HomeMy WebLinkAboutOrdinance 17100-08-2006-ORDINANCE NO 17100-08-2006 AN ORDINANCE APPROVING AN AMENDED PROJECT AND FINANCING PLAN FOR TAX INCREMENT REINVESTMENT ZONE NUMBER EIGHT CITY OF FORT WORTH, TEXAS (LANCASTER CORRIDOR TIF), MAHING VARIOUS FINDINGS RELATED TO SUCH AMENDED PLAN PROVIDING FOR SEVERABILITY AND PROVIDING AN EFFECTIVE DATE. WHEREAS, as authorized by Chapter 311 of the Texas Tax Code (the Act") and pursuant to Ordinance No 15775 adopted by the Crty Council of the City of Fort Worth, Texas (the `City") on December 9 2003 the City created Tax Increment Reinvestment Zone Number Eight, City of Fort Worth, Texas (the Zone"), and WHEREAS, on January 22, 2004 the board of directors of the Zone (the `Board") adopted a project and financing plan for the Zone (the `Plan"), as required by Section 311 O 11(a) of the Act; and WHEREAS, in accordance with Section 311 O 11(d) of the Act, on January 27 2004 the Crty Council approved the Plan pursuant to Ordinance No 15844 and WHEREAS, on February 24 2005 the Plan was subsequently amended by the Board pursuant to Board Resolution 2005-02, which amendment was approved by the City Council on March 29 2005 pursuant to Ordinance No 16343-03-2005 and WHEREAS, as authorized by Section 311 O11(e) of the Act, on June 29 2006, and pursuant to Board Resolution 2006-04 the Board amended Section IV of the Plan to add management and adrmnistrahon costs, certain unprovements to the historic T&P Warehouse and surrounding property and construction of public infrastructure associated with the redevelopment of Lancaster Avenue as authorized projects of the Zone, and made certain other Page 1 Ordinance Approving Amendment to Project and Financing Plan Tax Increment Reinvestment Zone Number Eight, City of Fort Worth, T xas --- non-material amendments to the Plan, all as depicted m the underlined language of Exhibit A and recommended that the Plan, as amended, be approved by the City Council, NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS. Section 1. FINDINGS. That the City Council hereby makes the following findings of fact: 1.1 The statements and facts set forth in the recitals of this Ordinance are true and correct. 1.2. That the Plan, as amended, includes all information requnred by Sections 311 O11(b) and (c) of the Act. 1.3. That the Plan, as amended, ns feasible and the amended and restated Plan conforms to the Crty's master plan. 1.4 That on August 15 2006 but prior to the adoption of this Ordinance, the Crty Council held a public hearing on the Plan, as amended, and afforded a reasonable opportunity for interested persons to speak for or against designation of the Zone and approval of the Plan, as amended, as well as for owners of property located nn the Zone to protest the nnclusnon of their property nn the Zone (the `Public Hearing"), as requnred by Section 311 O 11(e) of the Act. 1.5. That notnce of the Public Hearing was pubinshed nn a newspaper having general circulatnon m the Cnty on August 4 2006 which satisfies the procedural requnrement Page 2 Ordinance Approving Amendment to Project and Financing Plan Tax Increment Reinvestment Zone Number Eight, City of Fort Worth, T xas of Section 311 003(c} of the Act that notice of the Public Hearing be so published at least seven (7) days prior to the date of the Public Hearing. Section 2. APPROVAL OF AMENDED PLAN That based on the findings set forth In Section 1 of this Ordinance, the Plan, as amended, is hereby approved. Section 3. DELIVERY OF AMENDED PLANS TO TAXING ENTITIES. That the Econormc and Commumty Development Department is hereby directed to provide a copy of the Plan, as amended, to the governing body of each taxing umt that taxes real property located nn the Zone. Section 4. SEVERABILITY That if any portnon, section or part of a section of this Ordinance is subsequently declared invalid, inoperative or vond for any reason by a court of competent jurisdiction, the remaimng portions, sections or parts of sections of this Ordinance shall be and remain m full force and effect and shall not m any way be impaired or affected by such decision, opimon or judgment. Page 3 Ordinance Approving Amendment to Project and Financing Plan Tax Increment Reinvestment Zone Number Eight, City of Fort Worth, T xas Section 5. EFFECTIVENESS. That this Ordinance shall take effect and be m full force and effect from and after its adoption. AND .IT IS SO ORDAINED ADOPTED AND EFFECTIVE August 15, 2006 APPROVED AS TO FORM AND LEGALITY Peter Vaky Assistant City Attorney Date August 15, 2006 M&C G 15346 Page 4 Ordinance Approving Amendment to Project and Financing Plan Tax Increment Reinvestment Zone Number Eight, City of Fort Worth, T xas Financing Plan and Project Plan for the Tax Increment Reinvestment Zone Number Eight, City of Fort Worth, Texas (Lancaster Corridor TIF) June 29, 2006 Table of Contents I. Description of the Proposed Zone (Pages 3 5) A. Map B Legal Description II. Economic Impact (Pages 6-10) A. Necessary Pubhc/Private Partnerships B Catalyst Redevelopment Projects C Targeted Redevelopment Zones D Anticipated Economic Activity III. Tax Increment Projections (Page 11) IV Project Costs and Financing (Pages 12 14) V Term and Governance (Pages 15 17) 2 I. Description of the Proposed Zone A. TIF Map South ROW West ROW line of 3rd St. hne of Burnett lme ofR7o St. West ROW ~~ i'''°~l~ ~;,,~' ~-`'~~, ~ ~_ ti.,,-. ..tr~~ f ~~ ~ ~ ,:~`"f ,'" r line of :.- ~ ~: - -~ l f~ ~~ -~~, ~,~y~ ~ ~~ Henderson f! ~ -`' ~ ~ North ROW ~~ ~ ~~~,~,-~~-~ ~>'• ~ r.`~ i~~ f _ ''.' '~s_" ~ ~ ; ,~ ~ lme of 7th St. ' " 1 ~,.~/~.-''`~ ~-~ , r~" ~- _ 9 J.•, ~' / " --' _. ~~TH _... __ - ~ .~~~~ .., East ROW ~- ~. ~ z ~ ._ I ~~., ~ ~. _. ~ ... ~ _ _ ~ j ~ .~ ~\ i ~ ~ '~ L~ _ ~ t} 1 lTi `i r ~ I- I; 7* ~~~" ~ ire' T 3-~ _ ~ T~r~l-~b G ~ ~ ~ ,~ - '-.~1 r ~; c • ~ ~ ~~ i. f _ ~= ~ ~ - ~ ~_' 4. ~ . ~ _- __- t~~37L--v »~.w._..~ ~ i t ~ -, ~ ., }. i e ' ~. ~, S .. ~1 North ROW line of I 30 exit at Henderson St. North ROW ~ ~~~ lme of I 30 .~- ~- ~, ~~, ~~ h~ 4 B. Legal Description of the TIF District Beginning at a point of the intersection of a~ro~ection of the west ROW line of Henderson St and the south ROW line of 3r St. thence Northeasterly along the south ROW line of 3rd St. to a point where said line intersects with the west ROW line of Burnett St. thence Southeasterly along the west ROW of Burnett St. to a point where said line intersects the north ROW line of 7th St. thence Easterly along the north ROW line of 7th St. to a point where said line intersects the north ROW line of 7th St. thence Northeasterly along the north ROW line of 7th St. to a point where said line intersects the east ROW line of Calhoun St., thence Southeasterly along the east ROW line of Calhoun St. to a point where said line intersects the north ROW line of Interstate 30 thence Westerly along the north ROW line to a point where said line intersects the north ROW line of the Interstate 30 exit at Henderson St. thence Westerly along the north ROW line of the Interstate 30 exit at Henderson St. to a point where said line intersects the west ROW line of Henderson, thence Northward along the west ROW line of Henderson St. to a point where said line intersects with the south ROW line of 3rd St. which is the point of beginning. Map and Boundary Description prepared by Gideon Toal, Inc. 5 II. Economic Impact A. Necessary Public/Private Partnerships Lancaster Comdor Will Require Pubhc/Pnvate Partnerships to Develop m a Timely Manner The demolition of the former I 30 overhead has repositioned the Lancaster Ave as one of the mayor urban parkways m Fort Worth and Tarrant County and as one of the pnmary gateways to Downtown Fort Worth and the Medical Distract. A repositioned Lancaster Avenue opens the potential of sigmficant redevelopment in the Lancaster Comdor however the redevelopment of the Lancaster Comdor has many challenges and can be sigmficanthy accelerated with the prudent use of public/pnvate partnerships. Several of the contemplated redevelopment projects m the area will serve as a catalyst for further development m the area. The funded Lancaster Avenue roadway and streetscape will be an additional catalyst for further development. LANCASTER STREETSCAPE 7 -. B. Catalyst Redevelopment Projects Other projects in the redevelopment corridor will have spin-off economic benefits that will facilitate further private investment. FORT WORTH P:AMADA HOTEL CONVENTION CENTER ~.~`_~ ~. - ~ ~nM ~~°E-¢ L,"r «,Y, Several significant projects, includnng local and national hnstonc landmarks are poised to redevelop generating new taxes for the local taxing entrtnes and will create economic activity where rt has been dormant for many years. US POST OFFICE 8 ... ~.__ P.... 2K.8 FtSS{3Gl ES <,;~ ~ ~o~p, mu T&P TERMINAL T&P WAREHOUSE C. Targeted Redevelopment Zones It is anticipated that redevelopment will occur throughout the Lancaster Corridor with the use of appropriate public/private partnership incentives. 9 D Anticipated Economic Activity Attachment A details construction that is projected to occur over the next twenty years. By the end of 2005 it is estimated that 108 123 square feet of new property developments will become available wrthm the TIF boundary Likewise, by 2023 rt is estimated that 4 079 999 square feet of new property development will occur within the TIF boundary 10 ,„ III. Tax Increment Projections Attachment B projects the revenue for the TIF over its 21 year life, assuming a 1 5% annual appreciation of the property within the boundary of the TIF Additionally the projects assume new property value resulting from development occurring over the next 21 years In total, the TIF is projected to have revenue of around $45 million during its lifetime 11 IV Project Costs and Financing The TIF District anticipates the capture of increment from the new development outlined m Attachment A and utilizing those additional funds to leverage selective catalyst projects m the Lancaster Corridor This Project Plan includes the following protects. These protect costs are eh~ible for TIF funding. 1. T&P Terminal Buildm~. initial costs of $2 8 million m net present value terms (2003 dollars) for the redevelopment of the T&P Terminal Building (the `T&P Terminal Redevelopment Project") Project costs for the T&P Terminal Redevelopment Protect would include Historic Facade Easement Lease Facade and Site Work Professional Service Costs Improvements to the public right-of way for landscaping and pedestrian connections Environmental Remediation City Fee Support 2. Public Infrastructure Associated with Convention Center Hotel Protect construction and installation of public infrastructure, including street improvements, utility relocations, parking improvements and landscaping of public areas on and adtacent to the two (2) City blocks located on the west side of Houston Street known as Blocks 7 and 8 Tarrant County Convention Center Addition, on which construction by Omni Hotels, Inc of a hotel to support the Fort Worth Convention Center and various other related improvements, including a parking garage, is desired (the `Convention Center Hotel Development Project") Such public infrastructure would be paid for or reimbursed from tax increment remaining after satisfaction of any commitments to the T&P Terminal Redevelopment Project, the T&P Warehouse Redevelopment Protect and any other projects receiving priority of payment as subsequently determined by the TIF District s board of directors, subject to any restrictions specifically imposed by the participating taxing turisdictions. 3. Management and Administration Costs The TIF District s board of directors is authorized to expend up to 5% of annual TIF revenues for management and administrative purposes which allocation shall have 12 priority over-any other TIF protect mcludm~ but not limited to the T&P ~- Terminal Redevelopment Protect and the Convention Center Hotel Development Protect. 4. T&P Warehouse. up to $9 million for assistance with public infrastructure costs associated with the redevelopment of the T&P Warehouse (the `T&P Warehouse Redevelopment Project"), payable as a reimbursement following completion. Protect costs for the T&P Warehouse Redevelopment Protect would include. Environmental remediation and demolition Facade improvements Public streetscape/construction and relocation of utilities Site work on or adtacent to the T&P Warehouse Property Clearing and gradin#; of the T&P Warehouse Property Hardscape and landscape improvements Roof repairs and stabilization of the structure on the roof as necessary to preserve the historic facade of the T&P Warehouse Professional fees directly related to approved protect costs Costs of construchn~ a public plaza Administrative expenses (third party studies reports historical review and legal fees directly related to the protect costs) Reimbursement of City tap and impact fees Interest on any unpaid balance of the reimbursement 5. Public Infrastructure Associated. with Lancaster Avenue Redevelopment construction and installation of public infrastructure, includin street improvements, utllrty relocations parking Improvements and landscapmg_of public areas on and adtacent to all portions of Lancaster Avenue that are within the TIF District. Such public Infrastructure would be paid for or reimbursed from tax increment remaining after satisfaction of anX commitments to the T&P Terminal Redevelopment Protect the T&P Warehouse Redevelopment Protect and any other protects receivin priorrty of payment as subsequently determined by the TIF District s board of directors, subtect to any restrictions specifically op sed by the participating taxing turisdictions. Any additional TIF Protect costs would be subtect to review and approval by the participating taxing jurisdictions. Protects that could be subtect to 13 additional TIF funding, but subject to review and approval by the participating taxing entities would be • U S. Post O~ce• Streets, Utilities, Landscaping, Parking, Facade Protection • Four Blocks North. of Lancaster Public Infrastructure Streets, Utilities, Parking, Landscaping • Water Gardens Improvements Entrances to Lancaster Public Restrooms, Visitor Center Utilities, Streets, Landscaping, Access and Parking 14 V Boundaries,. Term and Governance Boundaries • The boundaries of the TIF District have been proposed to allow taxable properties to contribute to the surrounding Lancaster Corridor catalyst redevelopment projects and allow the taxing jurisdictions to receive additional funds that otherwise would not be collected. • The size and scope of the boundaries includes multiple tax-exempt properties that will benefit from the Lancaster Corridor redevelopment. • Below is a current land ownership map depicting the taxable and tax exempt properties. „. ~~~ ~~ O '~ ~.~ /~ ~.. ~ .~ .~ , ~``~ ~ ~. } +. ~ ~~ f~I I~~~ ` ,~= ~~~ r _ - ___ _ , , ~~ ~ ~~r -~ . ~_~ n ~~ ~ -~I 11.E ~ LANCASTER Lancaster shp C Non-Exempt 1 Church Exemption `~ Charitable Org Exemption Government Exemption 15 Boundaries (continued) • The size of the TIF District is 225 acres or 9 801 000 square feet of area. 225 acres Term • The TIF District expires on the earlier of (i) December 31 2024 or an earlier termination date designated by an ordinance subsequently adopted by the Crty Council of the City of Fort Worth or (ii) the date on which all project costs, tax increment bonds (if any) and interest on those bonds have been paid m full. • A cap on total expenditures is imposed, at 2003 dollars, of $16 000 000 Governance • The Project and Financing Plans only grant the TIF Board the use of $2 8 million in net present value terms for the T&P Terminal Redevelopment Project and any additional available tax increment for public infrastructure and improvements associated with the Convention Center Hotel Development Prod ect. 16 • Any additional expenditure would require participating taxing jurisdiction review and approval and subsequent TIF Board approval. 17 m M Z Q w o ~ v _. 7 V m ~. C 0 2 0 U m w ' m ~~ ~ ~ ~- ~W~ my r F 2Z~Z~ZZ~O2Z~ W W W W W O O W ~~~~W.~.~~~ W W W V ~~O ~ ~ ~u z ~ F~ oo~ _O O_ O O ~~~ C~ ~~oo0oao~~~o ~ f ~fg ig~f if f~ aaaaaa~aa ~000 00000 W a n Q 4 6'< 6'L SS¢ ~ ~ ~3 3~ ~~~~ a ~~ J J ~~~ J ~~~~~~~~~~~~ ~ ~W~~~~~~~~ z '~~ r- Z~ ZmZZZOZaz 22z aGuGauo2o2o2n 20¢ 2o <Z ~iiZ a=~~Z~~~Z rauYm2mcoxmozmZOm a~Z Z~ii~Z~ii Z=~ir ~ m ~ ~ . ~ ~ , o ~ r°~ N E 5R~ S Q4s ~25 RQy~QQ iS 25 3 Q QQQQg ~gq~ $ 6Li F~~ 5~ !y Q ~$ ~$~ef ~25 y N vi~ C C tOH~ C ~~N.SS~ g~~ry S ng ~ i •~8 I~aY E L 6 2 N ~ N N M N M N M M 1 Oil m~m~ ~^~ ~ O ~m"O ~ 8 t0~ m ~M1~ p C( ~lY i ~ ~ ~ 8 m O ^ 0~~ W~ 3 ~ ~ ^A~~ ~ ~R ~ ~a g~ ~~~ : ¢ ~a~s ~ ~6s ~ ~ X ' ~m ,~ [ ~ m _ ~ rio N in s N N r QQ QQ % ~ ~ ~~~ ~ ~ ~g~~ .°a nG~ ~ ~ ~ ~ r iSS~7125 S roKK F~°n e ~ °$ ~~~ ms~e se am s ~ ~~ ~ Y ~g~i ~ ~$ :m M m N N N a S R ~ ~~~~ S~ p~~~ S n~ ~~3 ~~~~m ~9s~~ ~ ?S ~ m ~ . ~ N » ' $,o ~~ ,~ .^~ R~ ! $4~ B mm $ :.Yi m~ ~ s N8' o `?~ ~t mr`4o E o a g s~ _ ~ ;a, a~ a ~ ~~ n ~ ; ~ s~ _ ~ S $ 8° ~ 8 $~ a~ o roo ~~~ o ~ ~ ~ J ~ ~ ~~~ ~ ~5 7 ~a an ~ ~a~~~~~3.~~ad__a`r~ a~ ~ a 555 °°° W~,5555~5~~~5 K SSo S o ~ ~555 55555 ggQ QS.B og _ m~~m~~~mm~ ~mnW~~~w~~ m w~ W$t~ ~~5 ~~ ~~ ~ ~ ~ a m~ s~9 m~m s »~esteeJ 5c 5mmmm5m555~ tj?j?» ~_ mmmmmmmm J ~~>~ >~~>~ W>~> >~>~ >~ ~ g mmm m m m ma n~ o aan ~. a aaaa a ~ nnanaanaLL a a~ °rd ~and n a n.nn a o,c N oa o 0 0 000 00 0 RRR R~ R gO~ 5 m ~S ~ ~e ~ ~~eo 2§2§~n~~,~~~ ~. $ o ~~ ~ bo ~ ~m ~- ~~~~ ~~ ~.~ ~g~ ~u5e~- ~.Sms€c p.~~'~ ~~Yqgg i. o.~.¢P.¢ d` i~0~(( ~~ ~ u ~~ ~ _ic ~ Le 3 2 9 @~ E _ggEE ~$$ ~~0 M.ae a°~~~~ a o. '~ LLaUa ua3 LL m5 mF ~ U 1-Z m 6mLL y.tSmN2J1- ff aLLmmvO ill C y °Nnn°nw mi°o'n°nn`rom°mm°m°~~~'i~~i S.Fi.9 ~i ~i~ mn m$~ {o n~~p°N~V n°DV°nm N~~~~~NNtVN 18 V Q L U w v c v m ~ y 5 d za N ~ a`. a v, m d C a1 Qi U C x (~ 9 a°~U°~ ~NgOggxN+VI {~~yry ~ ~tl4 N ua i ) ~ C+ e F ~ ~ ~ o U U _ ~~ a h^ ~pV ~~ ~ ~ ~ m ~ ~ ~ ~~ N rr~`n~ i ~ ~ ~i ~ n °~ W ~' ~ ~ y~ ;+~ ~ ~ ~ ~ b O N m P O~ ~ ~ ' ((VV G N~ V 0 Q ~. M ` ~ ; p ~ p ~ 6 ~ ~ ~ m • Yj ~ V~ i .- ~ N ~~ m Q ~ I Sf M1 O p N A ry M , OO [9 ~ RA 1 ry ti m ~ rv ~ ~~ h ~ V ~, I < A N ~ pp t7 r ~ O n_ 1 n o r6 fi C 1 t}" ~ H s 9 ~ s- ~ A p~ ._ 15 EV ~ ftl ~ f[{ f i.'J fV -J O '~ yJ i l 1 p ~ i i M } A ~ O In ~ CV ~ Pi + [~ ~ ( I~-t ~ H y + ~t~l ~ ® Q m YS ry N p ~ u'1 ry ~ ~ ~ ti €r; €~:' u~ Y }} [r ~ ~Yyi m% G~ 81 ry Ci m t~ s _ p ~ ~ CO 3~ ~ ~ ~ + ,~ ~ ~v ~ , wp gQ~ p} ~ { ~ ~p ~ O ~ H ~ w ~ ~ p.. R ~.00 17 C p 1 G mVr q ~~ py r S fll p IA o ~' m n( ~ m n N - [[ ~~ [~ i 8 ~~ ~ ~s ~ - ~, ~ ~i ~ ~ F H C Q ', ~ n m m ~ ~. h 1:". I i ~-~ x a .-. G~Ji Q ~ W (L(~yyF 1+ f tM V V ~ ~ ~tL ~i nN fJ O ~ M N ~ ~:'. 7 ~ J _ U pV M z ~ 8 ~ _ 8 ~ i~ w O a t w S ~ ~ ~ a ~ ~ a ~ ~ ~ > _ ~` a a ~ 'z w ¢ ~ w ~ ~ a ,~ ~~ m m Z~ W W J ~ ~ a < W~ O Z y C] O m ~ , m ~ '.~ ~, ~~ ~ ¢~Z ~ O 19 D ~ N R~ n ~' I I I I ,.~. g 4P W i I ~Ryi f (V i 'tlr [V ~ ~ ~ C ~ ~ lV (V C9 n p r' ! -t W o m ~° ~ ~~ ~3~ g :#: ~v a L tll m n l~ ~ $ a ~i `i ~ o ~n ~o ~ w w - A m ~ ~ m ~ ~y rp iV [Pp ~sM c~i m ^ pp ~ N (V p~ y [ii ~j N - a '' Z0.' ('_ ~' rqi ~, n ~ i n ~ ~~ $ Z Q = ~ ~' ~ ~ ~ i m N ~ m r, ~~ .. +~ ~ Q m r . NCH w n p rgr ~ `~ ~ ~ ~ o , ~ ~~ ~ o m i i o t o Ca ~ _ ~ r ~c~ m R - ~ ~ ~ ~ I ~ ~ ~ ~ ~~ N~ i ~ ~ o $ ¢~+ ~ @ ri t i~ D ( y {N'+ m tiJ p ~ I O i K ~ yy~~ 1~ $ N A ry ~ 4, ~A N i N ~ i~ a ~ O Q ~ o0 0 0 0 Q p$ p~Q j O _ j ~ ~ ~@ ~f R' p CO I g g W OOryry fOO N r i N h ~ _ ~ ~v Q t 5 ~ ~ yy1-~ ~ ~ ¢¢c+ ~e6: Q O (y ry N ~y N OJ h of a p W W ~ N n C J ~ " O j O ~ _ _ , w W R l N~i~ LL~} ~ spy ~p @ W 1 ~ ~ {.~ ~ P (p lV ~ ~ ~ L m p g ~~ [Y ID ~ fOb ~(p~ v ~ O ~ y O (~ 1~ ~ ~ 4 ~ t0 x Q H r N ~ ~ m 20 City of Fort Worth, Texas -~ Mayor and Council Communication COUNCIL ACTION Approved on 8/15/2006 Ordinance No 17100-08-2006 DATE Tuesday August 15 2006 LOG NAME 17TIF8 PLAN REFERENCE NO G 15346 SUBJECT Adopt Ordinance Amending the Project and Financing Plan for Tax Increment Reinvestment Zone .Number Eight, City of Fort Worth Texas (Lancaster Corridor TIF) RECOMMENDATION It is recommended that the City Council 1 Hold a public hearing concerning an amendment to the Project and Financing Plan (the Plan) for Tax Increment Reinvestment Zone Number Eight, City of Fort Worth Texas (Lancaster Corridor TIF) which is attached to the attached Ordinance to afford an opportunity for interested persons to speak for or against the recommended approval of the Plan amendment and the TIF's designation as well as for property owners to protest inclusion of their property in the TIF and 2 Close the public hearing and adopt the attached Ordinance approving the Lancaster Corridor TIF Plan amendment. DISCUSSION The Lancaster Corridor TIF project plan initially adopted by the TIF's board of directors and approved by the City Council limited authorized TIF projects to the T&P Terminal Building redevelopment project. On June 29 2006 the TIF Board adopted an amended TIF project plan that adds the T&P Warehouse redevelopment project, Lancaster Avenue Streetscape Improvements and a TIF management fee as additional TIF-eligible projects. This amended Plan does not require the TIF Board to fund any such projects but rather makes them eligible for TIF funding if the TIF Board wishes to provide assistance for those projects at some point in the future The TIF Board also made certain non-material changes to the TIF Plan The amended TIF Plan is included as part of the attached Ordinance All changes to the original TIF project plan are indicated either by adouble-underline for added language or a strikethrough for deleted language Before the amended Plan can take effect, state law requires that the City Council approve the Plan amendment by Ordinance adopted after the holding of a public hearing at which interested persons may speak for or against the amended TIF Plan or the TIF's designation and at which property owners may protest inclusion of their property in the TIF In accordance with state law notice of the public hearing was published in a newspaper having general circulation in the City at least seven days prior to the date of this hearing The Lancaster TIF is located in COUNCIL DISTRICT 9 Logname 17TIF8 PLAN Page 1 of 2 FISCAL INFORMATION/CERTIFICATION The Finance Director certifies that this action will have no material effect on City funds. TO Fund/Account/Centers FROM Fund/Account/Centers Logname 17TIF8 PLAN Page 2 of 2