HomeMy WebLinkAboutContract 28331 CIS SECRETARY ORIGINAL - D ,Zi c- FILE CO * Z3 NTRACTOR'S BONDING CO, SPECIFICATIONS CONSTRUCTION'S COPY AND CONTRACT DOCUMENTS CITY SECRETARY CLIENT DEPARTMENT CONTRACT NO. FOR SOUTHSIDE III WATER MAIN EXTENSION FROM CLEBURNE CROWLEY ROAD TO THE CITY OF BURLESON AT SHANNON CREEK WATER DEPARTMENT PROJECT NO. P161-060161141010 DEPARTMENT OF ENGINEERING PROJECT NO. 3416 GARY JACKSON KENNETH BARR CITY MANAGER MAYOR ROBERT D. GOODE, P.E. DALE A. FISSELER, P.E. DIRECTOR DIRECTOR TRANSPORTATION AND WATER DEPARTMENT PUBLIC WORKS MARC OTT A. DOUGLAS RADEMAKER, P.E. ASST. CITY MANAGER DIRECTOR DEPARTMENT OF ENGINEERING SEPTEMBER 2002 THOMM . . . . . . . .W.HASTR.� �i Oo'• 29m a FREESE•NICHOLS 4055 INTERNATIONAL PLAZA, SUITE 200 z FORT WORTH, TEXAS 76109-4895 (817) 735-7300 F&N No. FTWO1365 ORIGINAL City of Fort Worth, Texas "a."Or And COUIRCH COMI"Unication DATE REFERENCE NUMBER LOG NAME TPAGE 1/14/03 **C-19417 30LOUIS 1 of 3 SUBJECT AMENDMENT OF WHOLESALE WATER CONTRACTS AND AWARD OF CONTRACT TO S.J. LOUIS CONSTRUCTION OF TEXAS, LTD., LLP FOR SOUTHSIDE III, 36-INCH WATER TRANSMISSION MAIN EXTENSION FROM CLEBURNE CROWLEY ROAD TO THE CITY OF BURLESON AT SHANNON CREEK RECOMMENDATION: It is recommended that the City Council: 1. Authorize the City Manager to execute amendments to wholesale water contracts with the City of Burleson, City of Crowley, and Bethesda Water Supply Corporation providing for cost participation by these entities in the proposed water transmission main extension to meet each customer's estimated capacity/demand in 2020; and 2. Authorize the City Manager to execute a contract with S.J. Louis Construction of Texas, Ltd., LLP, in the amount of $2,781,800 for the Southside III, 36-Inch Water Transmission Main Extension from Cleburne Crowley Road to the City of Burleson at Shannon Creek. DISCUSSION: On August 8, 2001 (M&C C-18713), the City Council authorized the City Manager to execute an engineering contract with Freese & Nichols, Inc. to prepare plans and specifications for the Southside III water transmission main from Cleburne Crowley Road to the City of Burleson at Shannon Creek. This project will accommodate new growth in the Fort Worth extraterritorial jurisdiction, as well as areas currently served by wholesale water customers (Bethesda Water Supply Corporation and the Cities of Burleson and Crowley). In order to share in the costs of the overall project, wholesale water contracts must be amended. The wholesale customers agree to participate in the engineering and construction based on capacity of each customer's need as stated in the contract amendments. Under the terms of the contract amendment, the following cost participation estimates will apply to this final phase of the project: City of Burleson $1,099,084 City of Crowley $ 31,817 Bethesda Water Supply Corporation $1,099,084 City of Fort Worth $ 551,815 Total $2,781,800 City of Fort Worth, Texas "Agar and Council Communication DATE REFERENCE NUMBER LOG NAME PAGE 1/14/03 **C-19417T 30LOUIS 2 of 3 SUBJECT AMENDMENT OF WHOLESALE WATER CONTRACTS AND AWARD OF CONTRACT TO S.J. LOUIS CONSTRUCTION OF TEXAS, LTD., LLP FOR SOUTHSIDE III, 36-INCH WATER TRANSMISSION MAIN EXTENSION FROM CLEBURNE CROWLEY ROAD TO THE CITY OF BURLESON AT SHANNON CREEK The wholesale customers agree to repay Fort Worth, over a period of sixty (60) months, interest at a rate of six percent (6%) per annum from the date of completion and acceptance of the construction by the Water Department. The project consists of the installation of approximately 24,270 linear feet of 36-inch water line. BID ADVERTISEMENT - This project was advertised for bid on September 26 and October 3, 2002. On October 31, 2002, the following bids were received: BIDDER AMOUNT TIME OF COMPLETION S.J. Louis Construction of Texas, Ltd., LLP $2,781,800.00 175 Calendar Days Oscar Renda Contracting, Inc. $3,158,344.00 BRB Contractor's, Inc. $3,173,366.00 Jackson Construction, Ltd. $3,281,700.50 Texas Electric Utility $3,521,310.64 William J. Schultz, Inc. d/b/a Circle "C" $3,990,830.00 Construction Company In addition to the contract cost, $194,726.00 is required for inspection and survey, and $83,454.00 is required for project contingency to cover change orders. M/WBE - S. J. Louis Construction of Texas, Ltd., LLP is in compliance with the City's M/WBE Ordinance by committing to 22% M/WBE participation. The City's goal on this project is 21%. This project is located in COUNCIL DISTRICT 6, Mapsco 117 and 118. City of Fort Worth, Texas "Agor And cou"Cit Communication DATE REFERENCE NUMBER LOG NAME PAGE 1/14/03 **C-19417 30LOUIS 3 of 3 SUBJECT AMENDMENT OF WHOLESALE WATER CONTRACTS AND AWARD OF CONTRACT TO S.J. LOUIS CONSTRUCTION OF TEXAS, LTD., LLP FOR SOUTHSIDE III, 36-INCH WATER TRANSMISSION MAIN EXTENSION FROM CLEBURNE CROWLEY ROAD TO THE CITY OF BURLESON AT SHANNON CREEK FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Water Capital Projects Fund. MO:k Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY Office by: (to) Marc Ott 8476 Originating Department Head: Douglas Rademaker 6157 (from) APPROVED 1/14/03 P162 541200 060162141140 $2,781,800.00 Additional Information Contact: Douglas Rademaker 6157 Received: 10/18/02 5:07PM; S J LOUIS CONST; Page 2 Oct-18 . 2002 4:47PM . No•0359 P. 2!1 October 18,2002 ADDENDUM NO. 1 CITY OF FORTWORTH DEPARTMENT OF ENGINEERING TO THE SPECIFICATIONS AND CONTRACT DOCUMENTS FOR SOUTHSIDE III WATER MAIN EXTENSION FROM CLEBURNE CROWLEY ROAD TO THE CITY OF BURLESON AT SHANNON CREEK DOE#3416 � F �P WATER DEPT.PROJECT NUMBER: P161-060161141010 J CAL BRCWN ti Prospective bidders are hereby notified of the following: IMAt 1. PART A--NOTICE TO BIDDERS: 10 0 Z In NOTICE TO BIDDERS(page A-1)and COMPREHENSIVE NOTICE TO BIDDERS(page A-2) the paragraph beginning"A majority of the work ".the second line shall be modified to read"2 meter stations each with a 16-inch meter," 2. PART B-PROPOSAL: Pages 13-2, B-3 and B-4 of the bid proposal shall be replaced with the attached sheets.. On Page B-5,the fourth paragraph shall be deleted and replaced with the following: "The Bidder agrees to begin work on the Contract and complete all work within 175 calendar days. 36-inch water main, City of Burleson meter station and Bethesda Water Supply Corporation meter station shall be complete and in service by June 1 2003.." 3. PART DA—ADDITIONAL SPECIAL CONDfrIONS: Add Item DA-44' "All existing improvements that are damaged, removed or altered to permit installation of the work shall be repaired or replaced to equal or better condition by the Contractor. This work shall be considered incidental to the pipeline cost and shall include but is not limited to fences, sidewalks, pavement, curbs, utility pipelines, drainage structures, and repair and improvement of driveways as shown on plan sheets.," ji I i Addendum No. 1 FTWO1365 i Received: 10/18/02 5:08PM; S J LOUIS CONST; Pepe 3 Oct-18. 2002 4:47PM No-0359 P. 3/7 I 4. PART E—M&T§RLA&M6 CONSTRUCTION SPECIFICATIONS: ADDITIONAL TECHNICAL SPECIFICATION,02826 Steel Pipe in Section 2.03 Manufactured Products,4.Wall Thickness,the first sentence shall be modified to read: 'The minimum pipe wall steel thickness shall be 7/32-inch(0..2188 inches),with no minus tolerance.' ADDITIONAL TECHNICAL.SPECIFICATION 16640 Corrosion Protection/Monitoring In Section 1.01,Work Included, modify the first sentence of the third paragraph to read: "Bar wrapped concrete cylinder pipe,mortar coated steel and ductile iron pipe are to have bonded joints.." In Section 7.00, Inspection and Testing of Corrosion Monitoring System, add the following sentence after the first sentence in the paragraph. 'A continuity test forthe pipe shall be completed and the systern shall be checked to verity that there is a discontinuity at all insulated joints.` 5_ PLANS: r On Sheet 28 of 46, City of Burleson and Bethesda WSC Meter Station Site Plan,for the Bethesda WSC 16'Turbine Meter and Vault relocate the bypass piping outside the vault(8"DIP water line With 8'Locked Gate Valve)from the southwest side of the vault to the northwest side„ On Sheet 41 of 46, Cathodic Protection Details,the following note should be added for the Flush Test Station Protle Detail: "At all main line gate valves,a flush test station and 9-lb Magnesium Anode shall be installed with the test station having 2-No- 10 AWG THW Cables to Gate Valve and 1-No. 12 AWG THIN Cable to 9-lb Magnesium Anode' Failure to return a signed copy of the addendum with-the proposal shall be grounds for renderjng the bid non-responsive . A signed copy of this addendum shall be placed into the proposal at the time of bid submittal_ RECEIPT ACKNOWLEDGED A.Douglas Radernaker,P.E'.,Director Department if Engineering �y. y: : . S.T• LAIC C*JI'RKc i7aJ of TEV,A5 Rick Trice, E.,Manager Consultant Services � i i li • 1 . I . i . I • I s� Il Addendum No. 1 FTWO1365 II Received: 10/18/02 5:08PM; -> S J LOUIS CONST; Page 4 Oct•18. 2002 4:48PM No J359 P 36 -INCH SOUTHSIDE III WATER MAIN CLEBURNE CROWLEY ROAD TO THE CIN OF BURLESON AT SHANNON CREEK The bidder shall submit bids for Bid Item A and/or Bid Item B and/or Bid Item C and/or Bid Item D.. Bid Item E includes items common to all alternates. The Bidder shall submit bids for Bid Item E. BID PAY I APPROX. DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID A. AWWA C303 Bar Wrapped Concrete Cylinder Pipe a.. 24,270LF 36-inch (pressure class 150) pipe Dollars and $ $ Cents per LF b.. 1 LS 36-inch polyurethane coated concrete pressure pipe fittings and specials Dollars and $ $ Cents per LS C. 1 LS Cathodic Protection System Dollars and $ $ Cents per LS Subtotal A $ B. AWWA C200 Polyurethane Coated Steel Pipe a_ 24,270 LF 36-inch pipe (pressure class 150) Dollars and $ $ Cents per LF b. 1 LS 36-inch steel pipe fittings and specials Dollars and Cents per LS $ $ C.. 1 LS Cathodic Protection System Dollars and $ $ Cents per LS Subtotal B $ C. AWWA C200 Mortar Coated Steel Pipe a.. 24,270 LF 36-inch pipe (pressure class 150) Dollars and $ $ Cents per LF Addendum No. 1 FTWO1366 Received: 10/18/02 5:08PM; -> S J LOUIS CONST; Page 5 Oct• 18. 2002 4:48PM No•0359 36 -INCH SOUTHSIDE III WATER MAIN CLEBURNE CROWLEY ROAD TO THE CITY OF BURLESON AT SHANNON CREEK The bidder shall submit bids for Bid Item A and/or Bid Item B and/or Bid Item C and/or Bid Item D.. Bid Item E includes items common to all alternates. The Bidder shall submit bids for Pid Item E. BID PAY APPROX. DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID b. 1 LS 36-inch steel pipe fittings and specials Dollars and $ $ Cents per LS C. 1 LS Cathodic Protection System Dollars and $ $ Cents per LS Subtotal C $ D. AWWA C151 Class 51 Ductile Iron Pipe a, 24,270 LF 364nch Pipe Dollars and $ Cents per LF b. 28 TONS 36-inch DIP fittings and specials Dollars and $ $ Cents per TON C. 1 LS Cathodic Protection System Dollars and $ $ Cents per LS Subtotal D $ . E. ITEMS COMMON TO A, B, C and D 1. 252 LF '54-Inch Diameter Steel Casing Pipe j installed by Open Cut Dollars and $ $ Cents per LF 2. 416 LF *54-Inch Diameter Steel Casing Pipe installed by boring $ $ Dollars and Cents per LF i 36-Inch Butterfly Valve and Vault l 3. 10 EA Dollars and $ $ Cents per EA *Bid Item does not include 36-winch carrier pipe Addendum No. 1 FTW01365 Received: 10/19/02 5:09PM; -> S J LOUIS CONST; Page 6 Oct• 18. 2002 4:48PM No-0359 V 6/7 36 -INCH SOUTHSIDE III WATER MAIN CLEBURNE CROWLEY ROAD TO THE CITY OF BURLESON AT SHANNON CREEK The bidder shall submit bids for Bid Item A and/or Bid Item B and/or Bid Item C and/or Bid Item D. Bid Item E includes items common to all alternates. The Bidder shall submit bids for Bid Item E. BID PAY APPROX. I DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID 4. 7 EA 3-Inch Combination Air and Vacuum Valve and Vault $ $ Dollars and Cents per EA 5., 9 EA 8-Inch Diameter Blow-off Valve and Vault Dollars and $ $ Cents per EA 6, 24,000 LF Trench Safety System Dollars and $ $ J Cents per LF 7. 1 LS `*City of Burleson and Bethesda Water Supply Corporation Meter Stations, complete as shown on plans including site work, concrete driveway, crushed stone, culvert piping, fencing and gates, 16" meters, piping from Sta 242+09 to end and.all piping associated with both $ $ meter stations, fittings, valves, fire I hydrant, vault, electrical & instrumentation, and all associated appurtenances for meter station to be installed completed in working condition. Dollars and Cents per LS Aluminum Farm Gate 8. 10 EA Dollars and $ $ Cents per EA 9_ 24,000 LF Post Construction Hydro-Mulch/Seeding Dollars and $ $ Cents per LF 10.. 1 LS Erosion and Sediment Control During Construction, including implementation and maintenance of SWPPP $ $ Dollars and Cents per LS 11_ 100 CY Crushed Limestone for Construction Access and Additional Trench Backfill $ $ Dollars and Cents per CY "Contractor will be required to provide schedule of values for this bid item once contract is awarded Addendum No. 1 FTWO1365 �eceived: 10/19/02 5:09PM; -y S J LOUIS CONST; Page 7 Oct-18. 2002 4:48PM No-0359 P. 7/7 36-INCH SOUTHSIDE Ill WATER MAIN CLEBURNE CROWLEY ROAD TO THE CITY OF BURLESON AT OHANNON CREEK The bidder shall submit bids for Bid Item A and/or Bid Item B and/or Bid Item C and/or Bid Item D. Bid Item E includetitems common to all alternates. The Bidder shall submit bids for Bid Item E BID PAY APPROX. DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID 100 CY Additional Lean Concrete Backfill (Not 12 Shown on Plans) $ $ Dollars and Cents per CY 13. 200 LF Concrete Encasement For 36-Inch Waterline (Not Shown on Plans) $ $ Dollars and Cents per LF 14, 500 SF 6-inch Temporary HMAC pavement (Not Shown on Plans) $ $ Dollars and Cents per SF Subtotal E $ 36-INCH SOUTHSIDE III WATER MAIN CLEBURNE CROWLEY ROAD TO THE CITY OF BURLESON AT SHANNON CREEK CONCRETE CYLINDER PIPE OPTION (ITEM A+REM E) 'Add(+)or Deduct(-) $ Total Amount Bid $ POLYURETHANE COATED STEEL PIPE OPTION(ITEM B+ITEM E) " *Add(+)or Deduct(-) $ Total Amount Bid $ MORTAR COATED STEEL PIPE OPTION(ITEM C+ITEM E) f "'Add(+)or Deduct(-) $ Total Amount Bid $ DUCTILE IRON PIPE OPTION(ITEM D+ITEM E) " Add (+)or Deduct(-) $ Total Amount Bid $ "'Provision is made for Bidder to include an addition or deduction in the bid,if desired,to reflect any last-minute adjustments in price. The addition or deduction,if made,will be applied proportionately to the bid for Items A: B,C;,or D as applicable_ Addendum No. 1 FTWO1366 OCT-22-2002 16:11 FROM: TO:817 640 0030 P-001/001 OCT-22-02 TUE 1:59 Pi[ F.W. DEPT ENGINEERING FAX NO. 817 871 M4 r, t 0ct-22, !002 1:36P4 No-0371 P. 1 odolper u,zooz ADDENDUM NO.2 CITY Olt FORT'WORTH DEPARTMENT OF ENGVEERING TO THE SPE017CATIONIS AND CONTRACT DOCUMENTS FOR SOUTFISIDE III WATER MAIN EXTENSION FROM CLEBURNE CROWLEY ROAD TO THE CITY OF BURLESON AT SHANNON CREEK DOE#3416 WATER DEPT.PROJECT NUMBER:?161-060161141010 IV imsICAL WOM ttmr Pros "ve bidders are hmb no0ed of the IbUowin : ♦ �� 1� � 1P 1 Y 8 �bIIAt 1. CART A—NOTICE TO81� 10 z Z f c,.., In NOTICE TO BIDDERS(page A-1)and COMPREHENSIVE NOTICE TO BIDDERS(page A-2) The bid date"I be d4rq d fForn 1.30pnr,Thursday,October 24,2002 to 1:30pm,Thureday. October 31,2002.:, 2. PMT-E—N&TERW___A RMsQ1*UCTION SP_ECFFICATIONS: ADDITIONAL TECHNICAL SPECIFICATION,02620 Steel Pipe In Seabn 2.03 Manufactured Redacts.4.Wall Tthiokneaa,the first sentence shalt be moditd to read- "The mli tum pipe wag steel O*Mess shall be 020 Inches,Mn1h no nunus telemnee.- Failure to return a sigmed copy of the addendum with the pmposW shall be gmunds for rendering the bid non-respomive- A"signed copy of tNi addendum aWl be placid We Me propose!at the time of bid subruit:W. RECEIPT ACKNOW>LE OSD A.Douglas RademWw.PY,,..1.lkccwr ' Department of Engiacering i •t By: By S.T."V i/ ee-►r'ry u"W'! VicTFVOi s Rick Tticc, .,Marker Consw Services Addendum No. 2 FTWO136S --- -- .�. All 071 7854 9eu, P.01 SPECIFICATIONS AND CONTRACT DOCUMENTS FOR SOUTHSIDE III WATER MAIN EXTENSION FROM CLEBURNE CROWLEY ROAD TO THE CITY OF BURLESON AT SHANNON CREEK WATER DEPARTMENT PROJECT NO. P161-060161141010 DEPARTMENT OF ENGINEERING PROJECT NO. 3416 GARY JACKSON KENNETH BARR CITY MANAGER MAYOR GEORGE BEHMANESH, P.E. DALE A. FISSELER, P.E. INTERIM DIRECTOR DIRECTOR TRANSPORTATION AND WATER DEPARTMENT ` PUBLIC WORKS MARC OTT A. DOUGLAS RADEMAKER, P.E. ASST. CITY MANAGER DIRECTOR DEPARTMENT OF ENGINEERING AUGUST 2002 orm I FREESE-NICHOLS 4055 INTERNATIONAL PLAZA, SUITE 200 FORT WORTH, TEXAS 76109-4895 (817) 735-7300 F&N No. FTWO1365 TABLE OF CONTENTS 1. Part A - Notice to Bidders - Comprehensive Notice to Bidders 2. Special Instructions to Bidders 3. Minority and Women Business Enterprise Specifications 4. Part B - Proposal 5. Part C - General Conditions 6. Part D - Special Conditions 7. Part DA - Additional Special Conditions 8. Part E - Material and Construction Specifications 9. City of Fort Worth Standard Certificate of Insurance 10. Contractor Compliance With Worker's Compensation Law 11. Part F - Bonds: a. Performance Bond b. Payment Bond C. Maintenance Bond 11. Part G - Contract Appendix A - Easements Appendix B - Road Crossing Permits Appendix C - Nationwide Permit 12 Appendix D - Storm Water Pollution Prevention Plan Appendix E - Geotechnical Report PART A NOTICE TO BIDDERS PART A- NOTICE TO BIDDERS Sealed proposals for the following: FOR: SOUTHSIDE III WATER MAIN EXTENSION FROM CLEBURNE CROWLEY ROAD TO THE CITY OF BURLESON AT SHANNON CREEK WATER DEPARTMENT PROJECT NO. P161-060161141010 DEPARTMENT OF ENGINEERING PROJECT NO. 3416 Addressed to Mr. Gary Jackson, City Manager of the City of Fort Worth, Texas will be received at the Purchasing Office until 1:30 p.m., Thursday, October 24, 2002 and then publiclyopened { and read aloud at 2:00 p.m. in the Council Chambers. Plans and Specifcations for this project may be obtained at the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas. One set of plans and documents will be provided for a deposit of fifty dollars ($50.00). This deposit is refundable if the documents are returned in good condition within ten (10) days after the bids are opened. Additional sets maybe purchased on a nonrefundable basis for fifty dollars ($50.00) per set. A majority of the work consists of the following: Approximately 24, 300 LF 36"Waterline and Appurtenances 14 3 Meter stations, 2 with 16" meters and 1 with a 6" meter Included in the above will be all other items of construction as outlined in the Plans and i� Specifications. In accordance with City of Fort Worth Ordinance No. 13471 as amended by Ordinance No. 13781, the City of Fort Worth has goals for the participation of minority business enterprises and IL women business enterprises in City contracts. A copy of the ordinance can be obtained from the Office of the City Secretary. In order for a bid to be considered responsive, the AFFIDAVIT STATEMENT included within these bid documents must be completed and submitted with the bid. Failure to submit the completed AFFIDAVIT STATEMENT shall render a bid non- responsive. In addition, the fWWBE UTILIZATION FORM, M/WBE GOALS WAIVER FORM, AND GOOD FAITH EFFORT FORM, as applicable, must be submitted within five (5) City business days after the bid opening. Failure to complyshall render a bid non-responsive. For additional information concerning this project, please contact Dena Johnson, Senior Project Manager, City of Fort Worth (817) 871-7866, Thomas Haster, P.E. or Katherine Schwind, E.I.T., Freese and Nichols, Inc. at (817) 735-7300. A pre-bid meeting will be held on Tuesday, October 15 at 9:00 am in Room 255A, Department of L Engineering at the City of Fort Worth. Advertising Dates: 6k September 26, 2002 October 3, 2002 IL FTWO1365 A-1 k COMPREHENSIVE NOTICE TO BIDDERS Sealed proposals for the following: FOR: SOUTHSIDE III WATER MAIN EXTENSION FROM CLEBURNE CROWLEY ROAD TO THE CITY OF BURLESON AT SHANNON CREEK WATER DEPARTMENT PROJECT NO. P161-060161141010 DEPARTMENT OF ENGINEERING PROJECT NO. 3416 Addressed to Mr. Gary Jackson, City Manager of the City of Fort Worth, Texas will be received at the Purchasing Office until 1:30 p.m., Thursday, October 24, 2002 and then publicly opened and read aloud at 2:00 p.m. in the Council Chambers. Plans and Specifications for this project may be obtained at the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas. One set of plans and documents will be provided for a deposit of fifty dollars ($50.00). This deposit is refundable if the documents are returned in good condition within ten (10) days after the bids are opened. Additional sets may be purchased on a nonrefundable basis for fifty dollars ($50.00) per set. All bidders will be required to comply with Provision 5159a of "Vernon's Annotated Civil Statutes" of the State of Texas with respect to the payment of prevailing wage rates and City Ordinance No. 7278, as amended by City Ordinance No. 7400 (Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in employment practices. Bid security is required in accordance with Paragraph 2 of the Special Instructions to Bidders. A majority of the work consists of the following: Approximately 24, 300 LF 36" Waterline and Appurtenances 3 Meter stations, 2 with 16" meters and 1 with a 6" meter Included in the above will be all other items of construction as outlined in the Plans and Specifications. The City reserves the right to reject any and/or all bids and waive any and/or all formalities. Bidders shall not separate, detach, or remove any portion, segment, or sheets from the contract document at any time. Bidders must complete the proposal sections and submit the complete specifications book or face rejection of the bid as non-responsive. A pre-bid meeting will be held on Tuesday, October 15 at at 9:00 am in Room 255A, Department of Engineering at the City of Fort Worth. FTW 01365 A-2 AWARD OF CONTRACT: No bid may be withdrawn until the expiration of forty-nine (49) days from the date the M/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, and/or the GOOD FAITH FORM ("Documentation") as appropriate is received by the City. The award of the contract, if made, will be within forty-nine (49) days after this documentation is received, but in no case will the award be made until all the necessary investigations are made as to the responsibility of the bidder to whom it is proposed to award the contract. Bidders are responsible for obtaining all addenda to the contract documents prior to the receipt time and acknowledging them at the time of bid receipt. Information regarding the status of addenda may be obtained by contacting the Department of Engineering at (817) 871-7910. Bids that do not acknowledge all applicable addenda may be rejected as non-responsive. In accordance with City of Fort Worth Ordinance No. 13471 as amended by Ordinance No. 13781, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the ordinance can be obtained from the Office of the City Secretary. In order for a bid to be considered responsive, the AFFIDAVIT STATEMENT included within these bid documents must be completed and submitted with the bid. Failure to submit the completed AFFIDAVIT STATEMENT shall render a bid non-responsive. In addition, the M/WBE UTILIZATION FORM, M/WBE GOALS WAIVER FORM, AND GOOD FAITH EFFORT FORM, as applicable, must be received by the contracting department no later than 5:00 p.m., five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the contracting department to whom delivery was made. Such receipt shall be evidence that the Documentation was received by the City. Bidders are advised that the City of Fort Worth has not acquired all necessary easements and right-of-way for the construction of the project as shown in the Plans. Bidders are hereby notified that the City anticipates obtaining the necessary easements and right-of-way by the start of construction. In the event the necessary easements and/or right-of-way are not obtained, the City reserves the right to cancel the award of the contract at any time before the Contractor begins any construction work authorized by the City. FTWO1365 A-3 For additional information concerning this project, please contact Dena Johnson, Senior Project Manager, City of Fort Worth (817) 871-7866, Thomas Haster, P.E. or Katherine Schwind, E.I.T., Freese and Nichols, Inc. at (817) 735-7300. GARY JACKSON GLORIA PEARSON CITY MANAGER CITY SECRETARY Department of Engineering A. Douglas Rademaker, P.E. Director B Rick T ice, P.E. Manager, Consultant Services Advertising Dates: September 26, 2002 October 3, 2002 FTW01365 A-4 SPECIAL INSTRUCTIONS TO BIDDERS 1. PREQUALIFICATION REQUIREMENTS: A current financial statement, an acceptable experience record and an acceptable equipment schedule must be filed with the director of the Water Department at least one week prior to the hour for opening bids. The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate state licensing agency, and shall have been so prepared as to reflect the current financial status. This statement must be current and not more than one (1) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. Proposals submitted by the prospective bidder who has not fulfilled the above requirements shall remain unopened. Prospective bidders whose qualifications are not deemed to be appropriate to the nature and/or magnitude of the project on which bids are to be received will be notified before the date of bid opening, and any proposals submitted by them shall be returned unopened. Liquid assets in the amount of ten (10%) percent of the estimated project cost will be required. For an experience record to be considered acceptable for a given project, it must reflect the experience of the firm seeking the qualification in work of both the same nature and magnitude as that of the project for which bids are to be received, and such experience must have been on projects completed not more than five (5) years prior to the date on which bids are to be received. The Director of the Water Department shall be the sole judge as to the acceptability of experience for qualification to bid on any Fort Worth Water Department project. The prospective bidder shall schedule the equipment he has available.for the project and state that he will rent such additional equipment as may be required to complete the project on which he submits a bid. 2. BID SECURITY: A cashier's check, or an acceptable bidder's bond, payable to the City of Fort Worth, in an amount of not less than five (5%) percent of the largest possible total of the bid submitted must accompany the bid, and is subject to forfeiture in the event the successful bidder fails to execute the Contract Documents within ten (10) days after the contract has been awarded. To be an acceptable surety on the bond, (1) the name of the surety shall be included on the current U.S. Treasury list of acceptable sureties, or (2) the surety must have capital and surplus equal to ten times the limit of the bond. The surety must be licensed to do business in the State of Texas. The amount of the FTW01365 SI-1 bond shall not exceed the amount shown on the treasury list or one-tenth (1/10) the total capital and surplus. 3. BONDS: A performance bond, a payment bond, and a maintenance bond, each for one hundred (100%) percent of the contract price, will be required. Refer to Part C - General Conditions, Item C3-3.7, as well as Part D - Special Conditions. 4. WAGE RATES: Not less than the prevailing wage rates established by the City of Fort Worth, Texas, and as set forth in the Contract Documents must be paid on this project. — 5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal, the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the Proposal. 6. BIDDER LICENSE: Bidder must be a licensed Contractor in the State of Texas. 7. NONRESIDENT BIDDER: Pursuant to Article 601g, Tex. Rev. Civ. Stat., the City of Fort Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower that the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located. "Nonresident bidder" means a bidder whose principal place of business is not in this state, but excludes a contractor whose ultimate parent company or majority owner has its principal place of business in this state. "Texas resident bidder" means a bidder whose principal place of business is in this state, and includes a contractor whose ultimate parent company _ or majority owner has its principal place of business in this state. This provision does riot apply if this contract involves federal funds. The appropriate blanks in the Proposal must be filled out by all nonresident bidders in order for the bid to meet specifications. The failure of a nonresident contractor to do so will automatically disqualify that bidder. 8. PAYMENT: If the bid amount is less than $25,000.00, the contract amount shall be paid in one lump sum upon completion and acceptance by the City of Fort Worth Water Department. FTW01365 SI-2 9. AGE: In accordance with the policy ("Policy") of the Executive Branch of the Federal Government, Contractor covenants that neither it nor any of its officers, members, agents, employees, program participants or subcontractors, while engaged in performing this contract, shall, in connection with the employment, advancement or discharge of employees or in connection with the terms, conditions or privileges of their employment, discriminate against persons because of their age except on the basis of a bona fide occupational qualification, retirement plan or statutory requirements. Contractor further covenants that neither it nor its officers, members, agents, employees, subcontractors, program participants, or persons acting on their behalf, shall specify, in solicitations or advertisements for employees to work on this contract, a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification, retirement plan or statutory requirement. Contractor warrants it will fully comply with the policy and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractors against City arising out of Contractor's and/or its subcontractors' alleged failure to comply with the above-referenced Policy concerning age discrimination in the performance of this agreement. 10. DISABILITY: In accordance with the provisions of the Americans with Disabilities Act of 1990 ("ADA"), Contractor warrants that it and any and all of its subcontractors will not unlawfully discriminate on the basis of disability in the provision of services to the general public, nor in the availability, terms and/or conditions of employment for applicants for employment with, or employees of Contractor or any of its subcontractors. Contractor warrants it will fully comply with ADA's provisions and any other applicable federal, state, and local laws concerning disability and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractors against City arising out of Contractor's and/or its subcontractors' alleged failure to comply with the above referenced laws concerning disability discrimination in the performance of this agreement. 11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In accordance with City of Fort Worth Ordinance No. 11923, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. In order for a bid to be considered responsive, the AFFIDAVIT STATEMENT included with these bid documents must be completed and submitted with the bid. Failure to submit the completed AFFIDAVIT STATEMENT shall render a bid non-responsive. In addition, the bidder shall FTW01365 SI-3 submit the MBE/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM AND/OR THE GOOD FAITH EFFORT FORM (Documentation), as appropriate. The documentation must be received no later than 5:00 p.m., five (5) City business days after bid opening. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom the delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render a bid non-responsive. Upon request, Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and/or a Woman Business Enterprise (WBE) on the contract and payment therefore. Contractor further agrees to permit an audit and/or examination of any books, records, or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under the s appropriate federal, state or local laws or ordinances relating to the false statements. Further, any such misrepresentation (other than a negligent _ misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three (3) years. _ The City will consider the Contractor's performance regarding its M/WBE program in the evaluation of bids. Failure to comply with the City's M/WBE Ordinance, or to demonstrate "good faith effort", shall result in a bid being rendered non-responsive to specifications. Contractor shall provide copies of subcontracts or co-signed letters of intent with approved M/WBE subcontractors prior to issuance of the Notice to Proceed. Contractor shall also provide monthly reports on utilization of the subcontractors to the City's M/WBE office. The Contractor may count first and second tier subcontractors and/or suppliers toward meeting its goals. The Contractor may count toward its goal a portion of the total dollar amount of the contract with a joint venture equal to the _ percentage of the M/WBE participation in the joint venture for a clearly defined portion of the work to be performed. All M/WBE contractors used in meeting the goals must be certified prior to the award of the Contract. The M/WBE - contractor(s) must be certified by either the North Central Texas Regional Certification Agency (NCTRCA) or Texas Department of Transportation (TXDOT), Highway Division and must be located in the nine (9) county marketplace or currently doing business in the marketplace at the time of bid. The Contractor shall contact all such M/WBE subcontractors or suppliers prior to FTW01365 SI-4 listing them on the M/WBE utilization or good faith forms as applicable. Failure to contact the listed M/WBE subcontractor or supplier prior to bid opening may result in the rejection of bid as non-responsive. Whenever a change order affects the work of an M/WBE subcontractor or supplier, the M/WBE shall be given an opportunity to perform the work. Whenever a change order exceeds ten (10%) percent of the original contract, the M/WBE coordinator shall determine the goals applicable to the work to be performed under the change order. During the term of the contract the contractor shall: Make no unjustified changes or deletions in its M/WBE participation commitments submitted with or subsequent to the bid, and, If substantial subcontracting and/or substantial supplier opportunities arise during the term of the contract which the contractor had represented he would perform with his forces, the contractor shall notify the City before subcontracts or purchase orders are let, and shall be required to comply with modifications to goals as determined by the City, and, Submit a REQUEST FOR APPROVAL OF CHANGE FORM, if the contractor desires to change or delete any of the M/WBE subcontractors or suppliers. Justification for change may be granted for the following: Failure of Subcontractor to provide evidence of coverage by Worker's Compensation Insurance. Failure of Subcontractor to provide required general liability of other insurance. Failure of Subcontractor to execute a standard subcontract form in the amount of the proposed used by the Contractor in preparing his M/WBE Participation plan. Default by the M/WBE subcontractor or supplier in the performance of the subcontractor. Within ten (10) days after final payment from the City, the Contractor shall provide the M/WBE Office with documentation to reflect participation of each subcontractor and supplier used on the project, inclusive of M/WBEs. FTW01365 SI-5 ATTACHMENT 1A Page 1 of 2 City of Fort Worth ,; _,; ` Minority and Women business Enterprise Sped afihp� MBE/WBE UTILIZATION *32 NOU 5 PM 3 16 S.J. Louis Construction of Texas LTD. LLP October 31,2002 PRIME COMPANY NAME BID DATE Southside III Water Main Extension From Cleburne Crowley PROJECT NUMBER Rd.To The City of Burleson at Shannon Creek P161-060161141010/3416 PROJECT NAME PROJECT NUMBER CITY'S mmBE PROJECT GOAL: 21% Fm/"E PERCENTAGE ACHIEVED: 21.91% Failure to complete this form, in its entirety with supporting documentation, and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non-responsive to bid specifications. The undersigned bidder agrees to enter into a formal agreement with the MBE and/or WBE firms for work listed in this schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non-responsive to specifications. Company Name,Contact Name, Certified Specify All Contracting Specify All Items to be Dollar Amount Address,and Telephone No. Scope of Work(*) Supplied(*) � oc Qt o m N� Z AFS Environmental, Inc. Marcus L. Long 1736 Rhome St. X X Erosion Control Silt Fencing 1st $25,200.00 Dallas,Texas 75229 Hay Bails 972-402-9710 Guzman Construction,Inc. Butterfly Valve Vaults Thomas C.Villarreal Blow-off Valve Vaults 8356 Lake Anna Dr. X Concrete Structures Air Rel.Valve Vaults 1st $213,110.00 Dallas,Texas 75217 Meter Vaults 214-309-3955 Head Walls Sunset Transportation,Inc. Peggy Alexander P.O. Box 185058_ X Concrete Pipe Cement 2nd $ 13,394.00 Fort Worth,Texas 76181 Sand 817-589-1475 M/WBEs must be located in the 9(nine)county marketplace or currently doing business in the marketplace at the time of bid. (*) Specify all areas in which MWBE's are to be utilized and/or items to be supplied: (*) A complete listing of Items to be supplied Is required In order to receive credit toward the M/WBE goal. ('*)Identify each Tier level. Tier:Means the level of subcontracting below the prime contractor/consultant,Le.,a direct payment from the prime contractor to a subcontractor is considered 14 tier,a payment by a subcontractor to Its supplier is considered 2nd tier. THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m.,FIVE(5)CITY BUSINESS DAYS AFTER BID OPENING, EXCLUSIVE OF THE BID OPENING DATE Rev.6/2/98 Pages 1 and 2 of Attachment 1A must be received by the Managing Department ATTACHMENT 1A Page 2 of 2 C ity of Fort 11Nic thi�j p/is, Minority and Women business Enterprise Specifications MBE/WBE UT1rZA*Idh 3 16 Company Name,Contact Name, Certified Specify All Contracting Specify All Items to be Dollar Amount Address,and Telephone No. a Scope of Work(') Supplied(*) 0 P _ ~_ Ricochet Fuel Dist. Patti Trainer 1101-A Bedford Rd. X X Fuel Supplier Fuel 1st $20,000.00 Bedford,Texas 76022 Oil 817-268-5910 J M Materials, Inc. Judy Brown P.O. Box 496 X X Embedment Material Rock 1st $ 108,000.00 Alvord,Texas 76225 800-856-8733 Choctaw Pipe&Equip., Inc. Butterfly Valves Lori Johnson Air Release Valves 14215 Championship Lane X X Misc. Materials Blow-off Valves 1st $228,508.52 Houston,Texas 77069 Gate Valves 281-583-9003 D I Pipe&Fittings The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including MBE(s) and/or WBE(s) arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the MBE(s) and/or WBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three(3)years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one(1)year. �A--IA.A4 M Es and WBEs MUST BE CERTIFIED BY THE CITY BEFORE CONTRACT AWARD D. V ID A. bl CR.s a.1 Authorized Signature Printed Signature Sr. Prosect Manager,Secretary/Treasurer CK&M McbjToY/r - P"Tee- ' coog.ulWATatt Title Contact Name and Title(if different) S.J. Louis Construction,of Texas Ltd. LLP 817-477-0320 Company Name Telephone Number(s) 520 South 6th.Ave. 817-477-0552 Address Fax Number Mansfield,Texas 76063 11 141 ol- City/State/Zip Code Date THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m.,FIVE(5)CITY BUSINESS DAYS AFTER BID OPENING,EXCLUSIVE OF THE BID OPENING DATE Rev.6/2/98 Pages 1 and 2 of Attachment 1A must be received by the Managing Department PART B - PROPOSAL (This Proposal must not be removed from this book of Contract Documents) TO: Mr. Gary Jackson City Manager City of Fort Worth, Texas FOR: SOUTHSIDE III WATER MAIN EXTENSION FROM CLEBURNE CROWLEY ROAD TO THE CITY OF BURLESON AT SHANNON CREEK WATER DEPARTMENT PROJECT NO. P161-060161141010 DEPARTMENT OF ENGINEERING PROJECT NO. 3416 Includes the furnishing of all materials (except as specified to be furnished by the City), equipment and labor for the installation of all improvements and appurtenant work shown in the plans and specification, all necessary appurtenances and incidental work to provide a complete and serviceable project. Pursuant to the foregoing "Notice to Bidders", the undersigned bidder, having thoroughly examined the contract documents, including plans, special contract documents, and the General Contract Documents and General Specifications for Water Department Projects, the site of the project and understanding the amount of work to be done, and the prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment and material except as specified to be furnished by the City, which is necessary to fully complete the inspection and approval of the Director of the City Water Department of the City of Fort Worth, Texas; and binds himself upon acceptance of this proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, and Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums: (Furnish and install, including all appurtenant work, complete in place, the following items): FTW01365 B-1 FieCelVea: lu/7o/u1' 0:uwrmg -� a .� w�la t_wm�I ; rajje � Oct-18. 2002 4:48PM No•0359 P- 4/1 36 -INCH SOUTHSIDE III WATER MAIN CLEBURNE CROWLEY ROAD TO THE CITY OF BURLESON AT SHANNON CREEK +� The bidder shall submit bids for Bid Item A and/or Bid Item B and/or Bid Item C and/or Bid Item D. Bid Item E includes items common to all alternates_ The Bidder shall submit bids for Bid Item E. s BID PAY APPROX. DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID A. AWWA C303 Bar Wrapped Concrete Cylinder Pipe a.. 24,270LF 36-inch (pressure class 150) pipe 5E1ftrurry Dollars and $ 10,E $ 111014,9001-- -Cents b1$ 900Cents per LF b.. 1 LS 36-inch polyurethane coated concrete pressure pipe fittings and specials .e Dog 42!M �� S�xry'11+coswh Dollars and $ I��°0p $ 160,�•+ 00 Cents per LS C. 1 LS Cathodic Protection System `TwewE -D4wsANb Dollars and $ 12 ppp, $ 17_,wo,o0 00 Cents per LS t Subtotal A $ 1100c,900,60 B. AWWA C200 Polyurethane Coated Steel Pipe a_ 24,270 LF 36-inch pipe (pressure class 150) --rr Dollars and $ ro $ Al, $.0 tVo sib Cents per LF b. 1 LS 36-inch steel pipe fittings and specials Dollars and Alb at6 Cents per LS $ go $ I C 1 LS Cathodic Protection System j Dollars and o Caro 0 $ /v0 3r0 Cents per LS $ Ago C3� Subtotal B $ /✓o Q�4 C. AWWA C206 Mortar Coated Steel Pipe i a.. 24,270 LF 36-inch pipe (pressure class 150) / I Dollars and $ /yo �i0 $ Alb Sth Cents per LF I i Addendum No. 1 c FTWO1366 Oct -4. 2G0-I 4:48PM Nd.0359 . P. 6/1 36 -INCH SOUTHSIDE III WATER MAIN CLEBURNE CROWLEY ROAD TO THE CITY OF BURLESON AT SHANNON CREEK The bidder shall submit bids for Bid Item A and/or Bid Item B and/or Bid Item C and/or Bid Item D. Bid Item E includes items common to all alternates. The Bidder shall submit bids for Bid Item E. BID PAY APPROX. DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID 4. 7 EA 3-Inch Combination Air and Vacuum Valve and Vault Se ZA1141 onb709 la+.+o9°Dollars and $ �,ZoO. $No Cents per EA 5., 9 EA 8-Inch Diameter Blow-off Valve and Vault Foe 7%oamob Six goaeaEs Dollars and $ 5;&M.�' $ S'b 4 oo.!! Ivo Cents per EA 6.. 24,000 LF Trench Safety System No Dollars and $ 0. t-, $ Z40.'! 046 .- 046 . Cents per LF 7. 1 LS ;'`City of Burleson and Bethesda Water Supply Corporation Meter Stations, complete as shown on plans including site work, concrete driveway, crushed stone, culvert piping, fencing and gates, 16' meters, piping from Sta 242+09 to end and all piping associated with both o0 00 $ meter stations, fittings, valves, fire $ 3o OW. �• hydrant, vault, electrical& instrumentation, and all associated appurtenances for meter station to be installed completed in working condition. TkW ROIJba.Eo Six 'MoJSAPb Dollars and No Cents-per LS Aluminum Farm Gate 8. 10 EA ONs -Novsa,N� Dollars and $ I,00c>•°O $ l 0000,°= o Cents per EA 9. 24,000 LF Post Construction Hydro-Mulch/Seeding Ob oN,z Dollars and $ 1.if $ 300000.— Tweou FWa Cents per LF 10,. 1 LS Erosion and Sediment Control During Construction, including implementation 00 and maintenance of SWPPP $ ZS000.'- $ ZS000.- TwE►rry Ewe TkovsaND Dollars and r16 Cents per LS 11. 100 CY Crushed Limestone for Construction Access and Additional Trench Backfilloo ao Dollars and $ 15- $ 1,Soo,- ^�t o Cents per CY "Contractor will be required to provide schedule of values for this bid item once contract is awarded. Addendum No. 1 FTWO1366 -> .S' J LUU.L� Received: 10/18/02 5:09PM; —a- Oct.18, 2002 '4:48PM No•0359 P. 7/7 36-INCH SOUTHSIDE III{NATER MAIN CLEBURNE CROWLEY ROf D TO THE CITY OF BURLESON AT SHANNON CREEK The bidder shall submit bids for Bid Item A and/or Bid Item B and/or Bid Item C and/or Bid Item D. Bid Item E includes items common to all alternates. The Bidder shall submit bids for Bid Item E BID PAY APPROX. DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID 100 CY Additional Lean Concrete Backfill (Not 12. Shown on Plans) SIXU Rog Dollars and $ `< _ $ G,500• No Cents per CY 13. 200 LF Concrete Encasement For 36-Inch «, Waterline Not Shown on Plans) TA&U Dollars and 30. $ G�Doo. tag" Cents per LF 14.. 500 SF 6-inch Temporary HMAC pavement (Not ,o Shown on Plans) $ 1. M $ Z app, _ 50-J Dollars and +40 Cents per SF Subtotal E $ 910,yop, Within ten (10) days after acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required bythe Contract Documents, for the faithful performance of the Contract. The attached bid security in the amount of five (5%) percent is to become the propertyof the City of Fort Worth, Texas, in the event the contract or bonds are not e)ecuted and delivered within the time above set forth, as liquidated damages for delay and additional work caused thereby. The undersigned bidder certifies that he has been furnished at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and these specific Contract Documents and appurtenant plans. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited bythe terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin work on the Contract and to complete all work within /73 calendar days. 36-inch water main, City of Burleson meter station and Bethesda Water Supply Corporation meter station shall be complete and in service by May 2003. (Complete A or B below, as applicable:) [ ] A. The principal place of business of our company is in the State of [ ] Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. [ ] Nonresident bidders in the State of , our principal place of business, are not required to underbid resident bidders. [X] B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. Receipt is acknowledged off the following addenda: Addendum No. 1 ✓ Addendum No. 2 cin Addendum No. 3 Respectfully submitted, tV;4 f' � (SEAL) By: If Bidder is Corporation Title: CkmmAL AaA/A6 e6kh, Address:.5=2n 3. U`0 Y1l�a y►s l IX J AP-3 FTW01365 B-5 PROPOSAL LIST OF DUCTILE IRON FITTINGS FOR WATER LINE No. of Fittings Size of Fitting Type of Fitting Weight Per Total Weight Fitting (lbs.) (lbs.) 10 36-inch 22.50 Bend 1 36-inch 451 Bend 10 36-inch 90° Bend 1 36-inch x 12-inch Tee Total weight= lbs. ( Tons) LIST OF CONCRETE CYLINDER FITTINGS FOR WATER LINE No. of Fittings Size of Fitting Type of Fitting Price 10 36-inch 22.50 Bend f 060 . 00 1 36-inch 450 Bend '( 470. to. 10 36-inch 900 Bend 21496. �I - 1 36-inch x 12-inch ��0, asterar rift u� FT WO1365 B-6 PROPOSAL LIST OF POLYURETHANE COATED STEEL FITTINGS FOR WATER LINE No.of Fittings Size of Fitting Type of Fitting Price 10 36-inch 220 Bend 1 36-inch 450 Bend 10 36-inch 900 Bend 1 36-inch x 12-inch Tee LIST OF MORTAR COATED FITTINGS FOR WATER LINE No. of Fittings Size of Fitting Type of Fitting Price 10 36-inch 220 Bend 1 36-inch 450 Bend 10 36-inch 900 Bend 1 36-inch x 12-inch Tee FT V01365 B-7 PROPOSAL MATERIAL SUPPLIER INFORMATION FORM CONCRETE CYLINDER PIPE The concrete pipe and valve supplier information form bound with this project manual shall be provided by the Contractor at the time that bids were submitted. B TOT NaNsdu Pf;P� A#-&P Fr"r)%AcTf (NC Name of Manufacturer Type of Pipe 1003 NopTt4 r-*AP--(,•-UIL 6(-WD . G,fv.,.,n rM1o4E •k �5o5a Home Office Address of Manufacturer (,JzP&JP V�p Ir-1 6 1 11C. Location of plant in which pipe and fittings are to be manufactured DUCTILE IRON PIPE The ductile iron pipe and valve supplier information form bound with this project manual shall be provided by the Contractor at the time that bids were submitted. R0 RID Name of Manufacturer Type of Pipe Home Office Address of Manufacturer Location of plant in which pipe and fittings are to be manufactured STEEL PIPE The steel pipe supplier information form bound with this project manual shall be provided by the Contractor at the time that bids were submitted. No F31P Name of Manufacturer Type of Pipe Home Office Address of Manufacturer Location of plant in which pipe and fittings are to be manufactured FTWO1365 B-8 PART C GENERAL CONDITIONS PART C ` GENERAL CONDITIONS L 1 i t i r M i PART C - GENERAL -CONDITIONS . TABLE OF CONTENTS' NOVIEEBER, 1, 1987 TABLE 0. CONTENTS Cl-1 DEFINITIONS C1-1.1 De=inition of Terms Cl-1 (1) C1-1.2 Contract Documents Cl-1 (1) C1-1.3 Notice to Bidders Cl-1 ( 2) C1-1.4 Procos_l C1-1 (2) C1-1.5 Bidder C1-1 (2) C1-1. 6 General Conditions Cl-1 (2) C1-1.7 Social Conditions. C1-•1. (2) C1-1. 8 Specifications C1-1 (2) C1-1. 9 Bond C1-1 (2) C1-1.10 Contract C1-1 (3 ) C1-1.11 Plans C1-1 (3 ) C1-1. 12 City Ci-1 (3) C1-1.13 City Council C1-1 (3 ) C1-1.14 Mayor C1-1 (3 ) C1-1.15 City Manager C1-1 (3) C1-1.16 City Attorney C1-1 (3 ) C1-1.17 Director of Public Works Cl-1 (4 ) C1-1.18 Diractor, City Water Department C1-1 (4 ) C1-1.19 Engineer C1-1 (4) C1-1. 20 Contractor C1-1 (4) C1-1. 21 Sureties C1-1 (4) C1-1. 22 The Work or Project C1-1 (4) C1-1.23 Working Day C1-1 (4 ) C1-1. 24 Calendar Day C1-1 (4) C1-1. 25 Legal Holiday C1-1 (4) C1-1.26 Abbreviations C1-1 (5) C1-1. 27 Change Order C1-1 (6 ) C1-1.28 Paved Streets and Alleys C1-1 (6 ) C1-1.29 ' Unpaved Streets and Alleys . C1-1 (6 ) C1-1.30 City Streets C1-1 (6) C1-1.31 Roadway C1-1 (6) C1-1.32 Gravel Street C1-1 (6 ) C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL. C2-2.1 Proposal Form C2-2 (1) C2-2.2 Interpretation of Quantities C2_2 (1) C2-2.3 Examination of Contract Documents and Site C2-2' (2) C2-2. 4 Submitting of Proposal C2-2 (3) C2-2.5 Rejection of Proposals C2-2 (3 ) C2-2. 6 Bid Security C2-2. (3) ° (1) C2-2.7 Delivery or Proposal CZ-2 c , ) C2-2. 8 Withdrawing Proposals C2-2 (4 ) '^ C2-2. 9 Telegraphic Modification of Proposals C2-2 (4 ) C2-2.10 Public Opening of Proposal' C2-2 (4 ) C2-2 .11 Irregular Proposals C2-2 ( 4 ) C2-2.12 Disqualification of Bidders C2-2 (5 ) C3-3 AWARD AND EXECUTION OF DOCUMENTS C3-3 .1 Consideration of Proposals C3-3 (1) C3-3 . 2 Minority Business Enterpise Women-Owned Business Enter-arise compliance C3-3 (1) C3-3 . 3 Equal Employment Provisions C3-3 (1) C3-3 . 4 Withdrawal of Proposals C3-3 (2) C3-3 .5 Award of Contract C3-3 (2) C3-3 . 6 Return of Proposal Securities C3-3 (2) C3-3 .7 Bonds C3-3 (2) C3-3 . 8 Execution or Contract C3-3 (4 ) C3-3 . 9 Failure to Execute Contract C3-3 ( 4) C3-3 .10 Beginning Work C3-3 (4 ) C3-3 .11 Insurance C3-3 ( 4) C3-3 .12 Contractor' s Obligations C3-3 (7) C3-3 .13 Weekly Payroll C3-3 (7) C3-3 .14 Contractor's ,Contract Administration C3-3 (7) C3-3 .15 Venue C3-3 ( 8 ) C4-4 SCOPE OF WORK C4-4 .1 Intent of Contract Documents C4-4 (1) C4-4. 2 Spacial Provisions C4-4 (1) C4-4 .3 Increased or Decreased Quantities C4-4 (1) C4-4 .4 P1 t=ration of Contract Documents C4-4 (2) C4-4 .5 Extra Work C4-4 (2) C4-4 . 6 Schedule of Operations C4-4 (3 ) C4-4 .7 Progress Schedules for Water and Sewer Plant Facilities C4-4 ( 4) CS-5 CONTROL OF WORK AND MATERIALS C5-5 .1 Authority of Engineer C5-5 (1) CS-5.2 Conformity with Plans Cz-5 (1) CS-5. 3 Coordination of Contract Documents CS-5 (2) C5.-5. 4 Cooperation of Contractor C5-5 (2) CS-5.5 Emergency and/or Rectification Work C5-5 (3 ) CS-5. 6 Field Office CS-3 (3 ) C5-5 .7 Construction Stakes CS-5 (3 ) CS-5. 8 Authority and Duties of Inspectors , CS-5 (4 ) C5-5.9 Insoection C5-5 (5 ) CS-5.10 Removal of Defective and Unauthorized Work CS-5 (5 ) CS-5 .11 Substitute Materials or Equipment CS-5 (5 ) CS-5.12 Samples and Tests of Materials C3-5 ( 6) CS-5 .13 Storage of Materials C3-5 ( 6 ) C5-5 . 14 Existing Structures and Utilities C5-3 (7) CS-5 . 15 Interruption of ;Service • C5-5 (7 ) CS-5. 16 Mutual Responsibility 'of Contractors C5-5 (8 ) =% CS-5 . 17 Cleanup C5-5 ( 8 ) C5-5 . 13 Final Inspection C3-5 (9) (2) C5-6 T•?^=.L RELATIONS AND Pff3LIC RESPONSIBILITY.C6=6.1 Laws to be Observed _ a C6-6 (1) Co-o' .2 Permits and Licenses C6-6 (1) C6-6 .3 P=_t=rated Devices, Mat=rials and Processes C6-6 (1) C6-6 . 4 sani=a=y Provisions C6-5 (2) C6-6 . 5 Public Safety and Convenience C6-6 (2) C6-6 . 0' ?riJileges of Contractor in Streets, Alleys , and Right-of-Way a C06-6 (3) C6-6.7 Railway Crossings C0'-6 (4) C6-6. 8 Barricades, Warnings and Watchmen C6-6 (4) C6-6. 9 Use of Mxplcsives, Drop Weight, etc. C6-6 (5) Co-6.10 . Work Within Easements C0'-6 ( 6) C6-6.11 Independent Contractor Co'-6 (8) C5-6.12 Contractor ' s Responsibility for Damage Claims C60-6 (8) C6-6 .13 Contractor' s Claim for Damages C5-6- (10) Co'-6.14 Adjustuaat of Relocation of Public Utilities, etc. C5-6 (10) Co'-66 .15 Temporary Sewer Drain Connections Co-6 (10 ) Co'-6 .16 Arrangement and Charges of Water Furnished by City C6-6 (11) C6-6.17 Use of a Section of Portion of the Work C6-6 (11) C6-6 .18 Contractor' s Responsibility for Work C6-6 (11) C6-6 .19 No Waiver of Legal Rights C6'-6 (12) C6-6 .20 Personal Liability of Public Officials C6-6 (12) C6-6.21 State Sales Tax CO2-6 (12) C7-7 PROSECUTION AND PROGRESS C7-7.1 Subletting C7-7 (1) C7-7. 2 Assignment of Contract C7-7 (1) C7-7.3 Prosecution of the Work C7-7 (1) C7-7. 4 Limitations of Operations C7-7 (2) C7-7 .5 Character of Workman and Equipment C7-7 (2) C7-7. 6 Work Schedule C7-7 (3 ) C7-7.7 Time of Commencement and Completion C7-7 (4) C7-7. 8 Extension of time of Completion C7-7• (4 ) C7-7.9 Delays C7-7 (4) C7-7.10 Time of Completion C7-7 (5) C7-7.11 Suspension by Court Order C7-7 (6 ) C7-7.12 Temporary Suspension C7-7 (6 ) C7-7.13 Termination of Contract due to National Emergency C7-7 (7) C7-7 .14 Suspension of Abandonment of the Work and Annulment of Contract C7-7 (7) C7-7.15 Fulfillment of Contract C7-7 (9 ) C7-7.16 Termination for Convenience of the Onwer C7-7 (10) C7-7.17 Sa=ety Methods and Practices C7-7 (13 ) CS-8 MEAS UREM=NT AND PAY)-ENT C8-8 .1 Measurement of Quantities _ CS-8 (1) C8-8 . 2 Unit Prices CS-8 (1) 'D (3 ) C8-8 .3' Lump Sum • __ _ C8-8 . 4, Scope of Payment C3-8 (1) ; ,. C8-8 .5 Partial estimates and Petainage CS-8 (2) CS-8 . 6 Withholding Payment C8-8 (3 ) C8-8.7 Final Acceptance _ CS-8 (3 ) C8-8 . 8 Final Payment ' CS-8 (3) CS-8 .9 Adcuacy of Design C3-8 (4) C9-8 .10 General Guaranty C8-8 (4) CS-8 .11 Subsidiary Work C3-8 (5) C8-8 .12 Miscellaneous Placement of Material C3-8 (5) CS-8 .13 Record Documents C8-8 (5 ) ' (4) t �. =^• PART C - GENERAL CONDITIONS Cl-1 DEFINITIONS SECTION C1-1 DEFINITIONS C1-1 . 1 DEFINITIONS OF TERMS : Whenever in these Contract Documents the following terms or. pronouns in place of them are used , the intent and meaning shall be understood and interpreted as follows : C1-1. 2 CONTRACT DOCUMENTS: The Contract Documents are all of the written and drawn documents , such as specifications , tc . , which govern the terms and bonds , addenda , plans , e performance of the contract . These are contained in the General Contract Documents and the Special Contract Documents. a. GENERAL CONTRACT DOCUMENTS :' The General Contract Documents govern all Water Department Projects and include the following items: PART A - NOTICE TO BIDDERS (Sample) whit= .. PART B - PROPOSAL (Sample) White PART C - GENERAL CONDITIONS (CITY) Canary Yellow Y: (Developer) Brown PART D - SPECIAL CONDITIONS Green .:t PART E - SPECIFICATIONS El-White E2-Golden Rod E2A-White PERMITS/EASEMENTS Blue PART F - BONDS (Sammle) White • PART G - CONTRACT (Sammle) White . b. SPECIAL CONTRACT DOCUMENTS : The Special Contract Documents are prepared for each specific project as a sunolement to the General Contract Documents and includs the following items: PART A - NOTICE TO BIDDERS (Advertisement) Same as above PART B - PROPOSAL (Bid) PART C - GENERAL CONDITIONS PART D - SPECIAL CONDITIONS PART E - SPECIFIC.&TIONS PERMITS/EASEMENTS - PART F - BONDS PART G - CONTRACT PART H -' PLANS (Usually bound separately) C1-1 (1) C1-1 . 3 NOTICE TO BIDDERS : All of the legal publications either actually published, in public advertising mediums or furnished direct to interested parties pertaining to the work contemolat_d under the Contract Documents const itutas the notice to blda_rs. C1-1 . 4 PROPOSAL: The completed written and signed offer or tender of' a bidder to perform the work which the Owner desires to have done, together with the bid security, constitutes the Proposal, which becomes binding upon the Bidder when it is officially received by the Owner, bas been publicly opanad and read and not rejected by the Owner. i C1-1 , S 3IDDER : Any. parson, persons , firm , oartner3liip , company, _:sociation, torpor=_tion, acting directly or through a duly authorized representative, submitting a proposal for performing the work contemplated under the Contract Documants , constitutes a bidder. C1-1 . 6 GENERAL CONDITIONS : Th= General Conditions are the usual construction and contract requirements which govern the performance of the work so that it will be carried on in accordance with the customary procedure , the local statutes , and requirements of the City of Fort Worth ' s charter and promulgated ordinances . Wherever there may be a conflict between the General Conditions and Special Conditions , the letter shall take precedence and shall. govern. CI-1 . 7 SPECIAL CONDITIONS : Special conditions are the specific reauiraments which are necessary for the particular project covered by the Contract Documents and not specifically covered in the General Conditions . When considered with the General Conditions and other elements of the Contract Documents they provide the information which the Contractor and Owner should have in order to gain a thorough knowledge of the project. C1-1 . 8 SP3:CIFICATIONS : The Specifications is that section or part of the Contract Documents which sets forth in detail the requirements which must be met by all materials , construction, workmanship, equipment and services in order to render a completed and useful project. Whenever reference is made to standard specifications, regulations, requirements , statutes , etc . , such r=ferred- to documents shall become a part of the Contract Documents just as though they were embodied therein. C1-1 . 9 BOND: The bond or bonds are the written guarantee or security furnished by the Contractor for the prompt and C1-1 (2) faithful performance of the contract and include the X ollowing: a. ?erformance Bond (see paragraph C3-3 .7 ) b. ?aym=nt Bond (see paragraph C3-3 .7 ) c. Mzintenance Bond (see paragraph C3-3 .7 ) d. ?roposal or Bid Security (se_ Special Instructions to Bidders , ?art A and C2-2. 6) C1-1 . 10 CONTRACT: The Contract is the formal signed agreement between the Owner and the Contractor covering the mutual understanding of the two contracting parties about the project ' i to be completed under the Contract Documents . I CI-1 . 11 PL NS : The plans are the drawings or reprodu_tions therefrom mads by the Owner' s representative showing in d=tail the location , dimension and position of the various elements of the project , including such* profiles , typic =al cross-sections, layout diagrams, working drawings, preliminary drawings and such supplemental drawings as the Owner may issue to clarify other drawings or for the purpose of showing changes in the work hereinafter authorized by the Owner . The plans are usually bound separately from other parts of the Contract Documents , but they are a part of the Contract Documents just as though they were bound therein. ~ C1-1 . 12 CITY: The City of Fort Worth , Texas , a municipal s corporation, authorized° and chartered under the Texas State Statutes , acting by and through its governing body or its City Manger, each of which is required by charter to perform specific duties . Responsibility for final enforcement or Contracts involving the City of Fort Worth is by Charter vested in the City Manager. The terms City and Owner are synonymous. C1-1 . 13 CITY COUNCIL : The duly elected and qualified governing body of the City of Fort Worth, Texas. C1-1 . 14 MAYOR: The officially elected Mayor, or in his absence, the Mayor Pro tem of the City of Fort Worth, Texas. C1-1.15 CITY MANAGER: The officially appointed and authorized City Manager of the City of Fort 'north , Texas , or his duly authorized representative. C1-1. 16 CITY ATTORNEY: The officially appointed City Attorney of the City of Fort Worth, Texas , or his duly authorized representative. Cl-1 (3 ) '��`• C1-1 . 17 DIRECTOR OF PUBLIC. WORKS: The duly appointed official or the City of Fort Worth , referred to in the Charter as the City Engineer, or his • duly authorized representative. C1-1 . 18 DIRECTOR , CITY WATER DEPARTMENT: The duly appointed Director of the City Water Department of the City of Fort Worth , Texas , or his duly authorized representative , assistant, or agents. C1-1 . 19 ENGINEER: The Director of Public Works, the Director o= the Fort Worth City Water Department , or their duly authorized assistants , agents , engineers., inspectors , or superintendents, acting within the scope of the particular duties entrusted to them. , Cl -1 . 20 CONTRACTOR: The person , persons , partnership , company, firm, association , or corporation , entering into a contract with the Owner for the execution of the work, acting directly or through a duly ,authorized representative . A sub-contractor is a person, firm, corporation, or others under contract with the principal contractor, supplying labor and materials or only labor, for work at the site of the project. CI-1 . 21 SURETIES : The Corporate bodies which are bound by such bonds are recuired with and for the Contractor . The sureties engaged are to be fully responsible for the entire '`�K_ and satisfactory fulfillment of the Contract and for any and all requirements as set forth in the Contract Documents and approved changes therein. C1-1 . 22 TEE WORK OR PROJECT: The completed work cont_mm aced in and covered by the Contract Documents , including but not limited to the furnishing of all labor , materials , tools , equipment, and incidentals necessary to produce a completed and serviceable project. C1-1 . 23 WORKING DAY: A ' working day is defined as a calendar day, not including Saturdays, Sundays , and legal holidays , in which the w=eather or other conditions not under the control of the Contractor .permit the performance of the principal unit of work for a period of not less than seven (7 ) hours between 7 : 00 a.m. and 6 : 00 p .m. , with exceptions as permitted in paragraph C7-7.6. Cl-1. 24 CALENDAR DAYS : *. A calendar day is any day of the week or month, no days being excepted. CI-1 . 25 LEGAL HOLIDAYS : Legal holidays shall be observed as prescribed by the City Council of the City of Fort- Worth for observance by City employees as follows: Cl-1 (4) 1. New Year' s Day January 1 2. M. L. -Xing,* Jr. Birthday Third Monday in January 3. Memorial Day Last Monday in Kay 4. Independence Day July 4 5. Labor Day First Monday in September 6. Thanksgiving Day Fourth Thursday in November 7. Thanksgiving Friday Fourth Friday in November 8 . Christmas Day December 25 y . 9 . Such other days in lieu of 'holidays as the City Council may determing When on_ of 'he -above named holidays or a special holiday is declared by the City Council, falls on Saturday, the holiday shall .be observed on the preceding .Friday or if it falls on . Sunday, it- shall be observed on the following Monday, by those employees worsting on working day operations . Employees working calendar day operations will consider the calendar _ '. holiday as the holiday. C1-1. 26 ABBREVIATIONS : Wherever the abbreviations defined herein appe?r in Contract Documents , the intent and meaning shall be as follows: ! AkSHTO - American Association of MGD - Million Gallons Per State aighway Transco_tytion Day `4 cials ASCE - American Society of Civil CFS - Cubic* Foot per Engineers Second LAW - In Accordance With -ASTM - American Society of Min. - Minimum , = Tasting Materials Mono.- Monolithic AWWA - American Water Works 3 - Parcentum. Association R - Radius ASA - American Standards Association I.D. - inside Diameter HI - Hydraulic Institute O . D . - Outside j Diameter 1 Asph. - Asphalt Elev.- Elevation � Ave_ - Avenue Fahrenheit Blvd. - Boulevard C - Centigrade CI - Cast iron In. - Inch CL - Center Line Ft. - Foot GI - Galvanized Iron St. - Street ` Lin. - Linear or Lineal CY - Cubic Yard lb. - Pound Yd. - Yard MH - Manhole SY - Square Yard Max. - Maximum L. F.- Linear Foot D. I. - Ductile Iron Cl-1 (5) �~ Cl- 1 . 27 CHANGE ORDER : A " Change Order " is a written supplemental agreement between the Owner and the Contractor covering some added or deducted item or feature which may be found necessary and which was not specifically included in the scop_ of the project on which bids were submitted. increase in unit cua_nticies stated in the proposal are not the subject- matter ubjectmatter of a Change. Order unless the increase or decrease is more than 25% of the amount of the particular item or items in the originil propcsal. All " Change Orders " shall be prepared by the City from information as necessary furnished by the Contractor. C1-1 . 28 PAVED STREETS AND ALLEYS : A paved street or alley shall be defined as a street or all=y having one of the following types of wearing surfaces applied over the natural unimproved surface: 1. Any type of asphaltic concrete with or without samarate base material. 2. Any type of asphalt surface treatment , not including an oiled surface , with or without semarate base material. 3 . Brick, with or without sv_arate base material. 4 . Concrete, with or without s=_=rate base material. 5 . any combination of the above. C1-1 . 29 UNPAVED STREETS OR ALLEYS: An unpaved street, all=y, roadway or other surface is any area except those defined above for "Paved Streets and Alleys. " C1-1 . 30 CITY STREETS : A city street is defined as that area between the right--of-way lines as the street .is dedicated. C1-1 . 31 ROADWAY: The roadway is defined as the area between parallel lines two ( 2 ' ) feet back of the curb lines or four ( 4 ' ) f eet back of the average edge of pavement where no curb ' exists . Cl-1 . 32 GRAVEL STREET : A gravel street is any unpaved street to which has been added one or more applications of gravel or similar material other than the natural material found on the street surface before any improvement was made. C1-1 (6 ) SECTION C - GENERAL CONDITIONS C2-2 INTERPRETATION AM PREPARATION OF PROPOSAL SECTION C2-2 I?vTERPRETATION AND PREPARATION OF PROPOSP-7. C2-2.1 PROPOSAL FORM: The Owner will furnish bidders with proposal form, which will contain an itemized list of the items of work to be done or materials to be furnished and upon which bid prices are requested. The Proposal form will state the Bidder ' s general understanding of the project to be complytad, provide a space for furnishing the amount of bid security, and stats the basis for entering into a` formal contract. Te Owner will' furnish forms for the Bidder ' s "Experience Record, " "Equipment Schedule , " and "Financial Statement?" all of Which must be properly executed and filed with the ,Director of the City water Department one week prior to the hour for opening of bids. The financial statement required shall have been mr=pared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appromriate state licensing agency, and shall have been so prepared as to reflect the current financial status . This : «• statement ,must be current and not more than one ( 1) year old. In the case that a bidding date falls within the time a' *new statement is being prepared, the previous statement shall be updated by proper verification. Liquid assets in the amount of tan (10%) percent of the estimated project cost will be y required. For an .experience record to be considered to be acceptable for a given project , it must reflect the experience of the firm seeking qualification in work of both the same nature and magnitude as that of the project for which bids are to be received, and such experience must have been on projects complated not more than five (5 ) years prior to the date on which are to be received . The Director of the Water department shall be -sole judge as to the acceptability of .. experience for ual.ification to bid on any Fort north Water Department project. The prospective bidder shall schedule the equipment he has available for the project and state that he will rent such additional equipment as may be required to complete the project on which he submits a bid. C2-2 . 2 INTERPRETATION OF QUANTITIES: The quantities of work and materials to bs furnished as may be listed in 'the proposal C2-2(1) forms or other parts of the Contract Documents will be considered as approximate only and will be used for the purpose of comparing bids on a uniform basis. Payment will be rMae to the Contractor for only the actual quantities of work oerformed or materials furnished in strict accordance with the Contract Documents and Plans . The quantities of work to be oerformed and materials to be furnished may be increased or decreased as hereinafter provided, without , in any way invalidating the unit prices bid or any other requirements of the Contract Documents . C2-2 . 3 EXAMINATION Or CONTRkCT DOCUMENTS AND SITM Or P-ROJECT: Bidders are advised that the Contract Documents on file -with the Owner -shall , constitute 'all 'of the information which' . 6h Owner will furnish. All additional information and data which the owner will supply after promulgation of the formal contract documents shall be issued in the form of written addenda and shall become part of the Contract Documents just as though such addenda were actually written into the original Contract Documents . Bidders are required, prior to the filing of proposal, to read and become familiar with the Contract Documents , to vis4t the site of the project and examine carefully all local ' conditions , to inform themselves by their own independent {° research and investigations, tests, boring, and by such othe._ means as may be necessary- to gain a complete knowledge of the conditions which will be encountered during the construction of the project . They must judge for themselves the difficulties of the work and all attending circumstances affecting the cost of doing the work or the time required for its completion, and obtain all information required to make an intelligent proposal . No information given by the Owner or any representative of the Owner other than that contained 1.12 the Contract Documents and officially promulgated addenda thereto, shall be binding upon the Owner. Bidders shall rely - exclusively and solely upon their own estimates , investigation, research , tests , explorations , and other data which are necessary for full and complete information upon which the proposal is to be based. It is mutually agreed that the submission of a proposal is prima-facie evidence that the bidder has made the investigations, examinations and tests herein required. Claims for additional compensation due to variations between conditions actually encountered in construction and as indicated in the Contract Documents will not be allowed. The logs of Soil Borings, if any, showing on the plans are for general information only and may not be correct. Neither the Owner nor the Engineer guarantee that the data shown is reoras=nta=iv= of conditions which actually exist. C2-2 . 4 SUBMITTING OF PROPOSAL: The Bidder shall submit his Proposal on the corm furnished by the Owner. All blank spaces aonlicable to the project contained in the form shall be correctly filled in and the Bidder shall state the prices , written in ink in both words and numerals , for which he proposes to do the work contemplated or furnish= the materials required. All such .prices shall be written legibly. In case of discrepancy between the price written in words and the price written in numerals, the price most advantageous to the City shall govern. If a proposal is submitted by an individual, his or her name must be signed by him (her) or his (her) duly authorized agent. If a proposal is submitted by a firm, association , or partnership, the name and address of each member must be given , and the proposal must b; signed by a member of the firm, association , or partnership , or by a person duly authorized. If a proposal is submitted by a company or corporation , the company or corporate name and business address must be given, and the proposal signed by an official or duly authorized agent. The corporate seal must be affixed. Power of Attorney authorizing agents or others to sign 1 . proposal must be properly certified and mus: be in writing and - ' submitted with the proposal. C2-2 . 5 REJECTION OF PROPOSALS : Proposals may be rejected if they show any alteration of words or figures , additions not called for , conditional or uncalled for alternate bids, incomplete bids, erasures , or irregularities of any )rind, or contain unbalance value of any items . Pr000sal tendered or delivered after the official time designated for receipt of proposal shall be returned to the Bidder unopened. C2-2 . 6 BID SECURITY: No proposal will be considered unless it is accompanied by a "Proposal Security" of the character and in the amount indicated in the "Notice to- Bidders " and the "Proposal. " The Hid Security is required by the Owner as evidence of good faith on the part of the Bidder, and by way of a guaranty that if awarded the contract, the Bidder will within the required time execute a formal contract and furnish the required performance and other bonds. The bid security of the three lowest bidders will be retained until the contract is awarded or other disposition is wads thereof . The bid security of all other bidders may be returned promptly after the canvass of bids. C2-2(3 ) C2-2 .7 DELIy=Rv 0- PROPOSAL: No Dr000sal will be considered unless it is delivered , accompanied by its proper Bid Security, to the City •Manager or his representative in the official place of busiri_ss as set forth in the "Notice to Bidders . " It is the Bidder ' s sole responsibility to deliver the proDOsal at the Droner time to the Droner place. Th: mere f act that a proposal was dispatched will *not be considered. The Bidder -mast have the proposal actually delivered. Eac:1 proposal shall be in a sealed envelop= plainly marked with the word "PROPOSAL, " and the name or description of the project as designated in the "Notice to Bidders. " Th: envelo-oe shall be addressed to the City Manager, City Hall, Fort 'north, Texas . C2-2 . 8 WITEDRAWTNG PROPOSALS: Proposals actually -riled w_th 4 the City Manager cannot be withdrawn prior to the time set for opening proposals . A request for non-consideration of a proposal must be mad_ in writing , addressed to the City Manager , and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non-consideration are opened and publicly read aloud, the proposals for which non-consideration request's have been properly filed may, at the option of the Owner, be returned unopened. C2-2 . 9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by telegraphic communication at any time prior to the time set' for opening proposals , provided such telegraphic communication is received by the City Man=ager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48) hours atter the proposal opening time, no further consideration will be given to the proposal. C2-2 .10 PUBLIC OPENING Or PROPOSAL: Proposals which have been properly ill and for which no "Non-consideration Request" has been received will be publicly opened and read aloud by the City Manager or his authorized representative at the time and glace indicated in the "Notice to Bidders. " All proposals which have bean•opened and read Will remain on file with the Owner until the contract has been awarded. Bidders or their authorized razresentatives are invited to be -oresent for the opening of bids. C2-2 . 11 IRREGUL. R PROPOSALS: Proposals shall be considered as being "Irregular" if they show any omissions , alterations of form, additions, or. conditions not called for , unauthorized alternate bids, or irregularities of any kind. However , the C2-2(4) Owner reserves the right to waive any and all irregularities and to make the award of the contract to the best interest of the City. Tendering a proposal after the closing hour is an irregularity which cannot be waived. C2-2 . 12 DISQUALIFICATION OF BIDDERS : Bidders may be disqualified and their proposals not considered for any of, but not limited to, the following reason: a. Reasons for believing that collusion exists among bidders. b. Reasonable grounds for believing that any bidder is interested in more than one proposal for work contemplated. C. The bidder being interested in any litigation against the Owner or where the Owner may have a claim against or be engaged in litigation against the bidder. d. The bidder being in arrears on any existing contract .or having defaulted on a previous contract. e. The bidder having performed a prior contract in an unsatisfactory manner. f. Lack of competency as revealed by the financial statement, experience record, equipment schedule, ' and such inquiries as the Owner may see fit to make. g. Uncompleted work which , in the judgment of the Owner, will prevent or hinder the prompt completion of additional work if awarded. h. The bidder. not filing with the Owner, one week in advance of the hour of the opening of proposals the following: 1. Financial Statement showing the financial condition of the bidder as specified in Part "A" - Special Instructions. 2. A current experience record showing especially the projects of a nature similar to the one under consideration , which have been successfully completed by the Bidder. 3. An equipment schedule showing the equipment the bidder has available for use on the project. The Bid Proposal of a bidder who, in the judgment of the Engineer, is disqualified under the requirements stated herein, shall be set aside and not opened. C2-2(5) -� PART C - G.N7-3.AL CONDITIONS C3-3 A 3LRD AND =-CUTIOq 0_ DOCUMENTS SECTION C3-3 AWARD A?TD EXECUTION Or DOCIIkENTS: C3-3 . 1 CONSIDERATION Or PROPOSALS: After proposals have bean opened and read aloud, the proposals will be tabulated on the basis of the quoted prices , the quantities shown in the proposal , and the application of such =ormulas or other methods of bringing items to a common basis as may be established in the •Contract%Docurr►ents. The total obtained by taking the sum of the products of unit prices quoted and the estimated quantities plus any lump sum items and such other quoted amounts as may ent.r into the cost of the completed project will be considered as the amount of the bid. Until the aw=ard of the contract is made by the Owner, the right will be reserved to reject any or all proposals and waive technicalities, to r=-advertise for new propcsals , or to proceed with the work in any manner as maybe considered for tae best interest of the Owner. C3 -3 .^2 ?MINORITY BUSINESS ENTZR?—MISE/WOM-N-OWNED BUSINESS ENTERPRISE COMPLIANCE: Contractor agrees to provide to Owner , upon request , complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and or a a roman-owned Business -Enterpri s e (WBE ) on the contract and the payment therefor. Contractor further agrees , upon request, by Owner , to allow and audit and/or an examination of any books, records, or files in the possession of Contractor that will substantiate the actual work oerformad by the MBE or way. Any material misrepresentation of any nature will be grounds for termination of the contract and or initiating any action under appropriate federal , stat_ or local laws and ordinances relating to false statements ; further , any such misrepresentation may be grounds for disqualification of Contractor at Owner ' s discretion for bidding on future Contracts with the Owner for a period of time of not less than six ( 6 ) months.. C3-3 . 3 EQUAL EMPLOYMENT PROVISIONS : The Contractor scall ' comply with Current City Ordinance prohibiting. discrimination in employment practices. C3-3 (1) • The Contractor shall post the required notice to that effect } , his request, will be provided - on the project site, and at '- assistance by the City of Fort north ' s Equal Employmeat Officer who will refer any qualified applicant he may have on fit= in his office to the Contractor. Appropriate notices =ay be acquired from the Equal Employment Officer. C3-3 . 4 WITHDRAWAL 0: PROPOSALS: After a proposal has been read by the Owner it cannot be withdrawn by the Bidder within forty five ( 45 ) days after the date on which the proposals were opened. C3-3 . 5 AWARD OF CONTRACT : The Owner reserves the right to withholdfinal action on the proposals for a reasonable tiMa , not to exceed forty-five ( 43 ) days after the data of opening proposals, and in no _Vent will an award be made until after investigations have been made as to the responsibility of :.he DroDosed a ardee. The award of the contract, if°.an award is mads, will be to the lowest and best responsible bidder. The award of the contract shall not become effective until the Owner has notified the Contractor in writing of such award. C3-3 . 6 RETURN OF PROPOSAL SECURITIES : As soon as pr000sed price totals have been detarlined for comparison of bids , the Owner may, at its discretion, return the proposal security which accompanied the or000sals which, in its judgment , would not be considered for the award . All other or000sal securities, usually those of the three lowest bidders , will be retained by the Owner until the required contract has been executed and bond furnished or the Owner has otherwise disposed of the bids, after which they will be returned by the City Secretary. C3-3 . 7 BONDS : With tae execution and delivery of the Contract Documents , the Contractor shall furnish to, and file with the Owner in the amounts herein required, the following bonds: a. PERFORMANCE BOND : A good and sufficient performance bond in an amount not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise , guaranteeing the full and faithful execution of the work and performance of the contract, and for the protection of the Owner and all other persons against damage by reason of negligence of the Contractor, or improper execution of the work or the use of inferior materials . This performance C3-3 (2) bond shall -guarantee the payment far all" labor , materials , equipment, supplies , and services used in the construction of the work , and shall remain in full force and effect until provisions as above stipulated are accomplished and final payment is .ad;- on the project by the City. b. MAINTENANCE BOND : A good and sufficient maintenance bond, in the amount of not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the prompt , full and faithful erformance of the general guaranty whicla - is set forth iri•paragiaph CS-8 .10. C. ?iYMENT BOND : A good and sufficient payment bond, in an amount not less than 100 percent - of the amount of the contract, . as evidenced by the proposal tabulation or otherwise , guaranteeing the prompt, full and faithful payment of all claimants as defined in Article 5164 , Revised Civil- Statutes of Texas , • 1925 , as amended by Bouse Bill- 344 Acts 55th Legislature, Regular Session , 1959 , effective Aril 27 , 1959 , and/or the latest version thereof, supplying labor and materials in the prosecution of the work Drovided for in the contract being constructed under these specifications . Payment Bond shall remain in force until all payments as above stipulated are made. d. OTHER BONDS : Such other bonds as may be required by these Contract Documents shall be furnished by %he Contractor. No sureties will be accepted by the Owner which are at the time in default or delinquent on any bonds or which are interested in any litigation against the owner. All bonds shall be made on the forms furnished by the Owner and shall be executed by an approved surety company doing business in the City of Fort Worth, Texas , and which is acceptable to the owner . In order to be acceptable, the name of the surety shall be included on the current U. S . Treasury list of acceptable sureties, andthe amount of bond written by any one acceptable company shall not exceed the amount shown on the Treasury list for that company. Each bond shall be properly executed by both the Contractor and Surety Company. Should any surety on the contract be determined unsatisfactory at any time by the Owner, notice will. be given the Contractor to that effect and the Contractor shall immediately provide a a C3-3 (3 ) new surety satisfactory ' to the owner. No payment will be .,:ad= under the contract until the new surety or sureties , as required, have cualif ied and have been accepted by tae Ow-n=r. The contract shall not be operative nor will any payments be aue or paid until approval of the bonds by the owner. C3-3 . 8 EXECUTION Or CONTRACT: Within ten *•(10 ) days a=ter _ae Owner has cy appropriate resolution, or otherwise, awarded the �+ contract, the Contractor shall execute and file with the Owner the Contract and such bonds as may he required in the Contract Documents. No contract shall be' binding upon the owner until it has been attested by the City. Secretary, approved as to fora and legality by the City Attorney, and executed for the Owner by either the Mayor or City Manager. C3 -3 . 9 FAILURE TO EXECUTE CONTRACT : The failure of the Awardee to execute the required bond or bonds or to sign the required contract within ten. (10 ) days after the contract is awarded shall be considered by the Owner as an abandonment of his proposal, and the Owner may annul the Award. By reason of the uncertainty of the market Dri__s of. material and labor , and it being impracticable and difficult to accurately determine the amount of damages occuring to the Owner by reason of said awardee ' s failure to execute said bonds and contract within ten ( 10 ) days , the proposal security accompanying the proposal shall be the agreed amount of damages which Owner will suffer by reason of such failure on the cart of the awardee and shall thereupon immediately be forfeited to the Owner. The filing of a proposal will be considered as an acceptance of this provision by the Bidder. C3-3 . 10 BEGINNING WORK: The Contractor shall not, commence work until authorized. in writing to do so by the Owner . Should the Contractor fail to com+hence work at the site of the project within the time stipulated in the written =authorization- usually termed the "Work Order" or "Proceed Order" , it is agreed that the Surety Company will , within ten ( 10 ) days after the commencement, date set forth in such written authorization, commence the physical execution of the contract. C3-3 . 11 INSURANCE: The Contractor shall not commence work under this contract until he has- obtained all the insurance required under the Contract Documents, and such insurance has been approved by the Owner. The prime Contractor shall be responsible for delivering to the Owner the sub-contractors ' C3-3 (4) y ' certificate of insurance for approval. The prim= contractor shall indicate on the certificat= of 4nsLance included in the documents for execution whether or not his insurance covers sub-contractors . It is the intention of the Owner that the insurance coverage required herein shall include the coverage of all sib-contractors. a. COMPENSATION INSURANCE : The Contractor shall maintain ,. during the life of this contract , Workers ' t Compensation . Insurance on all of his employees to be engaged in work on the project under this contract, and for all stib-contractors. In case any class of employees engaged in hazardous work on the 'p'roject under this contract • is not protected under the Workers ' Compensation Statute, the Contractor shall provide adequate employer ' s general liability insurance for the protection of such of his employees not so protected. b. COMPREHENSIVE GENzZXL LIABILITY INSURANCE: The Contractor shall procure and shall maintain during the life of this contract Contractor ' s Comprehensive General Liability Insurance (Public Liability and - Property Damage Insurance) in an amount not less than $ 500 , 000 covering each occurrence on account of bodily injury, including death , and in an amount not less than $ 500 , 000 =' covering each occurrence on account of property damage with $2, 000,000 umbrella policy coverage. C. ADDITIONAL LIABILITY: The Contractor shall furnish insurance as separate policies or by additional endorsement to one of the above-mentioned polici=_s; and in the arlount as set forth for public liability and property damage, the following insurance: 1. Contingent Liability ( covers General Contractor ' s. Liability for acts of sub-con`s actors) . 2. Blasting, prior to any blasting being done. 3 . Collapse of buildings or structures adjacent to excavation ( if excavations -are to be aerformed adjacent to same) . 4 . Damage to underground utilities for $500, 000. v C3-3 (5 ) Builder' s risk (where above-around structures F are involved) . 6. Contractual Liability ( covers all indemnification requirements of Contract) . d. AUTOMOBILE INSUPANCE - BODILY INJURY AND PROPERTY D.PM3GE: The Contractor shall procure and maintain , during the life of this Contract, Comprehensive Katomobile Liability insurance in an amount not less than $ 250 , 000 for injuries including accidental death to any one person and subject to the same limit for each person an • amount not less than $ 500 , 0.00 on account of one accident , and automobile prooerty damage insurance in an aa!oint not le-es than $100 , 000. SCOPE OF INSIIRANCE AND SPECIAL HAZARD : The insurance required -under the above paragraphs shall mrovide adequate protection for the Contractor and his sub-contractors , respectively, against damage claims which may arise from operations under this contract, whether such ooeratior_s be by the insured or by anyone directly or indirectly employed by him, and also against any of the following special hazards which may be encountered in the performance of the Contract. f. PROOF OF CARRIAGE OF INSURANCE: The Contract c r shall furnish the Owner with, satisfactory proof of coverage by insurance required in these Contract Doc=encs in amounts and, by carriers satisfactory to the Owner . ( Sample attached. ) All insurance recuirements made upon the Contractor shall apply to the sub - contractor , should the Prime Contractor ' s insurance not cover the sue-contractor ' s work operations . g. LOCAL AGENT FOR INSURANCE AND BONDING : The insurance and bonding companies with whom the Contractor ' s insurance and performance, payment , maintenance and all such other bonds are written shall be represented by an agent or agents having an office located within the city limits of the C3-3 (6 ) City of Fort 'north, Tarrant County, Texas . Each such agent mall be a duly qualified, one upon whom service of process may be had , and must have authority and power to act on behalf of the insurance and/or bonding company to negotiate and settle with the City of Fort north , or any other claimant, any claims that the City of Fort Worth or other claimant or any property owner who has been damaged , may have against the Contractor , insurance, and/or bonding company. If the local insurance 'reprasentative is not so empowered by the insurance or bonding companies , then such authority must. be vested • in a local agent or claims of=icer residing_ in the Metroplex, the Fort worth-Dallas area. The nam_ of the agent or agents shall be set forth on all or such bonds and certificates of insurance. C3-3 . 12 CONTRACTOR' S OBLIGATIONS : Under the Contract, the Contractor shall pay for- all materials , labor and services when due. C3-3 . 13 EEXLY PAYROLL: A certified copy of each payroll covering uayment 6f wages to all person engaged in work on the project at the site of the project shall be furnished to the Owner's rspre=entative within seven ( 7 ) diys after the close of each payroll period. A copy or copies of the apoli_able -• minimum Nage rates as set forth in the Contract Docurents Shall be kept posted in a conspicuous place at the site of 'the project at all times during the course of the Contract . Copies of the wage rats will be furnished the Contractor, by the Owner; however, posting and protection of the wage rates shall be the responsibility of the Contractor. C3-3 . 14 CONT??ACTOR' S CONTRACT ADMINISTRATION: Any Contractor, whether a person , persons , partnership , company , firm , association , corporation or other who is approved to do business with and enters into a contract with the City for construction of water and/or sanitary sewer facilities, will have or shall establish a fully operational business office y within the Fort Worth-Dallas metropolitan area . The Contractor shall charge, delegate, or assign -this office (or he may delegate his Project Superintendent ) with full authority to transact all business actions required in the performance of the Contract. This local authority shall be mads responsible to act for the Contractor in all matters pertaining to the work governed by the Contract whether it be administrative or otherwise and as such shall be empowered, thus delegated and directed, to settle all material, labor or other expenditures, all claims against the work or any other C3-3 (7) matter associated such as maintaining adequate and appropri-ate insurance or security coverage for the project . Such local authority for administration of the work under t::= Contract shall be maintained until all business transaction s executed as cart of the Contract are complete. should the Contractor ' s principal base of °operations be other than in the sort worth-Dallas metropolitan area, notification of the Contractor ' s assignment of local authority shall be made in writing to the Engineer in =advance of any work on the project, all appropriately signed and sealed, as apclicable, by the Contractor ' s responsible officers with the understanding that this written assignment of authority to a local reores=ntative shall become Dart of the project Contract as though bound directly into the project documents . The intent of these requirements is that all matters associated with the Contractor ' s administration , whether it be oriented in furthering the work, or other, be governed direc= by local authority . This same requirement is imposed on insurance and surety coverage. Should the Contractar' s local representative Fail to perform to the satisfaction of Engineer, the Engineer, at his sole discretion , may demand that such local representative be replaced and the Engineer may, a his sole discretion , stop all work until a new local authority satisfactory to the Engineer is assigned . No credit of working time will be for periods in which work stoppages are in effect for this reason. • C3 -3 . 15 VENUE : Venue of any action hereinunder shall be exclusively in Tarrant County, Texas. C3-3 (8) t. ?PRT C - GEN RAIL CONDITIONS C4-4 SCOPE OF WORK SECTION C4-4 SCOPE Or ORS C4-4 . 1 INTENT Or CONTRACT DOCUMENTS : It is the definite intention of these Contract Documents to provide for a comple,�e, useful project which the Contractor undertakes to construct or furnish ; all in full compliance with the - requirements and intent of the Contract Documents . It is definitely understood that the Contractor shall do all work as provided for in the Contract Documents, shall do all extra or special work as may Be considered by the Owner as necessary to complete the project in a satisfactory and acceptable manner. The Contractor shall, unless otherwise specifically stated in these Contract Documents , furnish all labor, tools, materials , machinery, equip- went , special services , and incidentals necessary to the prosecution and completion of the project. C4-4 . 2 S2ECIAL PROVISIONS : Should any work or conditions which are not thoroughly and satisfactorily stipulated or covered by General or Special Conditions of these Contract Documents be anticipated, or should there be any additional 'proposed work which- is not covered by these Contract Documents, then "Special Provisions" covering all such work will be prepared by the Owner previous to the time of receiving bids or proposals for such work and furnished to the Bidder in the form of Addenda. All such "Special Provisions" shall be considered to be a mart of the Contract Documents ■ just as though they were originally written therein. p C4-4 . 3 INC3EASED OR DECREASED QGPWTITIES: The Owner reserves the right to alter the quantities of the ;cork to be merformed or to extend or shorten the improvements at any time when and as found to be necessary, and the Contractor shall perform the work as altered, increased or decreased at the unit prices. Such increased or decreased quantity shall not be more than 25 percent of the contemplated quantity of such item or items . Innen such chanras increase or decrease the original quantity of any item or items of work to be done or materials to be furnished by the 25 percent or more, then either party to the contract shall upon written request to the other party be entitled to a revised consideration upon that portion of the work above or below the 25 percent of the original quantity stated in the proposal; such revised consideration to be determined by special agreement or as hereinafter provided for "zxtra Work. " No allowance will be made for any changes in anticipated profits nor shall such changes be considered as C4-4 (1) waiving or invalidating any, conditions or provisions o the Contract Documents . Variations in quantities of sanitary sewer pip`s in deptz categories , shall be interpreted herein as applying to the overall quantities or sanitary sewer pip= in each Dine size, but not to the various depth categories. ' C4-4 . 4 ALTERATION Or CONTRACT DOCIIZ4---NTS: 3y Change Order, the Owner reserves the right to make such changes in the Contract Documents and in the character or quantities of the work as may be necessary or desirable to insure completion in the most satisfactory manner , provided. such changes do not materially alter the original Contract Documents or change the general nature of the project as a whole . Such changes shall not be considered as waiving or invalidating any condition or provision of the Contract Documents. C4-4 . 5 EXTRA WORK: Additional work made necessary by changes and alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents, shall be defined as ":;Xtra Work" and shall be performed by the Contractor in accordance with these Contract Documents or approved additions thereto ; provided, however, that before any extra work is begun a "Change Order" ^' shall be executed or written order issued by the Owner to co the` work for payments or credits as shall be determined by one or more 'combination of the following methods : a. Unit bid price previously approved. b. An agreed lump sum. C. The actual reasonable_ cost of (1) labor, (2) rental of equipment used on the extra work for the time so used at Associated General Contract-ors of _marica current equipment rental rates ; ( 3 ) materials entering permanently into the project , and ( "_ ) actual cost of insurance , bonds , and social security as determined by the Owner , plus a fixed fee to be agreed upon but not to exceed 10% of the actual cost of such extra work. The fixed fee is not to include any additional profit to the Contractor for rental of equipment owned by hint and used for the extra work. The f__ shall be full and complete compensation to cover the cost of superintendence , overhead', other profit, general and all other expense not included in (1 ) , ( 2 ) , ( 3 ) , and ( 4 ) abov;. The Contractor shall keen accurate cost records on the form and in the method ` C4-4 (2) suggested by the Owner and shall give the Owner access to all accounts , bills , vouchers , and records relating to the Extra Work. .No "Change Order" shall become effective until it, )'las been approved and signed by each of the Contracting parties. No claim for Extra work of any kind will be allowed unless ordered in writing by ttie Owner . In case any orders or instructions , either oral or written, appear to the Contractor to involve 'Extra work for which he should receive compensation, he shall make written request- to the Engineer For written orders authorizing such Extra ;fork , prior to beginning such work. Should a difference arise as to what does or does not constitute Ext-ra work, or as to the payment thereof , and the Engineer insists upon its performance, the Contractor shall proceed with the work after making written request. for written orders and shall keep an accurate account of the actual reasonable cost thereof as provided under method ( Item C ) . Claims for extra work will not be paid unless the Contractor shall file his claim with the Owner within five ( 5 ) days before the time for making the first estimate after such work is don: and unless the claim is supported by satisfactory vouchers and certified payrolls covering all labor and materials expended upon the said Extra work. The Contractor shall furnish the Owner such installation records of all deviations from the original Contract Documents as may be necessary to enable the Owner to oreoara for german=at record a corrected set of plans showing the actual installation. The compensation agreed upon for ' extra work' whether or not iniiti_t:d by a 'change order ' shall be a full, complete and final payment for all costs Contractor incurs as a result or relating to the ch=ange or extra work, whether said costs are known, unknown, foreseen or unfore-seen at that time, incluain; without limitation, any costs for delay, extended overhead, ., ripple or impact cost , or any other effect on changed or unchanged work as a result or the change or extra work. C4-4 . 6 SCEEDDLF. OF OPERATIONS: Before commencing any work under this contract, the Contractor shall submit to the Owner and receive th-e Owner ' s approval thereof , a "Schedule of Operations , " showing by a straight line method the date of commencing and finishing each of the major elements of the contract. There shall be also shown the estimated monthly cost of work for which estimates are to be expected. There C4-4 (3) shall be presented also - a composite graph showing the anticipated progress of construction with the time being plotted horizontally and the percentage of com®letion •plotted vertically. The progress charts shall be prepared on 8-1/2° x 11" sheets and at least five black or blue line prints shall be furnished to the Owner. C4-4 . 7 ?ROGRESS SCHEDULES FOR WATER AND SEWER PLANT FACILITIES : Within ten ( 10 ) days prior to submission of first monthly progress payment , the Contractor shall prepare and submit to the Owner for approval six copies of the schedule in which the Contractor proposes to carry on the work, the data of which he will start the several major • activities ( including` procuriment of materials , plans, and equipment) and the contemplated dates for completing the same . The schedule shall ce in the form of a time schedule Critical Path Method (CPM) network diagram. As the work progresses , the Contractor shall enter on, the diagram the actual progress at the end of each partial payment period or at such intervals as directed by the Engineer. The Contractor shall also revise the schedule_ to reflect any adjustments in contract time approved by the Engineer . Three copies of the updated schedule shall be delivered at such intervals as directed by the Owner. As a minimum, the construction schedule shall incorporate all work elements and activities indicated in the proposal and -in the technical specifications. . Prior to the final drafting of the detailed construction .- schedule, the Contractor shall review the 'draft schedule with the Engineer to ensure the Contractor ' s understanding Of. the contract requirements . The following guidelines shall be adhered to in preparing the construction schedule: a. Milestone dates and final project completion dates shall be developed to conform to time constraints , sequencing requirements and comoletion time. b. The construction process shall be divided into activities with time durations of approximately fourteen (14 ) days and consCruction values not to exceed $50 , 000 . Fabrication , delivery and submittal activities are exceptions to this guideline. C4-4 (4) C. Durations shall be in calendar days and normal holi'ays and weather conditions over the duration Oi t ? contract shall be accounted for within the duration of each activity. d. one critical path shall. .be shown on the cons.=uction schedule. e. Float time is defined as the amount of time between the earliest start date and the latest start date of a chain of activities of the CPM 1 construction schedule. Float time is not for the exclusive use. or benefit of either the Contractor or the O.rner. . f. Thirty days shall be used for submittal review unle_s otherwise speci`_ied. The construction schedule shall as a minimum be divided into general categories as indicated in the Proposal and Technical Specifications and each general category shall be broken down into activities in enough detail to achieve activities of approximately fourteen (14 ) days duration. For each gen_=a l category, the construction sc.^.edule shall . o¢ identify all trades or subcontracts whose work is represented by activities that follow the guidelines of this Section. f For each of to?= trades or subcontracts , the construction schedule shall indicate the following procurements , construction and preacceptance activities and :vents in their logical sequence for equioment and materials . 1. Preparation and transmittal of submittals. 2. Submittal review periods. . 3 . Shoo fabrication and delivery. 4 . Erection or installation. S . Transmittal of manufacturer ' s operation and maintenance instructions. 5 . Installed equipment and materials testing. 7. Owner's o__rator instruction (if applicable) . 8 . Final ins action. f y C4-4 (3) A 9 . Operational testing. 10. Final inspection. If , in the opinion of the Owner, work accomplished falls behind that scheduled , the Contractor shall take such action as nacessary to improve his progress . In addition, the* Owner may require the Contractor to submit a revised schedule demonstrating his program and proposed plan to make up lag in scheduled progress and to insure completion of the wort{ within the contract time . If the Owner finds the proposed plan not acceptable , he may require the Contractor to increase the work force , the construction plant and equipment , the number of work shifts or the * overtime operations without additional cost to the Owner. r ailuro of the Contractor to comply with these requirements shall be considered grounds for determination by the Owner that the Contractor is failing to prosecute the work with such diligence as will insure its completion within the time spacified. : C4-4 (6) PART C - GLN:.RAL CONDITIONS C5-5 CONTROL Or WORK AND _ ?rL�TERIALS • SECTION C3-5 CONTROL Or 'RORK AND MATERIAh'S CS-3 .1. iIIT30RITY Or ENGINEER: The work shall be performed to the satisfaction of the Engineer and in strict compliance with the Contract Documents . He shall decide all questions which arise as to the quality and acceptability of materials furnished , worst performed, rat= of progress of the work, overall sequence of the construction, int_rpretation "of the Contract Documents`, acceptable fulfillment of the contract, compensation, mutual rights between Contractor and Owner under these Contract Documents , supervision of the work, resumption of operations, and all other questions or disputes which may arise . Engineer will not be responsible for Contractor ' s means , methods , techniques , sequences or procedures of construction, or the safety precaution and programs incident thereto, and he will not be responsible for Contractor ' s failure to perform the work in accordance with the contract documents. He shall determine the amount and quality of the work completed and materials furnished , and his decisiohs and estimates shall be final . His estimates in such event shall be a condition to ,the right of the Contractor to receive money due him under the Contract. The Owner shall have executive_ authority to enforce and make effective such necessary decisions and orders as the Contractor tails to carry out promptly. In the =vent of any dispute between the Engineer and Contractor over the decision of the Engineer on any such matters , the Engineer must, within a reasonable time, upon written request of the Contractor, render and deliver to both the Owner and Contractor, a written decision on the matter in controversy. CS-5 . 2 CONFORMITY WITH PLANS : The finished project in all cases shall conform with lines , grades , cross-sections , finish , and dimensions shown on the plans or any other requirements otherwise described in the Contract Documents . Any deviation from the approved Contract Documents required by the Engineer during construction will in all cases be determined by the Engineer and authorized by the Owner by Change Order. CS-5 (1) .5-5 . 3 COORDINATION OF CONTRACT DOCUMMNTS : The Contract tncuments are made uo at several sections , which , taken together , are intended to describe and provide for a c--:vol=t= and useful grojec=, and any reauir_ments appearing in one of the sections is as binding as though it occurred in all =-actions . In case of discrepancies , figured dimension shall govern over scal=d, dimensions , plans shall govern over 3oecifications, special conditions shall govern over general conditions and standard specifications, and cuantities s:11own cn the plans shall govern over - those shown in ' ta_ proposal. The Contractor shall not take advantage of any appar=n� error c: omission in the Contract Doc=ents , and the Owner shall be -ermitted to mak: such corrections or int_rpr=talions as may deemed necessary for the fulfillment of the intent of the Contract Documents . In the e"ent the ContrActor discovers an apoarent error or discrepancy, he shall immediately call this =ondition to t-he attention of the Engineer. In the event of a conflict in the drawings , specifications, or other portions of the Contract Documents which were not reported prior to the =ward of Contract , the Contractor shall be deemed to have quoted the most expensive resolution of the conflict. C3-5 . 4 COOPERATION OF CONTRACTOR: The Contractor will be urnished with three sets of the Contract Documents and scall :ave available on the site of the project at all times one set - . � of such Contract Documents . The Contract shall give to the work the °constant attention necessary to facilitate the progress thereof and shall cooperate with the Engineer , his inspector , and other Contractors in every possible way. The Contractor shall at all times have competent personnel available to the project site for proper performance of the work. The Contractor shall provide and maintain at all times at the site of the project a competent , English-speaking superintendent and an assistant who are fully authorized to act as the Contractor ' s agent on- the work . Such superintendent and his assistant shall be capable of reading and understanding the Contract Documents and shall receive and ulfill instructions from the owner , the Engineer, or his authorized reoresentatives . Pursuant to this responsibility of the Contractor, the Contractor shall designate in writing to the project superintendent, to act as the Contractor ' s ` agent on the work. Such assistant project superintendent shall be a resident of Tarrant County, Texas and th all be subject to 'call, as is the project Superintendent, at any time Of the day or night on any day of the week on which the Sngineer determines that circa►rstances require the presence on he project site of a representative of the Contractor to i V, C5-5 (2) -