HomeMy WebLinkAboutContract 45897-FP3 CITY SECRETARY
?J89 (1 3
Department of TPW Const.Services CONTitACT N®.
DOE#_�� Date
Project Manage rc=�G4, �T WO RT H G rk) S CAtiA e,0t
Risk Management S.Canady S - 0
D.O.E. Brotherton _
CFA Westerman/Scanned ❑
The Proceeding people have been Contacted concerning the request 'ATION AND PUBLIC WORKS
for final payment&have released this project for such payment. F PROJECT COMPLETION C� 201 tl—4)3z
Clearance Conducted By Etta Bacy D.O.E.Ns: 7191
Regarding contract�117'19f po SENDERA RANCH EAST PHASE VIII SECTION 2 as required by the
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on N/A through
M&C N/A the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the
recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project
as complete.
Original Contract Prices: $487,520.55
Amount of Approved Change Orders: Ns 1
Revised Contract Amount: $487,520.55
Total Cost Work Completed: $487,520.55
Less Deductions:
Liquidated Damages: Days @$210.00/Day
Pavement Deficiencies:
Total Deduction Amount: $0.00
Total Cost Work Completed: $487,520.55
Less Previous Payments: $0.00
Final Payment Due $487,520.55
Recornmenfled for Acceptance Date
Asst. Director, TPW - Infrastructure Design and Construction
0,�. �J. 0 UA Y// r
Accepted 0Date
Asst. Director,
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
:5�s 2, 5--// -
Asst. City Manager —T
Date'
Comments: FUND ACCT:C205-475220207760223383
* OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
FORTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name SENDERA RANCH EAST PHASE Va SECTION 2
Contract Limits
Project Type STORM DRAIN&PAVING
City Project Numbers 02233
DOE Number 7191
Estimate Number I Payment Number I For Period Ending 4/15/2015
CD
City Secretary Contract Number 117191 Contract Time IED
Contract Date 6/14/2014 Days Charged to Date 169
Project Manager Jadwi Contract is 100.00 Complete
Contractor CONATSER CONSTRUCTION TAY
5327 WICHITA ST
FORT WORTH, TX 76119
Inspectors RODGERS i VASQUEZ
Friday,May 01,2015 Pagel of 4
S7 . 4
City Project Numbers 02233 DOE Number 7191
Contract Name SENDERA RANCH EAST PHASE VIII,SECTION 2 Estimate Number 1
Contract Limits Payment Number I
Project Type STORM DRAIN&PAVING For Period Ending 4/15/2015
Project Funding
UNIT III:STORM DRAIN IIAPROVEMENTS
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 21"RCP CLASS III 33 LF $48.00 $1,584.00 33 $1,584.00
2 27"RCP CLASS III 74 LF $65.00 $4,810.00 74 $4,810.00
3 42"RCP CLASS III 858 LF $90.00 $77,220.00 858 $77,220.00
4 ]0'CURB INLET 4 EA $2,200.00 $8,800.00 4 $8,800.00
5 T MANHOLE 2 EA $4,500.00 $9,000.00 2 $9,000.00
6 CONCRETE RIPRAP 42 SY $60.00 $2,520.00 42 $2,520.00
7 TRENCH SAFETY 965 LF $3.00 $2,895.00 965 $2,895.00
8 CITY BONDS FOR ALL STORM DRAIN 1 LS $2,500.00 $2,500.00 1 $2,500.00
IMPROVEMENTS PERFORMANCE,PAYMENT,
MAINT
Sub-Total of Previous Unit $109,329.00 $109,329.00
UNIT IN:PAVING IIAPROVEMENTS
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
-- --- ------ — -- ------
1
1 6"CONC PVMT W/7"CURB 9908 SY $29.55 $292,781.40 9908 $292,781.40
2 6"LIME TREATMENT 10579 SY $2.85 $30,150.15 10579 $30,150.15
3 HYDRATED LIME 190 TN $165.00 $31,350.00 190 $31,350.00
4 7"CONC CURB AND GUTTER 168 LF $25.00 $4,200.00 168 $4,200.00
5 BARRIER FREE RAMP TYPE R-1 8 EA $1,200.00 $9,600.00 8 $9,600.00
6 PAVEMENT HEADER 87 LF $30.00 $2,610.00 87 $2,610.00
7 REMOVE&RELOCATE STANDARD EOR 3 EA $500.00 $1,500.00 3 $1,500.00
BARRICADE
8 CITY BONDS FOR ALL PAVING I LS $6,000.00 $6,000.00 1 $6,000.00
IMPROVEMENTS PERFORMANCE,PAYMENT,
MAINTENANCE
--------- ---- ----- --
Sub-Total of Previous Unit $378,191.55 $378,191.55
Friday,May 01,2015 Page 2 of 4
City Project Numbers 02233 DOE Number 7191
Contract Name SENDERA RANCH EAST PHASE VRI,SECTION 2 Estimate Number I
Contract Limits Payment Number I
Project Type STORM DRAIN&PAVING For Period Ending 4/152015
Project Funding
Contract Information Summary
Original Contract Amount $487,520.55
Change Orders
Total Contract Price $487,520.55
X
Date-) Total Cost of Work Completed $487,520.55
C for Leu %Retained $0.00
Net Earned $487,520.55
�
Inspection Supe isor Date Earned This Period $487,520.55
Retainage This Period $0.00
Date lu���
Less Liquidated Damages
Project Manhge
Days® /Day $0.00
Date r LessPavement Deficiency $0.00
Asst cto lfPW-Infrastructure Design and Construction Less Penalty $0.00
G.� ate S 1
115-1te Less Previous Payment $0.00
Director/tntracting DepartrnentD Plus Material on Hand Less 15% $0.00
Balance Due This Payment 5487,520.55
Friday,May 01,2015 Page 3 of 4
City Project Numbers 02233 DOE Number 7191
Contract Name SENDERA RANCH EAST PHASE VIII,SECTION 2 Estimate Number I
Contract Limits Payment Number I
Project Type STORM DRAIN&PAVING For Period Ending 4/15/2015
Project Funding
Project Manager Jaafari City Secretary Contract Number 117191
Inspectors RODGERS / VASQUEZ Contract Date 6/14/2014
Contractor CONATSER CONSTRUCTION TxLP Contract Time 10 CD
5327 WICHITA ST Days Charged to Date 169 CD
FORT WORTH, TX 76119 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $487,520.55
Less %Retained $0.00
Net Earned $487,520.55
Earned This Period $487,520.55
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balanci Due This Payment 4 7,520.55
OFFICIAL RECORD
CITY SECRETARY
Friday,May 01,2015 FT.WORTH,TX-g- of 4
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a Notary Public in the state and county aforesaid,
on this day personally appeared Brock Huggins, Vice-President of Conatser Management Group,
Inc., general partner of Conatser Construction TX, LP, known to me to be a credible person, who
being by me duly sworn, upon his oath deposed and said:
That all persons, firms, associations, corporations or other organizations furnishing
labor and/or materials have been paid in Rill;
That the wage scale established by the City Council in the City of Fort Worth, has
been paid in full; and
That there are no claims pending for personal injury and/or property damages;
On Contract described as:
SENDERA RANCH EAST, PH VIII, SEC 2
WATER, SANITARY SEWER, PAVING,DRAINAGE
AND LIGHTING IMPROVEMENTS
City Project#: N/A
CITY OF FORT WORTH
STATE OF TEXAS
CONATSER CONSTRUCTION TX, LP
�J
Brock Huggins
Subscribed and sworn to before me this 8'day of April -
ACF U Bertha Gianulis Notary Public in Tarrant County, Texas
CD �� �� Notary Public for
r State of Texas
My commission expires:09/18/2015
CONSENT OF OWNER ❑
SURETY COMPANY ARCHITECT ❑
CONTRACTOR ❑
TO FINAL PAYMENT SURETY ❑
Conforms with the American Institute of OTHER
Architects, AIA Document G707
Bond No 0185064
PROJECT:
(name, address)Sendera Ranch East Phase VIII, Section 2
Fort Worth TX
TO (Owner)
FLENNAR HOMES OF TEXAS LAND AND ARCHITECT'S PROJECT NO:
CONSTRUCTION,LTD AND THE CITY OF FORT 7
WORTH CONTRACT FOR:
Sendera Ranch East Phase VIII,Section 2-Water,Sanitary Sewer,
Street,Storm Drain&Lighting Improvements
Fort Worth TX CONTRACT DATE:
CONTRACTOR: CONATSER CONSTRUCTION TX, L.P.
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
(here insert name and address of Surety Company)
BERKLEY INSURANCE COMPANY
475 Steamboat Road
Greenwich CT 06830 , SURETY COMPANY
on bond of there insert name and address of Contractor)
CONATSER CONSTRUCTION TX, L.P.
5327 Wichita St.
Forest Hill TX 76119-6035 , CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to (here insert name and address of Owner)
LENNAR HOMES OF TEXAS LAND AND CONSTRUCTION, LTD AND THE CITY OF FORT WORTH
Fort Worth TX , OWNER,
as set forth in the said Surety Company's bond.
IN WITNESS,WHEREOF,
the Surety Company has hereunto set its hand this 8th day of April,2015
BERKLEY INSURANCE COMPANY
/ Surety Company
Attest: r))L LI-I t< 2�Lc r�f SLI —!�, -93/1 11,6-j
(Seal). Signature of Authorized Representative
Rabbi Morales Attorney-in-Fact
Title
NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS,
Current Edition
ONE PAGE
No. BI-7280e
POWER OF.ATTORNEY
BERKLEY INSURANCE COMPANY
WILMINGTON,DELAWARE
NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully.
KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly
-- organized and existing under the laws of the State of Delaware, having its principal office in Greenwich, CT, has made, constituted
and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna; Don E. Cornell; Lisa M Bonnot;
Vena DeLene Marshall; Sophinie Hunter; Robbi Morales; or Kelly A. Westbrook of Aon Risk Services Southwest, Inc. of
Dallas, TX its true and lawful Attorney-in-Fact, to sign its name as surety only as delineated below and to execute, seal,
- acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that
no single obligation shall exceed Fifty Million and 00/100 U.S. Dollars(U.S.S50,000,000.00),to the same extent as if such bonds
=- had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own
proper persons.
This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware,
without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following
resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25,2010:
RESOLVED, that, with respect to the Surety business written by Berkley Surety Group, the Chairman of the Board, Chief
Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant
Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney-in-fact named therein
to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the
corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such
attorney-in-fact and revoke any power of attorney previously granted;and further
RESOLVED, that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances,
or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the
manner and to the extent therein stated;and further
= RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and
�,
further
RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any
_ power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or
other suretyship obligation of the Company;and such signature and seal when so used shall have the same force and effect as
though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any
person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have
ceased to be such at the time when such instruments shall be issued.
IN WITNESS WHEREOF, the Corppany has ca e, these presents to be signed and attested by its appropriate officers and its
corporate seal hereunto affixed this `day of 2015.
Attest: Berkley Insurance Company
(Seal) By By
Ira S. edermanJe Hafter
Senior Vice President&Secretary Se o e President
WARNING: THIS POWER INVALID IF NOT PRINTED ON BLUE"BERKLEY"SECURITY PAPER.
STATE OF CONNECTICUT)
ss:
V : COUNTY OF FAIRFIELD )
Sworn to before me, a Notary Public in the State of Connecticut, this 21 rrday ofc�.�IA— 2015, by Ira S. Lederman and
Jeffrey M. Hafter who are sworn to me to be the Senior Vice President and Secretary, and the Senior Vice P id it respectively,of
> t Berkley Insurance Company. MARIA C.RUNDBAKEN
= NOTARY PUBLIC -y'�- C�
MY COMMISSION EXPIRES Notary Public,State of Connecticut
Z ,J APRIL 30,2019
CERTIFICATE
Z
1, the undersigned, Assistant Secretary of BERKLEY INSURANCE COMPANY, DO HEREBY CERTIFY that the foregoing is a
3 true, correct and complete copy of the original Power of Attorney; that said Power of Attorney has not,been revoked or rescinded
and that the authority of the Attorney-in-Fact set forth therein, who executed the bond or undertaking to which this Power of
Attorney is attached, is in full force and effect as of this date.
Given under my hand and seal of the Company,this 8 th day of Aril 2015
(Seal)
Andr w
W WIL14AN JIM, JM
O
April 28, 2015
N. Fort Worth—Sendera Ranch,Phase 8-2
To Whom It May Concern,
This letter will serve as Lerurar Homes of Texas Land and Construction,LTD. written
acknowledgement and agreement that Conatser Site Services TX, L.P. will not be charged
liquidated damages related to the Sendera Ranch, Phase 8-2 development.
Regards,
Kyle Dickerson
Lei-mar Homes
Project Manager
Office: 469.587.5309
Cell: 817.829.3190
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH,TX
1707 Market Place Blvd,Suite 100,Irving,TX 75063
FORT WORTH
REV:02/20/07
TR.A_NSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
1) CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
Conatser Construction Sendera Ranch East Phase VIII, Section 2
DOE Inspector DOE Nzintber
Carlos Vasquez 7191
DOE Inrpeeror Project Manager
❑ Water❑ Waste Water❑ Storm DrainageE/I Pavement Khal Jaafari
Initial Contract Amount _ ProiectDiffindry
215'� t 5 ZO 5 ; 0 Simple ® Routine 0 Complex
Final Contract Amount Date
4/24/2015
H)PERFORIVIANCE EVALUATION
0-Inadequate I -Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N RATL\iG(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 3 8 6
2 Public Notifications 5 Y 2 20 10
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 3 60 45
Work Pe ioiTucd 15 Y 3 60 45
6 Finished Product 15 Y 3 60 45
7 Job Site Safety 15 Y 3 60 45
8 Traffic Control Maintenance 15 Y 3 60 45
9 Daily Clean Up 5 Y 3 20 15
10 Citizen's Complaint Resolution 5 Y 3 20 15
11 Property Restoration 5 Y 3 20 15
12 After Hours Response. 5 Y 3 20 15
13 Project Completion 5 Y 3 20 15
TOTAL ELEMENT SCORE(A) 336
BONUS POINTS(25 Maxunum)(B)
TOTAL,SCORE(TS) 336
IlTj CONTRACTOR'S RATING
Maximum Score(IVIS)=448 or sum of applicable element score max mums which= 448
Rating( [TS/MS]*100%) 336 / 448 = 75%
Performance Category Good
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to <g0%=Good >80%=Excellent
Inspector's Comments(INCLUDING EULAINATION OF BONUS POINTS AWARDED)
Signature DOE Inspector Signature Contractor,
C/
Signature DOE Inspector's Supervisor
CONTRACTOR'S CONINIENTS
TRANSPORTATION i ND PUBLIC WORKS
The City of FortWorth •1000 Throckmorton Street•FortWorth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
FORTWORTH REV:G2/22/07
�r
TRANSPORTATION AND PUBLIC,WORKS
CONTRACTOR'S EVALUATION OF CITY
1)PROJECT P< FORIViATIO-N Date: 114/24/2015
11vame of Contractor I Project Name
(Conatser Construction iSendera Ranch East Phase VM, Section 2
!DOE Inspector -- ^ --- Project Monager
Carlos Vasquez lKhal Jaafari
'DOE Number JProjectDculry Type of Contract
7191 Simple Routine 0 Complex I E] water E] waste water❑ Storm DrainageD Pavement
Initial Contract Amount71 Final Contract Amount _
20. 7 5 ��7, 20. 53~
II)PERFORNL4NCE EVALUATION
0-Inadequate 1 -Deficient 2 -Standard 3 - Good 4-Excellent
ELENFPNT RATL IG ELEMENT RATING I
(0-4) j (0-4)
JINSPECTION EVALUATION IPLANS &SPECIFICATIONS
1 Availability of Inspector 3 11 Accuracy of Plans to Existing Conditions
3
2 Knowledge of Inspector t 3 12 Clarity&Sufficiency of Details
13 Accuracy of Measured Quantities 3 13 Applicability of Specifications
4 Display Of Professionalism _ `1_3 14 Accuracy of Plan Quantities S 1
(5 Citizen Complaint Resolution � PROJECT(MANAGER EVALUATION_
6 Performance- Setting a Valve Crews,Labs � -,7 11 Knowledge And/Or Problem Resolution 1 7,
ADIVIINISTRATION _ 12 Availability of Project Manager
i 1 Change Order Processing Time 13 Communication
12 Timliness of Contractor Payments D F4 Resolution ofUtility Conflicts 1 �
13 Bid Opening to Pre-Con Meeting Timeframe 3
III) COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S CONVY1ENTS
TRANSPORTATION - ND PUBLIC WORKS
; s The City of Fort Worth• 1000 Tlirockmorton Street•Fort Worth,TX 76012-6311
(817) 392-7941 •Fax: (817) 392-7845
FORT WORTH
TRANSPORTATION AND PUBLIC WORKS
STATEMENT OF CONTRACT TIME
STATEMENT#
FINAL STATEMENT# 1 DOE 1 7191
NAME OF PROJECT: Senders Ranch East Phase VIII,Section 2 Contractor Conatser Const
YEAR:j 2015
PROJECT NO.: FINAL INSPECTION DATE 402015
2233 1 WD CD
CONTRACT TIME 90 1 1 X
PERIOD FROM: I 44IMS TO: I4P1 ti BEG - Mouth I IDEVELOPI
WORK ORDER EFFECTIVE: I IM212M SEO /n MID !n n 187.8%
DAY OF MONTH DAYS REASON FOR DAY OF MONTH DAYS REASON FOR
CHARGED DAYS CREDITED CHARGED DAYS CREDITED
1 Wed 0 oth 16 Wed
2 Thu 0 oth 17 Thu
3 Fri 0 oth 18 Fri
4 Sat 0 oth 19 Sat
5 Sun 0 oth 20 Sun
6 Mon 0 oth 21 Mon
7 Tue 0 oth 22 Tue
8 Wed 0 oth 23 Wed
9 Thu 0 oth 24 Thu
10 Fri 0 oth 25 Fri
11 Sat 0 oth 26 Sat
12 Sun 0 oth 27 Sun
13 Mon 0 oth 28 Mon
14 Tue 0 oth 29
1b i Wed 0 oth 30
31
NIA
Wk"&Hol Was Ud Oth
Not Applicable SAT,SUN,and WEATHER UTILITIES OTHERS DAYS TOTAL DAYS
HOLIDAYS RELOCATE CHARGED
THIS PERIOD 0 0 0 15 0 15
PREVIOUS PERIOD 0 169 169
TOTAL TO DATE 0 0 0 Mi -4"F 184
OFFICIAL RECORD
REMARKS:
time stopped on 319115 substantlally complete
tR"S, TX
a _
NISIX"Jum. Signature
(FriatNsme Carlos V*ues
coN7 m;t DAn lT DIBn=-- 1 A=2016