HomeMy WebLinkAboutContract 28766-A1 AMENDMENT NO. 1 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. 7A L (M&C Required) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and RJN Group, Inc. , (Engineer) made and entered into City Secretary Contract No. 28766, (the Contract) which was authorized by the City Council by M&C 19586 on the 13th day of May, 2003; and WHEREAS, the Contract involves engineering services for the following project: Sanitary Sewer Rehabilitation Contract LVIII (58) . WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I, of the Contract is amended to include the additional engineering services specified in M&C C-23440, adopted by the City Council on 14th day of April, 2009, and further amplified in a proposal letter dated February 17, 2009, copies of which are both attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $62,115.00. 2. Article II, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $361,954 .00. OFFICIAL RECORD CI7YSECRETARY FT.WORTH,TX 05-04-09 A08 :40 IN 3. A11 other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the day of _ 2009, in Fort Worth, Tarrant County, Texas . ATTEST: �tr-a—'c;t ConAuthorization Marty Hendri l.l-t 1 11 O� City Secretary ff 'TI Ditto APP -- �/R�/ECCOM�MENDED: / APPROVED: V77 �V ' S. Frank Crumb, P.E. Fernando Costa Director, Water Department Assistant City Manager RJN GROUP, INC. Engineer By: Name: Peter Lai , P.E . Vice President 4100 International Plaza, Ste. 460 Fort Worth, TX 76109 APPROVED TO GALITY: Assi ant t A torn 7 OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX a rin�p www.rjn.com Excellence through Ownership February 17,2009 Roberto C. Sauceda Project Manager Water Department City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102 Re: Amendment No. 1 City of Fort Worth Sanitary Sewer Rehabilitation Contract 58- City Contract#28766 Dear Mr. Sauceda, The following is a description of the tasks that the ENGINEER will perform as part of Amendment No. 1. Work Includes: Task Cost Basin Services 1. Monthly reporting and meetings with the City. $I0,980 2. Coordination with the Parks Department and modification to the $8,630 design of the sewer crossing at Overton Park. 3.Traffic control plans for all three parts.* $8,050 4. Revision of ROE letters $760 5. Site visit to verify validity of existing survey and design $4,330 6. Utility coordination to update changes since last submittal. $2,335 7. Update of specifications and bid items for 3 parts $7,855 8. Permits and easement updates for 3 parts $2,775 Special Services 1. Sub-consultant Administration fee 10%of$14,000 $1,400 2. Printing $1,000 3**. Geo-technical service $14,000 Total $62 I IS r j n ti_1-0 Ll [I www.rjn.com F%CApn^p!h'rf i_I�h l7W�PlShl�1 * A detailed traffic control design is included with Part I. Standard City of Fort Worth Traffic Control plans will be used for Part 2 and Part 3. **MWBE Participation Detailed explanation of each task is as follows: Basic Services: 1. Monthly reports and meetings. There is extra cost to prepare the monthly status reports and attend the monthly consultants meetings until the projects are under construction. 2. Coordination with the Parks Department and modifications to the design of the sewer crossing at Overton Park. Several revisions were made as a result of a series of meetings with the Parks Department which were not anticipated originally. RJN also prepared a landscape design plan to disguise the aerial crossing based on markups provided by the Parks Department's architect. 3. Traffic Control Plans for three parts. At the city's request, one detailed Traffic Control Plans (TCP)was developed for Part 1. For Parts 2 and 3, standard City of Fort Worth TCP plans will be used instead. 4. Preparation of Right of Entry (ROE) letters. ROE letters will have to be revised based on current ownership. 5. Site visit to verify existing survey and design. Since the survey was completed over four years ago, it is necessary to verify field conditions and update the design accordingly. 6. Utility coordination. Additional plans were sent to utility companies for review and RJN has also coordinated with various utility companies to update the location and size of the effected utilities. 7. Update of specifications and bid items. In addition to updating the specifications and bid item list to the current City of Fort Worth standards, these projects are now also funded by Texas Water Development Board(TWDB) so requirements from TWDB need to be included in the bid documents. 8. Permits and easement revision. Permits will need to be re-applied and submitted and easements need to be revised to meet current City of Fort Worth easement format and standards. Also, cost to prepare new easement has increased due to inflation in the last 4 years. New easements will be billed at 5600/each. Special Services: 1. Sub-consultants management fee. Based on 10%of sub-consultant fees. 2. Mileage and printing. Mileage for additional field visits and monthly consultants meetings. Additional printing cost for additional plan and spec submittals. 3. Geotechnical service. At the city's request, soil boring is being done due to the depth of the sewer main in Unit 2. A Letter of Intent(LOI) from Mas-Tek is attached with this amendment. M/WBE Participation. Participation Task Dollars Percent Perform soil boring and testing S14,000 22.549,/o 4100 International OvertonIre Tower 11,Suite 460-Fort • I76109 817.546.1113817.W.1 118 • r j n ro u t) www.rjn.com EnrPllance !h'nu�h Ownwship M/WBE Firms Mas-Tek Engineering and Associates, Inc. M/WBE Participation Summar Total Value M/WBE Value M/WBE Percent Original Contract $299,839 571,990 24.01% Amendment No. I $62,115 $14,000 22.54% Total $361,954 $85,990 23,76% Should you have any questions, please give us a call. Sincerely, 40:�— Peter Lai, P.E. Vice President RJN Group Inc. Attachments: 1. Cost breakdown 2. LOI from Mas-Tek for Geo-technical service. Nage I of . f---al __ -,f the -t. -f C-0 ., ' CITY COUNCIL AGENDA FORT WORTl COUNCIL ACTION: Approved on 4/14/2009 -Ord. No. 18549-04-2009 DATE: 4/14/2009 REFERENCE NO.: ""C-23440 LOG NAME: 60SS58A1 RJN CODE: C TYPE: CONSENT PUBLIC HEARING: NO SUBJECT: Authorize Amendment No. 1 in the Amount of$62,115.00 to City Secretary Contract No. 28766, an Engineering Agreement with RJN Group, Inc., for Sanitary Sewer Rehabilitation Along Branch Road and Sarita Drive and Adopt Appropriation Ordinance RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer of$65,115.00 from the Water and Sewer Operating Fund to the Sewer Capital Projects Fund; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Sewer Capital Projects Fund in the amount of$65,115.00 from available funds; and 3. Authorize the City Manager to execute Amendment No. 1 in the amount of$62,115.00 to City Secretary Contract No. 28766, an Engineering Agreement with RJN Group, Inc., for Sanitary Sewer Rehabilitation along Branch Road and Sarita Drive, thereby increasing the contract amount to $361,954.00. DISCUSSION: On May 13, 2003, (M&C C-19586) the City Council authorized the City Manager to execute an Engineering Agreement with RJN Group, Inc., in the amount of$299,839.00 for Sanitary Sewer Rehabilitation Contract LVIII (58). Amendment No. 1 will provide compensation for the following: Geotechnical services on the project; Updating the specifications and contract documents to meet current City standards; Preparation of right-of-way agreements; Easements and permits revision; and Additional survey on the project. M/WBE — RJN Group, Inc., is in compliance with the City's M/WBE Ordinance by committing to 22 percent M/WBE participation on this Amendment No. 1. In addition to the Amendment amount, $3,000.00 is required for project management. This project is located in COUNCIL DISTRICT 3, Mapsco 89G. (FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that upon approval of the above recommendations and the adoption of the attached ordinance, funds will be available in the current tpJiapps.cfwnet.org/council packet/mc rev1ew.asp'11D=11354&c0unci1date=4/14/2009 4/15/2009 Pare 2 of capital budget, as appropriated, of the Sewer Capital Projects Fund. TO Fund/Account/Centers FROM Fund/Account/Centers 182) 565,115.00 3)P258 531200 7031.70106032 $12 947.00 P258 476045 703170106OZZ 1) PE45 538040 0409020 $65,115.00 2IP258 531200 703170106033 $12-947.00 4P258 531200 703170106033 $49;168.00 2) F)258 531200 703170106032 $49,168.00 21258 511010 703170106030 $3000.00 Submitted for C�iMana eg es Office by: Fernando Costa (6122) Originating Department Head: S. Frank Crumb (8246) Additional Information Contact: Roberto C. Sauceda (2387) ATTACHMENTS 60SS58A1 RJN MAP_pdf 60 S58A1 RJN.doc tp://apps.cfwnet.or-'council packet/mc_review.asp?I13=11354&councildate=4/14/2009 4/15/2009