HomeMy WebLinkAboutContract 46703 CITY SECRETAW Ll CSJ#0172-06-092
CONTRACT NO, T)LDistrict#02-Fort Worth
Code Chart 64# 15000
Project: US 287 at
Miller Av/Wilbarger Street
intersection
Federal Highway Administration
CFDA#20.205
Not Research and Development
STATE OF TEXAS §
COUNTY OF TRAVIS §
LOCAL TRANSPORTATION PROJECT
ADVANCE FUNDING AGREEMENT
For A
CONGESTION MITIGATION AND AIR QUALITY IMPROVEMENT
PROGRAM (CMAQ) PROJECT
ON-SYSTEM
THIS Local Project Advance Funding Agreement(LPAFA) is made by and between the State of
Texas, acting by and through the Texas Department of Transportation, called the "State and the City
of Fort Worth, acting by and through its duly authorized officials, called the "Local Government."
WITNESSETH
WHEREAS, a Master Agreement between the Local Government and the State has been adopted
and states the general terms and conditions for transportation projects developed through this
LPAFA; and,
WHEREAS, the Texas Transportation Commission passed Minute Order Number 114125 that
provides for the development of, and funding for, the Project described herein; and,
WHEREAS, the Governing Body of the Local Government has approved entering into this LPAFA by
m resolution or ordinance dated 1 , 205, which is attached to and made a part of this
m agreement as Attachment A for th development of the Project. A map showing the Project location
appears in Attachment B, which is attached to and made a part of this agreement.
m
3 NOW, THEREFORE, in consideration of the premises and of the mutual covenants and agreements
of the parties, to be by them respectively kept and performed as hereinafter set forth, it is agreed as
follows:
00
o AGREEMENT
CA
1. Period of the Agreement
The period of this LPAFA is as stated in the Master Agreement, without exception.
� 2. Termination of this LPAFA
rn Termination of this LPAFA shall be under the conditions as stated in the Master Agreement. This
m LPAFA may be terminated by the State if the Project is inactive for thirty-six (36) months or longer
n
and no expenditures have been charged against federal funds.
7D 3. Amendments
Go Amendments to this LPAFA shall be made as described in the Master Agreement, without
a exception.
oR
AFA-LPAFA_ShortGen.doc Page 1 of 8 Revised 11/24/2014
CSJ#0172-06-092
District#02-Fort Worth
Code Chart 64# 15000
Project: US 287 at
Miller Av/Wilbarger Street
intersection
Federal Highway Administration
CFDA#20.205
Not Research and Development
4. Scope of Work
The scope of work for this LPAFA is described as US 287 at Miller Av/Wilbarger Street
intersection improvements to include upgraded traffic and pedestrian signalization and technology,
vehicle and pedestrian illumination and signals, sidewalk, ADA ramps, pavement markings, bus
transit improvements, signage and landscaping, and irrigation.
5. Right of Way and Real Property
Right of way and real property shall be the responsibility of the Local Government as stated in the
Master Agreement, without exception.
6. Utilities
Adjustment of utilities will be provided by the Local Government as required and as stated in the
Master Agreement, without exception.
7. Environmental Assessment and Mitigation
Environmental assessment and mitigation will be carried out as stated in the Master Agreement.
Additionally, before the advertisement for bids, the Local Government shall provide to the State
written documentation from the appropriate regulatory agency or agencies that all environmental
clearances have been obtained.
8. Compliance with Texas Accessibility Standards and ADA
Compliance with Texas Accessibility Standards and the Americans with Disabilities Act(ADA)will
be as stated in the Master Agreement, without exception.
9. Architectural and Engineering Services
Architectural and engineering services will be provided by the Local Government as stated in the
Master Agreement. The Local Government is responsible for performance of any required
architectural or preliminary engineering work. For projects on the state highway system, the
design shall, at a minimum conform to applicable State manuals. For projects not on the state
highway system, the design shall, at a minimum, conform to applicable American Association of
State Highway and Transportation Officials design standards. The State may review and
comment on the work as required to accomplish the public purposes of the State. The Local
Government will cooperate fully with the State in accomplishing these local public purposes to the
degree permitted by State and Federal law.
10. Construction Responsibilities
Construction responsibilities will be carried out by the Local Government as stated in the Master
Agreement.
11. Project Maintenance
Project maintenance will be undertaken as provided for in the Master Agreement, without
exception.
12. Local Project Sources and Uses of Funds
A. A Project Budget Estimate is provided in Attachment C. The State and the Federal
Government will not reimburse the Local Government for any work performed before the
AFA-LPAFA_ShortGen.doc Page 2 of 8 Revised 11/24/2014
CSJ #0172-06-092
District#02-Fort Worth
Code Chart 64# 15000
Project: US 287 at
Miller AvlWilbarger Street
intersection
Federal Highway Administration
CFDA#20.205
Not Research and Development
federal spending authority is formally obligated to the Project by the Federal Highway
Administration. After federal funds have been obligated, the State will send to the Local
Government a copy of the formal documentation showing the obligation of funds including
federal award information. The Local Government is responsible for one hundred percent
(100%)of the cost of any work performed under its direction or control before the Federal
spending authority is formally obligated.
B. If the Local Government will perform any work under this contract for which reimbursement will
be provided by or through the State, the Local Government must complete training before
federal spending authority is obligated. Training is complete when at least one individual who
is working actively and directly on the Project successfully completes and receives a certificate
for the course entitled Local Government Project Procedures Qualification for the Texas
Department of Transportation. The Local Government shall provide the certificate of
qualification to the State. The individual who receives the training certificate may be an
employee of the Local Government or an employee of a firm that has been contracted by the
Local Government to perform oversight of the Project. The State in its discretion may deny
reimbursement if the Local Government has not designated a qualified individual to oversee
the Project.
C. A Source of Funds estimate based on the Transportation Improvement Program (TIP) is also
provided in Attachment C. Attachment C shows the percentage and estimated dollar amount
to be contributed to the project by federal, state, and local sources. The parties agree that the
LPAFA may be amended from time to time as required to meet the funding commitments
based on revisions to the TIP, Federal Project Authorization and Agreement (FPAA), or other
federal document.
D. The Local Government is responsible for all non-federal and non-state funding, unless
otherwise provided for in this agreement or through amendment of this agreement. Where a
Special Approval has been signed by the State, the Local Government shall only in that
instance be responsible for overruns in excess of the amount to be paid by the Local
Government.
E. Prior to the performance of any engineering review work by the State, the Local Government
will pay to the State the amount specified in Attachment C. At a minimum, this amount shall
equal the Local Government's funding share for the estimated cost of preliminary engineering
for the project. At least sixty (60)days prior to the date set for receipt of the construction bids,
the Local Government shall remit its remaining financial share for the State's estimated
construction oversight and construction costs.
F. Whenever funds are paid by the Local Government to the State under this Agreement, the
Local Government shall remit a check or warrant made payable to the "Texas Department of
Transportation Trust Fund." The check or warrant shall be deposited by the State in an escrow
account to be managed by the State. Funds in the escrow account may only be applied by the
State to the Project. If, after final Project accounting, excess funds remain in the escrow
account, those funds may be applied by the State to the Local Government's contractual
obligations to the State under another advance funding agreement with approval by
appropriate personnel of the Local Government.
G. If any existing or future local ordinances, commissioners court orders, rules, policies, or other
directives, including but not limited to outdoor advertising billboards and storm water drainage
AFA-LPAFA_ShortGen.doc Page 3 of 8 Revised 11/24/2014
CSJ#0172-06-092
District#02-Fart Worth
Code Chart 64# 15000
Project: US 287 at
Miller Av/Wilbarger Street
intersection
Federal Highway Administration
CFDA#20.205
Not Research and Development
facility requirements, are more restrictive than State or Federal Regulations, or if any other
locally proposed changes, including but not limited to plats or replats, result in increased costs,
then any increased costs associated with the ordinances or changes will be paid by the Local
Government. The cost of providing right of way acquired by the State shall mean the total
expenses in acquiring the property interests either through negotiations or eminent domain
proceedings, including but not limited to expenses related to relocation, removal, and
adjustment of eligible utilities.
H. When a Special Approval has been signed by the State so that the Local Government bears
the responsibility for paying cost overruns, the Local Government shall make payment to the
State within thirty (30) days from receipt of the State's written notification of those amounts.
I. The state auditor may conduct an audit or investigation of any entity receiving funds from the
State directly under this contract or indirectly through a subcontract under this contract.
Acceptance of funds directly under this contract or indirectly through a subcontract under this
contract acts as acceptance of the authority of the state auditor, under the direction of the
legislative audit committee, to conduct an audit or investigation in connection with those funds.
Any entity that is the subject of an audit or investigation must provide the state auditor with
access to any information the state auditor considers relevant to the investigation or audit.
J. Payment under this contract beyond the end of the current fiscal biennium is subject to
availability of appropriated funds. If funds are not appropriated, this contract shall be
terminated immediately with no liability to either party.
K. The Local Government is authorized to submit requests for reimbursement by submitting the
original of an itemized invoice in a form and containing all items required by the State no more
frequently than monthly and no later than ninety (90) days after costs are incurred. If the Local
Government submits invoices more than ninety (90) days after the costs are incurred, and if
federal funding is reduced as a result, the State shall have no responsibility to reimburse the
Local Government for those costs.
13. Document and Information Exchange
The Local Government agrees to electronically deliver to the State all general notes,
specifications, contract provision requirements, and related documentation in a Microsoft®Word
or similar document. If requested by the State, the Local Government will use the State's
document template. The Local Government shall also provide a detailed construction time
estimate including types of activities and month in the format required by the State. This
requirement applies whether the Local Government creates the documents with its own forces or
by hiring a consultant or professional provider. At the request of the State, the Local Government
shall submit any information required by the State in the format directed by the State.
14. Incorporation of Master Agreement Provisions
This LPAFA incorporates all of the governing provisions of the Master Agreement in effect on the
date of final execution of this LPAFA, unless an exception has been made in this agreement.
15. Insurance
If this Agreement authorizes the Local Government or its contractor to perform any work on State
right of way, before beginning work the entity performing the work shall provide the State with a
AFA-LPAFA ShortGen.doc Page 4 of 8 Revised 11/24/2014
CSJ#0172-06-092
District#02-Fort Worth
Code Chart 64# 15000
Project: US 287 at
Miller Av/Wilbarger Street
intersection
Federal Highway Administration
CFDA#20.205
Not Research and Development
fully executed copy of the State's Form 1560 Certificate of Insurance verifying the existence of
coverage in the amounts and types specified on the Certificate of Insurance for all persons and
entities working on State right of way. This coverage shall be maintained until all work on the
State right of way is complete. If coverage is not maintained, all work on State right of way shall
cease immediately, and the State may recover damages and all costs of completing the work.
16. Debarment Certification
The parties are prohibited from making any award at any tier to any party that is debarred or
suspended or otherwise excluded from or ineligible for participation in Federal Assistance
Programs under Executive Order 12549, "Debarment and Suspension.' By executing this
Agreement, the Local Government certifies that it and its principals is not currently debarred,
suspended, or otherwise excluded from or ineligible for participation in Federal Assistance
Programs under Executive Order 12549 and further certifies that it will not do business with any
party, to include principals, that is currently debarred, suspended, or otherwise excluded from or
ineligible for participation in Federal Assistance Programs under Executive Order 12549. The
parties to this contract shall require any party to a subcontract or purchase order awarded under
this contract to certify its eligibility to receive federal funds and, when requested by the State, to
furnish a copy of the certification.
17. Cost Principles and Office of Management and Budget (OMB) Audit Requirements
In order to be reimbursed with federal funds, the parties shall comply with the Cost Principles
established in OMB Circular A-87 that specify that all reimbursed costs are allowable, reasonable,
and allocable to the Project.
18. Notices
All notices to either party shall be delivered personally or sent by certified or U.S. mail, postage
prepaid, addressed to that party at the following address:
Local Government: State:
Assistant City Manager Director of Contract Services Office
City of Fort Worth Texas Department of Transportation
1000 Throckmorton Street 125 E. 11 Street
Fort Worth, TX 76102 Austin, Texas 78701
All notices shall be deemed given on the date delivered in person or deposited in the mail, unless
otherwise provided by this agreement. Either party may change the above address by sending
written notice of the change to the other party. Either party may request in writing that notices
shall be delivered personally or by certified U.S. mail, and that request shall be carried out by the
other party.
AFA LPAFA ShortGen.doc Page 5 of 8 Revised 11/24/2014
CSJ#0172-06-092
District#02-Fort Worth
Code Chart 64# 15000
Project: US 287 at
Miller Av/Wilbarger Street
intersection
Federal Highway Administration
CFDA#20.205
Not Research and Development
19. Civil Rights Compliance
The Local Government shall comply with the regulations of the U.S. Department of Transportation
as they relate to non-discrimination (49 CFR Part 21 and 23 CFR Part 200), and Executive Order
11246 titled "Equal Employment Opportunity," as amended by Executive Order 11375 and
supplemented in the Department of Labor Regulations (41 CFR Part 60).
20. Disadvantaged Business Enterprise (DBE) Program Requirements
A. The parties shall comply with the Disadvantaged Business Enterprise Program requirements
established in 49 CFR Part 26.
B. The Local Government shall adopt, in its totality, the State's federally approved DBE program.
C. The Local Government shall set an appropriate DBE goal consistent with the State's DBE
guidelines and in consideration of the local market, project size, and nature of the goods or
services to be acquired. The Local Government shall have final decision-making authority
regarding the DBE goal and shall be responsible for documenting its actions.
D. The Local Government shall follow all other parts of the State's DBE program referenced in
TxDOT Form 2395, Memorandum of Understanding Regarding the Adoption of the Texas
Department of Transportation's Federally-Approved Disadvantaged Business Enterprise by
Entity, and attachments found at web address
htty.//ftp.dot.state.tx.us/oub/txdot-info/bop/dbe/mou/mou attachments.pdf.
E. The Local Government shall not discriminate on the basis of race, color, national origin, or sex
in the award and performance of any U.S. Department of Transportation (DOTyassisted
contract or in the administration of its DBE program or the requirements of 49 CFR Part 26.
The Local Government shall take all necessary and reasonable steps under 49 CFR Part 26 to
ensure non-discrimination in award and administration of DOT-assisted contracts. The State's
DBE program, as required by 49 CFR Part 26 and as approved by DOT, is incorporated by
reference in this agreement. Implementation of this program is a legal obligation and failure to
carry out its terms shall be treated as a violation of this agreement. Upon notification to the
Local Government of its failure to carry out its approved program, the State may impose
sanctions as provided for under 49 CFR Part 26 and may, in appropriate cases, refer the
matter for enforcement under 18 U.S.C. 1001 and the Program Fraud Civil Remedies Act of
1986 (31 U.S.C. 3801 et seq.).
F. Each contract the Local Government signs with a contractor(and each subcontract the prime
contractor signs with a sub-contractor) must include the following assurance: The contractor,
sub-recipient, or sub-contractor shall not discriminate on the basis of race, color, national
origin, or sex in the performance of this contract. The contractor shall cany out applicable
requirements of 49 CFR Part 26 in the award and administration of DOT-assisted contracts.
Failure by the contractor to cavy out these requirements is a material breach of this
agreement, which may result in the termination of this agreement or such other remedy as the
recipient deems appropriate.
21. Federal Funding Accountability and Transparency Act Requirements
A. Any recipient of funds under this Agreement agrees to comply with the Federal Funding
Accountability and Transparency Act (FFATA) and implementing regulations at 2 CFR Part
170, including Appendix A. This agreement is subject to the following award terms:
AFA-LPAFA ShortGen.doc Page 6 of 8 Revised 11/24/2014
CSJ #0172-06-092
District#02-Fort Worth
Code Chart 64# 15000
Project: US 287 at
Miller Av/Wilbarger Street
intersection
Federal Highway Administration
CFDA#20.205
Not Research and Development
http://www.gpo.gov/fdsys/pkq/FR-2010-09-14/pdf/2010-22705.pdf and
http://www.g po.gov/fdsys/pkq/F R-2010-09-14/pdf/2010-22706.pdf
B. The Local Government agrees that it shall:
1. Obtain and provide to the State a System for Award Management (SAM) number (Federal
Acquisition Regulation, Part 4, Sub-part 4.11) if this award provides more than $25,000 in
Federal funding. The SAM number may be obtained by visiting the SAM website whose
address is: https://www.sam.gov/portal/oublic/SAM/
2. Obtain and provide to the State a Data Universal Numbering System (DUNS) number, a
unique nine-character number that allows the Federal government to track the distribution
of federal money. The DUNS number may be requested free of charge for all businesses
and entities required to do so by visiting the Dun & Bradstreet (D&B) on-line registration
website http://fedgov.dnb.com/webform; and
3. Report the total compensation and names of its top five (5) executives to the State if:
I. More than 80% of annual gross revenues are from the Federal government, and those
revenues are greater than $25,000,000; and
ii. The compensation information is not already available through reporting to the
U.S. Securities and Exchange Commission.
22. Single Audit Report
A. The parties shall comply with the requirements of the Single Audit Act of 1984, P.L. 98-502,
ensuring that the single audit report includes the coverage stipulated in OMB Circular A-133.
B. If threshold expenditures are met during the Local Government's fiscal year, the Local
Government must submit a Single Audit Report and Management Letter (if applicable)to
TxDOTs Audit Office, 125 E. 11th Street, Austin, TX 78701 or contact TxDOT's Audit Office at
http://www.txdot.gov/inside-txdot/office/audit/contact.html. The expenditure threshold for fiscal
years beginning prior to December 31, 2014 is $500,000; the expenditure threshold for fiscal
years beginning on or after December 31, 2014 is $750,000.
C. If expenditures are less than the threshold during the Local Government's fiscal year, the Local
Government must submit a statement to TxDOT's Audit Office as follows: 'We did not meet the
$ expenditure threshold and therefore, are not required to have a single audit
performed for FY "
D. For each year the project remains open for federal funding expenditures, the Local
Government will be responsible for filing a report or statement as described above. The
required annual filing shall extend throughout the life of the agreement, unless otherwise
amended or the project has been formally closed out and no charges have been incurred
within the current fiscal year.
23. Signatory Warranty
Each signatory warrants that the signatory has necessary authority to execute this agreement on
behalf of the entity represented.
AFA LPAFA_ShortGen.doc Page 7 of 8 Revised 11/24/2014
CSJ#0172-06-092
District#02-Fort Worth
Code Chart 64# 15000
Project: US 287 at
Miller Av/Wilbarger Street
intersection
Federal Highway Administration
CFDA#20.205
Not Research and Development
THIS AGREEMENT IS EXECUTED by the State and the Local Government in duplicate.
THE LOCAL GOVERNMENT
FQRT
ATTEST: Q� Q City of Fort Worth
°
J-1 By
i Secre $ Fernando Costa
°°% °00000 S Assistant City Manager
EX A
APPROVED AS TO FORM AN APPROVAL RECOMMENDED
By By (IJ �..�
Assistant City Attorney D-010- L Douglas . Wiersig, P.E.
►�+}� G - 2.}L6S Director
Transportation and Public Works
Date: if 2
THE ST F TE S
Kenneth Stewart
Director of Contract Services
Texas Department of Transportation
Date
AFA-LPAFA_ShortGen.doc Page 8 of 8 Revised 11/24/2014
CSJ # 0172-06-092
District# 02-Fort Worth
Code Chart 64# 15000
Project: US 287 at
Miller Av/Wilbarger Street
intersection
Federal Highway Administration
CFDA#20.205
Not Research and Development
ATTACHMENT A
RESOLUTION OR ORDINANCE
AFA-LPAFA_ShortGen.doc Page 1 of 1 Attachment A
4 $
A Resolution
NO. 4438-04-2015
A RESOLUTION AUTHORIZING THE EXECUTION OF A LOCAL PROJECT ADVANCE
FUNDING AGREEMENT WITH THE TEXAS DEPARTMENT OF TRANSPORTATION IN
THE AMOUNT OF $1,232,853.00 TO INCLUDE DESIGN AND CONSTRUCTION FOR THE
MILLER AVENUE AND WILBARGER STREET INTERSECTION AND APPROACHES TO
PROVIDE PEDESTRIAN, VEHICLE AND BUS TRANSIT IMPROVEMENTS
WHEREAS,the Texas Department of Transportation,North Central Texas Council of Governments and
City of Fort Worth all have identified the need for pedestrian, vehicle and bus transit improvements in and around
the intersection of Miller Avenue and Wilbarger Street;and
WHEREAS, A Master Funding Agreement between the City of Fort Worth ("Local
Government") and the Texas Department of Transportation ("State") has been adopted and states
the general terms and conditions for transportation projects developed through a Local Project
Advanced Funding Agreement ("LPAFA"); and
WHEREAS, the Texas Transportation Commission passed Minute Order 114125, dated
November 20, 2014 that provides for the development of, and funding for the Miller Avenue and
Wilbarger Street Intersection Project ("Project') described herein; and
WHEREAS, the Local Government desires to enter into a LPAFA with the State for
engineering, environmental, right-of-way, utilities and construction for pedestrian, vehicle and
bus transit improvements to the Miller Avenue and Wilbarger Street intersection and approaches.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FORT
WORTH THAT:
The City Manager or his designee is authorized to execute a Local Transportation Project
Advance Funding Agreement with the Texas Department of Transportation in the amount of
$1,232,853.00 for engineering, environmental, right-of-way, utilities and construction of the
Miller Avenue and Wilbarger Street intersection improvements to include upgraded traffic and
pedestrian signalization and technology, vehicle and pedestrian illumination and signs, sidewalk,
ADA curb ramps, pavement markings, bus transit improvements, signage, landscaping and
irrigation.
Adopted this 14`x' day of April, 2015.
.Y 00000000
ATTEST: "74%,° Oo°�.®��
o
o g��
d
By — — ---- —¢ $ao ° pd
a o°000000°° p
Mary J. Kays ity Secretary a4�).xAZe�ao.
ht�v'a�
CSJ #0172-06-092
District#02-Fort Worth
Code Chart 64# 15000
Project: US 287 at
Miller Av/Wilbarger Street
intersection
Federal Highway Administration
CFDA#20.205
Not Research and Development
ATTACHMENT B
PROJECT LOCATION MAP
MILLER AVENUE AND 1MLBARGER STREET INTERSECTION IMPROVEMENTS
18JAM
0�LAS
t17
t l ` _ �,� r-•'�'` - x t 1 of p- rM wrsRe �� yN;�
1-
- RR \~t � iS-'t I- (- � i M° � ��
. g
1. akas; f .1
1_.
jj
It
f - •J ¢ T T L�,1 1 c�
CA
ca
y
3.100 GAm
�IIa
DETAtQ P'RO,JECT LOCATIt�#+l
cr�r+aTsurrr.nfryw�w.r�wrn. +swrs.rRr.r.ws.r.w CKY Pro]eaw
TM�rM.R`YIYrYr�I�r�rr rq Mi��rw�Ar�•���rM��T.w��A•�wM�F�Mr•
•M Rr��w ..rr w�r�r w s.w.+r.r..rte.r�M screw DOE$
Ts.esr r rrrr.r rw w w�stir w.mer r�r er.
AFA-LPAFA ShortGen.doc Page 1 of 1 Attachment B
CSJ#0172-06-092
District#02-Fort Worth
Code Chart 64# 15000
Project: US 287 at
Miller Av/Wilbarger Street
intersection
Federal Highway Administration
CFDA#20.205
Not Research and Development
ATTACHMENT C
PROJECT BUDGET ESTIMATE AND SOURCE OF FUNDS
Costs will be allocated based on 80% Federal funding and 20% Local Govemment funding until the
federal funding reaches the maximum obligated amount. The Local Govemment will then be
responsible for 100% of the costs.
Description otal Estimated Federal tate Local
Cost Partici ation iparticieation Participation
ID/Co Cost /o post /o ost
Engineering (by Local 200,000 0% $160,000 % 0 20% 40,000
Govemment
Construction (by Local $857,748 80% $686,198 % 0 0% 1171,550
Government
Subtotal $1,057,748 $846,198 0 $211,550
Environmental Direct State $5,000 0% 4,000 0% $1,000 % 0
Costs
Right of Way Direct State 1 % 0 100% 1 % $0
Costs
Engineering Direct State $5,000 80% $4,000 0% $1,000 D% so
Costs
Utility Direct State Costs 1 % 0 100% 1 % so
Construction Direct State $104,388 0% $83,510 0% $20,878 % 0
Costs
Indirect State Costs $60,715 % 0 100% $60,715 % 0
OTAL 1,232,853 937,708 83,595 211,550
Payment by the Local Government to the State before construction: $0.00
Estimated total payment by the Local Government to the State $0.00
This is an estimate. The final amount of Local Govemment participation will be based on actual
costs.
AFA-LPAFA ShortGen.doc Page 1 of 1 Attachment C
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 4/14/2015 —Ordinance No.21728-04-2015 & Resolution
No.4438-04-2015
DATE: Tuesday,April 14, 2015 REFERENCE NO.: C-27265
LOG NAME: 20MILLER/WILBARGER/BUS 287 INTERSECTION IMPROVEMENTS
SUBJECT:
Adopt Resolution Authorizing Execution of a Local Project Advanced Funding Agreement with the Texas
Department of Transportation in the Amount of$1,232,853.00 for Design and Construction of Pedestrian,
Vehicle and Bus Transit Improvements to the Miller Avenue and Wilbarger Street Intersection,Authorize
Transfer of Funds from the 2014 Bond Program Fund to the Grant Capital Projects Fund in the Amount of
$400,000.00 as Local Participation and Adopt Appropriation Ordinance for a Project Total Amount of
$1,421,303.00(2014 BOND PROGRAM)(COUNCIL DISTRICTS 5 and 8)
RECOMMENDATION:
It is recommended that the City Council:
1.Adopt a Resolution authorizing the execution of a Local Project Advanced Funding Agreement with the
Texas Department of Transportation in the amount of$1,232,853.00 for design and construction of
pedestrian,vehicle and bus transit improvements to the Miller Avenue and Wilbarger Street intersection;
2. Authorize the transfer of funds from the 2014 Bond Program Fund to the Grant Capital Projects Fund in
the amount of$400,000.00($211,550.00 in City's grant matching contribution and$188,450.00 in
independent City costs); and
3. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Grant
Capital Projects Fund for a project total amount of$1,421,303.00.
DISCUSSION:
Execution of this Local Project Advance Funding Agreement(Funding Agreement)with the Texas
Department of Transportation(TxDOT)in the amount of$1,232,853.00 for design and construction of
pedestrian,vehicle and bus transit improvements to the Miller Avenue and Wilbarger Street intersection and
approaches.The Funding Agreement includes$211,550.00 in City grant matching funds.The independent
City costs in the amount of$188,450.00 are separate from the Funding Agreement to minimize State charges.
The table below itemizes the City's grant and independent costs for this project.The total project cost is
$1,421,303.00.
— I LOCAL FUNDS VEDERALISTATEFUNDSI TOTAL FUNDS
FUNDING AGREEMENT,
Design $40,000.00 $160,000.00 $200,000.00
Construction $171,550.00 $686,198.00 $857,748.00
Direct State Costs $0.00 $114,390.00 $114,390.00
Indirect State Costs $0.001 $60,715.00 $60,715.00
Subtotal. $2ll 550.00 $1 02l 303.00 $1232 853.00
INDEPENDENT CITY COSTS:
Project Management $128,450.00 $0.00 $128,450.00
Inspection&Material Testing $60,000.00 $0.00 $60,000.00
ubtotah $188,450.00 $0.00 $188,450.001
TOTAL PROJECT COST: 1 $400,000.001 $1,021,303.001 $1421303.00
Staff will manage both design and construction of the project.Design is scheduled to begin early Summer
2015 with construction early 2016. Construction is estimated to be completed within 12 months. The City of
Fort Worth will be responsible to maintain the traffic signals,illumination and intersection upon completion
of the project.The Fort Worth Transportation Authority(The T)will be responsible for maintaining the bus
transit improvements.
This project is included in the 2014 Bond Program.Available resources within the General Fund will be used
to provide interim financing for these expenses until debt is issued. Once debt associated with this project is
sold,bond proceeds will reimburse the General Fund in accordance with the statement expressing official
intent to reimburse what was adopted as part of the ordinance canvassing the bond election—Ordinance No.
21241-05-2014.
The 2014 Bond Program includes$6,400,000.00 in transportation grant matching funds for street,
intersection, sidewalk and other transportation—related improvements.On August 5,2014 under M&C
C-26906,the City Council authorized$4,000,000.00 in transportation grant match funds for Council District
9 Street Repair and Reconstruction Program.Approval of this Mayor and Council Communication will
authorize $400,000.00 in transportation grant matches funds as the City's funding contribution for the Miller
Avenue and Wilbarger Street intersection improvements,leaving$2,000,000.00 in the 2014 Bond program
transportation grant matches funds for other projects.
This project is located in COUNCIL DISTRICTS 5 and 8,Mapsco 92D.
FISCAL INFORMATION:
The Financial Management Services Director certifies that upon approval of the above recommendations and
adoption of the appropriation ordinance funds will be available in the current capital budget of the Grant
Capital Projects Fund. The City portion of these funds are included in the Fiscal Year 2015 Adopted Budget
of the 2014 Bond Program,per Ordinance No. 21457-09-2014,and funds are available in the General Fund
to pay for expenses which will be incurred on this contract until reimbursement can occur from issuance of
public securities.Funding was approved in the 2014 Bond Program for Transportation Grant Matches in the
amount of$6,400,000.00. Upon approval of this M&C remaining 2014 Bond Program Transportation Grant
Matches funds will be $2,000,000.00.
FUND CENTERS:
TO Fund/Account/Centers FROM Fund/AccounbCenters
2)GR74 472210 020302XXXOQQ $400.000.00 2)0210 $400.000.00
3)GR74 538070 205210255280
5(VARIOUS) 020302XXXXXX $1.421.303.00
CERTIFICATIONS:
Suhmittcd for City Manager's Office by-, Fernando Costa (6122)
Originating Department Head: Douglas W.Wiersig (7801)
Additional Information Contact: Alonzo Linan (8009)
David Jodray (289 1)
ATTACHMENTS
1. 20MILLER WILBARGER BUS287 INTERSECTION IMPROVEMENTS GR74 AO15.docx
2. Funding Agreement.12df
3. MAP MILLER at WIL.BAR_F.R.pdf
4. Resolution Miller Wilbamer Intersection Iml2rov(Revised3.17.15).doc