Change Order Request
Project Namel 2007 Critical Capital Project(Council District 2)DOE 5913/5914 City Sec# 1 43797
Client Project#(s)l #00961 -#00956
Change Order Submittal# 0 Date 12/10/2014
Dept. TPContract TimeW Water Sewer Totals CD
Original Contract Amount $3,308,257.10 $634,674.90 $270,360.00 $4,213,292.00 465
Extras to Date $311,602.30 $125,330.00 $68,025.00 $504,957.30 230
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $3,619,859.40 $760,004.90 $338.385.00 $4,718,249.30 695
Amount of Proposed Change Order $41,088.29 $9,000,00 -$319.00 $49,769.29 60
Revised Contract Amount $3,660,947,69 $769,004.90 $338,066.00 $4,768,018.59 755
Original Funds Available for Change Orders $77,892.03 $31,733.75 $15,721.20 $125,346.98
Remaining Funds Available for this CO $0.00 $0.00 $0.00
Additional Funding(if necessary) $41,088.29 $9,000.00 $50,088.29
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 13.17%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $5,266,615.00
JUSTIFICATION (REASONS)FOR CHANGE ORDER
This change order is required to adjust the quantities of various line items in the contract. Items in this change order were either miscalculated
or omitted in the original design and include the following. The removal and replacement of sidewalk along NW 22nd street which was
deteriorated and presented trip hazards for pedestrians.Also,additional lime treated subgrade was needed on Lincoln Street and NW 22nd
Street. Extra driveway removal and replacement was needed at various locations in order to properly tie in to the existing driveways and to
maintain a proper slope.The installation of Type E Ramps was needed in lieu of the designed type F ramps to better accommodate field
conditions and to meet ADA requirements.Variable height curb was needed at the back of the sidewalk in various areas where sloping the
yards was not feasible due to the presence of trees and/or structures, Manhole adjustments were included in the original design but were of
insufficient quantities. Additional HMAC transitions were included in the original plans but quantities were miscalculated.
3 ,
SOT
A by..
7
7
1 K4ary J. er, Ci Secretary ca X
0�
o 000000°°`°
0
TAX
Q
w
UJ
LJW
cr_ OFRECORD
CITY SECRETARY
FT,WORTH,TX
FORT WORTH City of Fort Worth
Change Order Additions
Project Name 2007 Critical Capital Project(Council District 2)DOE 5913/5914 City Sec# 43797
Client Project# #00961-#00956
Change Order Submittal# 0 Date 1 211 012 01 4
ADDITIONS
ty unit UnitCost I otai
nc lock Sod
nc op SoilY
Inc emove Driveway(Asphalt&Concrete) P 5
IncConcrete Driveway TPW 1,228.00 SF $4.5o
nc Utility Adjustments P L
Fn—c-9— Remove Curb&Gutter .
--77 7—3213.0103 9.5"Concrete Paving TPW
Inc 3212.0401 HMAC Transitions Type D TPW-- 5
Inc 16 3211.05016"Lime Treated u grade
Inc 18 3471.0001 Trac Control P M
ncConcrete Sidewalk( eadwalks) T
ncBarrier ree Ramps Type E TPW
Inc TF—3305.0107 Adjust Manholes(Minor) .
ncRemove Sidewalk TPW 11,548.00
IncRemove Conc.Pavement TPW 7 .
Inc 30 9999.0000 Variable Height Sidewalk CurbTPW 601.00 LF
Inc 102 7"Conc Curb and Gutter TPW 8.00 LF
ncRemove Wall<4' W L 5.
--Inc74 3232.0100 Conc.Ret.Wall with Sidewalk,Face(Wall Portion my W ----M---.TF—
Incr7g--3232.0101 Conc Ret Wall with Sidewalk,Sidewalk Portion Only 5.
Inc7F—9999.0000 Gravel Driveways TPW $4.00 $5,744.00
New 38 9999.0000 ExtendedDriveway Removals by F atwork Crew TPW 1,530.00 SF1.
GROUP2E-DRAINAGE
Incr 3201.0613 8"Conc.Pavement epair TP Y
WATERGROUP 2E-
Inc 22 3312.0103 Connection to Existing "Water Main- Addendum ater 6.00 E4
GROUP 2D-SANITARY
emobilization Utility Crew Sewer L 5
1 Manhole Adjustment,Major ewer ,5
TPW $87,456.09
Water $9,000.00
Sewer $7,500.00
ub1 otal Addibons
Change Order Additions Page 2 of 4
FoR�H City of Fort Worth
Change Order Deletions
Project Name 2007 Critical Capital Project(Council District 2)DOE 5913/5914 CitySec# 43797
Client Project# #00961-#00956
Change Order Submittal# Date 12110/2014
DELETION5
ITEM UI=b(;HII`I ION DEPT Qty Unit Unitos otal
DecrConcrete Paving 7PW
ecrT6--3212.0601 HMAC Speed Cushion W 1,
ecr 1 oneidewal PW 5
ecr 13.0508 4'Bamer Free Ramp,Type H TP-W- E4
ecr 32 9999.0000 Remove&Replace 3teps TPW 75.00 SF
GROUP21E-DRAINAGE
ecr onc.Sidewalk .
Decr 30 3292.0400 Seeding y romulch 5
ecr 1 329 1.0100Topsoil W
ecr 41 Imported Select Backfill Material TPW .5
GROUP 2E SANITARYSEWER
ecr 1 PreInspection ewer 1,MM LF
Decr l hallow Manhole ewer EA
ecr 1F-3305.0109 Trench Safety- ewer --L-P-- 1.
ecr 19 3201.0400 Tempoary Asphalt Pavement Repair "Type"D" ewer 195.00 L
TPW $46,367.80
Water 1 $0.00
Sewer $7,819.00
u otal Deletions 5 ,
Change Order Deletions Page 3 of 4
M/SBE Breakdown for this Change Order
M/SBE Sub Type of Service Amount for this CO
N/A
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
CF W Change Order Approval 9 Page 1 of 3
Routing
Assigned To: Due Date:
Assigned By: Due Time:
Links 1
fortworthgov/Infrastructure Projects/00961 - 22nd and Lincoln. 2007 CO 2E/Contractor/Change Orders/Change Order 9
Breakdown Revised #2.xls
Attachments(0)
No Attachments have been added to this form.
https:Hprojeetpoint.btizzsaw.com/ bz web/Forms/FonnPrint.aspx?Siteld=51500&Processld... 3/5/2015
CFW Change Order Approval 9 Page 2 of 3
FORT NORTH,. city of Fort Worth
Change Order Request Approval
(Change Order Breakdown Available in Links)
For Change Order Submittal No.: 9
Change Order No.: 9 Date Started: 2014-12-15
City Sec. No.: 43797 Date Due: 2015-01-31
Project Name: Combined contracts 2D ( 00956) & 2E (00961)
00956 & 00961 DOE Numbers:
Project Numbers:
5913 / 5914
Project Water, Sewer Storm sewer & Pavement replacement for segments
Description: of NW 23rd ( 2D) , Lincoln ave & NW 22nd street (2E)
Project Manager: Khal Jaafari City Inspector: Richard Salazar
Contractor: Stabile & Winn
COUNCIL ACTION (If Required):
M&C Log Name: none
M&C Number: M&C Date:
COST AND DAYS SUMMARY:
Requested
Department: Cost($) Fund Account Center: Days:
TPW $ 77,512.79 C295 541200 202400096183 40
TPW Drainage $ -36,424.50 P227 541200 202280096183
Sewer $ 7,500.00 P258 541200 702170095683 8
Sewer $ -7,819.00 P258 541200 702170096183
Water $ 9,000.00 P253 541200 602170096183 12
Total Cost: $ 49,769.29 Total Requested Days: 60
Approval Status:
https://projectpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?SiteId=51500&ProcessId... 3/5/2015
CFW Change Order Approval 9 Page 3 of 3
Approved: Yes
Comments:
User: Tara Fishback
Date: 2015-02-04 3:13 PM
Approved: Yes
Comments:
User: Jerry Henderson
Date: 2015-02-04 3:36 PM
Approved: Yes
Comments:
User: Khal Jaafari
Date: 2015-02-05 10:19 AM
Approved: Yes
Comments:
User: Najib Fares
Date: 2015-02-05 1:59 PM
Approved: Yes
Comments:
User: Andy Anderson
Date: 2015-02-11 8:38 PM
Approved: Yes
Comments:
User: Doug Wiersig
Date: 2015-02-11 11:33 PM
Approved: Yes
Comments:
User: Doug Black
Date: 2015-03-03 12:37 PM
Approved: Yes
Comments:
User: Fernando Costa
Date: 2015-03-03 10:45 PM
Action Required: Review & circulate