HomeMy WebLinkAboutContract 31173 AMENDMENT NO. 7
STATE OF TEXAS 8 CITY SECRETARY CONTRACT NO.'
(No M&C Needed)
COUNTY OF TARRANT S
WHEREAS, the City of Fort Worth (City) and LOPEZGARCIA GROUP
formerly Wendy Lopez & Associates, Inc. , (Engineer) made and
entered into City Secretary Contract No. 26994, (the Contract)
which was authorized by the City Council by M&C C-18701 on the 9th
day of August 2001; and subsequently revised by six previous
amendments; and
WHEREAS, the Contract involves engineering services for the
following project:
Engineering contract for the design of Water and Sanitary
Sewer Extension for Bryson Tract Area.
WHEREAS, it has become necessary to execute Amendment No. 7
to said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
1 .
Article I of the Contract is amended to include the
additional engineering services specified in a proposal letter
dated December 17, 2004, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional design
services to be performed by Engineer total $4, 324 . 10 .
2 .
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services S11 not
exceed the sum of $136, 843 .36 . 101; flC-- 1A �
My She IV
FT, WNTRI EX.
ORIGINAL
3 .
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the 1 day of 204 in Fort
Worth, Tarrant County, Texas.
ATTEST: '1
Contract Authorization
Marty Hendrik, City Secretary
Date
APPROVAL RECOMMENDED: APPROVED:
A. Douglas Rademaker, P arc A. tt
Director, Department Assistant City Manager
Engineering
LOP ZGARCIA GROUP formerl
Wendy Lopez & Associates, Inc.
ENGI
:-
By:
Name . Douglas C. Mikeworth, P.E.
F V ce President_
1.00 _EasL--L5t1L Street Suite 200
Fort Worth, TX 76102
APPROVED AS TO FORM AND LEGALITY:
Gary Steinberger
Assistant City Attorney
-2- Fuw1m,
O D
TtyAly
Y1. N� I156i�
L . 0 R E z G A R c I A G R o u P
December 17, 2004
Mr. Mike A. Domenech, P.E.
Project Manager
City of Fort Worth
Department of Engineering
900 Monroe Street, Suite 201
Fort Worth, Texas 76102
RE: Request for Amendment No. 7
Water and Sewer Extension for Bryson Tract, D.O.E. 3312
LGGROUP Project No. 210069.00
Dear Mr. Domenech:
This Vetter is written in response to your request for additional engineering design and special
services for the above referenced project. The additional design services are as described
below. A detailed breakdown of the proposed fees for these additional services is also
attached.
Our proposed engineering fee for the additional work includes the following:
1. Remove two (2) private service sheets from D.O.E. 3312 bid documents and insert
them in Contract 2001 WSM-N bid documents. .
2. Prepare new location map for Bryson Tract services project.
3. Coordinate and update sheet references and notes according to WSM-N documents.
4. Update Engineer's Opinion of Probable Construction Cost.
5. Update Bid Proposal for Contract 2001 WSM-N bid documents.
6. Attend one (1) Contract 2001 WSM-N pre-construction conference.
7. Attend one (1) construction meeting with EMS-ISD.
8. Attend one (1) City of Fort Worth coordination meeting.
R
E
Iggroupinc.com plater Gardens Place,100 East 15th Street,Suite 200,Fort Worth,Texas,76102 (817)39 l81/)882-9462 Fax
r Cl F E Z G A R C i A ES R 0 L i✓
Mr. Miguel A. Domenech, P.E.
City of Fort Worth
December 17, 2004
Page 2
Please note that the proposed fee does not include the following work items:
✓ Preparation of easements or property descriptions,
✓ Preparation of Temporary Right-of-Entry Exhibits and Documentation,
✓ Bid assistance,
✓ Submission of anytype of electronic file, except as specifically indicated,
✓ Preparation of permits for various local, state, or federal authorities,
✓ Environmental documents or wetland determinations,
✓ Geotechnical studies or subsurface investigations,
✓ Storm Water Pollution Prevention Plan,
✓ Additional meetings, site visits, or reviews, except as specifically indicated,
✓ Construction layout surveying, or
✓ Other items not specifically identified within this document.
These additional efforts are considered outside our original scope of work, and we therefore
request a contract amendment to increase the lump sum fee amount by $4,324.10 (See
attached Cost Proposal Summary and Detail).
Original Lump Sum Amount: $67,830.00
Amendment No. 1: $8,077.00 — Approved 3/12/02
Amendment No. 2: $17,172.05 — Approved 8/20/02
Amendment No. 3 $14,305.55 — Approved 1/15/03
Amendment No. 4 $6,748.88 — Approved 9/3/03
Amendment No. 5: $2,831.70 — Approved 2/2/04
Amendment No. 6 $15,554.08 — Approved
Amendment No. 7 $4,324.10 — Requested Herein
Total Revised Amount: $136,843.36
If you have any questions or need additional information concerning this request, please feel
free to contact me or Charles H. Leist II, P.E. at (817) 390-1000.
Sincerely,
LOPEZGARCIA GROUP
LYCA�C_
Douglas C. Mikeworth, P.E.
Vice President
DM:chl
Enclosures
P:\FW\210069.00\Doc\Contract-Amendment\Amendmend No. 6 Rev(07-13-04).docQQ�p QQr�
Page 1 of 1
City of Fort Worth
Cost Proposal Summary and Detail
Contract No.
LGG No. 210069.00
Bryson Tract Amend. No. 7
12-2-04
LOPEZGARCIA GROUP
Direct Labor
Item Labor Category Hours Rate Labor Cost
002 Project Manager 11.5 $ 140.00 $ 1,610.00
003 Senior Civil Engineer 3 $ 125.00 $ 375.00
005 Civil Engineer-In-Training 27 $ 70.00 $ 1,890.00
Subtotal for Direct Labor $ 3,875.00
Overhead(if applicable) Rate: 0.00% $ -
Professional Fee (if applicable) Rate: 10.00% $ 387.50
Total Direct Labor $ 4,262.50
Direct Costs
Travel Description of travel: School Visit
Unit of
Description Measure Quantity Rate Totals
Per diem for lodging Day 0 $ 59.00 $ -
Mileage Mile 40 $ 0.34 $ 13.60
Subtotal of Travel Costs $ 13.60
Other Direct Costs
Unit of
Description Measure Quantity Rate Totals
Mylar Sheets EA 3 $ 16.00 $ 48.00
Subtotal of Other Direct Costs $ 48.00
Subtotal of Direct Costs $ 61.60
Professional Fee (if applicable) Rate: 0.00% $
Total Direct Costs $ 61.60
Project Totals
Total Labor Costs $ 4,262.50
Total Direct Costs $ 61.60
TOTAL DELIVERY ORDER COST 4,
+ 1: . VL`
.
'000TH, M
Page 1 of 1
City of Fort Worth
Cost Proposal Summary and Detail
Contract No.
LGG No. 210069.00
Bryson Tract Amend. No. 7
12-2-04
LOPEZGARCIA GROUP
Direct Labor -- Task Details
Civil Engineer-In-
Task No. Task Name Project Manager Senior Civil Engineer Training Total for Task
1.0 Update Existing Sheets
1.1 CADD Work Sht. 40 1 $ 70.00
1.2 CADD Work Sht. 41 _ 1 $ 70.00
1.3 CADD Work Sht.42 1 $ 70.00
1.4 Coordination 1.5 $ 2_10.00
1.5 QA/QC - 1 $ 125.00
1.0 Total 1.5 1 3 $ 545.00
2.0 Create Sheet 43
2.1 CADD Work Sht.43 24 $ 1,680.00
2.2 Coordination 1 $ 140.00
2.3 QA/QC 2 $ - 250.00
2.0 Total 1 2 24 $ 2,070.00
3.0 Coordination Meetings
3.1 COFW 2 $ 280.00
3.2 EMS-ISD 4 $ 560.00
3.3 Pre-Con Meeting 1 $ 140.00
3.0 Total 7 0 0 $ 980.00
4.0 Proposal/Cost Opinion
4.1 Bid Proposal 1 $ 140.00
4.2 Cost Opinion 1 $ 140.00
4.0 Total 2 0 0 $ 280.00
Total Direct Labor Hours 11.5 3 27
Rates $ 140.00 $ 125.00 $ 70.00
Total Labor Costs $ 1,610.00 $ 375.00 $ 1,890.00 $ 3,875.00