Loading...
HomeMy WebLinkAboutContract 43991-A2 QTY SECRETARY" CONTRACT PIC. qITLL AMEN O—MI T No. 2 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Khafra Engineering Consultants, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 43991, (the CONTRACT) which was authorized by M&C C-25911 on the 9t' day of October, 2012 in the amount of $146,110 .00; and WHEREAS , the CONTRACT was subsequently revised by Amendment No. 1 in the amount $4,022. 00 which was administratively authorized on the 12th day of April, 2013; and WHEREAS, the CONTRACT involves engineering services for the following project: Sanitary Sewer Rehabilitation, Contract 87; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated December 19 2014 , a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $1 ,232 . 00 . M M M < 2. o Article II of the CONTRACT is amended to provide for an n increase in the fee to be paid to Engineer for all work and `< services performed under the Contract, as amended, so that the 00 total fee paid by the City for all work and services shall be an o amount of $151,364 .00 . 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY Page -1- FT.WORTH, TX EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER Khaf:a Eng' eering Co sultan s, I 7 Fernando Costa Valentino B es, P.E. Assistant City Manager President DATE: _ S 6 /S DATE: APPROVAL RECON_"-'-NDED: Andrew T Cronberg/P.E. Assistant Directo,Water Department APPROVED AS TO FORM AND LEGALITY: M&C: N/A Date : N/A Douglas W. Black Senior Assistant City Attorney Qrt Q� QQ� ATTEST: �o QUO �g Q Q� V g S= QQ �*Q ry J ser °°°°00°p0° City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page -2- e HAFRA December 19, 2014 Rakesh Chaubey, P.E. Fort Worth Water Department Project Manager 311 West 10th Street Fort Worth, TX 76102 Re: Letter of Request for Amendment 2 to S.S. Rehabiliation Contract 87 Mr. Chaubey: The additional work to be done under this amendment will cover the survey work for the expansion of two temporary construction easements (TCE). This expansion will increase the easement area on parcels 113 and 134 and create a new easement on parcel 112. The reason for this change is as follows: Initially we had four temporary right of entries (TROE) and four easements for the installation of the two Tahoe Road lines. We eventually removed the TROE's after the Right-of-Way and Easements department reviewed our initial package because of the understanding that if a property had a TCE there wasn't a need for a TROE. When you and I reviewed the TCE's together we discussed the need to extend the existing easements out for the purpose of digging pits for pipe enlargement for the two lines. At that point neither of us thought we would need easements to simply move equipment across the property. That wasn't brought to our attention until after the land agent began to ask if they were needed because we didn't have TROE's. We ask that an amount of $1,232 be added to our original contract amount as noted below: Original Agreement Amount $146,110 Amendment 1 Amount $ 4,022 Proposed Amendment 2 Amount 1,232 Final Contract Amount $151,364 If you have any questions after you review the contents of this letter please feel free to contact me. Respectfully, Dietrich Bankhead, P.E., PMP Project Manager KHAFRA ENGINEERING CONSULTANTS,INC. 2720 North Stemmons Freeway,Suite 1000,South Tower Dallas,TX 75207 (214)689-9100 FAX(214)689-9948