Loading...
HomeMy WebLinkAboutContract 46685 Developer and Project Information Cover Sheet: Developer Company Name: Roanoke 35/114 Partners,L.P. Address, State,Zip Code:201 Main St, Suite 3100 Fort Worth TX 76102 Phone : 817-255-5780 E-Mail: KEbeling@FineLineMail.com Authorized Signatory/Title: William V Boecker/Manager Project Name and Brief Description: Champions Circle—Tanger Blvd/Bucees Blvd Project Location: SW quad of SH 114&I-35 W Plat Case No.: FP-14-039 Plat Name: Champions Circle Mapsco: 643-Q Council District: 7 City Project No : 02409 CFA: 2014-071 DOE: 7356 To be complete y sta _ Received by: Date: 5 �'1 6M c-) M M C3 3 N OFFICIAL RECORD ►-` CITY SECRETARY N FT.WORTH,TX i COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. L906 A WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements")related to a project generally described as Champions Circle—Tanger Blvd./Bucees Blvd ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the Proj ect. NOW,THEREFORE,For and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer acknowledge acceptance process requires the Developer's contractor 9WEIGlAtnRESORD 2 CITY SECRETARY FT. WORTHo TX affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub-contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City- approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water(A) X , Sewer (A-1) X , Paving (B) X , Storm Drain (B-1) X , Street Lights & Signs (C)X E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of 3 Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the 4 community facilities to be installed hereunder. I Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, it whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, 5 damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its 6 agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) 7 Cost Summary Sheet Project Name: Champions Circle—Tanger Blvd/Bucees Blvd CFA No.: 2014-071 DOE No.: 7356 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developers Cost A. Water and Sewer Construction 1. Water Construction $334,203.17 2.Sewer Construction $46,597.18 Water and Sewer Construction Total $ 380,800.35 B. TPW Construction 1.Street $ 693,933.98 2.Stone Drain $ 831,475.96 3.Street Lights Installed by Developer $ 102,970.00 TPW Construction Cost Total $ 1,628,379.94 Total Construction Cost(excluding the fees): $ 2,009,180.29 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 7,616.01 D. Water/Sewer Material Testing Fee(2%) $ 7,616.01 Sub-Total for Water Construction Fees $ 15,232.02 E. TPW Inspection Fee(4%) $ 61,016.40 F. TPW Material Testing(2%) $ 30,508.20 G. Street Light Inspsection Cost $ 4,118.80 H. Street Signs Installation Cost $ 3,325.00 Sub-Total for TPW Construction Fees $ 98,968.40 Total Construction Fees: $ 114,200.42 Financial Guarantee Options(Choose one) Amount Mark choice Bond= 100% $ 2,009,180.29 Completion Agreement=100%/Holds Plat $ 2,009,180.29 Cash Escrow Water/Sanitary Sewer-125% $ 476,000.44 Cash Escrow Paying/Stone Drain=125% $ 2,035,474.93 Letter of Credit= 125%w/2yr expiration period $ 2,511,475.36 x 8 IN TESTIMONY WHEREOF,the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager,attested by its City Secretary,with the corporate seal of the City affixed, and said Developer has execut this instrument vi qua ruplicate, at Fort Worth, Texas this -,14 '�Y4 day of_ 20 CITY OF FORT WORTH-Recommended by: Water Department Transportation&Public Works Department zv. V W Wendy Chi-BAbulal, EMBA, P.E. DouglasDY. Wiersig, P.E. Development Engineering Manager Director Approved as to Form & Legality: Approved by City Manager's Office Douglas . Black Fernando Costa Assistant City Attorney Assistant City Manager M&C No. Date: ATTEST: o $g �W g 8 Ma J. Kayser % 0.."* Z City Secretary J ?.�00000oos x� ATTEST: DEVELOPER: Roanoke 35/114 Partners,LP By: Roanoke 35/114 Genpar,LLC Signature Signature: (Print)Name: Print Name:William V Boecker Title:Manager OFFICIAL RECORD CITY lIECR�Tai�'Y 9 FT.WORT"t TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Location Map ® Exhibit A: Water Improvements ® Water Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Estimate ® Exhibit B: Paving Improvements ® Paving Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 10 �t jr y� t_J 100�4 PROJECT LOCATION '� ��� Ell c n FTI•IT WN 0 1000 2000 1"=1000" BURY CHAMPIONS CIRCLE 777 Man Stmt Suite 800 FT. WORTH, TEXAS VICINITY MAP Fol Wbrlh,Term.78102 7d.(817)887-0101 F.(817)881-SW I TSPEBF-1018 TBPLS IF-1010]802 �e021118 WATER LINE IMPROVEMENTS DAM 03-12-2015 I SCALE: V-1000' MAYM Or. RM I RLE R\01092x4\3000 \0HM 15\WC... PMEcr Na =0o2N—a000a ` ~ W Q \ \ Z ui \ Q W Q cr a cr 3: m m \ \ LULLw w =X WLU F_ F_ Q a VI \ e\\\ So SO 00 x x cr w LLI W W d d Co 11 I p \. \ 7 I' 1 a J 2� �x WZ W W �4j N . . M6InR LU ~ I� g ;!4,D td v F \\ z I rips !4m 1 I � o. W W m �\ LU Z / N �\\ Ln fn I I o o I i30 . o OU N M o � o IIf°�n m"' R `pM .+ Y I I u J m I I I S 1 I I 1 I I o WZ = Z S J :2 1.- -J �z it m LLL I W Q LLJ Q =xx ¢ ¢ 33 mW 3 � H Z 33 33 m 11J W W LU z z N N J ad cn cn 00 O X X x of W W d d a \ T O � I I \ LU II � I I � :Dei°yoy I la a \ w LU 0. Z I \\ 0 � Q I Ig U H w I 0) Z W ►-I 1: m .:. Z Z d O J I II $ _ \\��•� H I� � a3� o J m it 0 W I J m 1 F_ /� \ H z I 1 po 3 ce ZI I I u� 3 m Z < I l a<� m 1 I{U I I I ---3 f+1 0u I i 31I o 0 -----s m o o - O M Do H m Mall A g a N O o I a��LLa JLC � �3mk' Y u Y J 00 I IJ u ' O m I o I I wLL, F- z � w \ I i z z J H I I w m I w w0 0 Of Q X ' J 0 0 0 0 =cu j Z o o � i i i Z I W mom p j I C7 ZZ nnnn i W FF as as I J V) (1) 0000 ww aaaa I I I I I ,, I � < II p � ' ■� I I � III I � m 41 II L-1 I \ O S co d co WCL p p \\\s V r M W YYID U 130 z 0 U0 Jam_ .�._I m 11 U 2 $• 2Z m $� s �°�$� J $In I I - wV rMM a a.CO � o m�� Z co Y _ IoM =II 03 CL a 5L i %0rn Y OR'j��U z € io I '00 I o 0 0 co LO oWilk 0 m \ M re) Z W LU LLLI a 0 1 \ \\ ULl � co jr CL d a e CL °z CL CL J O \\ `\ --- mr4i o iI y m ow 0 nn `. ZZ ca.4v Jm I V 05 � C<L in a 00 J O 75 m M N1 1 U J0 Jm o M I "�s�= n o ( I � czm J t0 M I FLL��r� N_ M J m I I 1, 0 I , I 0 CONSTRUCTION COST ESTIMATE HIJRP#:R010928430003 PROJECT NAME: CHAMPIONS CIRCLE A C E R A G E: 0.00 BY: JM P H A S E: Tanger Blvd D A T E: 13-May-15 CHECKED: (;I- FILE FFILE NAME: DATE PREPD: REVISED: APPROXIMATE UNIT TOTAL ITEM NO. DESCRIPTION UNIT QUANTITY PRICE AMOUNT A.WATER DISTRIBUTION SYSTEM 3311.0061 4"P.V.C.WATERLINE LF 10 $15.39 $153.90 3311.0461 12-P.V.C.WATERLINE LF 1,851 $39.60 $73,299.60 3311.0681 24"CONCRETE WATERLINE LF 64 $22817 $14,609.28 3311.0001 DUCTILE IRON WATER FITTINGS WI RESTRAINT TON 3.03 $2,850.00 $8,635.50 3311.0021 6303 FITTINGS LS 1 $1,800.00 $1,800.00 3312.3001 4"GATE VALVE&BOX EA 1 $950.00 $950.00 3312.3002 6"GATE VALVE&-Box EA 6 $1,116.00 $6,696.00 3312.3005 12-GATE VALVE&BOX EA 9 $2,692.00 $24,228.00 3312.4211 24"X12-TAPPING SLEEVE AND VALVE EA 2 $18,322.00 $36,644.00 33122602 4"WATER METER VAULT EA 1 $10,000.00 $10,000.00 3312.2804 6"WATER METER VAULT EA 1 $25,000.00 $25,000.00 3312.0108 CONNECT TO EXISTING WATER LINE EA 2 $19,167.00 $38,334.00 9999.0001 24"WATERLINE LOWERING LS 1 $39,621.00 $39,621.00 3305.0005 12-WATERLINE LOWERING EA 2 $5,454.00 $10,908.00 9999.0002 RELOCATE EXISTING BLOWOFF VALVE EA 1 $5,230.00 $5,230.00 3312.0001 FIRE HYDRANT ASSEMBLY EA 5 $3,790.00 $18,950.00 3311.0462 CSS BACKFILL LF 100 $57.00 $5,700.00 3305.01 TRENCH SAFETY MEN LS 1 $3,150.00 $3,150.00 &SANITARY SEWER SYSTEM 3331.4115 8"P.V.C.PIPE(0'-10'DEEP) LF 616 $15.73 $9,689.68 3331.4108 6"P.V.C.PIPE(0'-1(Y DEEP) LF 21 $14.10 $296.10 9999.0004 ADDITIONAL LINE DEPTH(ILF PER VF) VF 2,040 $1.69 $3,447.60 3339.1101 f DIAMETER MANHOLE EA 3 $3,540.00 $10,620.00 3339.1102 6 DIAMETER DROP MANHOLE EA 1 $16,293.00 $16,293.00 9999.0005 ADDITIONAL MH DEPTH(>67 VF 33 $308.00 $10,164.00 9999.0006 CONNECT TO EXIST.S.S. EA 1 $1,950.00 $1,950.00 3305.0109 TRB4CHSAFETY LF 637 $1.08 $687.96 9999.0003 TESTING(EXCLUDING GEOTECH.) LF 637 $1.32 $80.84 C.STORM SEWER SYSTEM 3341.0201 21'R.C.P. LF 144 $53.71 $7,734.24 3341.0205 24"R.C.P. LF 104 $70.05 _ $7,285.20 3341.0302 30"R.C.P. LF 192 $88.16 $16,926.72 3341.0309 36"R.C.P. LF 50 $122.49 $6,124.50 3341.0409 48'R.C.P. LF 423 $176.00 $74,448.00 3341.0602 60'R.C.P. LF 324 $263.00 $85,21200 3341.1502 Bks'RC.B. _ LF 608 _ $392.00 $238,336.00 3341.1503 Bk6'R.C.B. LF 734 $429.00 $314,886.00 3349.5001 19 M.ET EA 4 12,694.00 $10,776.00 3349.7001 f DROP M.ET EA 2 $2,433.00 $4,866.00 3349.7002 6 DROP INLET EA 1 $3,844.00 $3,844.00 3349.0102 STORM SEWER MANHOLE RISER EA 2 $1,071.00 $2,142.00 3349.0003 JUNCTION BOX EA 1 $6,510.00 $6,510.00 3349.1000 8k6'HEADWALL EA 1 $14,283.00 $14,283.00 0241.3201 REMOVE EXISTING RCB LF 30 1390.00 $11,700.00 0241.4401 REMOVE EXISTING HEADWALL LS 1 $7,500.00 $7,500.00 3137.0101 CONCRETE RIPRAP SY 120 _ $78.00 $9,360.00 3305.0109 TRENCH SAFETY LF 2579 $2.38 $6,138.02 9999.01)(13 TESTING&TV INSPECTION LF 2579 $1.32 $3,404.21) BURY 1 2015-05-13 Champions Circle CFA Cosl.xls CONSTRUCTION COST ESTIMATE BURY#:R010928430003 PROJECT NAME: CHAMPIONS CIRCLE A C E R A G E: 0.00 BY: JM P H A S E: Tanger Blvd D A T E: 13-May-15 CHECKED: CF FILE NAME: DATE PREPD:' REVISED: APPROXIMATE UNIT TOTAL ITEM NO, DESCRIPTION UNIT QUANTITY PRICE AMOUNT D.STREET PAVING 3213.0103 8"REINFORCED CONCRETE STREET PVMT. SY 12,671 $49.55 $627,862.78 9999.0007 PAVEMENT HEADER LF 315 $29.08 $9,160.20 3213.0302 5 SIDEWALK LF 1,340 $19.04 $25,513.60 3213.0502 BARRIER FREE RAMPS EA 9 $1,100.00 $9,900.00 9999.0008 STREET BARRICADE EA 2 $695.00 $1,790.00 0241.1300 SAWCUT AND REMOVE EXIST.CURB LF 61 $6.00 $366.00 0241.1100 REMOVE EXISTING ASPHALT PAVING SY 123 $55.80 $6,863.40 3217.0003 STRIPING-4"STRIPE LF 4,146 $2.00 $8,292.00 3471.0001 TRAFFIC HANDLING M(y 2 $7.119M E.MISCELLANEOUS ITEMS 3441.3003 STREET LIGHT EA 10 $10,297.00 $102,970.00 3441.4OD3 STREET SIGNS E1 SUMMARYBus 11II(IIII.M.Ou A.WATER DISTRIBUTION SYSTEM $323,909.28 B.SANITARY SEWER SYSTEM $53,989.18 C.STORM SEWER S 1,475.96 D STREFT AND ALLEY PAVEMENT $693,933.98 TOTAL ESTIMATED COST $2,009,603.40 BURY 2 2015-05-13 Champions Circle CFA Cost.xls