HomeMy WebLinkAboutContract 28790-A8 AMENDMENT NO. 8
STATE OF TEXAS S CITY SECRETARY CONTRACT NO.QS-12 -/
(M&C Required)
COUNTY OF TARRANT S
WHEREAS, the City of Fort Worth (City) and Lockwood, Andrews
6 Newnam, Inc. , (Engineer) made and entered into City Secretary
Contract No. 28790, (the Contract) which was authorized by the
City Council by M&C C-19575 on the 13th day of May, 2003 and
subsequently revised by seven amendments; and
WHEREAS, the Contract involves engineering services for the
following project:
Sanitary Sewer Rehabilitation Contract La"VII (67) .
WHEREAS, it has become necessary to execute Amendment No. 8
to said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
1.
Article I, of the Contract is amended to include the
additional engineering services specified in M&C C-23685, adopted
by the City Council on the 4th day of August, 2009 and further
amplified in a proposal letter dated February 11, 2009, copies of
which are both attached hereto and incorporated herein. The cost
to City for the additional services to be performed by Engineer
total $50, 437 .00.
2 .
Article II, of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $509, 677.00.
OFFIIOIAL,.ia�.�RnEGORD
6I y1 Y SEt� RY
icy'.!NORTH°TX
3.
All other provisions of the Contract which are not expressly
amended herein shall remain in full force and effect.
-M(ECUTED on this the _ -+LA day ofAt , 2009,
in Fort Worth, Tarrant County, Texas.
�
ATTEST: Con act Authoriaatiox
LL L2Ak� --I CA�'og
Marty HencLAx Date
City Secretary
APPROVAL RE ED APPROVED: //yy
f". Frank Crumb, P. Fernando Costa
Director, Water Department Assistant City Manager
LOCKWOOD, ANDREWS & NEWHAM, INC.
Engineer
By:
Name:Jeffrey S. Ground, P.E.
Infrastructure Manager
1320 S. University Dr. , Suite 450
Fort Worth, TR 76197
APPROVED AS VFORK AND LEGALITY:
Assistant Ci me
OFFICIAL RECUKU
-2- CITY SECRETARY
FT. WORTH,TX
IVIM%- A..,V IG w Page l of
Official site of the t ity of Fort Worth,'r xc
CITY COUNCIL AGENDA
FoRr�H
COUNCIL ACTION: Approved on 8/4/2009 - Ord. No. 18739-08-2009
DATE: 8/4/2009 REFERENCE NO.: "'C-23699 LOG NAME: 6OSS67AB-LAN
CODE: C TYPE: CONSENT PUBLIC HEARING: NO
SUBJECT: Authorize Amendment No. 8 in the Amount of$50,937.00 to City Secretary Contract No.
28790 with Lockwood, Andrews& Newnam, Inc., for Sanitary Sewer Rehabilitation
Contract LXVII (67) on University Drive and Adrian Drive and Adopt Appropriation
Ordinance
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the transfer of$55,937.00 from the Water and Sewer Operating Fund to the Sewer
Capital Projects Fund;
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Sewer Capital Projects Fund in the amount of$55,937.00 from the available funds; and
3. Authorize the City Manager to execute Amendment No. 8 in the amount of$50,937.00 to City
Secretary Contract No. 28790 with Lockwood, Andrews& Newnam, Inc., for Sanitary Sewer
Rehabilitation Contract LXVII (67).
DISCUSSION:
On May 13, 2003, (M&C C-19575) the City Council authorized the City Manager to execute an
engineering agreement with Lockwood, Andrews& Newnam, Inc., in the amount of$260,706.00 for
sanitary sewer rehabilitation contract LXVII (67) (Project 00473).
The contract was subsequently revised by seven amendments totaling $197,494.00 that are further
described as follows:
Amendment No. 1 in the amount of$22,350.00 administratively approved by the City Manager on
July 15, 2004, provided survey and engineering design services for the replacement of additional
sanitary sewer mains as requested by the City;
Amendment No. 2 in the amount of$20,410.00 administratively approved by the City Manager on
September 1, 2004, provided for the rerouting of sewer main M-132 located on private property into
public right-of-way;
Amendment No. 3 in the amount of$14,900.00 administratively approved by the City Manager on
September 20, 2004, allowed for the preparation of an alignment study that provided several
alternate routes for a sewer main to covey wastewater from the redevelopment of the Montgomery
Ward property and the surrounding area;
Amendment No. 4 approved by Mayor and Council Communication (M&C) C-20452 on December 21,
2004, in the amount of$80,170.00 provided for survey and design of selected route in Amendment
No. 3 and rerouting a segment sewer main in conflict with the proposed Trinity River Vision
improvements;
Amendment No. 5 in the amount of $11,640.00 administratively approved by the City Manager on
April 6, 2005, provided for survey and design of additional water line improvements beyond the scope
of the original contract;
ttp://apps.cfwnet.org/council_packet/mc—review.asp?ID--i 1856&councildate=8/4/2009 8/5/2009
IVIM%, Yage 2 or
Amendment No. 6 approved by M&C C-21149 on November 15, 2005, in the amount of$23,744.00
provided for engineering design and survey for the replacement of severely deteriorated sewer main
M-132 located within the project limits; and
Amendment No: 7 in the amount of $24,280.00 administratively approved by the City Manager on
September 8, 2006, provided for the replacement of sewer lateral, L-3246, the preparation of a traffic
control plan and the separation of plans and specifications into three separate construction
documents.
Amendment No. 8 will provide compensation for the following:
Additional design and survey services for the relocation of severely deteriorated sanitary sewer
currently located on inaccessible private property into the following public
streets:
Street From To
University Drive Wingate Street White Settlement Road
Adrian Drive Wingate Street White Settlement Road
Redesign of the 30 inch sanitary sewer main located at the Carroll Street/7th Street intersection
due to conflict with a previously unknown AT&T duct bank;
Additional easement preparation on the project; and
Additional project coordination.
Lockwood, Andrews& Newnam, Inc., proposes to perform these additional services for a lump sum
fee of $50,937.00. City staff considers this fee to be fair and reasonable for the scope of services
proposed.
In addition to the amount requested, $5,000.00 is required for project management, real property
services and utility coordination.
Lockwood, Andrews & Newnam, Inc., is in compliance with the City's M/ BE Ordinance by
committing to an additional 15 percent M/ BE participation on this Amendment No. 8. The City's goal
on this Amendment No. 8 is 15 percent.
This project is located in COUNCIL DISTRICT 9.
FISCAL INFORMATIONICERTIFICATION:
The Financial Management Services Director certifies that upon approval of the above
recommendations and the adoption of the attached appropriation ordinance, funds will be available in
the current capital budget, as appropriated, of the Sewer Capital Projects Fund.
TO Fund/Account/Centers FROM Fund/Account/Centers
2) P258 531200 709170047331 $12,641.00 3) P258 531200 709170047332 $25,282.00
2) P258. 531200.709170047332 $25,282.00 31P258 531200 709170047331 $12,641.00
1&2) $55,937.00 3)P258 531200 709170047333 $4214.00
P258 476045.709170_0473ZZ 3I P258 531200 709170047351 $8,800.00
2) P258 511010 709170047330 $2,000.00
2)P258 531200 709170047333 $4,214.00 1� PE45 538040 0709020 $55,937.00
2) P258 541100 709170047341 $1,000.00
2) P258 531200 709170047351 $8,800.00
2) P258 531350 709170047342 $1,000.00
2) P258 531350 709170047373 $1000.00
Submitted for City Manager's Office by: Fernando Costa (6122)
ttp://apps.cfwnet.org/council_packet/mc_review.asp?ID=11856&councildate=8/4/2009 8/5/2009
Page 3 of
Originating Department Head: S. Frank Crumb (8207)
Additional Information Contact: Liam Conlon (6824)
ATTACHMENTS
60SS67A8-LAN AO.doc
60SS67A8-LAN MAP.pdf
itp:Happs.cfwnet.org/council_packet/mc_review.asp?ID=I 1856&councildate=8/4/2009 8/5/2;009
Lockwood,Andrews
&Newnam,Inc.
A LEO A DALY COMPANY
February 11,2009
Mr. Liam Conlon
City of Fort Worth
Water Department
1000 Throckmorton St.
Fort Worth,Texas 76102
Re: Amendment No.8
Engineering Services Part 1 and Part 3
Sanitary Sewer Rehabilitation Contract LXYII (67)
DOE#4144
Mr. Conlon:
Due to required changes in the constriction plans and revised construction schedules, we request this
contract amendment. The amendment corresponds to engineering services that Lockwood, Andrews &
Newnam, Inc. (LAN) has performed beyond the original contract scope with respect to the Part 1 and Part
3 plans for sanitary sewer main replacement in the proximity of White Settlement Road, Wimberly St.,
Tillar Street and Carroll Street. All of the work described in this Amendment relates to sanitary sewer
rehabilitation.
I. Redesign In Carroll Street at 7'e Street
A new 12" and 30" sewer main was constructed on the Montgomery Wards Site at the corner of 7th
Street and Carroll Street in conjunction with the new development as Part 1 of this contract.
Approximately 70 If of 30" sanitary sewer remained unfinished in the intersection of these streets. This
portion of the Part I plans was not constructed with the original contract for Part l due to an electrical
duct bank found to be in conflict with a 30" sewer main connecting in 7'h Street. The duct bank nuns
north from 7'h in Carroll Street and proved difficult to relocate or cross with the 30" sewer. LAN
modified the original plan sheets for Line A and Laterals A-I, A-2 and A-3 to create a single plan sheet
showing the extension of these lines that would be constructed as Addendum No.I to the original contract
for Part 1 in June of 2006. The duct bank was to be adjusted to allow the construction of these lines,
extending them to the west side of Carroll Street. Addendum No. I was not constructed.
The original design called for a 30" sewer line to connect to a manhole in 7'h Street, as mentioned above.
An 18" line would be extended west in 7'"by another consultant and an 8"line would connect to the south
side of West 7'h Street. Due to the conflict with the electrical duct bank, the 30" had to be terminated on
the north side of Carroll Street. The design was modified in the April of 2008 to facilitate the connection
to the manhole in 7'h. LAN designed an 8" sewer that crossed over the electrical duct bank to connect the
manhole in 7'h street to the 30" Sewer. This plan required an additional manhole on the east side of the
duct bank, where the pipe size changes from 30" to 8". The design was subsequently changed back to the
30" pipe. LAN was required to coordinate the design with new information provided on the location of
1320 Su.l%ni%ct,i1s t>rike,Siiih• 1:0 • toil%V%wh. Icre, 76107 • 4179200420 • 1 a\.917 X211JP t1 Lin-inc cunt
existing underground utilities. LAN was also required to coordinate the design with other consultants
plans to extend the 18"west in 7'h Street.
Fee for Item I $3,776
iL include 7'h& Carroll Street Sewers In Part 3 Plans
The 30" portion of sewer line in 7'h Street has been built as an addendum to the Part I plans, but laterals
A-1, A-2, A-3 and a portion of Line A at 5'h Street were not. it is necessary to include these laterals from
Part I with the Part 3 plans that will be let this year to complete the utility work in Carroll Street so that
the redevelopment of this thoroughfare can continue. Carroll Street is a 4 lane collector that connects 7'h
Street and White Settlement Road. In order to appropriate the ftlnding from the State, it was necessary to
modify the Part 3 plans to include the additional lines and laterals. The location map and cover sheet
were modified and all the sheets had to be re-numbered. Plotting the Part 3 plan sheets proved to be
difficult because files had become outdated when our systems and software were upgraded. The border
sheet file also had to be recreated. The plots were delivered to the City in time to get them to Austin for
review as required.
Fee for Item II $4,036
iii. Update the Right of Entry Forms
Right-of-entry exhibits were revised because they are required to be in the City's current format and
current ownership must be verified. The ownership for the property in this area changes periodically due
to it's proximity with the Trinity River Vision(TRV)project. The ownership has been verified for all lots
or parcels. There are currently 29 right-of-entry exhibits. The right of entry exhibits that will be required
for Adrian Street and University Drive are not included in these 29 exhibits. They are included, however,
in the design task for the new sewer mains in these streets.
Fee for Item III $3,675
IV- Bailey Industrial Plaza Design Updates
The sewer mains and new service lines located in the Bailey Industrial Park, and specifically between
Tillar Street and Cullen Street, immediately east of Foch Street, are required to be in easements because
the existing sewer is in an 8' alley that is not accessible. LAN needed to research the project to determine
if the easement instruments had been prepared in the past.
The design for the mains and services that previously connected in the alley now connects the services to
a sewer main in Tillar Street. LAN investigated the basis of the design to determine the justification for
the additional construction. A site visit was required to verify and insure physical conditions had not
changed. The owner of the Mosites property was contacted to verify that they are still amenable to the
proposed plan. "These sewers will also serve the Sprint Press Building on the east side of the Mosites site.
1120 South 1limo it} Dm e,Suitc450 - luttWutth, I,�a, 76107 - FI/.~20.0;20 - Inx 81?.8200111 - lin inc.com
Two permanent easements will be required for the public sewers in the Bailey Industrial Plaza Addition.
The area is heavy industrial, with manufacturing buildings and warehouses covering most the lot making
it difficult for the surveyors to locate the property monuments in the field. The alleys are not accessible
requiring the field work to be conducted from the streets surrounding of the site. The fee to provide
boundary survey for two easements and written legal instruments is$3,520
Fee for Item IV $4,395
V. University Drive and Adrian Street Sewers
New sewer mains will be designed in Adrian Street and University Drive between White Settlement Road
and Wingate Street. These streets are between the TRV and the Cultural District, a rapidly developing
area. These new sewers replace existing sewer mains L-2706, L-2706A and L-2709, located in the
middle of the blocks, where alleys may have been. Removing the sewers from the alleys make them more
accessible to the city. LAN will also design the sewer services to connect to the rear of the residences and
commercial business on these streets so that they will now connect to the new mains in the street right of
way. Construction documents will be prepared and added to the plans for Contract 67, Part 3.
The additional work will include meetings between the city and LAN, as well as coordination with the
property owners to locate the existing service connections and to provide a suitable location for the new
sewer services is also included. The additional work also includes right-of-entry exhibits and topographic
surveying.
A topographic survey has been provided for Adrian Street by the City and it will be utilized for the
design. A topographic survey will be required to complete the design for the sewer in University Drive.
The fee is$8,800 for the University Drive topographic survey.
Fee for Item V $29,471
VI. Revise Construction Documents& Estimates
The constriction estimate is required to be updated to utilize current information and to include the
additional sewer lines in Carroll Street,Bailey Industrial Park,University Drive and Adrian Street.
The Specifications Manual is no longer current and will need to be updated to reflect current standard
specifications and notices. The quantities in the contract proposal need to be updated to match the revised
plans.
LAN has conducted several review meetings with the City to discuss changes and plan for the eventual
letting. Meetings have also been conducted with designers and consultants working on the project or
adjacent to it, as a matter research and coordination.
Fee for Item VI $5,584
1121)SnWh Ifni%o,it� Dike,Suitt: 1;0 • I qt Nm1h, I -Ij, 76107 - 817 X20.0 t20 • I ax 817.8200ItI ���t�� Lut-inr.r nn
Based upon the work performed in order to meet the increased scope requirements as described above and
to revise the plans and specifications, a lump sum fee addition of $50,937 is hereby requested. This
increase will adjust the engineering fee from $458,740 to $509,677. A summary of the contract values
affected by the amendments including this Amendment No. 7 as proposed herein follows at the bottom of
this letter.
Please contact me should you require any additional information. We look forward to continuing our
work with you on this project.
Sincerely,
LOCKWOOD,ANDREWS,& NEWNAM,INC.
Walter P. Norwood, P.E.
Project Manager
Original Contract Amount: $260,706.00
Amendment No. 1 Amount: $22,350.00
Amendment No. 2 Amount: $20,410.00
Amendment No. 3 Amount: $14,900.00
Amendment No. 4 Amount: $80,710.00
Amendment No. 5 Amount: $11,640.00
Amendment No. 6 Amount $23,744.00 (Water Fee $2,522.00)
(Sewer Fee $21,222.00)
Amendment No. 7 Amount $24,280.00
Amendment No. 8 Amount $50,937.00
Total Revised Contract: $509,677.00
1120 South Um%,:riR5 Dmc,tiuitc lit) • lot Motth, le%a< 76107 b17.920,0420 • I ax.817.8200141 Lin-wc.com