Loading...
HomeMy WebLinkAboutContract 46501-A2 t TY SECRETASY AMENDMENT No. 2 CTRACT IIIO.. f TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Burgess and Niple, Inc. (ENGINEER) made and entered into City Secretary Contract No.46501, (the CONTRACT) which was authorized by M&C C-27193 on the 17th day of February, 2015 in the amount of $188,123 .00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount $19, 660 . 00 which was administrative authorized April 6, 2015; and WHEREAS, the contract involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2015, WSM-D; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal April 20, 2015, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $40,950 .00 . 2 . M M M Article II of the CONTRACT is amended to provide for an M increase in the fee to be paid to Engineer for all work and 0 services performed under the Contract, as amended, so that the 1 total fee paid by the City for all work and services shall be an 1 � amount of $248,733 .00 . N O 6.77 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page -1- 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER Burgess and Niple, Inc. 75i:A.Z w/ CML' Fernando Costa Steven D. Sanders, P. E. Assistant City Manager Vice President DATE: S DATE: 'y/Z�!)ZC) r 1 41 APPROVAL RECOMMENDED: Andrew T Cronberg, P. E. Assistant Director, Water Department APPROVED AS TO FORM AND LEGALITY: M&C: N/A Date: N/A Douglas W. Black Senior Assistant City Attorney ATTEST: o %0 a It A ° Mary J. Kaiser '00000D � � OFFICIAL RECORD City secretary CITY SECRETARY FT. WORTH$ TX Page -2- BURGESS & NIPLE 395o Fossil Creek Blvd. I Suite zzo 1 Fort Worth,TX 76137 817.306.1444 April 20, 2015 Mr. Rakesh Chaubey, PE Project Manager City of Fort Worth 311 W 10th Street Fort Worth, TX 76102 Re: Scope of Work Revision Request WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2015, WSM-D City Project No. 02444; B&N No. PR53959 Proposed Amendment No. 2 Mr. Chaubey: This letter is our formal request for a Scope of Work Revision for engineering services. Justification The City has requested that Burgess & Niple extend the water and sewer rehabilitation work within S. Edgewood Terrace from Garden Lane to Eastland Street and add this to the current City Project referenced above. See the attached project location map. Changes to the project Scope of Work is as follows: 1) Burgess & Niple will design the rehabilitation of the 8" water line in S. Edgewood Terrace from Garden Lane to Quails Lane. 2) Burgess & Niple will design the rehabilitation of the 16" water line in S. Edgewood Terrace from Quails Lane to Eastland Street. 3) Burgess & Niple will design the rehabilitation of the 8" sanitary sewer line in S. Edgewood Terrace from Garden Lane to Eastland Street. These water and sewer line rehabilitations will be incorporated into the current set of plans and specifications. Based upon this scope of work, the additional design cost proposed for Amendment No. 2 is $40,950.00. See the attached Level of Effort Spreadsheet. WA burgessniple.com April 20, 2015 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2015, WSM-D Proposed Amendment No. 2 Page 2 PROJECT FEE DETAILS Contract Item Description Fee Original Contract Water and SS Repl Contract 2015, WSM-D $188,123.00 Amendment No. 1 8" water line rehabilitation in Nolan Street $19,660.00 Rehabilitation of additional water and sewer lines in S. Edgewood Terrace from Proposed Amendment No. 2 Garden Lane to Eastland Street $40,950.00 REVISED TOTAL PROJECT FEE $248.733.00 Please let me know if you have any questions or need additional information concerning this request. Respectfully submitted, Burgess & Niple, Inc. TBPE FIRM REGISTRATION NO. F-10834 6)A;UV 6. kkat*&-w William D. Wendland, P.E. Associate Director, Fort Worth Municipal Projects Section Attachments P:1PR539591PMICONTRACT1C01CO-21PR53959 Amendment 2 WDW 20150420.docx burgessniple.com s. Attachment B Level of Effort Spreadsheet TASKMOUR BREAKDOWN Design Services for Water and Sanitary Sewer Replacement Contract 2015 WSM-D,Amendment#2 City Project No.02444 Labor hours Ea e Task DUW Principal Project P ject Senior Task N4 Ptias Manager Engineer OeaIgn.r Goo Administrative Tobl Labor SubconadbrR Task Sub Tobl Mid TEN Cost Trawl iA Rate $216 $1YMN94 $110 $139 $as $94 SBE Non-SBE 1.1 Manz'n Ba Team1.1. 0A/oC 2 2 $819 fa19 1.2 Communiadona and Re rtl1.2. P n Coordinabon Mwtin $0 so1.2. Desi SubmRbl Review Mwtin 2 2 SSW $W8 1.2. P ro Baseline Schedub 50 s0 Prepare Monthly Prcgrws Reports with 1.2. S,.dine 3 $581 $0 581 1.2. P re M-thly MSE/SBE Rs rte 3 $581 so ssin 1.2 SWaaldy Desl n Cocrdinall n Mwtin s 3 $581 $25 25 5606 0 1 a 13 —40 2.1 Data Coll tion 8 51 114 140 $40 $1,154 22 conceptual Desion Packs a so f0 2.2. Cover Shah so s0 s0 22 Exhibits and Summa 1 4 $751 so $751 2.2. Phawn so $0 so 2.2 Consbucdon Estimate 1 $139 D 139 "Illilk to a AT 0 31 12 g 3.1 Pref ins Deal n Pada a s0 s0 3.7. Cover $0 f0 so 3.1. Overall La out 8 $1.549 s0 St 549 3.1. Plan and Plan✓Pro6le Shasta 4 16 40 12 $9,692 $20 20 $9,712 3.1. S ll— 6 $836 so Sam 3.1. Construction Estimate 2 5279 f0 5279 3.2 Conlructkbilitv Review 2 2 $658 f0 $666 3.3 Utility Claarona 1 1 5333 so $333 0 11411 a 23 280 037 Final Drolt(90%)DoneW(Son Plana and 4.1 S Sans 8 12 20 $4,926 S20 20 $4.946 4.2 Final 100%Plans and SpwAcalicns B 12 8 $3902 $50 $50 13.952 4.3 Coratruedan Eatirnataa90%end 100% 1 $139 s0 $139 6 $ g 0 i 1 5.1 Bid 5 5.1. U ad Documanb W B.— $0 s0 0 Sell Contract Doamente and Mainlain 5.1. Plan Holders List $0 $40 S40 40 5.1. l—Atldwda 4 2 $1053 0 $1053 5.1. A1brd Bid Open., f0 so so 5.1. Tabuiab Bids and Rammmerd A—d 1 $194 30 $194 52 War DravA Don't do this;See 6.2 so s0 f0 0 11 a 191 0 6 S4.11137 10W O7 6.7 Consmreeon Su rt 6.1. Attend Preanstructicn Conference 7 3 3 3999 10 $10 $1,009 6.1. Mand Pudic Mastl 1 2 1 $527 510 $10 $537 6.1. Sib Viv'h Dudna Construction 6 2 2 3B88 310 210 $676 8.1. Rspord W RFI.10 2 2 $666 so SSW 6.1. Isaue chance Orden:1 2 2 $666 $0 666 8.2 Read Dawin Ma Bulk(Mlar 8 $1.114 130 $30 $1,144 0 0 0 0 0 0 so 0 0 7.1 Ri Idc$En Documards 0 vided $0 Sol s0 3A a 01 #1 a "MI tal so Sol VMj 47.3101111 8.1 Desi Su"Y I SO $6.600 110 ToW4 73 @1 11 b g p0 ;-7SAII water Line Fcot.9, 1 1,400 50% Project Summa Sawsr Uns Foallig, 1 1 400 50% Tobl Moura 22fi 2 600 100% Tobl Lobar 33 435 Tobi (7575 (A) Tabl Fee M9W MBFJSBE Submnaullanrt 8600 (B) Survey Fee 38.000 Non-MBFJSBE Submnsuaant SO (C Too Fs •snow Fw 534350 10% Sub Mar 5660 Watzr Fw 50%ofC Sewn Fw 50%orC MBElSBE Padid ation 18.1% 317,175.00 1 $17,175.00 1Total Pro eet Cort 540930.00 Desai WP Water Sewer Cones nl Ded n 30% 31 $5153.00 $5 153.00 Pre9min Dasign 60% 32 1$10,305.001 170.305.00 Final Design 10% 33 1$1,717.00 1$1.717.00 S 51 1$3 30000 $3,300M Suftlal $20.475.00 1$20475.00 Tolal 140 950.00 City of Fort Worth, Texas P:\PR53959\PM\CONTRACT\CO\CO-2\WSM-D CO-2 LOE 2015 WSM-D.xis Attachment B- Level of Effort Supplement Water and Sanitary Sewer Replacement Contract 2015 WSM-D,Amendment#2 FWWTR Official Release Date: 8.09.2012 4/13/2015 1:32 PM