HomeMy WebLinkAboutContract 28081-A1 AMENDMENT NO. 1
STATE OF TEXAS S CITY SECRETARY CONTRACT NO.�I 'F-1I
(MSC Required)
COUNTY OF TARRANT S
WHEREAS, the City of Fort Worth (City) and CH2M Hill , Inc. ,
(Engineer) made and entered into City Secretary Contract No. 28081, (the
Contract) which was authorized by the City Council by MSC C-19251 on the
17th day of September, 2002; and
WHEREAS, the Contract involves engineering services for the
following project:
Water Replacement Contract 2002 STM-M.
WHEREAS, it has become necessary to execute Amendment No. 1 to said
Contract to include an increased scope of work and revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through their
duly authorized representatives, enter into the following agreement which
amends the Contract:
1 .
Article I , of the Contract is amended to include the additional
engineering services specified in MSC C-23389, adopted by the City
Council on the 10th day of March, 2009, and further amplified in a
proposal letter dated December 8, 2008, copies of which are both attached
hereto and incorporated herein. The cost to City for the additional
services to be performed by Engineer total $59, 132 .00.
2.
Article II , of the Contract is amended to provide for an increase in
the maximum fee to be paid to Engineer for all work and services
performed under the Contract, as amended, so that the total fee paid by
the City for all work and services shall not exceed the sum of
$158,325 .00.
OFFICIAL RECORD f
CITYSECRETARY t
FT.WORTH,TX
03-20-0 9 q .-
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the pIA day of , 2009, in Fort Worth,
Tarrant County, Texas.
ATTEST:
Contract Authorization
Marty Hend x 3_
City Secretary gat@
APP AL RE NDED• APP D:
S. Frank Crumb, P.E. Fernando Costa
Director Water Department Assistant City Manager
CH2M Hill, Inc.
Engineer
By:
Name:Ken C. Hall, P.E.
Vice-President
309 W. 7th Street, Suite 1020
Fort Worth, TX 76102
APPROVEDO FORM GALITY:
�
Assistant Ci torney
-2-
OFFICIAL RECORD
j CITYSECRETARY
FT:WORTH,TX
CH2M HILL
309 West 7' Street
Suite 1020
Fort Worth,TX 76102
C H 2 M H I L L Tel 817.870.1129
s Fax 817.878.6763
December 8, 2008
Mr. Liam Conlon, P.E.
City of Fort Worth Water Department
1000 Throckmorton
Fort Worth,Texas 76102-6311
Subject: Water Main Replacement Contract 2002 STM-M, DOE 3759
Wichita Street(Mansfield Hwy to Wilbarger St.)
Amendment No. 1
Dear Mr. Conlon:
The purpose of this letter is to request authorization for additional funding in the amount of
$59,132.00 to complete the Water Main Replacement Contract 2002 STM-M Wichita Street
(Mansfield Hwy to Wilbarger St.) Project as described herein. The additional funding is
needed to meet the City's requests to resume work on the project(it was shelved in
September 2003), address changes,and bring it to completion. The amendment is
summarized in the following paragraphs and broken out in detail in Attachment 1,
enclosed.
Project History
This project's Notice to Proceed was issued on October 17, 2002. . The original scope of the
project called for two parallel 8-inch water mains along most of Wichita Street with a few
12-inch, 20-inch and 24-inch lines to replace existing water mains. Exhibit 1 summarizes the
overall project scope:
EXHIBIT 1
Summary of Oriqinal Scope of Work
Street WATER
Wichita St Existing Size(in) Proposed Replacement Length(LF)
Size(in)
Mansfield Hwy to Knox (E) 8 8 3,900
Timberline to Howard(E) 8 8 450
Knox to Timberline(E) 24 24 325
Howard to Wilbarger(E) 12 12 1.400
Amendment No. 1
December 8, 2008
Page 2
EXHIBIT 1
Summary of Original Scope of Work
Street WATER
Wichita St Existing Size(in) Proposed Replacement Length(LF)
Size(in)
Seminary 450-ft north(W) 8 8 450
Pecos to Pioneer(W) 8 8 550
Martin to Wiibarger(W) 20 20 2,900
Total Length 9,975
(E)—water main on east side of Wichita St.
(W)—water main on west side of Wichita St.
The last project deliverable was 95 percent drawings transmitted to the City on June 13,
2003. Discussions were held in September of 2003 to incorporate recommendations by
Kimley-Horn and Associates into the design drawings, however, the project was shelved by
the City due to funding constraints and CH2M HILL was directed to stop work.
Request for Additional Services
The additional services necessary to meet the City's request to revisit, revise, and complete
the design of the Wichita Street Project are summarized in the following sections.
Redesign Services
A meeting was held on July 22, 2008 to discuss design changes and the need for an
expedited schedule. The changes discussed included changes in alignment and pipeline
diameters throughout the existing corridor.The new alignment included a single 12-inch
water main along the center line of the roadway. At the direction of the City,CH2M HILL
redesigned the project with a single 12-inch water main and submitted near 30 percent
complete drawings. After additional review meetings,CH2M HILL was directed to go back
to the original design philosophy of having two parallel water mains in lieu of a single 12-
inch water main. Having parallel lines will avoid the abandonment of an existing 8-inch
water main installed in 1999 between Seminary and Martin.
The engineering effort for the redesign and review meetings is$13,612.
Although the original design philosophy of maintaining two parallel water mains remains,
there are some revisions to the original scope that have occurred. Exhibit 2 summarizes the
revised scope.
Amendment No. 1
December 8,2008
Page 3
EXHIBIT 2
Revised Scope of Work
Street Water
Existing Proposed Length Comments
Wichita St Size(in) Replacement (LF)
Size(in)
Mansfield Hwy to Martin(E) 8 8 3,300 No change in scope
Martin to Knox(E) 8 12 700 Change current plan sheets to plan
and profile sheets.
Knox to Timberline(E) 24 24 395 No change in scope
Knox to Timberline(E) N/A 12 250 Additional line added to scope
Timberline to Howard(E) 8 12 480 Change current plan sheets to plan
and profile sheets
Howard to Wilbarger(E) 12 12 1,400 No change in scope
Martin to Lomita(W) 20 8 2,640 Change current plan and profile
sheets to plan sheets
Misc. Side Road Connections 8-12 8-12 680
Total Length 9,845
(E)—water main on east side of Wichita St.
(W)—water main on west side of Wichita St.
The engineering effort for the revised scope of work is$13,584.00.
Update Contract Specifications
In May 2008, the City's Contract Front Ends/Specifications have changed and require
updating prior to advertisement. This will result in essentially a complete replacement of
the outdated specifications.The cost to update the contract specifications is$2,928.00.
Traffic Control Plans
The City has directed CH2M HILL to provide traffic control plans for the project. We intend
on using ANA,a M/WBE consulting firm, for this effort.The cost to prepare traffic control
plans, including a 10 percent subconsultant mark-up, is$9,240.
Storm Water Pollution Prevention Plan
The City has directed C1 12M HILI, to provide a Storm Water Pollution Prevention Plan
(SW3P) for the project. We intend on using ANA, a M/WBE consulting firm, for this effort.
The cost to prepare a SW3P, including a 10 percent subconsultant mark-up, is$4,400.
Survey/Utility Verification
Full topographic survey along the entire length of Wichita Street was not part of the original
surveyor's scope because plan and profile sheets were not required for all of Wichita Street.
Amendment No. 1
December 8, 2008
Page 4
Because some of the lines have increased in diameter from 8-inch to 12-inch, plan and
profile sheets are now required per City standards. 'The original survey and utility research
was completed in 2002 and is outdated. Field verification investigations are necessary to
confirm water meter locations,existing utilities,and new connections. Current parcel
ownerships also need confirmed.
We intend on using ANA, a M/WBE consulting firm, for the additional surveying and
parcel identification. CU12NI HILL will verify existing utilities. The cost for these services,
including a 10 percent subconsultant mark-up, is$13,788.00.
Reproduction Services
Additional reproduction services are needed to resubmit utility clearance drawings, develop
traffic control sheets to be included in the Contract plans,SW3Ps,and half size sets. Five
SW3P notebooks will also be delivered to the City. Additional reproduction is requested in
the amount of$1,580.00.
Project Summary
Exhibit 3 summarizes Amendment No. 1
EXHIBIT 3
Amendment No. 1 Summary
Description Fee
Redesign Services $27,196.00
Update Contract Specifications $2,928.00
Traffic Control Plan $9,240.00
SW3P $4,400.00
Survey/Utility Verification $13,788.00
Reproduction $1,580.00
Total $59,132.00
Amendment No. 1
December 8,2008
Page 5
Exhibit 4 summarizes the total Contract to date.
EXHIBIT 4
Contract To Date Costs
Contract Description Fee
Original Contract Design, Bid, and Construction Services for 9,975 LF of Water Main $99,193.00
Amendment No. 1 Re-design, Traffic Control Plan, SW3P, Survey, Utility Verification, $59,132.00
Reproduction
Total $158,325.00
The percentage of the requested Amendment that would be performed by M/WBE's is
approximately 35 percent. This would result in an overall M/WBE percentage for the
project of 29 percent,comparing favorably to the project goal of 17 percent.
Sincerely,
CH2M HIL/L^
Ken C. Hall, P.E. Chad M.Simmons, P.E.
Vice President Project Manager
Encl.: Attachment 1
cc: Mr.John Kasovich, P.E. w/encl
Mr.Tony Sholola, P.E.., w/encl
Mr. Robert Terrell w/ encl.
CHZII HILL
309 Weal r Sb
Suds 1020
Fort Worth.TX 76102
10 C H 2 M H I L L Tel17.870.1129
F=817.878.3733
December 8,2008
Mr.Liam Conlon,P.E.
City of Fort Worth Water Department
1000 Throckmorton
Fort Worth,Texas 76102-6311
Subject: Water Main Replacement Contract 2002 STM-M,DOE 3759
Wichita Street(Mansfield Hwy to Wilbarger St.)
Amendment No.1 -M/WBE Letter of Intent
Dear Mr.Conlon:
We intend to use ANA Consultants,L.L.C.,a M/WBE subconsultant,to complete the traffic
control plans,storm water pollution prevention plans, survey and parcel ownership for the
subject project Amendment No. 1. ANA's fee for these services is broken out as follows:
Task Description Fee
Traft Control Plans $8,400.00
Storm Water PolhAlon Prevention Plan $4,000.00
Survey/Parcel Ownership $8,100.00
TOW $20.500.00
Sincerely,
Accepted
CH2M HILL ANA Consultants,L.L.C.
4.
Ken C. Had,P.E. Mark ,
Vice President V' President
Attachment 1
Wichita Street Water Main Replacement
Proposed Fee,Amendment No. 1
SUBCONSULTANT
ACTIVITY DESCRIPTION GRADE HOURS RATE LABOR SERVICES TOTAL
Redesign Effort
Redesign(Single 12-inch Line)
Coordination Meetings E4 12 $115.00 $1,380.00
E5 6 $157.00 $942.00
CAD Realignment Effort T4 40 $106.00 $4,240.00
Engineering(horz.and vert.align.) E4 34 $115.00 $3,910.00
E5 20 $157.00 $3,140.00
Subtotal $13,612.00
Redesign(Parallel Lines)
Revise Plan Dwgs to P/P dwgs E4 16 $115.00 $1,840.00
E5 8 $157.00 $1,256.00
T4 32 $106.00 $3,392.00
Subtotal $6,488.00
Revise P/P Dwgs to Plan Dwgs
E4 6 $115.00 $690.00
E5 2 $157.00 $314.00
T4 24 $106.00 $2,544.00
Subtotal $3,548.00
New 12-inch W From Knox to Timberline E4 6 $115.00 $690.00
E5 2 $157.00 $314.00
T4 24 $106.00 $2,544.00
Subtotal $3,548.00
Update Contract Specifications E4 20 $115.00 $2,300.00
E5 4 $157.00 $628.00
Subtotal $2,928.00
Traffic Control Plans $8,400.00
10%Subconsultant Mark-Up $840.00
Subtotal $9,240.00
SW3P $4,000.00
10%Subconsultant Mark-Up $400.00
Subtotal $4,400.00
Survey/Utility Verification E4 40 $115.00 $4,600.00 $8,100.00
E5 4 $157.00 $628.00
10%Subconsultant Mark-Up $460.00
Subtotal $13,788.00
Reproduction Services
Compile Drawings(half size) T4 4 $106.00 $424.00 $100.00
Resubmit 13 Sets for Utility Clearance $375.00
Reproduction Expenses(SWPPP) $350.00
Reproduction Expenses(Traffic Control Plans) $260.00
10%Subconsultant Mark-Up $71.00
Subtotal $1,580.00
TOTAL AMENDMENT NO.1 FEE $37,547.00 $21,585.00 $59,132.00
AMENDMENT NO.1 SUMMARY
Total CH2M HILL Cost $37,547.00
Total Subconsultant Cost $21,585.00
AMENDMENT NO.1 TOTAL FEE $59,132.00
M/WBE Cost $20,500.00
M/WBE PERCENTAGE 34.7%
Attachment 1
Wichita Street Water Main Replacement
Proposed Fee,Amendment No. 1
SUBCONSULTANT
ACTIVITY DESCRIPTION GRADE HOURS RATE LABOR SERVICES TOTAL
Redesign Effort
Redesign(Single 12-inch Line)
Coordination Meetings E4 12 $115.00 $1,380.00
E5 6 $157.00 $942.00
CAD Realignment Effort T4 40 $106.00 $4,240.00
Engineering(horz.and vert.align.) E4 34 $115.00 $3,910.00
E5 20 $157.00 $3,140.00
Subtotal $13,612.00
Redesign(Parallel Lines)
Revise Plan Dwgs to P/P dwgs E4 16 $115.00 $1,840.00
E5 8 $157.00 $1,256.00
T4 32 $106.00 $3,392.00
Subtotal $6,488.00
Revise P/P Dwgs to Plan Dwgs
E4 6 $115.00 $690.00
E5 2 $157.00 $314.00
T4 24 $106.00 $2,544.00
Subtotal $3,548.00
New 12-inch W From Knox to Timberline E4 6 $115.00 $690.00
E5 2 $157.00 $314.00
T4 24 $106.00 $2,544.00
Subtotal $3,548.00
Update Contract Specifications E4 20 $115.00 $2,300.00
E5 4 $157.00 $628.00
Subtotal $2,928.00
Traffic Control Plans $8,400.00
10%Subconsultant Mark-Up $840.00
Subtotal $9,240.00
SW3P $4,000.00
10%Subconsultant Mark-Up $400.00
Subtotal $4,400.00
Survey/Utility Verification E4 40 $115.00 $4,600.00 $8,100.00
E5 4 $157.00 $628.00
10%Subconsultant Mark-Up $460.00
Subtotal $13,788.00
Reproduction Services
Compile Drawings(half size) T4 4 $106.00 $424.00 $100.00
Resubmit 13 Sets for Utility Clearance $375.00
Reproduction Expenses(SWPPP) $350.00
Reproduction Expenses(Traffic Control Plans) $260.00
10%Subconsultant Mark-Up $71.00
Subtotal $1,580.00
TOTAL AMENDMENT NO.1 FEE $37,547.00 $21,585.00 $59,132.00
AMENDMENT NO.1 SUMMARY
Total CH2M HILL Cost $37,547.00
Total Subconsultant Cost $21,585.00
AMENDMENT NO.1 TOTAL FEE $59,132.00
M/WBE Cost $20,500.00
M/WBE PERCENTAGE 34.7%
•1V1UG.t, l�GVlGW I Ur,%, 1 v
CITY COUNCIL AGENDA FORTH
COUNCIL ACTION: Approved on 3/10/2009 -Ord. No. 18507-03-2009
DATE: 3/10/2009 REFERENCE NO.: **C-23389 LOG NAME: 60STMA1-CH2M
CODE: C TYPE: CONSENT PUBLIC HEARING: NO
SUBJECT: Authorize Amendment No. 1 in the Amount of$59,132.00 to City Secretary Contract No.
28081, an Engineering Agreement with CH2M Hill, Inc., for Water Replacements in Wichita
Street from Mansfield Highway to Wilbarger Street and Adopt Appropriation Ordinance
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the transfer of$63,132.00 from the Water and Sewer Operating Fund to the Water
Capital Projects Fund in the amount of$63,132.00;
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Water Capital Projects Fund in the amount of$63,132.00; and
3. Authorize the City Manager to execute Amendment No. 1 in the amount of$59,132.00 to City
Secretary Contract No. 28081 with CH2M Hill, Inc. for additional engineering services thereby
increasing the contract amount to $158,325.00.
DISCUSSION:
On September 17, 2002, (M&C C-19251) the City Council authorized the City Manager to execute an
engineering agreement with CH2M Hill, Inc. in the amount of$99,193.00 for Water Replacement
Contract, 2002 STM-M.
Amendment No. 1 will provide for the following:
Revisions to the project plans and specifications as requested by the City.
Additional design survey on the project.
The preparation of traffic control plans.
The preparation of storm water pollution plans.
Additional reproduction on the project.
CH2M Hill, Inc., proposes to perform the necessary additional design work for a lump sum fee of
$59,132.00. City staff considers this fee to be fair and reasonable for the scope of services proposed.
In addition to the contract amount, $4,000.00 is required for easement acquisition and utility
coordination.
CH2M Hill, Inc., is in compliance with the City's M/WBE Ordinance by committing to an additional 35
percent M/WBE participation on this Amendment No. 1. The City's goal on this amendment is 20
percent.
This project is located in COUNCIL DISTRICT 8, Mapsco 92B and F.
http://apps.cfwnet.org/council_ packet/mc review.asp?ID=11162&councildate=3/10/2009 3/11/2009
,m&t- xeview Page 2 of�
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that upon approval of the above
recommendations and the adoption of the attached ordinance, funds will be available in the current
capital budget, as appropriated, of the Water Capital Projects Fund.
TO Fund/Account/Centers FROM Fund/Account/Centers
182 11 PE45 538040 0609020 $63132.00
P253 472045 6081701255ZZ �132,00
3L253 531200 608170125531 $13,603.20
2) P253 531200_608170125531 $13,603.20 3)253 531200 608170125532 $27,2.06.40
2 P) 253 531200 608170125532 $27 206.40 3) P253 531200 608170125533 $4_534.40
P253_531200 608170125533 $4_534.40 1) P253531200 608170125551 $13,748.00
2) F253531200 $13788.00
2)_P253 541100 708170125541 $1000.00
2) P253 531350 608170125542 $1,000.00
) P253 531350 608170125573 $2,0000.00
Submitted for City Manager's Office b . Fernando Costa (6122)
Originating Department Head_ S. Frank Crumb (8207)
Additional Information Contact: Liam Conlon (6824)
ATTACHMENTS
60STMA1-CH2M map.pdf
60STMA1-CH2M ord.doc
http://apps.cfwnet.org/council packet/mc review.asp?ID=11162&councildate=3/10/2009 3/11/2009