Loading...
HomeMy WebLinkAboutContract 28766-A2 AMENDMENT NO. 2 STATE OF TEXAS S CITY SECRETARY CONTRACT NO.M�L - (M&C Not Required) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and RJN Group, Inc. , (Engineer) made and entered into City Secretary Contract No. 28766, (the Contract) which was authorized by the City Council by MSC 19586 on the 13th day of May,2003 and subsequently revised by one previous amendment; and WHEREAS, the Contract involves engineering services for the following project: Sanitary Sewer Rehabilitation Contract LVIII (58) . WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated April 23, 2009, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $4,000.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $365,954 .00. -- OFFICIAL RECORD MSECRETARY FT.WORTH,T ORIGINAL a � 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the O24day of , 2009, in Fort Worth, Tarrant County, Texas. ATTEST: N--,\ � NO M&C REQUIRED Marty Hendrik City Secretary jAPPRjREC ( LADED• APPROVED: S. Frank Crumb, P.E. Fernando Costa Director, Water Department Assistant City Manager RJN GROUP, INC. Engineer By: Aw�� Name: Peter Lai, P.E. Vice President 4100 International Plaza, Ste. 460 Fort Worth TX 76109 APPROVED AS TOLEGALITY: Assistant City AA-o+4 OFFICIAL RECORD CINSECRETARY FT.WOWN,TX -2- ngr� www.rjn.com r Excellence through Ownership April 23, 2009 Roberto C. Sauceda Project Manager Water Department City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102 Re: Amendment No. 2 City of Fort Worth Sanitary Sewer Rehabilitation Contract 58- City Contract#28766 Dear Mr. Sauceda, The following is a description of the tasks that the ENGINEER will perform as part of Amendment No. 2. Work Includes: Task Cost Basin Services 1. Provide private sewer re-route design for 11 houses and a $4,000 commercial building Total $4,000 M/WBE Participation mmary Total Value M/WBE Value M/WBE Percent Original Contract $299,839 $71,990 24.01% Amendment No. 1 $62,115 $14,000 22.54% Amendment No. 2 $4,000 $0 0% Total $365,954.00 1 $85,990.00 123.50% Should you have any questions, please give us a call. Sincerely, A?� Peter Lai, P.E. Vice President RJN Group Inc. 4100 IntemationalOverton Centre Tower '4•1 -Fort Worth, 76109 817.546.1113 817.546.1118