HomeMy WebLinkAboutContract 43893-A2 AMENDMENT No.2 TO CITY SECRETARY CONTRACT ' WHEREAS, the City of Fort Worth (CITY) and Teague Nall and Perkins, Inc . , (ENGINEER) made and entered into City Secretary Contract No. 43893 , (the CONTRACT) which was authorized by the City Council by M&C C-25936 on the 23rd day of October, 2012 in the amount of $563 , 730 . 92 ; and Amendment No. 1 which was authorized by the City Council by M&C C-26486 on the 7th day of October, 2013 ; and WHEREAS, the CONTRACT involves engineering services for the following project : Chapel Creek Bridge over Interstate Highway 30 WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee . NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated April 27, 2015, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $45, 946 . 00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $835, 881 . 92 . 3 . All other provisions of the Contract, which are not expressly n amended herein, shall remain in full force and effect. M M 0 C= OFFICIAL RECORD CITY SECRETARY 0091 L FT.WORTH,TX Page -1- EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER Teague Nall and Perkins, Inc . Fernando Costa JoW Atwood, P.E. Assistant City Manager Principal DATE: DATE: Rft j Z0 APPROVAL ED: ,"'P,'-' Douglas, Wiersig, P.E. Director, Transportation and Public Works Department APPROVED AS TO FORM AND LEGALITY: Douglas W. Black Assistant City Attorney ATTEST: FORt 0 a y s e $ * City ecretary �0c,0X�S NO M&C REQUIRED OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX Page -2- stn ^ p Npw ndl i Mrk(ns wwvr.tvmcom April 27, 2015 engineers Surveyors landscape architects Mr. Michael Weiss, P.E. City of Fort Worth Transportation & Public Works Department 1000 Throckmorton Fort Worth, Texas 76102 RE: IH 30 at Chapel Creek Boulevard Bridge replacement Fee Proposal for Contract Amendment No. 2 DOE Number 901 CSJ: 091848-722 Dear Mr. Weiss: Teague Nall and Perkins, Inc. is submitting this fee Amendment for the above referenced contract based on additional services that resulted from TxDOT's request for the City of Fort Worth's environmental document sponsorship and changes in project schedule. The following is a brief description and cost for the additional services to be provided on this project: I. Project Management: Teague, Nall and Perkins will be required to perform additional project management services because the construction letting schedule milestone has been extended from the original contract date. The current contact schedule concluded September 2015. The projected contract award is November 2015 with construction to conclude in November 2016. This is 14 additional months of administration, invoicing, status reports, monthly meetings, and MWBE reporting. Additional project management fee is sought to recoup efforts expended to meet Texas Administrative Code (TAC) compliance for environmental service delivery (see details explained below in II, Additional Environmental Services). Fee: $20,167 II. Convert project to the 2014 TxDOT Standard Specifications: Teague, Nall and Perkins will be required to revise bid items and standards to conform to the 2014 TxDOT Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges adopted on November 1, 2014. Fee: $4,552 Fort Worth�1 100 Macon Street Fort Worth,Texas 76102 817.336.5773 Dallas—17304 Preston Road,Suite 1 340 Dallas,Texas 75252�214.461.9867 Denton-1517 Centre Place Drive,Suite 320—Denton,Texas 76205—940.383.4177 Sherman-200 North Travis Street,Suite 500-Sherman,Texas 75090-903.870.1089 Registered by the Texas Board of Professional Engineers,Finn No.F-230 Registered by the Texas Board of Professional Surveyors,Firm No.100116-00 Mr.Michael Weiss,PE April 27,2015 Page 2 of 3 III. Additional Environmental Services (DBE): During the course of project development, additional categorical exclusion (CE) documentation/tasks were identified to meet the current CE determination process required by the Texas Department of Transportation's (TxDOT) Fort Worth District and current standards required by TOOT policy to comply with Federal Highway Administration National Environmental Policy Act compliance procedures and Chapter 42 of the Texas Administrative Code (TAC). The original scope of services and fee was based on the April 16, 2012, provisions of the TAC for transportation projects. These provisions were subsequently amended to be effective April 16, 2014, and therefore required additional environmental documentation/tasks. In addition, some of the Fort Worth District's technical reports/forms were revised. All of the technical reports/forms for this project, which were prepared in March 2014, required updates/revisions. DBE Fee: $8,681 IV. Additional Geotechnical Investigation (DBE): The project scope has been modified to incorporate the ultimate typical section for IH 30. As a result, the bridge spans have been increased and additional retaining wall is required. An additional four (4) soil borings are required to meet TOOT maximum spacing requirement of 200 feet between borings. DBE Fee: $12,546 Summary of Contract Amendment Fee: I. Project Management: Fee: $20,167 Il. Convert project to the 2014 TOOT Spec Book: Fee: $4,552 III. Additional Environmental Services: DBE Fee: $8,681 III. Additional Geotechnical Investigation: DBE Fee: $12,546 Total Contract Amendment Amount: $45,946 Mr.Michael Weiss,PE April 27,2015 Page 3 of 3 Schedule: TxDOT's additional services related to environmental sponsorship has delayed the project a measurable 14 months. The City's desired letting is Fall 2015. TOOT and the MPO has the project scheduled for letting November 2016. The City is seeking an accelerated letting with MPO officials. The project is on schedule to meet this milestone and the above Project Management fee is shown accordingly. Sincerely, tnp teague nall & perkins Joseph W. Atwood, P.E. Director Transportation CC File: FTW12583 TNP,Inc. April 2015 Amendment 2 ATTACHMENT B LEVEL OF EFFORT Widening of Chapel Creek Blvd.Bridge at 11-130 Task Senior Design Total Task No. Task Description Project Structural Project Design Specialist Labor Subtotal Manager Engineer Engineer Engineer Engineer Hours Labor Rates $208.00 $176.00 $156.00 $153.00 $130.00 $95.00 Task 1 Project Management 1.1 Managing the Team 7 28 0 0 0 0 35 $6,384.00 1.2 Communications and Reporting Conduct 8 Document Monthly Update Meetings with City(12) 7 0 1 0 7 0 0 14 $2,527.00 Prepare and Submit Monthly Invoices 7 0 0 0 0 0 7 $1,456.00 Prepare and Submit Monthly Status Reports 7 0 0 0 0 0 7 $1,456.00 Prepare and Update Project Schedule 0 14 0 7 0 0 21 $3,535.00 Complete Monthly MWBE Reports 7 0 0 0 0 7 14 $2,121.00 Environmental TAC compliance 7 7 0 0 0 0 14 $2,688.00 Total Design Management 42 49 0 14 0 7 112 $20,167.00 Task 2 Convert to 2014 TxDOT Standard Specifications for Constnxtlon and Maintenance of Highways,Streets,and Bridges 2.1 Convert bid items to 2014 Spec Book 4 4 8 16 $2,276.00 2.2 Revise and update Details and Highway Standards 4 4 8 16 $2,276.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 0 $0.00 Total Design Management 0 0 6 a 16 0 32 $4,552.00 Task Senior Environmental Total Task No. Task Description Project Senior Scientist/ Cartography Clerical Labor Subtotal Manager Scientist Planner Staff Staff Hours Labor Rates $143.00 $130.00 $109.00 $84.00 $63.00 Task 3 Additional Environmental Services(DBE) Preliminary Sooping Worksheet 1 2 0 0 1 0 4 $466.00 Project Scope 1 6 0 0 2 0 9 $1,049.00 Project Coordination Request(Historical Studies) 1 2 6 1 2 0 12 $1,267.00 Initial Site Assessment(Hazardous Materials) 1 6 0 0 2 0 9 $1,049.00 Biological Evaluation Form 1 6 0 0 2 0 9 $1,049.00 Indirect and Cumulative Impacts Risk Assessments 1 4 0 0 2 0 7 $789.00 Project Coordination with T%DOT City,and TNP 2 20 0 0 2 0 24 $3,012.00 Total Environmental Services DBE 5 46 6 1 13 0 74 $8,681.00 Task No. Task Description Project Project Staff Engineer Geologist Engineering Administrative Total Labor Task Subtotal Manager Engineer Technician Assistant Hours Labor Rates 1 $125.00 $110.00 $85.00 $85.00 $45.00 50.00 Task 4 Additional Geotechnical Investigation(DBE) Raoind and recommendations 3 5 10 16 4 1 39 $3,365.0 Field Work $7,785. Laboratory Testing $1,396. Total Additional Geotechnical Investigation DBE 3 5 10 16 4 1 39 $12 546.0 Total Supplement 2 fes 48 $45 9 .