Change Order Request
ProjectName:1 Tulsa Way Drainage Improvements City Sec No.: 1 46047
Project No.(s): PZvr—407�'7 0� o Z?g DOE No. 6002 City Proj.No.: 01074
10ll'10/07463 ftZ.7-2 7Za0107yB3
Project Description: Construction of storm drain mains along Watonga Street and Camp Bowie Blvd to alleviate flooding on Tulsa Way.
Installation of water,sewer and re-paving of Watonga Street were included on this project.
Contractor: Woody Contractors, Inc. Change Order# 0 Date: 4/7/2015
City Project Mgr.J Raul E.Lopez CityInspector: I Quincy Jones
Phone Number:1 817-392-2457 Phone Number:1 817-992-0873
Dept. Water Sewer TPW Totals Contract Time
Storm Water (Calender days)
Original Contract Amount $472,684.00 $114,888.00 $1,324,795.90 $1,912,367.90 2.70
Revision to match appropriations on C-26983 $39,136.47 $39,136.48 -$78,272.95
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date Per C-26983) $511,820.47 $154,024.48 $1,246,522.95 $1,912,367.90 270
Amount of Proposed Change Order $15,110.00 1 $15,110.00 05
Revised Contract Amount $526,930.47 $154,024.48 $1,246,522.95 $1,927,477.90 275
Original Funds Available for Change Orders $25,591.02 $15,402.45 $74,006.53 $115,000.00
Remaining Funds Available for this CO $25,591.02 $15,402.45 $74,006.53 $115,000.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1 0.79%
' MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $2,390,459.88
he change order will provide for the following:
• 24"x20" WL reducer to be removed was not located where shown in the construction plans but underneath the
floor of a 24" GV vault,causing a significant amount of extra work to access, and requiring pa tion
and reconstruction of the vault. T
• Two domestic water services serving 2 addresses on Watonga were found to be connecte � '3-
m inch line off a distant 8" WL on Tulsa Way. Domestic services will be connected to th wQ�°4" L whi
rr i runs along Watonga and the old 3" WL will be abandoned. Line Item included in this ordjpr�s on�y$
< cost differential of 24" tapping saddles over 8" tapping saddles. The price for domesti es (qff i)}e 8"� ,
M
WL)is already included in the contract.
• The addition of the appropriate paving item quantities to the water and sanitary sewers i Sgr4arVe with tai
n3 agreement between Water and TPW Storm Water for reconstruction of the roadway se ti �e° eoateT°a
-� sewer paving pay items quantities were inadvertently omitted in the proposal sections at the tlu p�o
was advertised for bid.This change order will allow for one-half of all the pay items quantities00
y
Storm Water section to be added to the water and sanitary sewer sections(via 50/50 split)and also reduce the
c TPW Storm Water pay item quantities by one-half. This action does not require additional funding because
the necessary funds are already appropriated in M&C C-26983.
Staff concurs with the contractor's request for 5 additional calendar days on the change order.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents pa t
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order,
0.4
Woody Contractors, Inc. Troy Wood
r J`
S c >s
s 411s*
Mwe ACI
M&C Number M&C Date Approved A
1 0n-r WOR'T'H City of Fort Worth
Change Order Additions
Project Name Tulsa Way Drainage Improvements City Sec No.: 46047
Project No.(s): P253-609170107483,P258-709170107483,P227-207280107483 DOE No. 6002 City Proj.No.: 01074
Project Construction of storm drain mains along Watonga Street and Camp Bowie Blvd to alleviate flooding on Tulsa Way.
Description Installation of water,sewer and re-paving of Watonga Street were included on this project.
Contractor Woody Contractors, Inc. Change Order:= Date: F 417/2015
City Project Mgr. Raul E.Lo ez City Inspector Quincy Jones
ADDITIONS
DEPT ---Tow
-T --
33 Remove 24"x20"WL reducer under GV vault&partially reconstruct vault Water 1.00 LS $14,850.00 $14,850.00
34 Price differential(vs. 8")for 24"domestic service tapping saddles Water 2.00 EA $130.00 $260.00
35 0241.1700 Pavement Pulverization Water 1,017.50 SY $2.65 $2,696.38
36 3212.0302 2"Asphalt Type D Water 1,017.50 SY $13.27 $13,502.23
37 3211.0702 8"Cement Treatment Water 1,017.50 SY $1.45 $1,475.38
38 3211.0600 Cement Water 2.50 TN $148.00 $370.00
39 3213.0301 4"Conc Sidewalk Water 237.50 SF $5.30 $1,258.75
40 3213.0401 6"Concrete Driveway Water 412.50 SF $6.10 $2,516.25
41 3216.0102 7 Conc Curb and Gutter Water 462.50 LF $17.05 $7,885.63
42 0241.0100 Remove Sidewalk Water 237.50 SF $1.55 $368.13
43 0241.0401 Remove Concrete Drive Water 412.50 SF $1.05 $433.13
44 0241.1300 Remove Conc Curb&Gutter Water 462.50 LF $5.85 $2,705.63
45 Paving Construction Allowance Water 5,925.00 EA $1.00 $5,925.00
20 0241.1700 Pavement Pulverization Sewer 1,017.50 SY $2.65 $2,696.38
21 3212.0302 2"Asphalt Type D Sewer 1,017.50 SY $13.27 $13,502.23
22 3211.0702 8"Cement Treatment Sewer 1,017.50 SY $1.45 $1,475.38
23 3211.0600 Cement Sewer 2.50 TN $148.00 $370.00
24 3213.0301 4"Conc Sidewalk Sewer 237.50 SF $5.30 $1,258.75
25 3213.0401 6"Concrete Driveway Sewer 412.50 SF $6.10 $2,516.25
26 3216.0102 7"Conc Curb and Gutter Sewer 462.50 LF $17.05 $7,885.63
27 0241.0100 Remove Sidewalk Sewer 237.50 SF $1.55 $368.13
28 0241.0401 Remove Concrete Drive Sewer 412.50 SF $1.05 $433.13
29 0241.1300 Remove Conc Curb&Gutter Sewer 462.50 LF $5.85 $2,705.63
30 Paving Construction Allowance Sewer 5925.00 EA $1.00 $5,925.00
Water $15,110.00
Sewer
TPW
Page 2 of 4 Additions Sub Total 1$15,110.00
FORT' WORTH City of Fort Worth
Change Order Deletions
Project Name Tulsa Way Drainage Improvements City Sec No.: 46047
Project No.(s): P253-609170107483,P258-709170107483,P227-207280107483 DOE No.
6002 City Proj. No.: 01074
Project Description Construction of storm drain mains along Watonga Street and Camp Bowie Blvd to alleviate flooding on Tulsa
Way. Installation of water,sewer and re-paving of Waton a Street were included on this project.
Contractor Woody Contractors, Inc. Change Order=1 Date 4/7/2015
City Project Mgr. Raul E.Lopez City Inspector: Quincy Jones
DELETIONS
ITEM .1C*11 DEPT City Unit Unit Cost Total
1 0241.1700 Pavement Pulverization TPW 2,035.00 SY $2.65 $5,392.75
2 3212.0302 2"Asphalt Type D TPW 2,035.00 SY $13.27 $27,004.45
3 3211.0702 8"Cement Treatment TPW 2,035.00 SY $1.45 $2,950.75
4 3211.0600 Cement TPW 5.00 TN $148.00 $740.00
5 3213.0301 4"Conc Sidewalk TPW 475.00 SF $5.30 $2,517.50
6 3213.0401 6"Concrete Driveway TPW 825.00 SF $6.10 $5,032.50
8 Paving Construction Allowance TPW 11,850.00 EA $1.00 $11,850.00
7 3216.0102 7"Conc Curb and Gutter TPW 925.00 LF $17.05 $15,771.25
9 0241.0100 Remove Sidewalk TPW 475.00 SF $1.55 $736.25
10 0241.0401 Remove Concrete Drive TPW 825.00 SF $1.05 $866.25
11 0241.1300 Remove Conc Curb&Gutter TPW 925.00 LF $5.85 $5,411.25
Water
Sewer
TPW
Page 3 of 4 Deletions Sub Total
M/WBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
N JAKI 7
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
No u e
Total $0.00
Page 4 of 4
Fund Appropriation Requests
0*1 General
Project Number: 01074 Creator: Robert Sauceda
Project Name: Tulsa Way Drainage Status: Pending
Improvements
Title: FAR for Change Order No. 1 Creation Date: 05/04/2015 01:41 PM Local
Water (GMT-6)
Record Number: FAR-00018 Target Completion Date:
Amount Requested: 15,110.00 Effective Date:
Fund Appropriation Request Internal FAR Data Type Code: 2
Type:
Fund Appropriation RequPst Information
Remarks:
Explanation:
Comments: FAR for WATER on Change order No. 1
M&C Required?: No Journal Voucher Required?: No
M&C Number: Description 3(Journal Voucher
No.):
M&C Approval Date:
c<i
Task Details
From: Task Due Date: Not Applicable VTask Notes(0)
To: Dan Pepon Task Status: View Only
Cc:
Sent For: 2 Review
Workflow Progress
Step Name Assignee Company Status Action Completion Date
1 Creation Robert Sauceda CFW Completed Send 05/04/2015 01:41 PM Local
(GMT-6)
2 Review Dan Pepon CFW Not Started
MI Line Item
1 Item(s)
No. FBS Code Funding FAC Short Description 2 WBS Code Total Amount WBS FAC Original FAC
Description
BONDS-
WATERCP- A-WATER-
WATER- P265-485111- WATERPROJ- P265-541200-
001 WATERPROJ-601159990100 83 17-83-60- 15,110.00607170107483
P265-15-60-
485111- 541200-P265
601159990100
Total Amount: $15,110.00