HomeMy WebLinkAboutContract 28006-A4 AMENDMENT NO. 4
STATE OF TERAS S CITY SECRETARY CONTRACT NO. -k4
(M&C Required)
COUNTY OF TARRANT S
WHEREAS, the City of Fort Worth (City) and Dannenbaum
Engineering Corporation, (Engineer) made and entered into City
Secretary Contract No. 28006, (the Contract) which was authorized by
the City Council by M&C C-19172 on the 30th day of July, 2002 and
subsequently revised by three previous amendments; and
WHEREAS, the Contract involves engineering services for the
following project:
Sanitary Sewer Main 257 and 325 Middle and Upper Village Creek
Parallel Relief Alignment Study and Design.
WHEREAS, it has become necessary to execute Amendment No.4 to
said Contract to include an inc eased scope of work and revig-a
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following
agreement which amends the Contract:
1.
Article I, of the Contract is amended to include the additional
engineering services specified in M&C C-24794, adopted by the City
Council on the 22°d day of March, 2011, and further amplified in a
proposal letter dated December 2, 2010, a copy of which is both
attached hereto and incorporated herein. The cost to City for the
additional services to be performed by Engineer total $60,835.00.
2.
Article II, of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the total
fee paid by the City for all work and services shall not exceed the
sum of $1,320,766.28.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
3.
All other provisions of the Contract which are not expressly
amended herein shall remain in full force and effect.
EXECUTED on this the ` day of r 2011, in
Fort Worth, Tarrant County, Texas.
� ���n�a
as *ORr �►�a�
ATTEST: a 00 00
• �p o°u 00
1��(
V-goo
�s���
Marty Hendrix'-' (.� 0 c d
City Secretary 4� 000
4 tea,
0'Q(,"'103UUU� b
APP RE C ED* �lt�n NROVED:
1 %-
2�d
S. Frank Crumb, P.E. Te4rnand& Costa
Director, Water Department Assistant City Manager
Dannenbaum Engineering Corporation
Engineer
By:
N '-' W a Ahrens P.E. Princi al Contract Authorizatioa
6421 Camp Bowie Blvd.
Suite 400 Date
Fort Worth, TR 76116-5421
To FORM AND LEGALITY:
7%r
Assi City Attorney
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
DANNENBAUM ENGINEERING CORPORATION
6421 CAMP BOWIE BLVD..SUITE 400 FORT WORTH,TEXAS 76116-5421 (817)763-8883 cum
tiO
u
CRcoL.-
December 2, 2010
Mr. David Cooper, P.E.
Water Department
City of Fort Worth
1000 Throckmorton Street
Fort Worth, Texas 76102-6311
RE: Supplemental Agreement No. 4
Sanitary Sewer Mains 257 and 325 Middle and Upper Village Creek
Parallel Relief Alignment Study and Design
Water Project No. P 170-070170140030
D.O.E. No. 3650
Dear Mr. Cooper:
This letter is to provide Supplemental Agreement No. 4 for the realignment of Main 325
from Approximately Station 87+20 to Station 110+00 at the City's request in
negotiations with affected landowners. This alignment reflects the relocation of the main
to follow the alignment of Deer Creek as requested by the City.
As you are aware, the realignments of Main 325 will require additional field survey,
environmental, geotechnical and design effort. Based on discussions concerning the
project realignment on August 10, 2010, and the follow up alignment exhibit, delivered
by Dannenbaum's FTP site on August 12, 2010, 1 am supplying this Supplemental
Agreement No. 4 which, when approved, will increase the design fee from $1,259,931.28
to $1,320,766.28, an increase of$60,835.00.
Please inform us of the City's approval of the contract changes. If you have any
questions in the meantime, please do not hesitate to call.
Sincerely,
Grady . Beachum, P.E.
Project Manager
cc: Mark Lorance, P.E.
File 3642-32
G:11210\3642-32WdminWgreement�Supplemental#4\Cover Letter Cooper 2010-12-02.docx
EXHIBIT B-3
(SUPPLEMENT TO ATTACHMENT B)
SUMMARY OF TOTAL PROJECT FEES - SUPPLEMENTAL AGREEMENT NO. 4
SANITARY SEWER MAIN 257 & 325 MIDDLE & UPPER VILLAGE CREEK
PARALLEL RELIEF ALIGNMENT STUDY & DESIGN
SEWER PROJECT NO. P170-070170140030
D.O.E. NO. 3650
Phase Scope of Services Fee M/WBE % M/WBE
I - Design Services
Part 1 Alignment Study,
Environmental Documents(Blanton) $ 16,280.00 $ 14,800.00 90.9%
Part 2 Main 325 Design
Engineering $ 26,471.00 $ - 0.0%
Survey (ANA), (2,280 L.F @$3.00/ L.F.) $ 7,524.00 $ 6,840.00 90.9%
Easements (ANA) (6 total) $ 6,600.00 $ 6,000.00 90.9%
Geotechnical (Geotel) $ 3,960.00 $ 3,600.00 90.9%
TOTAL $ 60,835.00 $ 31,240.00 51.4%
Proposed M/WBE Subconsultants Fees % MIWBE
ANA Consultants (Field Survey and Easements) $ 12,840.00 21.1%
Blanton &Associates (Environmental Documentation) $ 14,800.00 24.3%
Geotel Engineering (Geotechnical) $ 3,600.00 5.9%
TOTALS $ 31,240.00 51.4%
G:\1210\3642-32\Admin\Agreement\Supplemental#4\3642-32 Manhours and Exhibit B-AA 2010-12-02.xisx
EXHIBIT B-3 1 of 1 12/2/2010
EXHIBIT B-3A
(SUPPLEMENT TO ATTACHMENT B)
SUMMARY OF TOTAL PROJECT FEES -SUPPLEMENTAL AGREEMENT NO. 4
SANITARY SEWER MAIN 257 & 325 MIDDLE & UPPER VILLAGE CREEK
PARALLEL RELIEF ALIGNMENT STUDY S DESIGN
SEWER PROJECT NO. P170-070170140030
D.O.E. NO. 3650
BASIC ENGINEERING DESIGN FEE: FEE M/WBE %M/WBE
Revise Design for New Alignment $ 26,471.00 $ - 0.0%
SUBTOTAL(BASIC ENGINEERING DESIGN FEE) $ 26,471.00 $ - 0.0%
SPECIAL SERVICES
Field Survey(ANA Consultants) $ 6,840.00 $ 6,840.00 100.0%
Easements(ANA Consultants) $ 6,000.00 $ 6,000.00 100.0%
Environmental(Blanton) $ 14,800.00 $ 14,800.00 100.0%
Geotechnical(Geotel) $ 3,600.00 $ 3,600.00 100.0%
SUBTOTAL(SPECIAL SERVICES) $ 31,240.00 $ 31,240.00 100.0%
CONSTRUCTION SERVICES
Construction Phase Services $ - $ - 0.0%
As-Built Drawings $ - $ - 0.0%
SUBTOTAL(CONSTRUCTION SERVICES) $ - $ - 0.0%
REPRODUCTION/DIRECT EXPENSES
8 Sets Review Plans $ - $ - 0.0%
16 Sets Preliminary Plans (Utility Clearance) $ - $ - 0.0%
50 Sets Construction Plans $ - $ - 0.0%
50 Sets Specifications $ - $ - 0.0%
As-Built Plans $ - $ - 0.0%
1 Set Mylar Plans $ - $ - 0.0%
AUTO EXPENSE $ - $ - 0.0%
Mounted Exhibits for Public Meetings $ - $ - 0.0%
SUBTOTAL(REPRODUCTION) $ - $ - 0.0%
10%SUB-CONTRACTOR MARK-UP $ 3,124.00
TOTAL LUMP SUM FEE(THIS ADDENDUM) $ 60,835.00 S 31,240.00 51.4%
PROPOSED M/WBE SUBCONSULTANTS
(THIS ADDENDUM) PROPOSED SERVICES FEES %CONTRACT
ANA Consultants Survey&Easements $ 12,840.00 21.1%
Blanton&Associates Environmental $ 14,800.00 24.3%
Geotel Geotechnical S 3,600.00 5.9%
TOTAL M/WBE(THIS ADDENDUM) $ 31,240.00 51.4%
G:\1210\3642-32\AdminAgreement\Supplemental#4\3642-32 Manhcurs and Exhibit B-3&A 2010-12-02.xlsx
EXHIBIT B-3A FEE SUMMARY 1 of 1 12/2/2010
Official site of the City of Fort Vinr1h, T CX is
Crry COUNCIL AGENDA FORT WORTII
COUNCIL ACTION: Approved on 3/2212011
DATE: 3/22/2011 REFERENCE NO.: **C-24794 LOG NAME: 60M325AMEND4-DEC
CODE: C TYPE: CONSENT PUBLIC NO
NO
SUBJECT: Authorize Execution of Amendment No. 4 in the Amount of$60,835.00 to City Secretary
Contract No. 28006 with Dannenbaum Engineering Corporation for Sanitary Sewer Main
257 and 325 Middle and Upper Village Creek Parallel Relief Alignment Study and Design
from Hemphill Street to West Rendon Crowley Road, thereby Increasing the Contract
Amount to $1,320,766.28 (COUNCIL DISTRICTS 6 and 8)
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute Amendment No. 4 in
the amount of$60,835.00 to City Secretary Contract No. 28006 with Dannenbaum Engineering
Corporation for Sanitary Sewer Main 257 and 325 Middle and Upper Village Creek Parallel Relief
Alignment Study and Design from Hemphill Street to West Rendon Crowley Road, thereby increasing
the contract amount to $1,320,766.28 (Project No. 01333).
DISCUSSION:
On July 30, 2002, (M&C C-19172) the City Council authorized the City Manager to execute an
Engineering Agreement with Dannenbaum Engineering Corporation in the amount of $721,899.76 to
prepare plans and specifications for Sanitary Sewer Main 257 and 325 Middle and Upper Village
Creek Parallel Relief Alignment Study and Design. The agreement was subsequently revised by
three amendments totaling $538,031.52 as follows:
Amendment No. 1 in the amount of $111,800.52 (M&C C-19936, January 20, 2004) provided for
additional engineering services required for the design of Sanitary Sewer Laterals 2389, 2484,
3694, 9920 and Main 238.
Amendment No. 2 in the amount of $329,406.00 (M&C C-22535, November 27, 2007) provided for
engineering services for the design of additional segments of sanitary sewer Main 325.
Amendment No. 3 in the amount of $96,825.00 (M&C C-23578, June 9, 2009) provided for the
redesign of the original approved alignment for the sewer main due to conflicts with recently
installed and proposed gas mains, recently completed and continuing development and easement
acquisition problems, modifications to the environmental information document and storm water
pollution prevention plans.
Amendment No. 4 will provide for the following:
Engineering services for the redesign of a portion of Main 325 crossing properties owned by
Huguley Hospital and Elton M. Hyder. The original alignment was across developable land on the
north side of the said properties. The respective owners requested that the sewer main be moved
to undevelopable floodway across the south end of these tracts. The revised alignment will require
additional survey, geotechnical work, design, revisions to the environmental Information document
and the preparation of new easement documents. The new alignment will result in lower easement
acquisition costs.
Dannenbaum Engineering Corporation proposes to provide the additional requested services for a
lump sum fee of$60,835.00. City staff considers this fee to be fair and reasonable for the scope of
services proposed.
Logname: 604061000 I-SJLOUIS Page 1 of 2
Dannenbaum Engineering Corporation is in compliance with the City's M/WBE Ordinance by
committing to an additional 51 percent M/VVBE participation on this Amendment No. 4. The City's
goal on this amendment is 51 percent.
In addition to the contract amount, $2,500.00 is required for project management.
The project is located in COUNCIL DISTRICTS 6 and 8.
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that funds will be available in the current
capital budget, as appropriated, of the Clean Water SRF 2007 Series.
TO Fund/Account/Centers FROM Fund/Account/Centers
P254 531200 708140133333 $60_835.00
Submitted for City Manager's Office_ Fernando Costa (6122)
Originating Department Heath; S. Frank Crumb (8207)
Additional Information Contact: David Cooper (8252)