HomeMy WebLinkAboutContract 28766-A2 AMENDMENT NO. 2
STATE OF TEXAS S CITY SECRETARY CONTRACT NO.M�L -
(M&C Not Required)
COUNTY OF TARRANT S
WHEREAS, the City of Fort Worth (City) and RJN Group, Inc. ,
(Engineer) made and entered into City Secretary Contract No. 28766,
(the Contract) which was authorized by the City Council by MSC
19586 on the 13th day of May,2003 and subsequently revised by one
previous amendment; and
WHEREAS, the Contract involves engineering services for the
following project:
Sanitary Sewer Rehabilitation Contract LVIII (58) .
WHEREAS, it has become necessary to execute Amendment No. 2 to
said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following
agreement which amends the Contract:
1.
Article I of the Contract is amended to include the additional
engineering services specified in a proposal letter dated April 23,
2009, a copy of which is attached hereto and incorporated herein.
The cost to City for the additional design services to be performed
by Engineer total $4,000.00.
2.
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $365,954 .00. --
OFFICIAL RECORD
MSECRETARY
FT.WORTH,T
ORIGINAL
a �
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the O24day of , 2009, in Fort Worth,
Tarrant County, Texas.
ATTEST:
N--,\ �
NO M&C REQUIRED
Marty Hendrik
City Secretary
jAPPRjREC ( LADED• APPROVED:
S. Frank Crumb, P.E. Fernando Costa
Director, Water Department Assistant City Manager
RJN GROUP, INC.
Engineer
By: Aw��
Name: Peter Lai, P.E.
Vice President
4100 International Plaza, Ste. 460
Fort Worth TX 76109
APPROVED AS TOLEGALITY:
Assistant City AA-o+4
OFFICIAL RECORD
CINSECRETARY
FT.WOWN,TX
-2-
ngr� www.rjn.com
r
Excellence through Ownership
April 23, 2009
Roberto C. Sauceda
Project Manager
Water Department
City of Fort Worth
1000 Throckmorton Street
Fort Worth, TX 76102
Re: Amendment No. 2
City of Fort Worth Sanitary Sewer Rehabilitation Contract 58-
City Contract#28766
Dear Mr. Sauceda,
The following is a description of the tasks that the ENGINEER will perform as part of Amendment No. 2.
Work Includes:
Task Cost
Basin Services
1. Provide private sewer re-route design for 11 houses and a $4,000
commercial building
Total $4,000
M/WBE Participation mmary
Total Value M/WBE Value M/WBE Percent
Original Contract $299,839 $71,990 24.01%
Amendment No. 1 $62,115 $14,000 22.54%
Amendment No. 2 $4,000 $0 0%
Total $365,954.00 1 $85,990.00 123.50%
Should you have any questions, please give us a call.
Sincerely,
A?�
Peter Lai, P.E.
Vice President
RJN Group Inc.
4100 IntemationalOverton Centre Tower '4•1 -Fort Worth, 76109 817.546.1113 817.546.1118