Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 28091-A2
AMENDMENT NO. 2 STATE OF TEXAS S CITY SECRETARY CONTRACT NO.aS (M&C Not Required) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Dannenbaum Engineering Corporation, (Engineer) made and entered into City Secretary Contract No. 28091, (the Contract) which was authorized by the City Council by M&C C-19256 on the 24th day of September 2002 and subsequently revised by one previous amendment; and WHEREAS, the Contract involves engineering services for the following project: Sanitary Sewer Rehabilitation Contract LIII (53) . WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated March 18, 2010, a copy of which is attached hereto and incorporated herein. The cost to the City for the additional services to be performed by Engineer total $9,872 .81 . 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $250,701.88. N RECORDRETARYTH, TX 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the 4 day of , 2010, in Fort Worth, Tarrant County, Texas. ATTEST: �01 00000000 V `V — �o % Marty Hendrix �0 8�� City Secretary 0 o.rd ��AA o00 0 ICY Al 0 00000 ICY 44 APPROVAL RECOMMENDED: aA� �ED: �rsw,rw�� Frank Crumb, P.E. Fernando Costa Director, Assistant City Manager Water Department Dannenbaum Engineering Corporation NO M&C REQUIRED ENGINEER By: Name: Wayne Ahrens, P.E. Vice President 6421 Camp Bowie Blvd; Ste. 400 Fort Worth, Texas 76116 APPROVED AS TO FORM AND LEGALITY: AssisfaqnflCity Attorney OFFICIAL RECORD _2 CITY SECRETARY F . - M, TX DANNENBAUM ENGINEERING CORPORATION 4CF0 6421 CAMP BOWIE BLVD.,SUITE 400 FORT WORTH,TEXAS 761165421 (817)763-8883 Yun of March 18,2010 Mr. Rakesh Chaubey, P.E. City of Fort Worth 1000 Throckmorton Street Fort Worth,Texas 76102-6311 RE: Design Fee Cost Summary—Supplemental Agreement No.2 Sanitary Sewer Rehabilitation Contract LIII (53) Sanitary Sewer System Rehabilitation and Improvements DOE No. 3764 Dear Mr. Chaubey: This letter is to provide information regarding the change in scope on the Water Department work on the above referenced project. The following changes in scope are as follows: 1. The City requested that Dannenbaum Engineering prepare revised Rights of Entry for 54 parcels. 2. The City requested that the Plans and Specifications be updated to current Standards. The Original Design Fee is $226,406.99. Amendment Number 1 Fee is $14,422.08. The cost for the proposed changes in Supplemental Agreement No. 2 is $9,872.81. Approval of the Supplemental Agreement No. 2 will increase the Design Fee to$250,701.88. If you have any questions in the meantime,please do not hesitate to call. Sincerely, Grady H. Beachum, P.E. Project Manager cc: Gary W. Fisher,P.E. File 3750-32 G:\1210\3750-32\ADMIN\Agreement\Supplemental#2\Letter Chaubey 2010-03-16.docx EXHIBIT B-3 (SUPPLEMENT TO ATTACHMENT B) DESIGN FEE COST SUMMARY—SUPPLEMENTAL AGREEMENT No. 2 SANITARY SEWER REHABILITATION CONTRACT LIII (53) Sanitary Sewer System Rehabilitation and Improvements DOE No. 3764 Phase Scone of Services Fee M/WBE I- Design Services Pipe Rehabilitation $ 9,872.81 $ 500.00 TOTAL $ 9,872.81 $ 500.00 Proposed M/WBE Subconsultants Services Fees % ANA Consultants Field Survey and Easement Preparation $ 500.00 5.06% TOTALS $ 500.00 5.06% B3-1 EXHIBIT B-3A SUMMARY OF TOTAL PROJECT FEES - SUPPLEMENTAL AGREEMENT No. 2 Sanitary Sewer Rehabilitation Contract Lill (53) DOE No. 3764 Includes: 1. Update plans to current City Standards 2. Right-of-Entry Documents and Easement Preparation BASIC ENGINEERING DESIGN FEE: FEE MIWBE % MIWBE Update Plans&Specifications to Current Standards $4,846.31 $ - 0.00% SUBTOTAL(BASIC ENGINEERING DESIGN FEE) $ 4,846.31 $ - 0.00% SPECIAL SERVICES FEE MIWBE % MIWBE Easement Preparation (ANA) $ 500.00 $ 500.00 100.00% Right-of-Entry Documents (54 Documents) $4,476.50 $ - 0.00% SUBTOTAL(SPECIAL SERVICES) $ 4,976.50 $ 500.00 10.05% CONSTRUCTION SERVICES As-Built Drawings $ - $ - 0.00% SUBTOTAL(CONSTRUCTION SERVICES) $ - $ - 0.00% REPRODUCTION (Assumes 1 contract with 3 total sheets) 16 Sets of Preliminary Plans(Utility Clearance) (HTA) $ - $ - 0.00% 45 Sets of Construction Plans(HTA) $ - $ - 0.00% 1 Sets of As-Built Plans(HTA) $ - $ - 0.00% 1 Set of Mylars $ - $ - 0.00% SUBTOTAL(REPRODUCTION) $ - $ - 0.00% 10%SUB-CONTRACTOR MARK-UP $ 50.00 TOTAL LUMP SUM FEE $ 9,872.81 $ 500.00 5.06% PROPOSED MIWBE SUBCONSULTANTS PROPOSED SERVICES FEES % CONTRACT ANA Consultants, Inc. Field Survey & Easement $ 500.00 5.06% TOTAL MIWBE $ 500.00 5.06% B3A-1 m as as . 7 . 4&�# a@ _ §2 e )S7a 7( aJ 01 #,_& o # )§»� )■ 2 ] k� ° § m/ m \ k>q , � ( § ( 2 k o■; , / 0, 2§ § §§� Cc2 rx }] /§ §§ k k 6§2g w � b �©, N ` ° ` SO § e _ § ]Lu ; 7 ))q■§§ ] IL § a gf§\ ) )22 m 2 2® « t ■\2 - k� �S ® � G$ @ U. ,4 §uj 2§ m 2 \# 7 ■ a J �( " W § § ■� agCL2 Z;a: @ & §2 ; & § � -29 ,� @ ) 2 2: 0: CL CL ) tZ § mss U. 0UJS S ; §§ ■ 22 ) 7 m § ■» C a§ 0 Ek §) ■2 § Lu CL%ui \\§ §§ as ® Ix z ) cn k A [ ■ ) \ Z CL Ul LUs ©§$ CL- @ _ o� - 2 IS cn 2 asx § 7� ■=e;§ ■ a2k6§ § § §1 G�W04 § s m @ §CL