Loading...
HomeMy WebLinkAboutContract 46107-FP2 cmr sEcRiErAW IfI a�, [Risk epartm rpt of TP&W Const, Services CONTRACT NO. 4 OE# A ate 5 roject age r _ g_ f' CT WORTH, Mana ement J. Page D.O.E. Brotherton CFA Westerman/Scann'SCLEb The Proceeding people have been C ntacted concerning the request for final payment&have released this project for such payment. ATION AND PUBLIC WORKS Clearance Conducted By Shameka Kennedy F PROJECT COMPLETION D.O.E.Ne: 7097 Regarding contract 317097 for ROLLING MEADOWS PHASE 2A2-ST LIGHT as required by the TRANSPORTATION&PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director of the TRANSPORTATION&PUBLIC WORKS upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. Original Contract Prices: $35,127.05 Amount of Approved Change Orders: Ne Revised Contract Amount: Total Cost Work Completed: $35,127.05 Less Deductions: Liquidated Damages: Days @$210.00/Day Pavement Deficiencies: Total Deduction Amount: Total Cost Work Completed: $35,127.05 Less Previous Payments: $0.00 Final Payment Due $35,127.05 Recommended for Acceptance Date i Asst. Dir ctor, TPW - Infrastructure Design and Construction m Accepted f Date C-) Asst. Director, TRANSPORTATION & PUBLIC WORKS m m 0 z Asst. City Manager Date 0 �.. Comments: C205-541200-207320215483 N � O r OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX FoRTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name ROLLING MEADOWS PHASE 2A2 Contract Limits Project Type STREET LIGHTING City Project Numbers 02154 DOE Number 7097 Estimate Number I Payment Number I For Period Ending 4/20/2015 CD City Secretary Contract Number 317097 Contract Time 3CD Contract Date 8/22/2014 Days Charged to Date 185 Project Manager Buckley Contract is 100.00 Complete Contractor INDEPENDENT UTILITY CONSTRUCTION 5109 SUN VALLEY DRIVE FORT WORTH, TX 76119 Inspectors LAYER / BI,EVINS Tuesday,April 21,2015 Page I of 4 City Project Numbers 02154 DOE Number 7097 Contract Name ROLLING MEADOWS PHASE 2A2 Estimate Number I Contract Limits Payment Number I Project Type STREET LIGHTING For Period Ending 4/20/2015 Project Funding UNIT I:STREET LIGHTING IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 RDWY ILLUM ASSMBLY TY 8,11,D-25 AND D 7 EA $1,763.00 $12,341.00 7 $12,341.00 30 2 RDWY ILLUM FOUNDATION TY 1,2,AND 4 7 EA $1,007.00 $7,049.00 7 $7,049.00 3 2"CONDT PVC SCH 40(7) 1035 LF $8.35 $8,642.25 I035 $8,642.25 4 NO 6 INSULATED ELEC CONDR 3105 LF $0.76 $2,359.80 3105 $2,359.80 5 GROUND BOX,SMALL,W/LID APRON 5 EA $947.00 $4,735.00 5 $4,735.00 Sub-Total of Previous Unit $35,127.05 $35,127.05 ------------------- -- ------------------- Tuesday,April 21,2015 Page 2 of 4 City Project Numbers 02154 DOE Number 7097 Contract Name ROLLING MEADOWS PHASE 2A2 Estimate Number I Contract Limits Payment Number I Project Type STREET LIGHTING For Period Ending 4/20/2015 Project Funding Contract Information Summary Original Contract Amount $35,127.05 Change Orders Total Contract Price $35,127.05 Date l Total Cost of Work Completed $35,127.05 Con Less %Retained $0.00 Date s)z1 s Net Earned $35,127.05 Insti pe r Earned This Period $35,127.05 OKi�� Retainage This Period $0.00 Date !!!! � Less Liquidated Damages Pro ect M Days @ /Day $0.00 Date LessPavement Deficiency $0.00 As t. TtUPW,-Infrastructure Design and Construction Less Penalty $0.00 w-Z " ate 5�Z /��� Less Previous Payment $0.00 Director&ontracting Departrmfi Plus Material on Hand Less 15% $0.00 1/'3 Balance Due This Payment $35,127.05 7 a-� .JJ Tuesday,April 21,2015 Page 3 of 4 City Project Numbers 02154 DOE Number 7097 Contract Name ROLLING MEADOWS PHASE 2A2 Estimate Number I Contract Limits Payment Number I Project Type STREET LIGH'T'ING For Period Ending 4/20/2015 Project Funding Project Manager Buckley City Secretary Contract Number 317097 Inspectors LAYER / BLEVINS Contract Date 8/22/2014 Contractor INDEPENDENT UTILITY CONSTRUCTION Contract Time 30 CD 5109 SUN VALLEY DRIVE Days Charged to Date 185 CD FORT WORTH, TX 76119 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $35,127.05 Less %Retained $0.00 Net Earned $35,127.05 Earned This Period $35,127.05 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $35,127.05 Tuesday,April 21,2015 tOFFICIAL RECJ Page 4 of 4 SECRETWORTH, FORTWORTH rev 03/05/07 TRANSPORTATION&PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:I NAME OF PROJECT: Rolling Meadow East Phase 2A2 PROJECT NO.: 2154 CONTRACTOR: Independent DOE NO.: 7097 PERIOD FROM:10/13/14 TO: 04/15/15 FINAL INSPECTION DATE: 21-Apr-15 WORK ORDER EFFECTIVE:10/13/2014 CONTRACT TIME: 50 O WD O CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS THIS 0 0 0 0 185 185 PERIOD PREVIOUS 0 0 0 0 0 0 PERIOD TOTALS 0 0 0 0 185 185 TO DATE *REMARKS: 91 V, - l ►� ��� CONT CTOR ATE INSPECTOR DATE ENGINEERING DEPARTMENT 0 The City of Fort Worth-1000 Throckmorton Street-Fort Worth,TX 76012-6311 (817)392-7941 -Fax:(817)392-7845 FORTWORTH REV:02/20/07 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR I) CONTRACTOR&PRO,IECT DATA Name of Contractor Project Name Independent Utility Construction,Inc. Rolling Meadows East Phase 2A2 DOE Inspector DOE Number Habte Taezaz 7097 DOE Inspector Project Manager ❑ Water ❑ Waste Water ❑ Storm Drainage ❑ Pavement Initial Contract Amount Project Difficulty $35,127.05 0 Simple OO Routine O Complex Final Contract Amount Date $35,127.05 4/27/2015 In PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE 1 Submission of Documents 2 Y 3 8 6 2 Public Notifications 5 N 3 Plans on Site 5 Y 3 20 15 4 Field Supervision 15 Y 3 60 1 45 5 Work Performed 15 Y 3 60 45 6 Finished Product 15 Y 3 60 45 7 Job Site Safety 15 Y 4 60 60 8 Traffic Control Maintenance 15 Y 4 60 60 9 Daily Clean Up 5 Y 3 20 15 10 Citizen's Complaint Resolution 5 Y 4 20 1 20 11 Property Restoration 5 Y 3 20 15 12 After Hours Response 5 N 13 Project Completion 5 Y 3 20 15 TOTAL ELEMENT SCORE(A) 341 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 341 III)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 408 Rating([TS/MSI*100%) 341 / 408 = 84% Performance Category Excellent <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good 2:80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Signature DOE Inspector tLu, A -(�- — Signature Contractor Signature DOE Inspector's Supervisor 7ff.&G�c.._ CONTRACTOR'S COMMENTS OFFICIAL RECORD _ TRANSPORTATION AND PUBLIC WORKS CITY SECRETARY The City of Fort Worth• 1000 Thtockmorton Street•Fort Worth,TX 7012mW1WORTHI TX (817)392-7941 •Fax:(817)392-7845 CONSENT OF OWNER ❑ SURETY COMPANY ARCHITECT CONTRACTOR ❑ TO FINAL PAYMENTSURETY R El OTHE(SIMILAR TO AIA DOCUMENT G707) Bond No. 0965579 PROJECT: Fort Worth&Beazer Homes Texas,L.P. /Street Lighting Improvements to serve (name,address) Rolling Meadows, Phase 2A2,Fort Worth, Texas TO (Owner) ARCHITECTS PROJECT NO: City of Fort Worth I CONTRACTFOR: Above Project 1000 Throckmorton Street Fort Worth, Texas 76102 CONTRACT DATE: CONTRACTOR: Independent Utility Construction,Inc. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the(here insert name and address of Surety Company) Ohio Farmers Insurance Company 555 Republic Drive, Suite 450 Plano, Texas 75074 ,SURETY COMPANY, on bond of(here insert name and address of Contractor) Independent Utility Construction, Inc. 5109 Sun Valley Drive ,CONTRACTOR, Fort Worth, Texas 76119 hereby approves of the final payment to the Contractor, and agrees that the final payment to the Contractor shall not relieve the Surety Company of any of its obligations to(here insert name and address of owner) City of Fort Worth 1000 Throckmorton Street ,OWNER, Fort Worth, Texas 76102 as set forth in the said Surety Company's bond. IN WITNESS WHEREOF, The Surety Company has hereunto set its hand this 27th day of April 2015 OHIO FARMERS INSURANCE COMPANY Surety By Sig re of Au orized Repres ive Attest: (Seal): Kyle W. Sweeney Attorney—in—Fact Title Note:This form is intended to be used as a companion document to the Contractor's Affidavit of Payment of Debts and Claims,Current Edition THIS POWER OF ATTORNEY SUPERCEDES ANY PREVIOUS POWER BEARING THIS SAME POWER`/#AND ISSUED PRIOR TO 04/20/11, FOR ANY PERSON OR PERSONS NAMED BELOW. General POWER NO. 4220052 06 Power Westfield Insurance Co. of Attorney Westfield National Insurance Co. Ohio Farmers Insurance Co. CERTIFIED COPY Westfield Center, Ohio Know All Men by These Presents, That WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, corporations, hereinafter referred to individually as a 'Company' and collectively as 'Companies," duly organized and existing under the laws of the State of Ohio, and having its principal office in Westfield Center, Medina County,Ohio,do by these presents make,constitute and appoint CHARLES D.SWEENEY,MICHAEL A.SWEENEY, KYLE W.SWEENEY, ELIZABETH GRAY,JOINTLY OR SEVERALLY of FORT WORTH and State of TX its true and lawful Attorney(s)-in-Fact, with full power and authority hereby conferred in Its name, place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings, or other instruments or contracts of suretyship- - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - -- - - - - LIMITATION: THIS POWER OF ATTORNEY CANNOT BE USED TO EXECUTE NOTE GUARANTEE, MORTGAGE DEFICIENCY, MORTGAGE GUARANTEE,OR BANK DEPOSITORY BONDS. and to bind any of the Companies.thereby as fully and to the same extent as if such bonds were signed by the President,sealed with the corporate seal of the applicable Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney(s)-in-Fact may do in the.premises. Said appointment is made under and by authority of the following resolution adopted by the Board of Directors of each of the WESTFIELD INSURANCE COMPANY,WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY: 'Be It Resolved,that the President,any Senior Executive,any Secretary or any Fidelity&Surety Operations Executive or other Executive shall be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attorneys)-in-Fact to represent and act for and on behalf of the Company subject to the following provisions: The Attorney-in-Fact. may be given full power and authority for and in the name of and on behalf of the Company,to execute,acknowledge and deliver,any and all bonds, recognizances, contracts, agreements of Indemnity and other conditional or obligatory undertakings and any and all notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such Attorney4n-Fad shall be as binding upon the Company as If signed by the President and sealed and attested by the Corporate Secretary.' 'Be It Further Resolved,that the signature of any such designated person and the seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile,and any power of attorney or certificate bearing facsimile signatures or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which It is attached.' (Each adopted at a meeting held on February 8,2000). In Witness Whereof, WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY have caused these presents to be signed by their Senior Executive and their corporate seals to be hereto affixed this 20th day of APRIL A.D.,2011 . Corporate u.wl �. u••" �„w r.u..,y ,r"asY�,(p �, •'�%oNnLi'.,, 4 WESTFIELD INSURANCE COMPANY Seals ..••-•..,0� y4 r•`�P..••• •.!lsG,; �NSUR{�C WESTFIELD NATIONAL INSURANCE COMPANY Affixed �vr .aK.r tp� O; r 17 Z;n +t�:H�T� • OHIO FARMERS INSURANCE COMPANY �"v► . L i�.a fro. N SEAL :r0n_ ^CM11348 -:59 f �4 •.� .....•.• 4 •'•. .••• J By 4,� : State of Ohio "•' ...........•••`� '"• •.•' . Richard L. Kinnaird, Jr., National Surety Leader and County of Medina ss.: Senior Executive On this 20th day of APRIL A.D.,2011 ,before me personally came Richard L. Kinnaird, Jr. to me known, who, being by me duly sworn, did depose and say,that he resides-In.Medina, Ohio;that he Is Senior Executive of WESTFIELD INSURANCE COMPANY,WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, the companies described In and which executed the above instrument;that he knows the seals of said Companies;that the seals affixed to said instrument are such corporate seals;that they were so affixed by order of the Boards of Directors of said Companies;and that he signed his name thereto by like order. Notarial nN,••�«w,,,w Seal Rt A L ti4 Affixed ,�P,.• ""'-.5�+� a.: \ill/��ti William J. Kahelin,A rney at Law, Notary Public State of Ohio :N n1ll o My Commission Does Not Expire(Sec. 147.03 Ohio Revised Code) County of Medina ss.: ss y %. ' b r I,Frank A.Carrino,Secretary of WESTFIELD INSURANCE COMPANY,WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, do hereby.certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said Companies,which is still In full force and effect;and furthermore,the resolutions of the Boards of Directors, set out in the Power of Attorney are In full force and effect. In Witness Whereof, I have hereunto set my hand and affixed the seals of said Companies at 7tlday of Aril ..»•a°;'^ 2015.,,.- •�" �ttsu" 4� OFFICIA p �asua,c,y� , +ntif. ••� �'•.. L RECORD I E�ARY Ni 3>c za: ,,nT /� .may SE m e g 0• :�'= J f J�d/!! ' ' '' � 'y' o,' •�.1848 '�=AF Frank A. Carrino, Secr to BPOAC2 (combined)(06-02) AFFIDAVIT STATE OF Texas COUNTY OF Tarrant Before me,the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Richard Wolfe, VP Of Independent Utility Construction Inc.,known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Rolling Meadows East Phase 2A-2 BY Richard Wolfe/Vice esi nt Subscribed and sworn before me on this date.27th of April, 2015. Dolvona Andwry *, Public STATE STATETE O OF TEXAS Notary Public mea My Coram,expiros May 11,2017 �y I Tarrant County, Texas FORTWREV:02/22/07 TRANSPORTATION AND PUBLIC,WORKS CONTRACTOR'S EVALUATION OF CITY I)PROJECT INFORMATION Date: 4/27/2015 Name of Contractor Project Name Independent Utility Construction,Inc. Rolling Meadow East Phase 2A2 DOE Inspector Project Manager Habte Taezaz Patrick Buckly DOE Number Project Difficulty Type of Contract 7097 10 Simple O Routine O Complex 0 Water O Waste Water ❑ Storm Drainage 0 Pavement Initial Contract Amount Final Contract Amount $35,127.05 1$35,127.05 Il)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent ELEMENT RATING ELEMENT RATING (0-4) (0-4) INSPECTION EVALUATION PLANS&SPECIFICATIONS 1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector k 2 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities Ll 3 Applicability of Specifications 4 Display Of Professionalism 4 Accuracy of Plan Quantities 5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager 1 Change Order Processing Time 11 3 Communication 2 Tim liness of Contractor Payments 4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timeframe Ill)COMMENTS&SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 d 1 (817)392-7941 •Fax:(817)392-7845