Loading...
HomeMy WebLinkAboutContract 45924-A2 CITY SECRETAR' AMENDMENT No. 2 RACT NO° 45�a�f TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Shield Engineering Group, PLLC. (ENGINEER) made and entered into City Secretary Contract No.45924, (the CONTRACT) which was authorized by M&C C- 26932 on the 26th day of August, 2014 in the amount of $244,534 .00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount $135,352 . 00 authorized on the 18th day of March, 2015 M&C C-27190; and WHEREAS, the CONTRACT involves engineering services for the following project: Water Sanitary Sewer Replacement Contract 2014, WSM - A; and WHEREAS, it has become necessary to execute Amendment No.2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the n following agreement, which amends the CONTRACT: m m 1 . 0 3 Article I of the CONTRACT is amended to include the -a� additional engineering services specified in a proposal dated I" May 11, 2015 a copy of which is attached hereto and incorporated o herein. The cost to City for the additional design services to be v' performed by Engineer totals $25, 616. 00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $405,502 . 00 . 3 . OFFICIAL RECORD CITY SECRETARY All other provisions of the Contract, which are O" ITX Page -1- amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER Shield En 'neering, Group, PLLC Fernando Costa . Crai . Barnes, P. E. Assistant City Manager Pre ent DATE: ic4i s` DATE: 65' / 8' 15 APPROVAL RECOMMENDED: /J-9 z Y 2 Andrew T Cronberg, . Assistant Director, ater Department APPROVED AS TO FORM AND LEGALITY: M&C: NA Date: NA WC x Douglas'*. Black Senior Assistant City Attorney ATTEST: 01000 �GG i 0 y J. Kayser i °tT � City Secretary S OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page -2- May 11, 2015 Robert Sauceda Project Manager City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth, TX 76102 Re: Water and Sanitary Sewer Replacements Contract 2014 WSM-A: CPN 02369 Dear Robert, Shield Engineering Group (SEG) is pleased to submit the following as amended services to the original contract shown above: • Prepare Sanitary Sewer Plan and Profiles to replace existing lines M-6, $11,940 L-644and L-5363 (approximately 1020 LF). Plans include sewer (SS Part 2 Yr 2 CIP) details, overall sewer map exhibit, and existing sewer service connections. Topographic survey services for design is included in this task item. • Revise plan sets to move Sylvania, Retta, Ackers, Blevins, Colonial $2,760 and First sewer and water design plans from the Part 2 Year 2 CIP (W&SS Part 3 Non-CIP) plan submittal into the Part 3 Non-CIP plan submittal. (approximately 35 sheets) • Provide approximately 8 hours of efforts with the Transportation $1,020 and Public Works Group for the incorporation of specifications, (TPW Part 2 & Part 3) details and bid proposal provided by TPW into the Part 2 and Part 3 bid books. This scope assumes that TPW will be signing and sealing any necessary details and specs. • Provide Bid Phase Services for Part 2 and Part 3 construction plans. $4,025 Both bid services include a pre-bid meeting at the City with the (W&SS Part 2 Yr 2 CIP) Contractors. $4,025 (W&SS Part 3 Non-CIP) • Additional Reproduction Costs for Part 2 and Part 3 construction plans. $750 (W&SS Part 2 Yr 2 CIP) $750 (W&SS Part 3 Non-CIP) 10% sub markup 346 $25,616 Subtotal Water $6,328 Sewer $ 18,268 TPW $ 1,020 Total $25,616 Shield Engineering Group, PLLC 1200 W. Freeway, Suite 300, Fort Worth, TX 76102 • office (817) 810-0696 • fax (817) 810-0372 _V Email: info@segpllc.com • www,shieldengineeringgroup.com Total change/addendum to the contract Original contract $244,534 Amendment 1 $135,352 Amendment 2 $25,616 (Water Dept Cost$24,596; TPW Dept Cost $1.020) Revised contract $405,502 The new contract amount will be $405,502. See Attachment A for detailed scope of Amendment 2 Water and Sanitary Sewer Improvements. Please feel free to contact me with any questions or comments. Sincerely, Craig Barnes,P.E. President Shield Engineering Group,PLLC Enc:Attachment A for Amendment 2 Shield Engineering Group, PLLC 1200 W. Freeway, Suite 300, Fort Worth, TX 76102 • office (817) 810-0696 • fax (817) 810-0372 Email: info@segplic.com • www.shieldengineeringgroup.com ! k & 2 - 7 kkK*) | 2 � ■� C.'4 E d§oL�. � oxo ,Lm 1a. i2at� R§ CO ` � ! &� ■ . , - � ) 7 . k u - )■ I` k� f•, �.) ! | } /\ - - -0 :2o . k! _ir iz }§ 19 t (j\k27 / § | £�!; tE )§ \ = Ao 13 4!§