0.00
w ate I Less Previous Payment $0.00
Directo Contracting Departmen Y.
wF. Plus Material on Hand Less 15•/. S0.00
rl
Balance Due This Payment 513,03320
Monday,April 13,2015 Page 3 of 4
City Project Numbers 02130 DOE Number 7076
Contract Name THE BAR C RANCH,PHASE 4A Estimate Number 1
Contract Limits Payment Number 1
Project Type STREET LIGHT For Period Ending 4/13/2015
Project Funding
Project Manager Jaafari City Secretary Contract Number 317076
Inspectors LAYER / DOVERS Contract Date
Contractor C&S UTILITY CONTRACTORS,INC. Contract Time 30 W
6705 HIGHWAY 287 Days Charged to Date 15 W
ARLINGTON, TX 76001 Contract is 000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $13,033.20
Less %Retained $0.00
Net Earned $13,033.20
Earned This Period $13,033.20
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $13,033.20
Monday,April 13,2015 Page 4 of 4
FORTWORTH nw 03/05/07
TRANSPORTATION&PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:1
NAME OF PROJECT: Bar C Ranch Phase 4-A
PROJECT NO.: 0205-2077602130 CONTRACTOR: CBIS Construction
DOE NO.: 7076
PERIOD FROM:01/05/15 TO: 02/13/15 FINAL INSPECTION DATE: 7-Apr
WORK ORDER EFFECTIVE:S 2014 CONTRACT TIME: 30 • W
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
S. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26. OFFICIAL RECORD
12. 27. CITU'SECRETARY
13. 28. n MRTH9 TX
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS OTHERS CHARGED DAYS
THIS 11 4 15 30
PERIOD
PREVIOUS 0 0 0 0 0
PERIOD
TOTALS 11 4 15 30
TO DATE
*REMARKS:
CONTRACTOR DATE INSPECTOR D
_ ENGINEERING DEPARTMENT
The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax(817)392-7845
FORTWORTHREV:02/22/07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
PROJECT INFORMATION Date: 4/8/2015
Name of Contractor Project Name
C&S Utility Contractors,Inc. Bar C Ranch Phase 4-A
DOE Inspector Project Manager
Keith Dovers Kahl Jaafari
DOE Number Project D02culty Type of Contract
7076 10 Simple * Roudne 0 Complex ❑ Water[:] WasteWater[:] Stam Drainage❑ Pavement
Initial Contract Amount Final Contract Amount
$13,033.20 $13,033.20
II)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector 12 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities 3 Applicability of Specifications
4 Display Of Professionalism 4 Accuracy of Plan Quantities
5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION
6 Performance-Setting Valve Crews,Labs 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processing Time Ll 3 Communication
2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe
III)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor -/1110 12 1=
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth-1000 Throckmorton Stmt-Fort Worth,TX 76012-6311
(817)392-7941 -Fix:(817)392-7845
FORTWORTHREV:00/07
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
C&S Utility Contractors,Inc. Bar C Ranch Phase 4-A
DOE Inspector DOE Number
Keith Dovers 7076
ELaspectar Project Manager
❑ Water❑ Waste Water❑ Storm Drainage❑ Pavement Khal Jaafari
Initial Contract Amount roject Di iculty
$13,033.20 O Simple Routine O Complex
Final Contract Amount Date
1$13,033.20 4/8/2015
In PERFORMANCE EVALUATION
0-Inadequate I-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 3 8 6
2 Public Notifications S N
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 3 60 45
6 Finished Product 15 Y 3 60 45
7 lob Site Safety 15 Y 3 60 45
8 Tragic Control Maintenance 15 N
9 Daily Clean Up 5 Y 3 20 1 15
10 Citizen's Complaint Resolution 5 N
11 Property Restoration 5 Y 2 20 10
12 After Hours Response 5 N
13 Project Completion 5 Y 3 20 15
TOTAL ELEMENT SCORE(A) 261
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 261
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 Q sum of applicable element score maximums which= 323
Rating(ITS/MS]*100%) 261 ! 328 = 20%
Performance Category Oood
<20%—Inadequate 20A to«0%—DeJkknt 40%to<60%—Standard 60%to<80%=Good 2:80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature DOE Inspector �- Signature ContractorN
Signature DOE Inspector's Supervisor
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
•^ The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941•Fax:(817)392-7845
AFFIDAVIT
STATE OF Texas
COUNTY OF Tarrant
Before me,the undersigned authority,a notary public in the state
and county aforesaid,on this day personally appeared Dyana Saylors,Vice
President Of C&S Utility Contractors,Inc.,known to me to be a credible
person,who being by me duly sworn,upon his oath deposed and said;
That all persons,firms,associations,corporations,or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages; OFFICIAL RECORD
On Contract described as; CITY 8ECRUARY�i'�ORTH,TX
Bar C Ranch Phase 4
BY
Dyana Saylors,Vice President
Subscribed and sworn before me on this date 12 of February,2015.
*My
ANIL KARAMAuNO Pub11C Notary Public
STATE OF TEXAS
Tarrant County,Texas Comm.Exp.08/19/2018
SURETEC INSURANCE COMPANY
9737 Great Hills Trail, Suite 320, Austin, Tx 78759
OWNER ❑
ARCHITECT ❑
CONSENT OF SURETY CONTRACTOR ❑
TO FINAL PAYMENT SURETY OTHER 0
BOND NO.: 4396073
TO OBLIGEE:
(N—aftdAd'—) CONTRACT FOR:
Forester(USA)Real Estate Group,Inc.& The Bar C Ranch,Phase 4A
City of Fort Worth City Project#02130 4396073
PROJECT: CONTRACT DATED:
(Name and Ad*em) May 20,2014
The Bar C Ranch
PRINCIPAL: C&S Utility Contractors,Inc.
At the request of the Obligee and the Principal indicated above,(finers Trane adad*w gfSesryl
SureTec Insurance Company,9737 Great Hills Trail, Suite 320,Austin,Tx 78759
SURETY,
on bond of
(Jnerrtmwandad&vssofComvctor) C&S Utility Contractors,Inc.
,CONTRACTOR,
and conditioned on the representation by Obligee that all Contract provisions relating to the payment of final
payment under the Contract have been satisfied by Principal as of the date of final payment,and that no claims
by Obligee or any third party are known or believed by Obligee or its representatives to exist as of the date of
final payment,representations as to the truth and accuracy of the foregoing conditions being deemed to have
been made by Obligee in connection with this request for Consent of Surety,hereby approves of the final
payment to the Principal,and agrees that final payment in accordance with the terms hereof shall not relieve the
Surety of its obligations to
0nnr1n2e0daddr,es+9f0614K1 Forester(USA)Real Estate Group,Inc.&City of Fort Worth
,OBLIGEE,
as set forth in said Surety's bond.
IN WITNESS WHEREOF,the Surety has hereunto set its hand on this date: January 28,2015
(Inert in writing tie maul followed by the nwwrk dine aedyrar)
Surer c Insurance Com any
(S're
(Signat of authorized Wprfsentative)
Reba Rockett
Attest: ,Attorney-in-Fad
(Seal): (Printed name and title)
SURETEC CONSENT TO FINAL PAYMENT REV. 1.1.2004
POA a: 4396073
SureTec Insurance Company
LIMITED POWER OF ATTORNEY
Know Aft Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and
existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents
make,constitute and appoint
Rebecca Rockett
its true and lawful Attorney-in-fact,with full power and authority hereby conferred in its name,place and stead,to execute,acknowledge
and deliver any and all bonds,recognizances, undertakings or other instruments or contracts of suretyship to include waivers to the
conditions of contracts and consents of surety for:
Principal: C&S Utility Contractors, Inc.
Obligee: Forestar(USA)Real Estate Group, Inc. and City of Fort Worth
Amount: S 13,033.20
and to bind the Company thereby as fully and to the same extent as if such bond were signed by the President,sealed with the corporate
seal of the Company and duly attested by its Secretary,hereby ratifying and confirming all that the said Attorney-in-Fact may do in the
premises. Said appointment is made under and by authority of the following resolutions of the Board of Directors of the SureTec
Insurance Company:
Be it Resolved that the President,any Vice-President,any Assistant Vice-President,any Secretary or any Assistant Secretary shall be and is
hereby vested with full power and authority to appoint any one or more suitable persons as Attomey(s)-in-Fact to represent and act for and on
behalf of the Company subject to the following provisions:
Attorney-in-Fact may be given full power and authority for and in the name of and of behalf of the Company,to execute,acknowledge and
deliver,any and all bonds,recognizanecs,contracts,agreements or indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attomey-in-Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary.
Be it Resolved that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or
any certificate relating thereto by facsimile,and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid
and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 206 of April,
1999.)
In Witness Whereof,SURETEC INSURANCE COMPANY has caused these presents to be signed by its President,and its corporate seal
to be hereto affixed this 21 st day of March,A.D.2013.
SURAN O�
SURETEFnox .,
OMPANY
�u't` X q"tC� By:
Johnident
State of Texas ss:
County of Harris
On this 21 st day of March.A.D.2013 before me personally came John Knox Jr.,to me known,who,being by me duly sworn,did depose and say,that he
resides in Houston, Texas, that he is President of SURETEC INSURANCE COMPANY, the company described in and which executed the above
instrument;that he knows the seal of said Company;that the seal affixed to said instrument is such corporate seal;that it was so affixed by order of the
Board of Directors of said Company;and that he signed his name thereto by like order.
JACQUELYN MAL.DONADO
Notary Public
State of Texas
q�. My Comm.Exp.5MI2017 acquelyn Maldonado,Notary Public
My commission expires May 18,2017
I,M.Brent Beaty,Assistant Secretary of SURETEC INSURANCF COMPANY,do hereby certify that the above and foregoing is a true and correct copy
of a Power of Attorney,executed by said Company,which is still in full force and effect;and furthermore,the resolutions of the Board of Directors,set
out in the Power of Attorney are in full force and effect.
Given under my hand and the seal of said Company at Houston,Texas this 28th day of— Jan a 2015 A.D.
20
Brent Beaty, istant SAcretary
Any Instrument Issued In excess of the penalty stated above Is totally void and without any validity.
For verification of the authority of this power you may call(713)812-0800 any business day between 8:00 am and 5.00 pm CBT.