HomeMy WebLinkAboutContract 46720 Developer and Project Information Cover Sheet:
Developer Company Name: Bloomfield Homes,L.P.
Address, State,Zip Code: 1050 E Hwy 114 Suite 210, Southlake, TX, 76092
Phone 817-416-1572 E-Mail: don@bloomfieldhomes.net
Authorized Signatory/Title:Donald Dykstra,President
Project Name and Brief Description: Edgewood Phase 2
Project Location: Generally located north of FM1187 and west of 135W
Plat Case No.: FP-14-091 Plat Name: Edgewood Phase 2
Mapsco: 118 Council District: 3 City Project No 02536
CFA:2015X_ 91 DOE: 7422
To be co leted '
Received b
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. A,-�3,o
WHEREAS, the undersigned Developer ("Developer") desires to make certain
specific improvements as described below and on the exhibits attached hereto
("Improvements") related to a project generally described as Edgewood Phase 2
("Project")within the City of Fort Worth, Texas("City"); and
WHEREAS, the City has no obligation to participate in the cost of the
Improvements or Project; and
WHEREAS, any future City participation in this CFA is subject to the availability
of City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community
Facilities Agreement ("CFA" or"Agreement") in connection with the Improvements and the
Project.
NOW,THEREFORE,For and in consideration of the covenants and
conditions contained herein,the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth, as amended, is
hereby incorporated into this Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder and to cause all
contractors hired by Developer to comply with the Policy in connection with
the work performed by said contractors.
mB. Developer shall provide financial security in conformance with paragraph 6,
< Section II, of the Policy and recognizes that there shall be no reduction in the
m
collateral until the Project has been completed and the City has officially
c
Z accepted the Improvements. Developer acknowledges tha said
I IAL RECORD
N acceptance process requires the Developer's contractor(s) to s� i� an
TX
Y SEC
s
CITY
affidavit of bills paid signed by its contractor and consent of surety signed
by its surety to ensure the contractor has paid any sub-contractors and
suppliers in full. Additionally, the contractor must also provide in writing
that the contractor has been paid in full by Developer for all the services
provided under their contract.
C. Developer agrees to cause the construction of the Improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City-
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof. Water(A) X
, Sewer(A-1) X , Paving(B) X , Storm Drain (B-1)
, Street Lights & Signs(C)_K-
E.
C)XE. The Developer shall award all contracts for the construction of the
Improvements in accordance with Section II, paragraph 7 of the Policy and the
contracts shall be administered in conformance with paragraph 8, Section II, of
the Policy.
F. For all Improvements included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being prequalified, insured,
licensed and bonded to do work in public streets and/or to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the Improvements, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the Improvements valid for a period of two (2) years from the date of
final acceptance insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be
furnished before work is commenced and to meet the requirements of
3
Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer-awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the Certificate of Insurance
(ACORD or other state-approved form) supplied by the contractor's
insurance provider and bound in the construction contract book.
iv. To require its contractor to give at least 48 hours' advance notice of intent
to commence construction to the City's Construction Services Division so
that City inspection personnel will be available; to require the contractor to
allow the construction to be subject to inspection at any and all times by
City inspection forces, to not install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City in order to schedule a Pre-Construction Meeting. The
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City-issued
Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer shall provide, at its expense, all engineering drawings and
documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the Improvements contemplated herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
4
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the
City harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to any
property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said
Developer, his contractors, subcontractors, officers, agents or employees,
or in consequence of any failure to properly safeguard the work, or on
account of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its
officers,servants, or employees.
M. Developer will further require its contractors to indemnify, defend and
hold harmless the City, its officers, agents and employees from and against
any and all claims, suits or causes of action of any nature whatsoever,
whether real or asserted, brought for or on account of any injuries or
damages to persons or property, including death, resulting from, or in any
way connected with, the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees. Further, Developer will require its
contractors to indemnify, and hold harmless the City for any losses,
5
damages, costs or expenses suffered by the City or caused as a result of said
contractor's failure to complete the work and construct the improvements
in a good and workmanlike manner,free from defects, in conformance with
the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the
Improvements, Developer will assign to the City a non-exclusive right to
enforce the contracts entered into by the Developer with its contractor along
with an assignment of all warranties given by the contractor, whether express or
implied. Further, Developer agrees that all contracts with any contractor shall
include provisions granting to the City the right to enforce such contracts as an
express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years,
provided, however, if construction of the Improvements has started within
the two year period, the developer may request that the CFA be extended
for one additional year.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
6
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements
if at the end of two (2) years from the date of this Agreement (and any
extension period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the Improvements or to cause the payment
of costs for construction of same before the expiration of two (2) years if
the Developer breaches this Agreement, becomes insolvent or fails to pay
costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLAND
7
IN TESTIMONY WHEREOF,the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager,attested by its City
Secretary,with the corporate seal of the City affixed,and s4,,4q Devel per has exeptKqd this
instrument in qu uplicate,at Fort Worth,Texas this day o
20'
CITY OF FORT WORTH-Recommended by:
Water Department Transportation&Public Works Department
a - &�L - L'Ie5- C--,)r �j -
Wendy Ch' Babulal, EMBA, P.E. Douglas#. Wiersig, P.E. 1
Development Engineering Manager Director
Approved as to Form&Legality: Approved by City Manager's Office
- Q K--2Q a L 7:�i�-- 4�r��
Douglas W. Black Fernando Costa
Assistant City Attorney Assistant City Manager
M&C No. r
Date:
ATTEST: �Q �0000,
AW o f�
a
ary J. a s d'o.Zy
City Secre P'°Q004w0000ap
ATTE DEVELOPER: Bloomfield Homes,L.P.
By: Bloomfield Prope ies,Inc.
f _
ature Signature:
(Print)N e- Print Name:Donald J.Dykstra
Title:President
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
9
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
® Location Map
® Exhibit A: Water Improvements
® Water Estimate
® Exhibit A-1: Sewer Improvements
® Sewer Estimate
® Exhibit B: Paving Improvements
® Paving Estimate
® Exhibit B-1: Storm Drain Improvements
® Storm Drain Estimate
® Exhibit C: Street Lights and Signs Improvements
® Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
10
m
x
N COIN
CLARK
COAD
n n BLUE R
r
o ALSUE
n
CI
LINT AIRFIELD GARDEN ACRES PLAZA
AIRFIELD Y
CITY W
U =
F
a: y
w
w m
TIMOTH
STELLA MAE
z STUCKERT
0
m CROCKETT
J
O
U
Deer
CROWLEY
pop 8,974
DAVIS Oeel
PRAIRIE VIEW Bi-CenYennid
E GLENDA Park 7fD1fD
BOVELL w 1ppC,ll�A
E MUSTAN
E MISSION 2.0 CROWLEY BURLES N
CROWLEY BURLESON
SMIT
E E
GILE
FORT WORTH
BLF ESOR
N 0Ty 3`�
LINT
O O�SV C^,p LINT
O
VICIN17 Y MAP
� Kn
61
N EDGEWOOD
d
0
PHASE 2
N
a 0 LOCATEDIN
3
w
C= OF FORT WORTH, TEXAS
0
IL DEVELOPER/OWNER: PREPAY BY:
v
0
3. H
OOMOESFIELD GOOD !
®
W hdLARSHAL L Y
1050 E.HWY 114,SUITE 210 CML ENGINEERS-PLANNERS-SURVEYORS
m SOUTHLASE,TX 76092 a+os Musle�q Lhlr.Gnp�ine Tss 7Il061
o PHONE(972)877-1508 Metro(81 7)s29-4
w FAX(817)416-1397 APRM9 2015
EDGEW®®D PHASE 2
WATM N
}ptcn[7flflm¶r fl p 99
11iLilIL7WJ�Jl 1l Cil W E
LEGEND s
W PROPOSED WATER LINE SCALE: Il N e 200'
—W — — EXISTING WATER LINE
PROPOSED FIRE HYDRANT ASSEMBLY
►1 PROPOSED GATE VALVE
-}- EXISTING FIRE HYDRANT ASSEMBLY NOTE :
D4 EXISTING GATE VALVE ALL WATER LINES SHOWN
ARE 8" IN DIAMETER.
1 : 2 : 3 : 4 5 6 7
56 :: FUTUI*,E EDGEPNOOb PH, 3 84
0pJm CIRCLE -
55
54 61
53 14 13 12 11 10 9 8 60
� B CK F
52m - 59
51 1 2 3 4 5 6 7
®58
50 �
- 57
49
048 �56
Y 14 13 12 11 10 9 8 I�55 a
0 47 _
B CK E 54 U
m 46 0
86X 1 2 3 4 5 6 7 53 m
45 __ 52
__ 51
44
a 43IT
42 41 40 39 38 37 36 50
49
BOCK D
0 27\\` 28 29 30 31 32 33 34 35 48
9- RD 47
cli IF4
��2545
ZI 46
N T
CL 1 37 38 39 40 41 42 43 44
0 B
0 24 I OCK A
3
a9
rn
W
c
p
a
DEVELOPER/OWNER: ]PREPARED BY:
0
0
BLOOMFIELD
GOODWINI
®HOMES
W MARSIEIIAU Y
' 1050E HWY 114,SUITE 210 aft ENGINEERS-KMNERS-SURVEYORS
ro SOUTHL ARE.TX 76092 2405 MudmV Drt^aapowM.T99)v!70mi
Meho(8177 9'2"M
Lf) PHONE(972)877-1508
i FAX(817)416-1397
Li
IEDG EWOOD PHASE 2
SE"VVTA N
IT"A-Ill W+E
LEGEND s
S PROPOSED SANITARY SCALE: I"
0 200s
SEWER LINE
EXISTING SANITARY
SEWER LINE
• PROPOSED SANITARY
SEWER MANHOLE
EXISTING SANITARY NOTE:
SEWER MANHOLE ALL PROPOSED SANITARY SEWER
LINES SHOWN ARE 8' IN DIAMETER.
1 2 3 4 5 6 7
56 ;: FUTU,;�E EbGEINOOD PN, 3 84
55 ORML CIRCLE
54 61
53 14 13 12 11 10 9 8 60
0 BCK F
52� - 59
51 1 2 3 4 5 6 7
®58
50 OO Sl REE j_j
57
49
0 48 x]56
Y 14 13 12 11 10 9 8 x+°55 a
m 47
BLOCK E 54 0 \
46
86X 1 2 3 4 5 6 7 53 °0
45 __ 52
51
� 44
0 43 m 42 41 40 39 38 37 36 50
49
BOCK D
n
48
a � 27\ 28 29 30 31 32 33 34 35
a '\ DRIMV FOC D URT47
L 26 46
a 2537 38 39 40 41 42 43 44 45
0 — 24 BOCK A
cn
w
i
a DEVELOPER/OWNER: PREPARED BY-
0
BLOOMFIELD G�DW�I
HOMES
1050 E.HWY 114,SUITS 210 CML ENGINEERS—PLANNERS—SURVEYORS
CD SOUTIILASF,TX 76092
2405 MUWMV orals.mow.Trans 76051
tc)
MWO(817)9284.979
O PHONE(972)877-1508
i FAX(817)416-1397
w
IEDG EWOOD PHASE 2
LEGEND S' TS N
EXMIT"B" W*
E
S
PROPOSED 29' B-B ROADWAY
w/ 50' R.O.W. SCALE: I" =29
6' THICK REINFORCED
CONCRETE PAVEMENT
•• 1 : 2 : 3 : 4 : 5 : 6 : 7
56 FUTURE EbGEWOOb PH, 3 :• 84
OIItII L a$=
55
54 61
53 14 13 12 11 10 9 8 M60
B CK F
52m - 59
51 1 2 3 4 5 6 7
®58
50 RIC IR 00 D S
57
49
048 tA 56
Y 14 13 12 11 10 9 8 V455 a
0 47 BLOCK E x --
m 46 - 54
86X 1 2 3 4 5 6 7 53 00
-- �D�Y4 52
4 ' SIDEWALK PER
THIS CONTRACT -- 51
44
43 m 42 41 40 39 38 37 36 50
0 49
"' BOCK D
28 29 30 31 32 33 34 35 48
m 27DRI MV FOC D S nU ET 47
cn I 26 46
m
a 25 3738 39 40 41 42 43 44 45
a -- 24 BOCK A
0
0
0
3
m
o
v
W
i D]EVID..®PER/OWNER: PREPARED BY:
v
0
3. BLOOMFIELD G OODWIIN!
®HOMES
W
b AISHAI I I
1050 E.HWY 114,SONE 210 CML ENGINEERS-PLANNERS-SURVEYORS
Lc) 2405 Mu�W n OrM,Gr�pwka,Tem 7E061
CD SOUTHLAXE,TX 76092
o PHONE(972)877-1508 Ma,,(817)32D43M
i FAX(817)416-1397
w
EDGEW®®D PHASIC 2
E)aMr C"B-1" W E
LEGEND
PROPOSED STORM DRAIN LINE 3
EXISTING STORM DRAIN LINE S([rAIZ: 11° _200'
PROPOSED STORM DRAIN INLET
PROPOSED STORM DRAIN HEADWALL
PROPOSED STORM DRAIN OUTLET
GRADE-TO-DRAIN CHANNEL
1 : 2 : 3 : 4 : 5 : 6 7
6
FU7UPE Eb6EkVOOD PH 3
27 R.C.P IN ET ORM CM=
55
' 21'R.C.P.
54 61
IC'INLE
J
z53 14 13 12 11 10 9 8 60
Q - B CK F
v 52� - 59
51 1 2 3 4 5 6 7 ®58
50 �
Z - 57
49 I'R.C.P.
k p 48 10'INLE S �i 56
W N 14 13 12 11 10 9 8
47 X55 a
o � B CK_ E 54 u
m 46 -10 o
1 2 3 4 5 6 7 53 00
45 -- 52
66'R.C.P.
_ 51
Lo 44 7 MA NHO E
0 43 42 41 40 39 38 37 36 50
N X
ch
r m 49
0
0) B OCK D
0 27\\ 28 29 30 31 32 33 34 35 48
a �\\ lIg D T 47
t ��265
46
N EX 66'R. .P
a
37 38 39 40 41 42 43 44 45
0 24 I BLOCK A
w
i
0 O
a DEVE[.OPEMAINIER: PREPARED BY:
v
0
®HOMOOESFIELD G OODWI NI
KARSHM g. Y
10M E.HW 114,SLJrM 210 CML ENGINEERS—PLANNERS—SURVEYORS
CD SOUTHLAKE.TX 76092 2406 Mueletq Alva,emmift Taus 7"1
o oh
PHONE(972)877-1508 Mo(017)30479
i FAX(817)416-1397
w
EDG EWOOD PHASE 2
LEGEND EICIM T"Clo w*E
2' PVC CONDUIT S
PROPOSED LIGHT POLE •$ SCAM: 1" m 200s
EXISTING LIGHT POLE �$
TRANSFORMER ON PADFA
HAND HOLE
1 : 2 : 3 ; 4 : 5 : 6 ; 7
56 EUTUPE EVOEGVOOD PH, 3 84
OR.C$GIC.IE
55
54 61
53 14 13 12 11 10 9 8 60
BLDCK F
52� - 59
51 1 2 3 4 5 6 7
®58
50 100D SIREET
- 57
49
co 56
0 48
14 13 12 1110 9 8 R55 a
0 47 B CK_ E 54
cs
m 46 0
86X 1 2 3 4 5 6 7 53 m
45 __ M 1 52
51
Lo 44
0 43 42 41 40 39 38 37 36 50
49
BL OCK D HI
48
27 28 29 30 31 32 33 34 35
a 4TtHJTJ47
N
0 26 46
25 37 38 39 40 41 42 43 44 45
o � 24 BOCK A
d
bi
w
i
a DEVELOPER/OWNER: PREPARED BY:
v
0
MHOMESFIELD GOGLP 3
HOMES
W �(Lt HAILL Y
1 10%E.HWY 114,SUM 210 cnaL ENG NEERS-PLANNERS-SURVEYORS
CD SOiT EII AIE,TX 76092 2405 Map aw.c�.p.Nr»,T.m 7W51
o PHONE(972)877-1508 MOO M17)320-4878
FAX(817)416-1397
IEDG EWO®D PHASE 2
S=T SIGNS N
E%]EIIMIIT"C-1" W*E
LEGEND s
+ PROPOSED STREET NAME SIGN SQ- E: I" 2w9
1 : 2 : 3 : 4 : 5 : 6 : 7
56 :: FU7UF2E EPOEWOOb PH 3 84
ORM I CIRCLE
55
54CK TF
61
53 14 13 12 118 60
B
52M - 59
51 1 2 3 4 5 6 7
®58
50 100D SIRMT
- 5
49 7
048 �]56
Y 14 13 12 11 10 9 8 fes°55 a
0 47 QL DCK_ E 54
m 46 0
86X 1 2 3 4 5 6 7 53 00
45 __ i 52
51
� 44
0 43 42 41 40 39 38 37 36 50
49
BOCK D
0n 27 28 29 30 31 32 33 34 35 48
rOCD SnUET 47
N -
N
t 26 46
N
25 37 38 39 40 41T 44 45
o 24 B
3
ui
w
i
i
DEVELOPER/OWNER.- PREPARED BY:
0
0
®BLOOMFIELD GOODWIIHB
HOMES
1050 E.HWY 114,SUITE 210 CML ENGINEERS-PLANNERS-SURVEYORS
m SOUTHLA�TX 76092 2106 MuiWq DrNa, .Twp 78067
o PHONE(972)877-1508 1i1e o(817)92"
i FAX(817)416-1397
UJ
Bm RrOAbY
M1�1
SEMON 00 42 43
Ilewiopa Awnded Projects-PROPOSAL FORM
UNIT PRICE BID
Rajen ban laforeaab mm.,Paparl
Bit"11 s u� BidQrgsY uab Price ad Veae
Wets F.i hkes
1 3311.0261 8"PVC Water.Pi 33 11 12 LF 3,202 $32.00 $
102 464.00
2 3312.30078"Gate Valw&Velw Box 331220 FA t2 1050.00 512600.00
3 3312.0001 Std.Fim t Assembl w/6"Get.Valve&Velw Box 331240 EA 5 $3,200.00 $16.000.00
4 3311.0001 Ductile hon Water Fi' w1- rnt 331111 TON 2.7 54 000.00 $10,800.00
5 3312.2003 I"Da-be Water Service 331210 EA 85 5850.00 $72,250.
6 3312.0117 Connect w Existing 8"W.L.Stub-a 331225 EA 2 $500.00 $1000.00
7 0241.1118 End&PWA 8"W.L.8"Ptnsum PI 0241 14 EA 2 $475.00 $
950.00
0 3305.0109 Trench Safey 33 05 10 LF 3,202 $800.50
3216 864.50
Sud Sewer Facilities
9 3331.4115 8'PVC Sewer Pi 3311 10 LF 1,294 0.00 $51,760.00
10 3331.4116 8"PVC Sewer Pi w/CSS Backfill 33 11 10 LF 80 .00 $3,840.00
11 3339.1001 4'Std.Iia.S.S.Manhole 33 39 10 EA 7 53,400.00 $23.8D0.00
12 3339.1003 Extra Depth for 4'Std.Die.Medroie 33 39 10 VF 19 $175.00 $3,325.00
13 3331.3313 Cannat To Exis 8'S.S.M.H 3331 50 EA 3 $1,000.00 $3.GDO.00
14 3305.0113 Trench Water 330515 EA 8 $250.00 $1500.00
15 3331.3101 4"Sewer Service on Ex.SS Line 33 31 50 EA 46 $850.00 $39.100.00
16 3331.3101 4'SService m .SS Lme 33 31 50 EA 39 $650.00 $25.350.00
ewer
17 3305.0106 Manhole Ad'ntment Minor-A'tut Ex.S.S.M.H.Rim Elevetiwu 33 05 14 EA 4 $500.00 $2.000.00
18 3305.0114 Manhole 'tutrnen Ma m w/Coves-Lower Ex.1.S.M.H. 33 0514 VF 10 5205.00 2 050.00
19
330,5
30,0101 Manhole Vawmm Tntin 33 01 30 FA 7 350.00 350.00
20 3301.0001 TV Senna Sewn Line 330131 LF 1,294 $1.70 $2199.80
21 3305.0109 Trench Safety330510 LF 1.294 $1,035.20
3159 310.00
Storm Drain Facades
22 3349.5001 10'Curb Ides 334920 EA 6 32,290.00 313 740.00
23 3341.0201 21'RCP Class IR 3341 10 LF 236 $
50.00 $11,800.00
24 3341.0205 24"RCP Class HI 33 41 10 LF 288 $55.00 15 840.00
25 3341.0208 27"RCP Class IH 3341 10 LF 54 $60.00 3 240.00
263341.0605 66"ACP Coss ID 3341 10 LF 367 $205.00 575 235.00
27 3349.0004 7 Stam J,,c Box 33 4910 EA 1 $7 500.00 S7 500.00
28 3349.4106 27"SIErd Hesdwell SET 1 Pi 33 49 40 EA 1 $2.500.00 $2,500.00
29 3349.3014 66'SI End Headwall SET 1 Pi 33 49 40 EA 1 $6,400.00 $6.400.00
30 3305 0112 Carinate Collar 330517 EA 3 $500.00 $1,500.00
31 0241.3025 Remow Ex.66"R.C.P.Stam Lime 02 41 14 LF 10 1 $50.00 $500.00
32 10241.4401 Rernow Ex.66"R.C.P.SI End Hndwall 0241 14 EA 1 51,000.00 $1 000.00
33 3136.0104 Twisted Gabion;auror s 31 3600 CY 37 $150.00 $5550.00
34 19999m0001 Manta Ray MR-3 Anchaa for Gabion 000000 EA 26 $950.00 $24 700.00
35 13305,0109 Tratch Safety 330510 LF 940 WAS $799.00
$170 304.00
WabrfSarifary SewwfStorrn Drain Facilities Snhbohl 5516 478.50
PBAomwtce/PaymenNMairttenvrca Band $13.998.00
Paving Facilities
35 3213.0101 6"Comate Pa 321313 SY lu,391 $3300 $342,903.00
36 3211.0501 6"Li-Tran- 321129 SY 11,073 $2.85 $31,558.05
37 3211.0400 H ted Lente 11 N 183 $31,091.70
38 3213.0501 4'Barrier Fra Ram,T R-1 1320 FA 12 $1,124.70 $13,496.40
39 3217.0301 4'Concrde Sidewalk 321320 186 $920.70 [
40 9999.0002 Camat w Exis Con x Header 00 00 DO LF 58 $10.50 $609.DOTIA
41 3217.2103 Reflw iw 4"Raised Pavnnent Markers T ll-A-A 321723 LS 1 $749.00 749.00 d am' 1
42
4414006
trod Sig, 344130
16 $47,415
.00
43 39999.0003 C...bw Concrete Hader and Erxl of--Reed B-ad. 000000 LF 58$34.90 $2,024.20
µ 134710001 Tnffec Control 34 71 T-3-1 LS 1 WMI $
996.00
5431944.05 4
PerfomrarlcalPaymerd/Ma'aaansrtca Bond 58.000.00 N f C'Leg
Street Lighting Facilitlea
45 13441,3101 100WHPSPC Li Fixnu ,T llw/33BAnn $43,500.00
46 3441.1501 Grand Box T B 34 41 10 EA 72 $260.00 3 120.00 `/
4712602.3011 2"CONDT PVC SCH 40 26 g5 33 725 $8,99D.00
48 3441.1410 No.10 huulawd Ela Condr,Almnivum N6 XFRIW 3441 10 2,1 $3,915.00
359 525.00 1 n n[A
Perforntarlce/PayrtwMlMairdenance Band S1.100.D0 /JA
Bid Sammy
Water/Sanitary Sewer/Stom Drain Facilities Subtotal $546 478.50
P-*W Facilities Subtotal $43,1.9".P5
Street LI¢rdq Facilities Suhbotal $59 525.00
PerfomuncNPaymwMAairmenarrn Bards 423,0%.00
Tool Bid $1,061,045.55
M,oi,QTaxX,m
sratmunexxararx�mn ss;calca3rmrom veaExn
Fmeaw�1ID1ID1ID g2fdwBi,l
fi`a4 pyr.l yl}t5da