Loading...
HomeMy WebLinkAboutContract 44344-A2 CITY SECRETARY �. CONTRACT NO. SECOND AMENDMENT TO CITY SECRETARYCONTRACT NO.44344 WHEREAS, on April 3, 2013, the City of Fort Worth ("City") and Javier Villagomez d/b/a GTO Construction, a sole proprietorship, ("Contractor") made and entered into City Secretary Contract No. 44344 (the "Contract") for Lead-Safe program ("LSP") services as approved by the City Council on February 19, 2013 in M&C G-17816; WHEREAS, the Contract provided payment to Contractor for abatement of lead-based paint hazards or lead-based paint for the Lead Safe Program under the Lead Hazard Reduction and Demonstration Program using grant funds received by the City from the United States Department of Housing and Urban Development as accepted by the City Council on January 10, 2012, in M&C C-25398; WHEREAS, the Contract was for a 1 year term from April 3, 2013 through April 2, 2014 and provided for 4 additional 1 year extensions of the term; WHEREAS, the First Amendment erroneously identified the first term as running from April 18, 2013 through April 17, 2014 and extended the term for an additional year to expire April 17, 2015; WHEREAS, the Parties have agreed to extend the Contract for an additional 1 year term beginning April 18, 2015 through April 2, 2016, the correct ending date of the additional term, and to revise the prices paid by the City for Contractor's services; and WHEREAS, it is the mutual desire of City and Contractor to amend the Contract to meet Contract objectives. NOW, THEREFORE, City and Contractor hereby agree to amend the Contract as follows: I. The first sentence of ARTICLE 5. TERM OF CONTRACT is amended to be and read as follows: M C-) M "This Contract shall commence as of the Effective Date and shall automatically expire M upon the earlier of the expenditure of$300,000.00 or April 2 2016 (the "Expiration Date"), if not terminated sooner or extended as described below." 3 D o� Attachment C attached to the Contract is hereby replaced with the attached Attachment C Revised 4/2015. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX SECOND CONTRACT AMENDMENT CSC NO.44344 Page 1 Lead-Safe Program---Javier Villagomez d/b/a GTO Construction Rev.5/2015 III. All other terms and conditions of City Secretary Contract No. 44344 not amended herein remain unaffected and in full force and effect, are binding upon the Parties, and are hereby ratified by the Parties. Capitalized terms not defined herein shall have meanings assigned to them in the Contract. [REMAINDER OF PAGE LEFT INTENTIONALLY BLANK] SECOND CONTRACT AMENDMENT CSC NO.44344 Page 2 Lead-Safe Program---Javier Villagomez d/b/a GTO Construction Rev. 5/2015 ACCEPTED AND AGREED. ATTEST: Q`C .�Z TY OF FORT WORTH a 0 ity Secr ty —44 emandozzbs- SFX a, Assistant City Manager M&C G-17816 02/19/20 ate:°sA APPROVED AS TO FO GALITY" X1, Vicki S. Ganske, Senior Assistant City Attorney CONTRA TOR er lllagomez, l7wrier Date: _5' `i !S OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX SECOND CONTRACT AMENDMENT CSC NO.44344 Page 3 Lead-Safe Program---Javier Villagomez d/b/a GTO Construction Rev.5/2015 ATTACHMENT C-REVISED 4/15 RFP Le*Contractors-Pricin& Material Labor Unit Negotiated Item Cost Unit Cost Cost Price 1.Set up of Interior Containment EA $ 220.00 EA $200.00 $420.00 2.Set up of Mini Containment $75.00 EA $ 125.00 EA $200.00 3.Set up of Exterior Containment EA $ 140.00 EA $160.00 $300.00 4.Removal of hazardous lead dust per room $50.00 EA $ 75.00 EA $125.00 1.Fascia board $1.25 LF $ 2.00 LF $3.25 2.Soffit $1.50 LF $ 2.00 LF $3.50 3.Wood deck $100 SF $ 1.75 SF $2.75 4.Roof Replacement SQ $ 80.00 SQ $105.00 $185.00 5.Vinyl Soffit LF LF $2.20 $ 3.30 $5.50 6.Replace 1"x 12"trim LF LF 2.00 $ 3.00 $5.00 7.Replace 1"x 8"trim LF LF $1.80 $ 2.70 $4.50 8.Replace 1"x 6"trim LF LF $1.60 $ 2.40 $4.00 9.Replace 1"x 4"trim LF LF $1.40 $ 2.10 $3.50 10.Replace 1"x 2"trim LF LF $0.90 $ 1.35 $2.25 1.Remove ceiling $1.25 SF $ 2.75 SF $400 2.Replace wooden posts 4"x4" $20.00 EA $ 30.00 EA $50.00 3.Replace wooden posts 4"x6" EA $ 30.00 EA $25.00 $55.00 4.Enclose ceiling with 5/16"Hardipanel Siding $1.50 SF $ 3.50 SF $500 erior Wall 1.Wet scrape and encapsulate $1.50 SF $ 3.00 SF $4.50 2.Remove/replace damaged wood siding $1.30 SF $ 3.00 SF $4.30 3.Wet scrape,prime,paint exterior(Wood Siding Clapboard) $1.00 SF $ 3.00 SF $4.00 SECOND CONTRACT AMENDMENT CSC NO.44344 Page 4 Lead-Safe Program---Javier Villagomez d/b/a GTO Construction Rev.5/2015 4.Wet scrape,prime,paint exterior(Cement Siding rile) $1.00 SF $ 2.00 SF $3.00 S.Remove/replace cement siding the $14.58 SF $ 4.00 EA $18.58 6.Install vinyl siding $1.38 SF $ 2.07 SF $3.45 7.Replace 1"x 4"trim $1.20 LF $ 1.80 LF $3.00 1.Replace interior window trim $1.00 LF $ 1.50 LF $2.50 2.Replace exterior window trim $1.00 LF $ 2.00 LF $3.00 3.Remove,wet scrape,reinstall old windows $2.30 UI $ 3.00 UI $5.30 4.Install new windows(Vinyl) $1.75 UI $ 2.00 UI $3.75 5.Install new windows(Wood) $3.00 UI $ 2.50 UI $5.50 6.Install Picture Window $1.60 UI $ 2.00 UI $3.60 7.Replace window sill $6.00 LF $ 9.00 LF $15.00 8.Replace 1'x 8"trim $1.80 LF $ 2.70 LF $4.50 9.Removal and reinstallation of burglar bars $ 50.00 EA $50.00 1.Abate friction points $25.00 EA $ 200.00 EA $225.00 2.Install new prehung interior 24"flush door $102.40 EA $ 153.60 EA $256.00 2.Install new prehung interior 30"flush door $131.00 EA $ 125.00 EA $256.00 3.Install new prehung interior 32"flush door $102.40 EA $ 153.60 EA $256.00 4.Install new prehung interior 36"flush door $131.00 EA $ 125.00 EA $256.00 4.Install new prehung interior 24"6 panel door $102.40 EA $ 153.60 EA $256.00 5.Install new prehung interior 30"6 panel door $131.00 EA $ 125.00 EA $256.00 6.Install new prehung interior 32"6 panel door $102.40 EA $ 153.60 EA $256.00 7.Install new prehung interior 36"6 panel door $131.00 EA $ 125.00 EA $256.00 8.Replace 36"prehung wooden exterior door $200.00 EA $ 260.00 EA $460.00 9.Replace 36"prehung metal exterior door $200.00 EA $ 260.00 EA $460.00 10.Replace 32"prehung metal exterior door $200.00 EA $ 260.00 EA $460.00 11.Replace 32"prehung wooden exterior door $200.00 EA $ 260.00 EA $460.00 12.Replace 1"x 8"trim $1.80 LF $ 2.70 LF $4.50 13.Replace 1"x 6"trim $1.60 LF $ 2.40 LF $4.00 14.Replace 1"x 4"trim $1.40 LF $ 2.10 LF $3.50 15.Replace interior doorjamb $66.00 EA $ 99.00 EA $165 SECOND CONTRACT AMENDMENT CSC NO.44344 Page 5 Lead-Safe Program--Javier Villagomez d/b/a GTO Construction Rev.5/2015 16.Replace exterior doorjamb $90.00 EA $ 135.00 EA $225.00 17.Replace threshold $26.00 EA $ 39.00 EA $65.00 1.New 1/4"sheetrock drywall $1.25 SF $ 2.50 SF $3.75 2.New 3/8"sheetrock drywall $1.25 SF $ 2.50 SF $3.75 3.New 1/2"sheetrock drywall $1.25 SF $ 2.50 SF $3.75 4.New pre-finished wooden wall paneling $1.25 SF $ 2.25 SF $3.50 5.Wet-scrape,prime and paint interior components $1.50 SF $ 2.00 SF $3.50 1.Remove/replace wall cabinets $40.00 LF $ 65.00 LF $105.00 2.Remove/replace base cabinets $60.00 LF $ 60.00 LF $120.00 3.Remove/replace bathroom vanity base $200.00 EA $ 100.00 EA $275.00 4.Replace shelf $ 6.50 $1.50 LF LF $8.00 1.Remove baseboard 2"and replace with like materials $1.10 LF $ 0.90 LF $2.00 2.Remove baseboard 4"and replace with like materials $1.50 LF $ 1.00 LF $2.50 3.Remove baseboard 6"and replace with like materials $1.50 LF $ 1.00 LF $2.50 4.Paint and stabilize baseboard $1.00 LF $ 1.00 LF $2.00 5.Install new vinyl sheet floor covering $1.50 SF $ 2.25 SF $3.75 6.Sand,seal and varnish wood floors $1.00 SF $ 4.00 SF $5.00 7.Install new carpet and pad $8,00 YD $ 12.00 YD $20.00 1.Remove soil-up to 3" $8.50 SY $ 6.50 $15.00 2.Backfilling with new soil and sod $16.00 YD $ 9.00 $25.00 3.Labor rate for carpentry services $ 45.00 HR $45.00 4.Markup percentage for equipment,parts and supplies 20.00% EA 5.Labor rate for master plumber $ 40.00 HR $90.00 6.Labor rate for HVAC service $ 85.00 HR $85.00 7.Clean horizontal surfaces with 3 bucket system $25.00 EA $ 100.00 EA $125.00 8.HEPA vac paint chips SF $ 1.00 SF $1.00 1.Packing and storage of all household items $ 200 EA $ 700.00 EA $900.00 SECOND CONTRACT AMENDMENT CSC NO.44344 Page 6 Lead-Safe Program---Javier Villagomez d/b/a GTO Construction Rev.5/2015 2.Storage fees per week $55.00 EA EA $55.00 Moving and covering interior furniture $ 20.00 HR $20.00 13 SECOND CONTRACT AMENDMENT CSC NO.44344 Page 7 Lead-Safe Program---Javier Villagomez d/b/a GTO Construction Rev.512015