HomeMy WebLinkAboutContract 44406-FP2 FORTWORTH. CS y �4h ( CITY sECRETA W T PORTATION AND PUBLIC WORKS CONTRACT NO. 0 JUN O 3 2015 ICE OF PROJECT COMPLETION D.O.E.Ns: 6565 Regarding con 8yfor WKI EN KIRD SANITARY SEWER REPLACEMENT CONTRACT 2009 W as required by the WATER DEPARTMENT as approved by City Council on 03/05/2013 throw M&C C-26142 the director of the WATER DEPARTMENT upon the recommendation of the Assistant Director of the Transportation& Public Works Department has accepted the project as complete. Original Contract Prices: $1,638,47530 Amount of Approved Change Orders: $68,033.65 Ns 1,2 Revised Contract Amount: $1,706,508.95 Total Cost Work Completed: $1,694,415.70 Less Deductions: Liquidated Damages: Days®$210.00/Day Pavement Deficiencies: Total Deduction Amount: $0.00 Total Cost Work Completed: $1,694,415.70 Less Previous Payments: $1,666,415.70 Final Payment Due $28,000.00 Recommended for Acceptance Date Asst. Director, TPW - Infrastructure Design and Construction Accepted Date . Director, WATER DEPARTMENT - -s- m Asst. City Manager Date n R7 Comments: FUND P253-608170144483/P258-708170144483 2nd Green Sheet due to over-looking line item no.5 on M m Water Side. v OFFICIAL RECORD o CITY SECRETARY c FT.WORTH,TX o D 9C C ndG ? ?5 3 —6114 W4 JUN 0 3 2015 CS q 44Lf 0(0 City Project Numbers 01444 Sji DOE Number 6565 Contract Name WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2009 Estimate Number 24 Contract Limits Payment Number 24 Project Type WATER&SEWER For Period Ending 531/2015 Project Funding Project Manager Chaubey City Secretary Contract Number 44406 Inspectors RODGERS / SALAZAR Contract Date 3/5/2013 Contractor JACKSON CONSTRUCTION LTD Contract Time 200 CD 5112 SUN VALLEY DRIVE Days Charged to Date 299 CD FORT WORTH, TX 76119 Contract is .000000 Complete CITY OF FORT WORTH Eo # 0 b-1 SUMMARY OF CHARGES MICE # Line Fund Account Center Amount Gross Retainage Net Funded -k3-014 4 algmoo Total Cost of work completed $1,694,415.70 WATER DEPARTMENT Las X Retained $0.00 ENGINEERING AND FISCALSERVICES Net Earned $1,694,415.70 Contact Person' gerdena Di -Ext.8429 Earned This Period $28,000.00 ent oval Signatu r Z. Retainage This Period $0.00 DBPAIrfME CHECK PICK-UP YES Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $1,666,415.70 Plus Material on Hand Less 15% $0,00 Balance Due This Payment $28,000.00 Monday,June 01,2015 Page 6 of 6 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2009 WS Contract Limits Project Type WATER&SEWER City Project Numbers 01444 DOE Number 6565 Estimate Number 24 Payment Number 24 For Period Ending 5/31/2015 9t CD City Secretary Contract Number 44406 Contract Time D Contract Date 3/5/2013 Days Charged to Date 299 Project Manager Chaubep Contract is 99.000 Complete Contractor JACKSON CONSTRUCTION LTD 5112 SUN VALLEY DRIVE FORT WORTH, TX 76119 Inspectors RODGERS / SALAZAR Monday,June 01,2015 Page 1 of 6 City Project Numbers 01444 DOE Number 6565 Contract Name WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2009 Estimate Number 24 Contract Limits Payment Number 24 Project Type WATER&SEWER For Period Ending 5/31/2015 Project Funding WATER IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 24"PVC C905 WATER PIPE(CO#2) 2013 LF $108.00 5217,404.00 2013 $217,404.00 2 12"WATER PIPE(CO#2) 1115 LF $46.00 $51,290.00 1115 $51,290.00 3 8"WATER PIPE(CO#2) 8634.4 LF $27.00 5233,128.80 8634.4 $233,128.80 4 6"PVC WATER PIPE(CO#2) 85 LF $27.00 $2,295.00 85 $2,295.00 5 24"GATE VALVE WNAULT 3 EA $28,000.00 $84,000.00 3 $84,000.00 6 12"GATE VALVE 5 EA $2,000.00 $10,000.00 5 $10,000.00 7 8"GATE VALVE(CO#2) 18 EA $1,100.00 $19,800.00 18 $19,800.00 8 6"GATE VALVE 13 EA $775.00 $10,075.00 13 $10,075.00 9 SALVAGE 3/4"WATER METER 264 EA $15.00 $3,960.00 244 $3,660.00 10 SALVAGE FIRE HYDRANT(CO#2) 11 EA $500.00 $5,500.00 11 $5,500.00 11 REMOVE 6"WATER VALVE 13 EA $50.00 $650.00 13 $650.00 12 SALVAGE 24"WATER VALVE 3 EA $175.00 $525.00 2 $350.00 13 T WIDE ASPHALT PVMT REPAIR,RESD(CO#2) 11872.68 LF $30.00 5356,180.40 11872.68 $356,180.40 14 TEMPORARY ASPHALT PAVING REPAIR 6505 LF $11.50 $74,807.50 6505 $74,807.50 (RYAN AVE)(CO#2) 15 6"CONC PVMT REPAIR(CO#2) 386 SY $87.00 $33,582.00 386 $33,582.00 16 4"CONC SIDEWALK(CO#2) 866.64 SF $8.00 $6,933.12 866.64 $6,933.12 17 4'BARRIER FREE RAMP,TYPE A(CO#2) 6 EA $900.00 $5,400.00 6 $5,400.00 18 7"CONC CURB AND GUTTERI815(CO#2) 635 LF $33.00 $20,955.00 635 $20,955.00 19 7"CONC VALLEY GUTTER(CO#2) 32 SY $89.00 $2,848.00 32 $2,848.00 20 TEMPORARY WATER SERVICES I LS $80,000.00 $80,000.00 1 $80,000.00 21 TRENCH SAFETY(CO#2) 3128 LF $0.10 $312.80 3128 $312.80 22 CONCRETE COLLAR(CO 112) 6 EA $415.00 $2,490.00 6 $2,490.00 23 DUCTILE IRON WATER FITTING W/ 4.04 TN $8,800.00 $35,552.00 4.04 $35,552.00 RESTRAINT(CO#2) 24 1"WATER SERVICE(CO#2) 255 EA $530.00 5135,150.00 255 $135,150.00 25 1 1/2"WATER SERVICE 10 EA $1,435.00 $14,350.00 10 $14,350.00 26 2"WATER SERVICE(CO#2) 4 EA $1,990.00 $7,960.00 4 $7,960.00 27 1"WATER SERVICE METER RELOCATION(CO 255 EA $230.00 $58,650.00 255 $58,650.00 #2) 28 1 1/2"WATER SERVICE METER RELOCATION 10 EA $275.00 $2,750.00 10 $2,750.00 29 2"WATER SERVICE METER RELOCATION(CO 3 EA $300.00 $900.00 3 $900.00 #2) Monday,lune 01,2015 Page 2 of 6 City Project Numbers 01444 DOE Number 6565 Contract Name WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2009 Estimate Number 24 Contract Limits Payment Number 24 Project Type WATER&SEWER For Period Ending 5/31/2015 Project Funding 30 CONNECTION TO EXISTING 24"WATER MAIN 2 EA $8,000.00 $16,000.00 2 $16,000.00 31 CONNECTION TO EXISTING 12"WATER MAIN 4 EA $1,000.00 $4,000.00 4 $4,000.00 32 CONNECTION TO EXISTING 8"WATER MAIN 10 EA $1,000.00 $10,000.00 10 $10,000.00 (CO#2) 33 CONNECTION TO EXISTING 6"WATER MAIN 10 EA $1,000.00 $10,000.00 10 $10,000.00 36 FIRE HYDRANT(CO#2) 11 EA $2,400.00 $26,400.00 11 $26,400.00 37 2"WATER AIR RELEASE VALVE VAULT I EA $12,000.00 $12,000.00 1 $12.000.00 38 TRAFFIC CONTROL 6 MO $1,250.00 $7,500.00 6 $7,500.00 39 SWPPP>1 ACRE 1 LS $3,200.00 $3,200.00 1 $1200.00 40 WATER LINE GROUTING(FLOWABLE FILL) 72 CY $140.00 $10,080.00 72 $10,080.00 (CO#2) 41 9"CONCRETE PAVEMENT REPAIR HIGH 226 SY $114.00 $25,764.00 226 $25,764.00 EARLY STRENGTH(CO#1) 42 ADDITIONAL SIGNAGE&BARRICADES FOR 1 LS $13,014.83 $13,014.83 1 $13,014.83 BERRY/RYAN INTERSECTION(CO#1) Sub-Total of Previous Unit $1,615,407.45 $1,614,932.45 SEWER P"ROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 8"DIP SEWR PIPE 52 LF $200.00 $10,400.00 52 $10,400.00 2 8"SEWER PIPE 645 LF $34.00 $21,930.00 645 $21,930.00 3 REMOVE 4'SEWER MANHOLE 4 EA $400.00 $1,600.00 4 $1,600.00 4 4'WIDEASPHALT PVMTREPAIR, 760 LF $39.00 $29,640.00 353.25 $13,776.75 RESIDENTIAL 5 TEMPORARY ASPHALT PAVING REPAIR 52 LF $14.00 $728.00 391 $5,474.00 6 TRENCH SAFETY 744 LF $1.00 $744.00 697 $697.00 7 PRE-CCTV INSPECTION 697 LF $2.00 $1,394.00 8 POST-CCTV INSPECTION 697 LF $1.50 $1.045.50 697 $1,045.50 9 CLAY DAMS 1 EA $150.00 $150.00 1 $150.00 10 4"SEWER SERVICE,2-WAY CLEANOUT 2 EA $780.00 $1,560.00 2 $1,560.00 11 4'MANHOLE 6 EA $2,500.00 $15,000.00 6 $15,000.00 12 MANHOLE VACUUM TESTING 6 EA $150.00 $900.00 4 $600.00 13 CONCRETE COLLAR 4 EA $415.00 $1,660.00 14 4'EXTRA DEPTH MANHOLE 7 VF $300.00 $2,100.00 15 BLOCK SOD PLACEMENT 125 SY $8.00 $1,000.00 750 $6,000.00 Monday,June 01,2015 Page 3 of 6 City Project Numbers 01444 DOE Number 6565 Contract Name WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2009 Estimate Number 24 Contract Limits Payment Number 24 Project Type WATER&SEWER For Period Ending 5/31/2015 Project Funding 16 TRAFFIC CONTROL 1 MO $1,250.00 $1,250.00 1 $1,250.00 17 MANHOLE VACUUM TESTING 6 EA Sub-Total of Previous Unit $91,101.50 $79,483.25 Monday,June 01,2015 Page 4 of 6 s City Project Numbers 01444 DOE Number 6565 Contract Name WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2009 Estimate Number 24 Contract Limits Payment Number 24 Project Type WATER&SEWER For Period Ending 5/31/2015 Project Funding Contract Information Summary Original Contract Amount 51,638,475.30 Change Orders Change Order Number 1 $36,428.83 Change Order Number 2 $31,604.82 Total Contract Price $1,706,508.95 Date Total Cost of Work Completed 51,694,415.70 Contra Less %Retained $0.00 Net Earned $1,694,415.70 at /Zocs Insp oa Su Earned This Period $28,000.00 i�f= Retainage This Period 50.00 Lem Liquidated Damages PrJect M Days @ Day $0.00 Date LasPavement Deficiency $0.00 Directorn?W-Infrastructure Design and Construction Len Penalty $0.00 Date4C-7-If- Less Previous Payment $1,666,415.70 �or/ ' g Department Plus Material on Hand Less 15`/• $0.00 Balance Due This Payment $28,000.00 Monday,June 01,2015 Page 5 of 6 FQRTWORTH TRANSPORTATION AND PUBLIC WORKS STATEMENT OF CONTRACT TIME STATEMENT# FINAL STATEMENT# 24 DOE I ON NAME OF PROJECT: Vhftr and San tary Sewer Replacement Contrera 44406 Contractor Jw*Wn Cons. YEAR:j 2015 PROJECT NO.: FINAL INSPECTION DATE8/91-2014 1414 WD CD CONTRACT TIME ow I x PERIOD FROM: tli1t11201d TO. 5t31lg016 MID - Month I 1uLVxw"a?f4 /N N WORK ORDER EFFECTIVE: I 1I1I hW3BEG 1 n '. MID(yin) DAY OF MONTH DAYS REASON FOR DAY OF MONTH DAYS REASON FOR CHARGED DAYS CREDITED CHARGED DAYS CREDITED 1 ALDP fame 16 Sat 0 AL09011w 2 0 WA 17 Sun 0 stop*" 3 0 NIA 18 Mon 0 fide 4 0 WA 19 Tue 0 Lib-2 Oft 5 0 WA 20 Wed 0 oft 6 0 WA 21 Thu 0 7 0 WA 22 Fri 0 8 0 WA 23 Sat 0 fto ON 9 0 NIA 24 Sun 0 ftothm 10 0 WA 25 Mon 0 ftefte 11 0 WA 26 Tue 0 afty One 12 0 WA 27 Wed 0 stop amt 13 0 WA 28 Thu 0 stop Stns 14 0 NCA 29 0 time 15 0 WA 30 0 stn time 31 0 lime NA VVIm A Mol Wea Ud Oth Not Applicable SAT,SUN,and WEATHER LMLffMS OTHERS DAYS TOTAL DAYS HOLIDAYS RELOCATI CHARGED THIS PERIOD 0 0 0 0 0 0 PREVIOUS PERIOD 0 299 299 TOTAL TO DATE 1 0 1 0 1 0 1 0 1 299 299 REMARKS: Corrected adder!one 24"gate valve.Stop time on 810112014. SRuature: Signature: (Print Name) lRichard comriAcroR DADAT& 6/1 m i r.afFir CITY SECRETARY FT.WORTH,TX City of Fort Worth Inspectors Estimate Worksheet City Project Numbers 01444 Contract Name WATER AND SANITARY SEWER REPLACEMENT DOE Number 6565 Contract Limits Estimate Number 24 Project Type WATER&SEWER Payment Number 24 Control Number 656501 For Period Ending.L—/,J/,a Contract 44406 Contract Date: 3/5/2013 Contract Tim 200 CD Inspectors RODGERS / SAAR Days Charged to Date CD Date Prepared by Inspector t! 01 / Contract is %Complete Construction ID: 9294 Item Description of Items Estimated Uni Unit Cost Previous Quanity Completed Total Cost No. Quanity Quanity for Month Quanity WATER IMPROVEMENTS 1 24-PVC C905 WATER PIPE(CO 2013 LF $108.00 2013 #2) 2 12-WATER PIPE(CO#2) 1115 LF $46.00 1115 3 8-WATER PIPE(CO#2) 8634.4 LF $27.00 8634.4 4 6"PVC WATER PIPE(CO#2) 85 LF $27.00 85 5 24-GATE VALVE WNAULT 3 EA $28,000.00 2 f 51 6 12-GATE VALVE 5 EA $2,000.00 5 7 8-GATE VALVE(CO#2) 18 EA $1,100.00 18 8 6"GATE VALVE 13 EA 5775.00 13 9 SALVAGE 3/4'WATER METER 264 EA $15.00 244 10 SALVAGE FIRE HYDRANT(CO 11 EA $500.00 11 #2) 11 REMOVE 6"WATER VALVE 13 EA $50.00 13 12 SALVAGE 24-WATER VALVE 3 EA $175.00 2 13 4'WIDE ASPHALT PVMT 11872.68 LF $30.00 11872.68 REPAIR,RESD(CO 02) 14 TEMPORARY ASPHALT PAVING 6505 LF $11.50 6505 REPAIR(RYAN AVE)(CO#2) 15 6"CONC PVMT REPAIR(CO#2) 386 SY $87.00 386 16 r CONC SIDEWALK(CO#2) 866.64 SF $8.00 866.64 17 4'BARRIER FREE RAMP,TYPE 6 EA $900.00 6 A(CO#2) Monday,Jane 01,2015 Page 1 RECEIVED JUN - 12M City of Fort Worth Inspector's Estimate Worksheet City Project Numbers 01444 ContractName WATER AND SANITARY SEWER REPLACEMENT DOE Number 6565 Contract Limits Estimate Number 24 Project Type WATER&SEWER Payment Number 24 18 7"CONC CURB AND 635 LF $33.00 635 GUTTER1815(CO#2) 19 7"CONC VALLEY GUTTER(CO 32 SY $89.00 32 #2) 20 TEMPORARY WATER SERVICES 1 LS $80,000.00 1 21 TRENCH SAFETY(CO#2) 3128 LF $0.10 3128 22 CONCRETE COLLAR(CO#2) 6 EA $415.00 6 23 DUCTILE IRON WATER FITTING 4.04 TN $8,800.00 4.04 W/RESTRAINT(CO#2) 24 1"WATER SERVICE(CO#2) 255 EA $530.00 255 25 1 112"WATER SERVICE 10 EA $1,435.00 10 26 2"WATER SERVICE(CO#2) 4 EA $1,990.00 4 27 1"WATER SERVICE METER 255 EA $230.00 255 RELOCATION(CO#2) 28 1 112"WATER SERVICE METER 10 EA $275.00 10 RELOCATION 29 2"WATER SERVICE METER 3 EA $300.00 3 RELOCATION(CO#2) 30 CONNECTION TO EXISTING 24" 2 EA $8,000.00 2 WATER MAIN 31 CONNECTION TO EXISTING 12" 4 EA $1,000.00 4 WATER MAIN 32 CONNECTION TO EXISTING 8" 10 EA $1,000.00 10 WATER MAIN(CO#2) 33 CONNECTION TO EXISTING 6" 10 EA $1,000.00 10 WATER MAIN 36 FIRE HYDRANT(CO#2) 11 EA $2,400.00 11 37 2"WATER AIR RELEASE 1 EA $12,000.00 1 VALVE VAULT 38 TRAFFIC CONTROL 6 M $1,250.00 6 39 SWPPP>1 ACRE 1 LS $3,200.00 1 40 WATER LINE GROUTING 72 CY $140.00 72 (FLOWABLE FILL)(CO#2) Monday,June 01,2015 Page 2 City of Fort Worth Inspector's Estimate Worksheet City Project Numbers 01444 Contract Name WATER AND SANITARY SEWER REPLACEMENT DOE Number 6565 Contract Limits Estimate Number 24 Project Type WATER&SEWER Payment Number 24 41 9"CONCRETE PAVEMENT 226 SY $114.00 226 REPAIR HIGH EARLY STRENGTH(CO#1) 42 ADDITIONAL SIGNAGE& 1 LS $13,014.83 1 BARRICADES FOR BERRY/RYAN INTERSECTION (CO#1) 'estimated Total This Unit $1,615,407.45 Completed Total This Unit $1,586,932.45 Construction ID: 9295 Item Description of Items Estimated Uni Unit Cost Previous Quanity Completed Total Cost No. Quanity Quanity for Month Quanity SEWER IMPROVEMENTS 1 8"DIP SEWR PIPE 52 LF $200.00 52 2 8"SEWER PIPE 645 LF $34.00 645 3 REMOVE 4'SEWER MANHOLE 4 EA $400.00 4 4 4'WIDE ASPHALT PVMT 760 LF $39.00 353.25 REPAIR, RESIDENTIAL 5 TEMPORARY ASPHALT PAVING 52 LF $14.00 391 REPAIR 6 TRENCH SAFETY 744 LF $1.00 697 7 PRE-CCN INSPECTION 697 LF $2.00 8 POST-CCN INSPECTION 697 LF $1.50 697 9 CLAY DAMS 1 EA $150.00 1 10 4"SEWER SERVICE,2-WAY 2 EA $780.00 2 CLEANOUT 11 4'MANHOLE 6 EA $2,500.00 6 12 MANHOLE VACUUM TESTING 6 EA $150.00 4 13 CONCRETE COLLAR 4 EA $415.00 14 4'EXTRA DEPTH MANHOLE 7 VF $300.00 Monday,June 01,2015 Page 3 City of Fort Worth Inspector's Estimate Worksheet City Project Numbers 01444 Contract Name WATER AND SANITARY SEWER REPLACEMENT DOE Number 6565 Contract Limits Estimate Number 24 Project Type WATER&SEWER Payment Number 24 15 BLOCK SOD PLACEMENT 125 SY $8.00 750 16 TRAFFIC CONTROL 1 M $1,250.00 1 17 MANHOLE VACUUM TESTING 6 EA r LY ?stimated Total This Unit $91,101.50 Completed Total This Unit $79,483.25 Total Itemized Amount(Including Change Order $1,706,508.95 / 7-0- DATE DATE C Jun IS Total Cost of Work Completed Inspector Less I—%Retained Net Earnedl die! v Previous Payment $1,666,415.70 Material on Hand 15% Balance Due This Payment S' , o Monday,June 01,2015 Page 4 m w 0 O O oo O O O O O O O O O 7 �n O O O O O 00 N O 7 O O O O p O O O p l� N cn p p N [� O O\ N O+ O O O l� - - oo O oo M O vi V O -- C3 "1 _O O\ O_ ri vi �O 7 m �O �n O N O d N c+1 69 00 69 69 h fV) 69 6fi N V3 00 V3 cNc 69 69 69 69 � 6y 69 69 69 p N N CD 10 m h m 6 G. c ^ o d U O O O O o O O o p O O p O p p O p o o O _o O O O O O O O p O O O O O O N O O O O O O U w 10 l O OO N N O O N O l Oo O M O\ O O O O l� O �n [� M ^ Oo 604 O M oo p 59 69 69 69 O O l 69 �n 6A - 69 69 69 OlQ9 Q9 C G ao N 69 O V) 4�4 w w w w ¢ ¢ Q Q Q Q Q Q w w Y w Q w cn w Aa a a a w w w w w w w w a a v, A w a v, ...� a c rn N ^ c�+1 t+l v7 ,�. 1p ^ `0 N N � � � 1010� c+l w ^ W A Q �+ N O u U � Q h U O N N C4 U cu U st at c4 Q ,o # W W W y U O > W ¢ at F F R' C4 a N O ¢ cv > F c4 O c Fw- 5) r4 a at U at o; > c4 O c4 a a C1 v U U w w 3 > > > > w w D w ¢ a w v > cn z z z Z O U O O Z U u u� N oo 1O N ^ oo D [Q/] c W V] 7 F O 7 7 l [ F F Lam+ O •^ O V1 �•+ 00 O 4J 10 Ol VF 1n 10 t0 00 O. O N r� 7 vi �O loo O N M 7 .O 1 10 10 10 10 10 10 10 10 10 10 10 10 1 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 0 !-+H LO oo 12 0 00 00 00 = 0 2 2 LO 0 ? �? ? ! >o !? oo m w 0 O O O O O O O O O O O O O O O O O O m N O O O O O O O O O O O O O O O O O O O oo O N O O O O O O O Cl Cl O O O O O O ,I- Z> O O O Cl O O O O N Vl Vl V r [V �D O O 'oO d 69 m b9 Vt fJj fA ,-• ,-• N 69 69 -- N +r 69 69 H9 69 69 69 69 b9 69 b9 69 r. co 10 � C a � oa U w O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 omo O V1 O V � W � V D` 69 69 b9 69 /f3 6R 69 69 � S9 69 � Wa N a_ F 4k O r m 0 O 14 Oa, W O U O U V� 0 Cf) V] OU Q W a W W a W w cd c 3 0, 0 N � O ++ _ H N M V rD P4 c0 D` O N m 10 r D\ O N N N r4 N N N N E„i A Vt O r W o. O N m C V't 10 of Cl 10 00 00 00 00 00 rno. rn o. o, o, (7\ Cl 0 0 0 0o co CO 00 00 02 op 00 00 00 CO 00 00 Lo C0 02 00 CO W o\ Q\ M w 0 W r . CD O o v v o Cl O o H M M o � a o 0 00 00 000 N N 34 69 b9 a+ �+ 7 y j O a y w U o w m W o 0 CJ d A � � C E 8 a w wa s H a w U h Q � O N � O r+ H a� G 7 Cq C N w 0 0 0 o v o 0 o O o o O O O ^ o 0 0 0 0 0 � c 0 0 0 v r 0 0 0 0 0 0 F o M O rn v 0 0 0 m V U lD l� 7 10 10 O O rA d N 69 bR bR f5 H9 69 ►w Vi by 69 69 N �n 7 h N N 10 r0 C' N 0� T Q. >r 10 r+'1 10 10 l� s = oa v w o O o o O o o O O o 0 o O o O O O O O O O O O o — O O O O O Cl Cl O V O Oa V N ^+ O O O O6 00 6 7 m 69 6A 69 69Gn y o0 O O 69 N 69 69 69 69 N 69 6'9 v) r� 69 69 w > cn � w a ol u w caw t ON 7 W Q O F, O U c.� z 1 L Cl. w w x d a "' rW F- 0 � w a a U O N t+1 .D t , 77 7 vi .n v� v� �n �n �n v� v� vi .D �O to v `O 1O 1O 1D 'o 1O 1O 0 1O 1O 1D �O �D �O �D 1D 0 � CO 00 00 CO GO CO CO 00 00 OG CO CO OO CO CO CO 00 N w O n n O O O N N N O O O O 0 O OCD m 69 O a O E � 03 m r U F Oy ci 0, r7 a Q Q � = E � c w r F C 0 a U h Q � O N � O H y C RS C .D p M FORTWORTH REV:02120/07 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR CONTRACTOR&PROJECT DATA Name of Contractor Project Name Jackson Construction Water and Sanitary Sewer Replacement Contract 2009 DOE Inspector DOE Number Richard Salazar 6565 EInspector Project Manager 21 Water 21 Waste Water❑ Storm Drainage❑ Pavement Rakesh Chaube Initial Contract Amount Project Difficulty $1,638,475.30 O Simple OO Routine O Complex Final Contract Amount Date $ 1,706,508.95 6/1/2015 In PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE Y/ RATING 0-4 MAX SCORE SCORE I Submission of Documents 2 Y 3 8 6 2 Public Notifications 5 Y 3 20 15 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 3 60 45 5 Work Performed 15 Y 4 60 60 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 3 60 45 8 Traffic Control Maintenance 15 Y 3 60 45 9 Daily Clean U2 5 Y 3 20 15 10 Citizen's Complaint Resolution 5 Y 3 20 15 11 Property Restoration 5 Y 3 1 20 15 12 After Hours Response 5 Y 3 20 15 13 Project Completion 5 Y 3 20 15 TOTAL ELEMENT SCORE(A) 371 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 37I III)CONTRACTOR'S RATING Maximum Score(MS)—448 Qr sum of applicable element score maximums which= 448 Rating([TS/MS[*100%) 371 / 448 93% Performance Category Excellent <20%=Inadequate 209116 to<40%=Deficient 40016 to<60*6=Standard 60'16 to<80*A=Good >_80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Signature DOE Inspector ` Signature Contractor Signature DOE Inspector's Supervisor CONTRACTORS COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth-1000 Throckmorton Street-For W -6311 (817)392-7941 -Fa::(817)392-7845 OFFICIAL RECORD CITY SECRETARY FT- WORTH,TX FORTWORTH REV:007 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY PROJECT INFORMATION Date: 6/1/2015 Name of Contractor Project Name Jackson Construction,LTD Water and Sanitary Sewer Replacement Contract 2009 DOE Inspector Project Manager Richard Salazar Rakesh Chaube DOE Number Project Dculty Tvpe of Contract 6565 O Simple 0 Routine O Complex [DWater El Waste Water❑ Storm Drainage[] Pavement Initial Contract Amount Final Contract Amount 1,706,508.95 $1,694,415.70 II)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent ELEMENT RATING ELEMENT RATING 0-4 0-4 INSPECTION EVALUATION PLANS&SPECIFICATIONS 1 Availability of Inspector 1 Accuracy of Plans to Existin Conditions 2 Knowledge of Inspector 12 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities 3 Applicability of Specifications 4 Display Of Professionalism 4 Accuracy of Plan Quantities 5 Citizen Com taint Resolution PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager 1 Chane Order Processing Time 3 Communication 2 Tfin iness of Contractor Payments 4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timeframe III)COMMENTS&SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector Signature DOE Inspector's Supervisor 01 INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS (a The City of Fort Worth-1000 Throckmorton Street-Fort Worth,TX 76012-6311 (817)392-7941 -Fax:(817)392-7845 FORTWORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR:- PROJECT OR:PROJECT NAME: Water and Sanitary Sewer Replacement Contract 2009 PROJECT NUMBER: 1444 DOE NUMBER: 6565 WATER PIPE LAID SIZE TYPE OF PIPE LF 24" PVC 2013 12" PVC 1115 8" FVC 8634.4 6" PVC 85 FIRE HYDRANTS: 11 VALVES(16"OR LARGER) PIPE ABANDONED SIZE TYPE OF PIPE LF 24" PVC 2013 12" PVC 1115 8" PVC 8634 6" PVC 85 DENSITIES: Yes NEW SERVICES: (255) 1" (10) 1 1/2" (5)2" SEWER PIPE LAID SIZE TYPE OF PIPE LF 8" DIP 52 8" PVC 645 PIPE ABANDONED SIZE TYPE OF PIPE LF 8" PVC 697 DENSITIES: Yes NEW SERVICES: (2)4" PVC TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fac(817)392-7845 March 09,2015 Jackson Construction, LTD 5112 Sun Valley Dr. Fort Worth, TX, 76119 Re:Acceptance Letter Project Name: Water and Sanitary Sewer Replacement Contract 2009 WSM-A Project Type: 01/02 Project Ns: 01444 D.O.E. Ns: 6565 Contract Ns: Dated: N/A To:Whom It May Concern: On September 09,2014 a final inspection was made on the subject project.There were punch list items identified at that time.The punch list items were completed on September 09,2014.The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City.The warranty period will start on September 09,2014,which is the date of the punch list completion and will extend for(2)years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance,please feel free to contact me at (817)392-6051. Yours Truly, Rakesh Chaubey, ,Project Manager / cc: Douglas W.Wiersig,P.E.,Director,T/PW Richard Martinez,Asst.Director T/PW Alonzo Linan,P.E.,Asst.Director T/PW Allen Hall,Acting Superintendent,T/PW Andy Cronberg,P.E.,Acting Director,Water Department Cornell Gordon,PACS Tony Sholola,Program Manager ANA Consultants,Consultant Jackson Construction,LTD,Contractor N/A,Developer Dennis Rodgers,Supervisor,T/PW Richard Salazar,Inspector,T/PW F= FORT WOn-irm City of Fort Worth CITY SECRETARY Change Order Request CONRACT N4. i Cf (J Project Name Water&Sanitary Sewer Replacement Contract 2009,WSM-A City Sec No. 1 44406 E Project No.(s)P253-X81701444831 P258-708170144483 DOE No. F-65--65---1 Cilfr Pro.No. 01444 , 's Protect Deripibn Water and Sanitary Sewer Main Replacement on 5th Avenue,6th Avenue,Ryan Avenue,Ryan Place Detre,Stadium Olive, Avondale Avenue,Lowden Street and Frazier Avenue Contactorl Jackson C—m s cdon,Lld. Change Order# Date: 7/16/20!4 City Protect Mgr.I Rakesh Chaubey City Inspector RMard Salazar Phone Number. 817-392-6051 Phone Number. 817-223-2261 Dept. Water Sewer Totals Contract Time Calendar Days) Original Contract Amount $1,547,373.80 $91,101.50 $1,638,475,30 200 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,547.a73.80 $91,101.50 $1.638,475.30 200 Amount of Proposed Change Order $3642883 ,428.83 015 Revised Contract Amount $1,583802. $91,101.50 $1,674,904.1 215 Original Funds Available for Change Orders $46,421.00 $4,555.00 $50,976.00 Remaining Funds Available for this CO Additional Funding(if necessary) 1 $36,428.83 $36,428.8-31 CHANGE ORDERS to DA TE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 2.22;6 MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $2,048,094.13 The change order will provide for the following: • High early strength concrete on Berry Street to permit vehicular traffic as soon as possible. • Additional signage and barricade for traffic control and safety at the Berry/Ryan intersection. • Additional pay item quantity for epair beyond trench width for enhanced pavement transition on 5th Avenue an Q�v��r Staff concurs with the contractor ad 1 calendar days on the project. .a 8 177 ����00000aa�° � XA� It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment In full(both time and money)for all costs arising out at,or Incidental to,the above Change Order, Jackson Construction,Ltd. Steve Haberstroh r i 2W1 Sit 3! /* M&C NumberPdIA M&C Date Approved NfA RECEIVEU AUG - 12Q14 FORT V�TOItTH City of Fort Worth Change Order Additions Project Neme lWater&Sanitary Sewer Replacement Contract 2009,WSM-A City Sec No. 44406 Project No.(s) P253-081701444831 P258-708170144483 DOE No. 6565 City Pro.No. 01444 Project Water end Sanitary Sewer Main Replacement on 5th Avenue,8th Avenue,Ryan Averare,Ryan Place Drive,Stadium Drive, DescrWn Avondale Avenue,Lowden Street and Frazier Avenue Contractor J Construction,Ltd. Change Order# L� Date: 7!1812014 City Project Mgr. Rakesh Chaubey City Inspector F Richard Salazar ADDITIONS [TOM DESCRIPTION or" Qty Unit Unit Cost Total 41 9-inch Concrete Pavement Repair h h early strength Water 226.00 SY $114.00 $25,764.00 42 Additional Sign a and barricades for Berry I Ryan Intersection Water 1.00 LS $13,014.83 $13,014.83 43 Extra width asphalt pavement repair Water 30.00 TN $125.00 $3,750.00 f 1 I i Water $42,528.83 Sewer Additions Sub Total $42,528.83 Page 2 of 4 FORT WORTH City of Fort Worth Change Order Deletions Project Name lWater&Sanitary Sewer Replacement Contract 2009,WSM A City Sec No. 44406 Project No.(s) P253-6081701444831 P258-708170144483 DOE No. 6565 City Pro.No. 01444 Project Description Water and Sanitary Sewer Main Replacement on 5th Avenue,61h Avenue,Ryan Avenue,Ryan Place Drive,Stadium Drive,Avondale Avenue,Lowden Street and Frazier Avenue Contractor Jackson Construction,Ltd. Change Order#r1 Date 711&2014 City Project Mgr. Rakesh Chaubey City InspectorRichard Salazar —� DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 35 24in x 8ln tapping sleeve and valve Water 1.00 EA $6,100.00 $6,100.00 i Water $6,100.00 Sewer Page 3 of 4 IDeleflons Sub Total $6,100.00 { MMBE Breakdown For this Change Order Total Previous Change Orders - 8 Total �. -z �Q�-r WORTH City of Fort Worth q7Y SECRETAW 44400-22- Change Order Request COCTNA. Project Name Water 8 Sanitary Sewer Replacement Contract 2009,INSM-A City Sec No. 44406 Project No.(s)P253-608170144483/13258-708170144483 DOE No. 6565 City Pro,No. 01444 Water and Sanitary Sewer Main Repiaoemant on 5th Avenue,6th Avenue,Ryan Avenue,Ryan Place Drive,Stadium Drive, Project Avondale Avenue,Lowden Street and Frazier Avenue Jackson Construcliorr,Ltd. Change Order# 0 Date: 1/13015 City Project Mgr.I Raitesh(Mabey City Inspector I Richard Salazar Phone Number 817-N2401 Phone Number: 817-223.2261 Dept. water Sewer Totals Contract Time (Calendar Days) Original Contract Amount $1,547,373.80 $91,101.50 1,638,475.30 200 Extras to Date $36,428.83 $36,428.83 15 Credits tD Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,583,802.63 $91,101.50 $1,674,904.13 215 Amount of Proposed Change Order 354.82 43,750.00 1604.82 084 Revised Contract Amount $1,619,157.45 $87,351.50 $1,706,508.95 299 Original Funds Available for Change Orders $46,421.00 $4,555.00 $50,976.00 Remaining Funds Available for this CO $9,992.17 1 $4,555.00 $14,547.17 Additional Funding(I necessary) $25,362.65 [_— $251362.65 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1 4.15% MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) 1 $2,048,094.13 The change order will provide for the following: • Increased pay item quantities of temporary asphalt, permanent asphalt and concrete pavement repair that are necessary on the project. • Additional 8-inch gate valves that are necessary on the project. m • The deletion of pay item quantities that are no longer needed on the project. n m_ Staff concurs with the contractor's request for 84 additional calendar days on the project for the 0 order. Af� Q o M t ser, 1 It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and repres in full(both time and money)for all casts ar€ %out of,or incidental to,the above Change Ord* tttt _ Nttltarrte Cotriradar.Nenae r" t>h ate Jackson Construction,Ltd. I Steve Haberstroh I DaGtr Frp ect z l s- u M&C Number &C Date Approved RTA FORT WORTH City of Fort Worth Change Order Additions Project Name lWater&giigj Sewer giepiamnant Contract 2009,WSWA City Sec No. Project No.(s) P253-6081701444831 P258-708170144483 DOE No. 6565 City Pro.No. 01444 Project Water and Sanitary Sewer Main Replacemant on 5th Avenue,61h Avenue,Ryan Avenue,Ryan Place Drive,Stadtrxn Ddve, Description Avondale Avenue,Lowden Street and Frazier Avenue Contractor I Jackson Ca mire ilon,Ltd. Change Order# Q Date: 1/1 31201 5 City Project Mgr. I Rakesh City Inspector I Richard Salazar ADDITIONS DEPT Unit Unit Cost Tota, 3 8-inch Water Pipe Water 33.40 LF 27.00 $901.80 7 8'Gate Valve Water 10.00 EA $1,100.00 $11,000.00 13 4'Wide Asphalt PVMT Repair Residential Water 1487.68 LF $30.00 $44,630.40 14 Temporary Asphalt Paving Repair Water 1750.00 LF $11.50 $20,125.00 15 6'Conc PVMT Repair Water 206.00 SY $87.00 $17,922.00 16 4'Conc Sidewalk Water 846.64 SF $8.00 $6,773.12 17 4'Barrier Free Ramp,Type A Water 4.00 EA $900.00 $3,600.00 19 7'Cone Valley Gutter Water 7.00 LF $89.00 $623.00 24 1'Water Service Water 1.00 FA $530.00 $530.00 27 1'Water Service Relocation Water 1.00 EA $230.00 $230.00 32 Connection to Existing 8'Water Main Water 1.00 EA $1,000.00 $1,000.00 Water $107,335.32 Sewer Page 2 of 4 Additions Sub Total $107,335.32 Fo T Vvo TH City of Fort worth Change Order Deletions Project Name jWaW&Sanitary Sewer Replacement Contract 2009,WSM-A City Sec No. 1 44406 Project No-(s) P253.608170144483/P2%708170144483 DOE No. 6565 City Pro.No. 01444 Projecd Description Water and Sanitary Sewer blain Replacement on 51h Avenue,61h Avenue,Ryan Avenue,Ryan Place Drive,Stadium Drive Avondale Avenue.Lowden Streat and Frazier Avenue Contractor Jackson Construction,Ltd, Change Order A= Date 1/13!2015 Gly Project Mgr. R*mh Chaubey City Inspector I Ridrard Salazar DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 1 24'PVC C95 Wafer Pipe Water 5.00 LF $108.00 $540.00 2 12"Water Pipe Water 20.00 LF $46.00 $920.00 4 6'PVC Water Pipe Water 45.00 LF $27.00 $1,215.00 10 Salvage Fn Hydrant Water 1.00 EA $500.00 $500.00 18 7'Cone Curb&Gutter Water 1180.00 LF $33.00 $38,940.00 21 Trench Safety Water 25.00 LF $0.10 $2.50 22 Concrete Collier Water 7.00 EA $415.00 $2,905.00 23 Ductile Iran Water Fitting with Restraint Water 0.21 TN $8,800.00 $1,848.00 26 2'Water Service Water 1.00 EA $1,990.00 $1,990.00 29 T Water Service Meter Reloction Water 2.00 EA $300.00 $600.00 34 2'x8'Tapping Sleeve&Valve Water 1.00 EA $3,300.00 $3,300.00 36 Fire Hydrant Water 2.00 EA $2,400.00 $4,800.00 40 Water Line Grouting(Flowable Fit) Water 103.00 CY $140.00 $14,420.00 43 Extra Width Asphalt Pavement Repair Sewer 30.00 TN $125.00 $3,750.00 OIFFIC D Water $71,980.50 CITY SECRETARY sewer $3,750.00 FT' WORTH TX Nge 3 4 Deletions Sub Total $75,730.50 � MMBE Breakdown for this Change Order 77 Total Previous Change Orders Total