HomeMy WebLinkAboutContract 45924-A2 CITY SECRETAR'
AMENDMENT No. 2 RACT NO° 45�a�f
TO CITY SECRETARY CONTRACT
WHEREAS, the City of Fort Worth (CITY) and Shield Engineering
Group, PLLC. (ENGINEER) made and entered into City Secretary
Contract No.45924, (the CONTRACT) which was authorized by M&C C-
26932 on the 26th day of August, 2014 in the amount of
$244,534 .00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment
Number 1 in the amount $135,352 . 00 authorized on the 18th day of
March, 2015 M&C C-27190; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Water Sanitary Sewer Replacement Contract 2014, WSM - A; and
WHEREAS, it has become necessary to execute Amendment No.2 to
the CONTRACT to include an increased scope of work and revised
fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and
through their duly authorized representatives, enter into the
n following agreement, which amends the CONTRACT:
m
m 1 .
0
3 Article I of the CONTRACT is amended to include the
-a� additional engineering services specified in a proposal dated
I" May 11, 2015 a copy of which is attached hereto and incorporated
o herein. The cost to City for the additional design services to be
v' performed by Engineer totals $25, 616. 00 .
2 .
Article II of the CONTRACT is amended to provide for an
increase in the fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall be an
amount of $405,502 . 00 .
3 . OFFICIAL RECORD
CITY SECRETARY
All other provisions of the Contract, which are O" ITX
Page -1-
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date last written by a
signatory, below.
APPROVED:
City of Fort Worth ENGINEER
Shield En 'neering, Group, PLLC
Fernando Costa . Crai . Barnes, P. E.
Assistant City Manager Pre ent
DATE: ic4i s` DATE: 65' / 8' 15
APPROVAL RECOMMENDED:
/J-9 z Y
2
Andrew T Cronberg, .
Assistant Director, ater Department
APPROVED AS TO FORM AND LEGALITY: M&C: NA
Date: NA
WC x
Douglas'*. Black
Senior Assistant City Attorney
ATTEST: 01000
�GG
i 0
y J. Kayser i °tT �
City Secretary
S OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Page -2-
May 11, 2015
Robert Sauceda
Project Manager
City of Fort Worth Water Department
1000 Throckmorton Street
Fort Worth, TX 76102
Re: Water and Sanitary Sewer Replacements Contract 2014 WSM-A: CPN 02369
Dear Robert,
Shield Engineering Group (SEG) is pleased to submit the following as amended services to the original
contract shown above:
• Prepare Sanitary Sewer Plan and Profiles to replace existing lines M-6, $11,940
L-644and L-5363 (approximately 1020 LF). Plans include sewer (SS Part 2 Yr 2 CIP)
details, overall sewer map exhibit, and existing sewer service connections.
Topographic survey services for design is included in this task item.
• Revise plan sets to move Sylvania, Retta, Ackers, Blevins, Colonial $2,760
and First sewer and water design plans from the Part 2 Year 2 CIP (W&SS Part 3 Non-CIP)
plan submittal into the Part 3 Non-CIP plan submittal.
(approximately 35 sheets)
• Provide approximately 8 hours of efforts with the Transportation $1,020
and Public Works Group for the incorporation of specifications, (TPW Part 2 & Part 3)
details and bid proposal provided by TPW into the Part 2 and
Part 3 bid books. This scope assumes that TPW will be signing and
sealing any necessary details and specs.
• Provide Bid Phase Services for Part 2 and Part 3 construction plans. $4,025
Both bid services include a pre-bid meeting at the City with the (W&SS Part 2 Yr 2 CIP)
Contractors. $4,025
(W&SS Part 3 Non-CIP)
• Additional Reproduction Costs for Part 2 and Part 3 construction plans. $750
(W&SS Part 2 Yr 2 CIP)
$750
(W&SS Part 3 Non-CIP)
10% sub markup 346
$25,616
Subtotal
Water $6,328
Sewer $ 18,268
TPW $ 1,020
Total $25,616
Shield Engineering Group, PLLC
1200 W. Freeway, Suite 300, Fort Worth, TX 76102 • office (817) 810-0696 • fax (817) 810-0372
_V Email: info@segpllc.com • www,shieldengineeringgroup.com
Total change/addendum to the contract
Original contract $244,534
Amendment 1 $135,352
Amendment 2 $25,616 (Water Dept Cost$24,596; TPW Dept Cost $1.020)
Revised contract $405,502
The new contract amount will be $405,502. See Attachment A for detailed scope of Amendment 2 Water and
Sanitary Sewer Improvements.
Please feel free to contact me with any questions or comments.
Sincerely,
Craig Barnes,P.E.
President
Shield Engineering Group,PLLC
Enc:Attachment A for Amendment 2
Shield Engineering Group, PLLC
1200 W. Freeway, Suite 300, Fort Worth, TX 76102 • office (817) 810-0696 • fax (817) 810-0372
Email: info@segplic.com • www.shieldengineeringgroup.com
!
k
& 2 -
7 kkK*)
|