HomeMy WebLinkAboutContract 46501-A2 t TY SECRETASY
AMENDMENT No. 2 CTRACT IIIO.. f
TO CITY SECRETARY CONTRACT
WHEREAS, the City of Fort Worth (CITY) and Burgess and Niple,
Inc. (ENGINEER) made and entered into City Secretary Contract
No.46501, (the CONTRACT) which was authorized by M&C C-27193 on
the 17th day of February, 2015 in the amount of $188,123 .00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment
Number 1 in the amount $19, 660 . 00 which was administrative
authorized April 6, 2015; and
WHEREAS, the contract involves engineering services for
the following project:
Water and Sanitary Sewer Replacement Contract 2015, WSM-D; and
WHEREAS, it has become necessary to execute Amendment No. 2 to
the CONTRACT to include an increased scope of work and revised
fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and
through their duly authorized representatives, enter into the
following agreement, which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the
additional engineering services specified in a proposal April 20,
2015, a copy of which is attached hereto and incorporated herein.
The cost to City for the additional design services to be
performed by Engineer totals $40,950 .00 .
2 .
M
M
M Article II of the CONTRACT is amended to provide for an
M increase in the fee to be paid to Engineer for all work and
0
services performed under the Contract, as amended, so that the
1 total fee paid by the City for all work and services shall be an
1 � amount of $248,733 .00 .
N
O
6.77
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Page -1-
3 .
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date last written by a signatory,
below.
APPROVED:
City of Fort Worth ENGINEER
Burgess and Niple, Inc.
75i:A.Z w/ CML'
Fernando Costa Steven D. Sanders, P. E.
Assistant City Manager Vice President
DATE: S DATE: 'y/Z�!)ZC) r
1 41
APPROVAL RECOMMENDED:
Andrew T Cronberg, P. E.
Assistant Director, Water Department
APPROVED AS TO FORM AND LEGALITY: M&C: N/A
Date: N/A
Douglas W. Black
Senior Assistant City Attorney
ATTEST:
o %0
a
It
A °
Mary J. Kaiser '00000D
� � OFFICIAL RECORD
City secretary CITY SECRETARY
FT. WORTH$ TX
Page -2-
BURGESS & NIPLE
395o Fossil Creek Blvd. I Suite zzo 1 Fort Worth,TX 76137 817.306.1444
April 20, 2015
Mr. Rakesh Chaubey, PE
Project Manager
City of Fort Worth
311 W 10th Street
Fort Worth, TX 76102
Re: Scope of Work Revision Request
WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2015, WSM-D
City Project No. 02444; B&N No. PR53959
Proposed Amendment No. 2
Mr. Chaubey:
This letter is our formal request for a Scope of Work Revision for engineering services.
Justification
The City has requested that Burgess & Niple extend the water and sewer rehabilitation work within
S. Edgewood Terrace from Garden Lane to Eastland Street and add this to the current City Project
referenced above. See the attached project location map.
Changes to the project Scope of Work is as follows:
1) Burgess & Niple will design the rehabilitation of the 8" water line in S. Edgewood Terrace from
Garden Lane to Quails Lane.
2) Burgess & Niple will design the rehabilitation of the 16" water line in S. Edgewood Terrace from
Quails Lane to Eastland Street.
3) Burgess & Niple will design the rehabilitation of the 8" sanitary sewer line in S. Edgewood Terrace
from Garden Lane to Eastland Street.
These water and sewer line rehabilitations will be incorporated into the current set of plans and
specifications.
Based upon this scope of work, the additional design cost proposed for Amendment No. 2 is $40,950.00.
See the attached Level of Effort Spreadsheet.
WA
burgessniple.com
April 20, 2015
WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2015, WSM-D
Proposed Amendment No. 2
Page 2
PROJECT FEE DETAILS
Contract Item Description Fee
Original Contract Water and SS Repl Contract 2015, WSM-D $188,123.00
Amendment No. 1 8" water line rehabilitation in Nolan Street $19,660.00
Rehabilitation of additional water and
sewer lines in S. Edgewood Terrace from
Proposed Amendment No. 2 Garden Lane to Eastland Street $40,950.00
REVISED TOTAL PROJECT FEE $248.733.00
Please let me know if you have any questions or need additional information concerning this request.
Respectfully submitted,
Burgess & Niple, Inc.
TBPE FIRM REGISTRATION NO. F-10834
6)A;UV 6. kkat*&-w
William D. Wendland, P.E.
Associate
Director, Fort Worth Municipal Projects Section
Attachments
P:1PR539591PMICONTRACT1C01CO-21PR53959 Amendment 2 WDW 20150420.docx
burgessniple.com
s.
Attachment B
Level of Effort Spreadsheet
TASKMOUR BREAKDOWN
Design Services for
Water and Sanitary Sewer Replacement Contract 2015 WSM-D,Amendment#2
City Project No.02444
Labor hours Ea e
Task DUW Principal Project P ject Senior
Task N4 Ptias Manager Engineer OeaIgn.r Goo Administrative Tobl Labor SubconadbrR Task Sub Tobl
Mid TEN Cost Trawl iA
Rate $216 $1YMN94 $110 $139 $as $94 SBE Non-SBE
1.1 Manz'n Ba Team1.1. 0A/oC 2 2 $819 fa19
1.2 Communiadona and Re rtl1.2. P n Coordinabon Mwtin $0 so1.2. Desi SubmRbl Review Mwtin 2 2 SSW $W8
1.2. P ro Baseline Schedub 50 s0
Prepare Monthly Prcgrws Reports with
1.2. S,.dine 3 $581 $0 581
1.2. P re M-thly MSE/SBE Rs rte 3 $581 so ssin
1.2 SWaaldy Desl n Cocrdinall n Mwtin s 3 $581 $25 25 5606
0 1 a 13 —40
2.1 Data Coll tion 8 51 114 140 $40 $1,154
22 conceptual Desion Packs a so f0
2.2. Cover Shah so s0 s0
22 Exhibits and Summa 1 4 $751 so $751
2.2. Phawn so $0 so
2.2 Consbucdon Estimate 1 $139 D 139
"Illilk to a AT 0 31 12 g
3.1 Pref ins Deal n Pada a s0 s0
3.7. Cover $0 f0 so
3.1. Overall La out 8 $1.549 s0 St 549
3.1. Plan and Plan✓Pro6le Shasta 4 16 40 12 $9,692 $20 20 $9,712
3.1. S ll— 6 $836 so Sam
3.1. Construction Estimate 2 5279 f0 5279
3.2 Conlructkbilitv Review 2 2 $658 f0 $666
3.3 Utility Claarona 1 1 5333 so $333
0 11411 a 23 280 037
Final Drolt(90%)DoneW(Son Plana and
4.1 S Sans 8 12 20 $4,926 S20 20 $4.946
4.2 Final 100%Plans and SpwAcalicns B 12 8 $3902 $50 $50 13.952
4.3 Coratruedan Eatirnataa90%end 100% 1 $139 s0 $139
6 $ g 0 i 1
5.1 Bid 5
5.1. U ad Documanb W B.— $0 s0 0
Sell Contract Doamente and Mainlain
5.1. Plan Holders List $0 $40 S40 40
5.1. l—Atldwda 4 2 $1053 0 $1053
5.1. A1brd Bid Open., f0 so so
5.1. Tabuiab Bids and Rammmerd A—d 1 $194 30 $194
52 War DravA Don't do this;See 6.2 so s0 f0
0 11 a 191 0 6 S4.11137 10W O7
6.7 Consmreeon Su rt
6.1. Attend Preanstructicn Conference 7 3 3 3999 10 $10 $1,009
6.1. Mand Pudic Mastl 1 2 1 $527 510 $10 $537
6.1. Sib Viv'h Dudna Construction 6 2 2 3B88 310 210 $676
8.1. Rspord W RFI.10 2 2 $666 so SSW
6.1. Isaue chance Orden:1 2 2 $666 $0 666
8.2 Read Dawin Ma Bulk(Mlar 8 $1.114 130 $30 $1,144
0 0 0 0 0 0 so 0 0
7.1 Ri Idc$En Documards 0 vided $0 Sol s0
3A a 01 #1 a "MI tal so Sol VMj 47.3101111
8.1 Desi Su"Y I SO $6.600 110
ToW4 73 @1 11 b g p0 ;-7SAII
water Line Fcot.9, 1 1,400 50% Project Summa
Sawsr Uns Foallig, 1 1 400 50% Tobl Moura 22fi
2 600 100% Tobl Lobar 33 435
Tobi (7575
(A) Tabl Fee M9W MBFJSBE Submnaullanrt 8600
(B) Survey Fee 38.000 Non-MBFJSBE Submnsuaant SO
(C Too Fs •snow Fw 534350 10% Sub Mar 5660
Watzr Fw 50%ofC Sewn Fw 50%orC MBElSBE Padid ation 18.1%
317,175.00 1 $17,175.00 1Total Pro eet Cort 540930.00
Desai WP Water Sewer
Cones nl Ded n 30% 31 $5153.00 $5 153.00
Pre9min Dasign 60% 32 1$10,305.001 170.305.00
Final Design 10% 33 1$1,717.00 1$1.717.00
S 51 1$3 30000 $3,300M
Suftlal $20.475.00 1$20475.00
Tolal 140 950.00
City of Fort Worth, Texas P:\PR53959\PM\CONTRACT\CO\CO-2\WSM-D CO-2 LOE 2015 WSM-D.xis
Attachment B- Level of Effort Supplement
Water and Sanitary Sewer Replacement Contract 2015 WSM-D,Amendment#2
FWWTR Official Release Date: 8.09.2012 4/13/2015 1:32 PM