Loading...
HomeMy WebLinkAboutContract 21476-CO4 DISTRIBUTION: WHITE-FILE CITY OF FORT WORTH a RY-CONSTRUCTION FILE Plink�-PROJECT MANAGER CHANGE ORDER REQUES'ICITY$ECS 9 + GOLDENROD-CONTRACTOR CONTRACT 140. CHANGE ORDER NO. DATE D.O.E.NO. CT NO. T�PW77-060770500020 4 &PW77-060770500030 PROJECT DESCRIPTION: North and South Holly Water Treatment Plants CITY SECRETARY CONTRACT Backwash Facilities Modifications and Chlorine and Ammonia Facilities Rehabilitation NO. 21426 ORIGINAL CONTRACT AMOUNT..........................................$ 7.747,000.00 EXTRAS TO DATE...............................................$ 121 769.96 CREDITS TO DATE..............................................$ 0.00 CONTRACTCOST TO DATE..............................................................................................................................................................$ 7.868,76996 AMOUNT OF PROPOSED CHANGE ORDER.............................................................................................................................ft.....$ 14,594.32 REVISEDCONTRACT AMOUNT.......................................................................................................................................................$ 7,883,364.28 TOTAL FUNDS APPROVED BY COUNCIL.......................................................................................................................................$ 7,979,410.00 IN ACCORDANCE WITH THIS CHANGE ORDER,THE CONTRACTOR SHALL:Modify and change the contract as shown below to provide a complete, functional and operational laboratory.These changes are listed below:Further descriptions and information is shown on Attachment#I along with other attached material: PCM-022,ITEM 1:GALVANIZED STEEL STAIRWAY AT NORTH HOLLY RAW WATER#1 VALVE VAULT---------------$ 8,138.88 The contractor shall install a galvanized Stairway at the North Holly Raw Water#1 Valve Vault. Currently access to the Raw Water#1 Valve vault is limited to the unimproved road at the top of the levee making assess is difficult and dangerous during wet weather. The stairway will allow access from the a lower parking area.The Contractor has provided a price proposal of$8,138.88 for this work. PCM-022: ITEM 2:MODIFY NORTH HOLLY RAW WATER 2&3 CHEMICAL APPLICATION VAULT LID -----------------$ 5,375.86 The contractor shall modify the North Holly Raw Water 2&# Chemical Application Vault Lid. Current access is through a standard 24-inch manhole rim (and cover)using a ladder. This is to small to allow access for personnel when using an airpack. The plant has requested Contractor has provided a price proposal of$5,375.86 for this work. PCM-022: ITEM 3:REMOVE PORTION OF NORTH HOLLY SEDIMENTATION BASIN#1 WALL ------------------------------$ 2,714.32 The contractor shall remove a portion of the North Holly Sedimentation Basin#1 Wall. The plant has requested that a portion of the basin wall be removed to allow visual inspection of the chemical storage area from the road.The Contractor has provided a price proposal of$2,714.32 for this work. PCM014:CREDIT FOR NORTH HOLLY 2300 VOLT DUCK BANK MODIFICATIONS----------------------------------------------$(1,634.74) The contractor shall revise the alignment of the 2300 volt electrical feeder ducts between the North Holly WTP High Service Pump Station medium voltage switchgear and transformers T1,T2(adjacent to North Holly Chemical Building)and 13 (at northeast corner of North Holly Chlorine Building).Part of the realignment allows the use of existing duct bank for a portion of the feeder run to transformer T3.The other realignment for the feeder run to transformers Tl &T2, avoids a conflict with Sedimentation Basin#3. This realignments lowered the construction cost s for the feeder ducts. The contractor is providing a proposed credit of$1,34.74 for these changes. THE TOTAL COST FOR CHANGE ORDER NUMBER#4 IS $ 14,594.32 Cost breakdown by Project Number is PW77-060770500030 $ 14,594.32 The contract time of completion is February 5, 1997 It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction RECEIVED JUN 16101 and represents payment in full(both in time and money)for all costs arising out of,or incidental to,the Change Order. ORIGINAL CONTRACT TIME ADDITIONAL APPROVED TIME TO DATE APPROVED CONTRACT TIME TO DATE ADDITIONAL TIME FOR THIS CHANGE ORDER 450 Calendar Days None 450 Calendar Days None CONTRACTOR �� � DATE FIELD ENGINEER / e-, DATF Cajun on tors,Inc G /.. G.E.Gay,P. . re e& IchbIs,Inc MANAG CO ST. ER. DATE DIRECTOR(r1ANAGING D / DATE David ownsen ,Faci rties Engineer 1�� G, DIRECTO G DEPT. DATE CITY A TORNEY DATE Lee C.Bradley ,PE,Water Director OFFICIAL R€ ORD CrrY MANAGER DAT / COUNCIL ACTION(IF REQUIRED): CI I Y SEC ❑ APPROVED ❑ DISAPPROVED I I OT" JNOMTX Freese MaW.Freese,P.E. 1900.1990 Marvin � Marvin C.Nichols,P.E. 1896-1%9 AND Nichols,INC. CONSULTING ENGINEERS October 18,1996 Mr.Tommy Bower Cajun Contractors, Inc. 1500 E.Beldine Carrollton,Texas 75005 Re: City of Fort Worth Water Department North and South Holly WTP Backwash Facilities Modifications and Chlorine and Ammonia Facilities Rehabilitation PW77-060770500020 and PW77-060770500030 Change Order No.4 Dear Mr.Bower: Transmitted herewith please find five copies of the referenced change order. Please execute the change orders in the appropriate signature block on page two and return all copies to us for forwarding to the Water Department. You will receive two executed copies back after the City Council has acted on this Change Order. Sincerely, PRESSE AND NICHOLS,INC. G.E.Gay,P.E. xc: Dave Townsend Charly Angadicheril Mike Morrison Coy Veach File FTW95312.4.43.004 [FfWM2r-H=Y\C ANGEs\ao\aoaT1)CAJ-GBG TELEPHONE 817-735-7300 • 4055 INTERNATIONAL PLAZA,SUITE 200 FORT WORTH,TEXAS 76109-4895 • METRO 817-429-1900 • FAX 817-735-7491 CHANGE OR EXTRA WORK ORDER PROJECT: NQS Holly Chlorine/Ammonia/Backwash Facilities OWNER: City of Fort Worth PROJECT NO. PW770607705-00020 & 30 CONTRACTOR: Cajun Contractors, Inc. PROJECT NO. 95028 ENGINEER: Freese and Nichols, Inc. PROJECT NO. FTW95312 CHANGE ORDER NO. : Four (4) DATE: October 18,1996 CHANGE OR EXTRA WORK TO BE PERFORMED In accordance with previous discussions and negotiations, summarized below are the changes or extra work to be performed in the above referenced project. REFERENCE PGM-014 4a) Modify the 2300 V feeder conduit alignment from the North Holly High Service Pump Station load break switches to transforers T1, T2, and T3. This would result in a credit of $ 1, 634 . 74 . No additional Contract Time has been requested. DEDUCT ($ 1, 634 .74) REFERENCE PCM-22 3b) Item 1 : Install new stairs at the North Holly Raw No. 1 valve vault . Subtotal ADD $ 8, 138 . 88 Item 2 : Modify the existing access manhole on top of the North Holly Raw 2&3 Post Chemical Application Vault to be an access hatch and ladder. Subtotal ADD $ 5, 375. 89 Item 3: Lower the east wall of the existing North Holly abandoned sedimentation basin by deleting the upper wall section. Subtotal ADD $ 2, 714 .32 The total cost for this PCM is $ 16,229.06. No additional Contract Time has been requested. ADD $16,229.06 Change Order #4 October 18, 1996 It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of or incidental to, the above described change order. Original Contract Amount $ 7,747,000.00 Previous Contract Modifications (C.O. #1) $ 64,348.57 Previous Contract Modifications (C.O. #2) $ 9,508.04 Previous Contract Modifications (C.O. #3) $ 47, 913.35 Present Contract Amount $ 7,868,769. 69 Net Increase in Contract Amount $ 14,594 .32 Revised Contract Amount $ 7, 883,364 . 01 Original Contract Time FEBRUARY 5, 1997 Previous Change in Contract Time of Final Completion (C.O. #1) 0 DAYS (C.O. #2) 0 DAYS (C.O. #3) 0 DAYS Present Change in Contract Time For Final Completion (C.O. #4) 0 DAYS Net Increase in Contract Time of Final Completion 0 DAYS Revised Contract Time for Final Completion FEBRUARY 5, 1997 Recommended by Approved by FREESE AND NICHOLS, INC. CAJUN CONTRACTORS, INC. By /lL /ate/G/1 By ,k�� /'d=z Date Date Approved by CITY O RT RTH EXAS By /U y D to Attachments: Proposed Contract Modification-014 Proposed Contract Modification-022 R:\forms\admin\co.cs cc INTER-OFFICE CORRESPONDENCE TO: Ted Gay, Freese &Nichols, Inc. . FROM: David Townsend, Facilities Engineer Water Department DATE: October 16, 1996 SUBJECT: PCM-014: North Holly 2300 Volt Duct Bank Modifications North and South Holly Water Treatment Plant Backwash Facilities Modification and Chlorine and Ammonia Rehabilitation Project Nos. PW77-060770500020 & PW77-060770500030 This office has reviewed your correspondence dated October 2 1996 on the proposed contract modification (PCM-014 ) concerning the revising the alignment of the 2300 volt electrical feeder ducts between the North Holly WTP High Service Pump Station medium voltage switchgear and transformers T1, T2 (adjacent to North Holly Chemical Building) and T3 (at northeast corner of North Holly Chlorine Building). Part of the realignment allowed the use of existing duct bank for a portion of the feeder run to transformer T3. The other realignment for the feeder run to transformers T1 & T2, avoids a conflict 'with Sedimentation Basin #3. This realignments lowered the construction cost s for the feeder ducts. The Water Department agrees with your recommendation that the contractor proposed credit of$1,34.74 for these changes should be accepted as the credit proposed is fair and reasonable. Therefore, this office will recommend to the City Council (and/or the City Manager's Office), the approval and acceptance of this credit in the form of a change order to be prepared and submitted by you to this office. For accounting purposes, this PCM will be assigned to from PW77-060770500030. David R. Townsend, P.E. cc: Frank Crumb Files - Freese Simon W.Freese,P.E. 19041990 Marvin C Nichols,P.E. 18961%9 AND Nichols INC. CONSULTING ENGINEERS October 2, 1996 Mr. David Townsend,P.E. Facilities Design and Construction City of Fort Worth Water Department P.O. Box 870 Fort Worth, Texas 76102. l:e: North and South Ilollt' Water '] rcatrn^nt Bacl,%\,asll Facilities \Icuiili,s,tion : anal Chlorine and .Alnnionia Facilities 14-habilitation 1'1\'77-060770300020 and 1'1%V7-0,>07A130003.% PCM-014 North Ilollt• 2300 V 1>,!,7t 13:in1: l:e�'isic is Dear \'lr. Tcm,nsend: transmitted here�\,ith please find a cops of C'ajun's September 2-), 1976, pnt? proposal for the referenced l'C1\9. ']his 1'C\1 rel,ises the Project C alignment cit the 230J %,olt feeder ducts betv%,een the ?forth Ilollt' Iligh SCIA-Le P111111 Station nlecilUI11 \,oltage s16t_ligear and transformers '1'l, T2, and 13. This change in alignment alloi\,s the contractor to use a.11 existirli', spare duct for a portion of the nut to traIisformer T3. It also reroutes the proposed duct ban], run to transformers 11 and 12 to zwoid a coiiflict i6th the backup sedimentation basin no. 3. These changes in alignment do not affect the capacity of these duct ba1>_la, ai,oid potential conflicts, and result in a lo%\,er construction cost. No additional Contract lime has been requested. We have re\•ie«,ed the price proposal and recommend the City accept this credit and issue a deductive Change Order in the amou-nt of S 1,634.74. ]'lease ad%-ise if the Water Department desires this I'C\1 to lie incorporated into a Change Order. Sincerely' PT7T'.T'.C`1' A rT AT t— T J rREUPS' :rk1vl�i,�I�.I�OIa�, II�C, / / l� G.B.Gay,I�'.E. xc: Charly Angadicheril Randy Romack Coy Veach 4c:1 A Al Al A 1A A? 11114 lllr T 1 Y Y 9JJ1L.'3.'31.V1'2��!.'3.1.VV$ [Fid 453121C:WOLL1 tCHANOI SPCM3�CM 14t2CM.tit tl TELEPHONE 817-735-7300 • 4055 INTERNATIONAL PLAZA,SUITE 200 FORT WORTH,TEXAS 76109-4895 • METRO 817-429-1900 • FAX 817-735-7491 CAJUN CONTRACTORS BATON ROUGE.DALLAS•HOUSTON September 25 , 1996 Freese & Nichols, Inc . 4055 International Plaza, Suite 200 Fort Worth, Texas 76109-4895 Attention: Ted Gay RE : North and South Holly Water Treatment Plants City of Fort Worth, Texas PCM-014 Dear Mr. Gay: Please find attached our cost proposal for PCM-014 . Work under this change includes revisions to the 2300V duct bank at North Holly. This change does not require a change in the contract time . Sincerely, CAJUN CONTRACTORS, INC. Chris Thompson Project Manager CCT File 1 . 21 (d) (95028) Field HOME OFFICE: DALLAS OFFICE: HOUSTON OFFICE: FREEPORT OFFICE: LAKE CHARLES OFFICE: Post Office Box 104 Post Office Box 59367 Post Office Box 890809 Post Office Box 1058 Post Office Box 1487 Baton Rouge,Louisiana 70821-0104 Dallas,Texas 75229 Houston,Texas 77289-0809 Clute,Texas 77531-1058 Lake Charles,Louisiana 70602.1457 (504)753.5857 (214)323-9333 (713)479.5554 (409)265-0032 (318)625-3773 FAX(504)751-9777 FAZ((214)323-9555 FAX(713)479-0309 FAX(409)265-6751 FAX(318)625.3817 �r M F- M �t cc O Qc co T � T vi Z O `n O O M Ch N O m I J c°o Ir! U [G Q (V m co O cc OT T LL O O W O U QULL 0 L � r m O O Co W U) U) LLL <Y t7 T O � T LU O O Op O ka M cc: g � m � ! o 0 CD ka og a o U CD Cl W7 Q O O ycn w ka Z z0 Q w zm LO U) LU Z N cr am W F- F U W � U Q oC Z y 3U O o J W v� J -j 9: > W 20 Cl) U Y O co = N 0 0 cu m On Z LL p O o OU H Z a. CO — CME LIELECTRIC 1ILCompmv ELECTRICAL CONTRACTORS U! L September 13, 1996 P 18 1996 Cajun Contractors ; ! P.O. Box 59367 PJTRACTORS INCjDallas, Texas 75229 ALLAS TX f Attention: Chris Thompson Ref: City of Fort Worth, Texas North Holly WWTP PCM-014 Gentlemen: We are please to propose pricing for deletion of scope of work as per above mentioned reference. Material $ 4.074.40 <$ 4,568.01> Labor $ 2,640.89 <$ 3,604.27> Total Deduct <$ 1,456.99> The pricing for this proposal is valid for thirty (30) days from the date of this proposal. In the event that this proposal is not resolved in that time, ACME Electric reserves the right to adjust pricing and time extension, as necessary. Tax is not included in this proposal. Should any alterations, substitutions, additions, or subtractions of this proposal be made, without written approval from ACME Electric, the altered proposal will be deemed null and void. If you have any questions please call me. Respectfully, Hector Zamora cc: Ronny Brown ACME Marvin Mally ACME Sally Walker ACME Job File 2280-32.Doc 4703 MARTIN STREET • FORT WORTH,TEXAS 76119 METRO(817)654-1618 FAX(817)534-4940 too c") O v %o C I CO QQQ R toCC.) Cv ^ voCl) 0 cietri ►; dd codddd a i y Z m cz o ti W) to C O C O C N O O O r� vhO0) C (0 Cl) W (0 co h co N N C N N O O 0 N CO ^ C O v O O � N NN J U U U W U U U U U W W ^ - - - - 0 o O CO 0 0 0 0 0 0 0 m m m m m m m m m m m v o o ^ 0 0 0 0 0 0 0 ^ ori dAttaiciCO ^ dd x22222222222 a a m W) hco0C000W) o0 W vh0co aco W Nhh ^ ^ ^ ^ ^ ^ ^ d � ai d r< ci 6 r: tci %6 K -6m m m m m m m m m h O ^ v n C W G m V E� E� E� o � � � � � �E E E E E E E v ^ � ^ C ^ N N (J 2 2 2 d 2 Z 2 2 2 2 2 Z m C L.7 ^ W Z t 0 0 0 0 0 0 0 0 0 0 • \ t 0 0 0 0 0 0 0 0 0 0 • C W N O N N N O O O O 1 h d \ J U U U U U U W U U W W h O C 0 0 0 0 0 to 0 0 O Cl) O n o co O p to N to h tci � N ^OO � v C b b N cn ^ � Ivy i D CC V' N 10 to m C aC', O Co Ja; o) Ulr . ZW � j Cl) WIZ ~ C[ YON cayWa ^ Vv o t � a c a � goCo -4 cJca Ci J m W Q Q ;Z, m D c") N4c�i � � �SWU t� ^ N et h (o I� C w V Q ca zi ^ co � COO ^ U W CC Q N m v V � yjC0 � 'LU0 Q � � tW. 2 � 2N > W W Z S V U W 044 W Oa 0; Qgi� Q� SOp � Umm � U h v Q ' O ^ Op � QZ w U O CL co ► N M v h c0 n C C O ^ 1 obi obi _ o� o� o m 2 Fo co CO m 4 J O ` co o m co U o � ' Z w 2 0 � o ~ IP y � a o o O d c°o Q m Q v ` i V C N J � U . � Q c ,o O Q % Z Q U b 0 U y � m NtaNQQ N (7) ON0000QQ Cl) 0 Qo 0) ^ CO (0 0 0 t4icit66Ci ^ OCd04 Cl) CO HO ^ ^ OO C ^ 000 J J N j J w O O � O �TO <� �tMOOCoC� h W 04oN ^ v �tQQ O MO �oObroOtovw — N00) 0) hh CV) N N p to N � N r • K Cl)% N N cvs 'i "i "i b � N w N h ti ti J U U U U U U U U U U U U U U U U U W W — 'o — — — — — — N ^ d tQ to fp ^ tci Oj ^ !j ^ -i M N ^ O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 w � J O J V OOMNNO) O �Orro W ONOO �0 �000 aO ^ aMnOOMc0co N bhLOh m 0 R m m m m m m m c m cddri cocid4i (dto NdNhcd (dto* E E E E E E E E E E N O� hN N 1 ^ N Co N N N M 0) ^ �O C l 1 1 1 IE � � E M E M E I �, � E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 Nt ci y a O a N N N h M M to O 10 b O O O M ^ m N CO ^ W M w M (0 J Z N ? 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 s ,� 0000000000000000000 J\" �� d o d d Ci o o d d d d d d o o N M M N N N N N N N N N N N N N N N N o a v J U U U U U U W O o o p C) o v O CO M o 0 0 0 o M o 0 0 0 OOC� C� 0� r� h0coO (aO (a0ca to Lo 4iOhaNaNhNciciO � �o oi � dh � 1 �� nN M M MO^ a ^ to J h N ^ h ^ M Cl) 2 X W � JO C V tco 0vC4NNLnMMh0 (0to000M0^ hti � OmjW � � -: WU Q N N ^ N M w Cl w M b J Z W m Q M ~ V v Z J m 1� J `' 000QO JZy QUO co Wo) 2U 4� wZQO � U U U U W U U U U � b O W U Z Z N C Wuj oUOQQ QQaa tt O ~ � 1v a m U .�. .�. w O O • • • • Q v I y M w N W W N N x V O N N N N N N N N N ^ NMah o o> O ^ NMah oncOc) w w w w w w w w w w 1 � O a OU ti � Q �J U 2 QC p � � = 20J W o0m � � � j2W °pQ aih ~ U � 42J � UQUxWo� 2U co to U UU U U O D U M i 2 U 2 p N tiCC ff N N Nto N N N N N QO Q Z N M ^ Co p p O N N N N N N N N N 4 ICL k M W U IC4 M ito (oco NMah (oN � � w w w w w w w w w w toNN00 O a� M Co O O O O LO o - m a a Fo to to000 .. n - 00 W �f t: 46 as N N wi •� W It It O �t 4 N N M cli h JUUZWW L� \ m ro mm C* a ° oo —co IEEE 0 ^ dm7idd .. ci2° 2° 2° 22 h1 J 0 4O 4o '. n 0 to z E E E E m + 0 a � v . Cl) a t o 00 0 0 00000 � d JUU' W W OZ. co O O O to h I Ot (a a - cz ct Q V IT J I J M W Y 2 N Q Lo o a a o U U Q W d 4 N N O , V Ci QNN � 4] U ti N Cl) 't to M v cc cC Q WQv� UpO J m � U U O 2 o W Y 2 N o a a o W U Q •aNNO , U Q N N § LLIx U ti w N M ,It +n . . trfs��s�aa+ou LETTOR OF TMANSHITITAL TO: -_-- (A" I �n�c DATE: FItOJECT N0: � ATTENTION: -� OktNER:PW77-060'17054. 20&30 OWNBR:City of Fort Worth FIN: FTW95312 �� Project:North & South Holly Water Treatment r Plant Backwash & Chlorine & Ammonia Facilities We are sending you Attached ❑ Under Separate Cover VIA the. following items: ❑ Daily Construction Reports No. D flans (1 Specifications 17 HF1 No. _ 0m No.- U Addendum No. _ _ _ 0 Hemo.Ir'o:___ ir,rem too. �U Change Order 0 Field Order .No...­-- 0 No. __0 Pay Iteq. 0 Submittal No. _ 0 Other Copies ltef .No. Description 4 j Pf rn O o(W 1-k/ 230o V F�&/e ; A- mtvf �v%s, o,Yr ` 7ttese are transmitted fo► •our : U Use 0 11-eview 1. Coiim nl p �n(c,rrzi ion i] Approval 0 Distribution to Paitics Lr ItcsE)onsc U ltccord 0 Other - - - — -- -- -- — Rcciarks :_--- - ---- � --- ----- -- -- -....— -- i ► JUE - - I-AJUN CONTRACTOp i ' LLAS TX Copies to: GtG Route To: r C A• $y: - -- Telephone 817/735.7300 Fax 817/735-7491 Metro 817/429.19DD 4055 International Plaza, Suite 200, Fort Worth, TX 76109.4895 PROPOSED CONT. T MODIFICATION PROJECT:HOLLY WTP Chlorine & Ammonia/Backwash Facilities PROJECT NUMBER OWNER:City of Fort Worth PW77-060770500020 & 30 CONTRACTOR: Cajun Contractors 95028 ENGINEER: Freese and Nichols, Inc FTW95312 PCM DESCRIPTION: North Holly 2300 V Feeder Conduit Alignment Revisions PCM NO. 014 NOTIFICATION TO CONTRACTOR: The Owner proposes to make the additions, modifications or deletions to the Work described in the Contract Documents as shown in Attachment "A". We request that you take the following action within 10 calendar days: Notify us that you concur that this change does not require a change in Contract time or amount. A Field Order will be issued. x Submit a Price Proposal with detailed cost breakdown of labor, materials, equipment, all other cost related to this change and a revised schedule for performing the described change. Proceed with the change. Payment will be made at the unit price bid. Proceed with the change under the time and materials provisions of the Contract. Authorization to proceed with changes must be approved by Field Order or Change Order in accordance with the Contract Documents. By: r Date: CONTRACTOR'S RESPONSE: We respond to your request as follows: ❑ We concur that this is a no cost or time change. Issue Field Order. ❑ We submit the attached Price Proposal with detailed cost breakdown and revised schedule for performing the described change. ❑ We are proceeding with the change at the unit price bid. ❑ We are proceeding with the change under the time and materials provisions of the Contract. By: Date: ACTION TAKEN: ❑ Proposed Contract Modification rejected. Contractor is hereby notified NOT to proceed: By: Date: ❑ Field Order issued: No. Date: By: 13 Change Order issued: No. Date: By: CZW L"V:iTrJ I.ViV lritil,l- i`1VL1Cll..`'i11Ua PCM-014 ATT 'HMENT A PFtOJECT:HOLLY WTP Chloi.ra & AmmoniaiSack-wash Facilities PROJECT NUMBER OWNER:City of Fort Worth PW77-060770500020 & 30 CONTRACTOR: Cajun Contractors 95028 ENGINEER: Freese and Nichols, Inc FTW95312 PCM DESCRIPTION: North Holly 2300 V Feeder Conduit Alignment Revisions PCM NO.014 The Owner proposes to make the following additions, modifications or deletions to the work described in the Contract Documents. Authorization to proceed with these changes must be approved by Field Order or Change Order in acco:danc� with the Contract Documents. 1. Modify the 2300 V feeder conduit alignment from the North Holly High Service Pump Station load break switches to transforers T1, T2, and T3 as shown on the attached sketch. 2. Modify your record drawings as appropriate. By: f Date: EXISTING TRANSFORMER VAULT WITH TRANSFORMER TT AND T2 ON TOP OF VAULT N' -- M_— NEW TRANSFORMER LE G. T3 2 ABANDONED CAP SPARE CONDUIT HYDRAULIC SAW CUT EXISTING IN VAULT MIXING . ROAD FOR 3-2 1/2' CHAMBERS CONDUITS. SEAL CHEM. AROUND CONDUITS. BLDG. NO.1 NEVA 4X II . JUNCTION BOX 11 O O CHLORINE AND 11 AMMONIA .- BUILDING II ---I� -- -- �� - CONDUITS MOUNTED ALONG II j' BASIN WALL. REFER 10 II II II DETAIL THIS SHEET. CHLORINE/1 MONIA If II 3 1 D SPARE STORAGE A D II II I 2 i 2 2 1 2 SCRUBBER CILITIES I I 11 2 4K POWER &2 + 4KV POWER II 2 2 uI i i I all /�r> i 1 A CONDUIT I OUTIN SAW CUT EXISTING �( ROAD FOR 3-2IIV2- SEDIMENTATION CONDUITS. BASIN N0. 3 3 #�0 /•,1 -TRANSITION FROM UNDERGROUND I EXISTING LOAD BREAK I�f TO ABOVE GROUND. I SWITCHES LOCATED Iv BASEMENT NEW CONDUIT AND WIRING. FIELD ROUTE IN BASEMENT. z CORE DRILL WALL a EXISTING 5KV SWITCHGEAR FOR CONDUITS. SEAL < LOCATED ON OPERATING AROUND ALL CONDUITS a i LEVEL 1 CLEARWELL NO. 5 FIELD ROUTE NEW CONDUITS IN BASEMENT OF PUMP STATION CAP PUMP STATIOONDUIT INSIDE CORE DRILL PUMP STATION WAIL FOR 3-2 1/2' CONDUITS. SEAL AROUND 2, id•/c. CONDUITS • A NORTH HOLLY WATER scAL�:r TREATMENT PLANT --SITE PLAN . ao• 6�i>�s t INTER-OFFICE CORRESPONDENCE TO: Ted Gay, Freese &Nichols, Inc. . FROM: David Townsend, Facilities Engineer Water Department DATE: October 16, 1996 SUBJECT: PCM-022: North Holly Safety Related Improvements North and South Holly Water Treatment Plant Backwash Facilities Modification and Chlorine and Ammonia Rehabilitation Project Nos. PW77-060770500020 & PW77-060770500030 This office has reviewed your correspondence dated October 15,1996 on the proposed contract modification (PCM-022 ) concerning the three safety related items for the North Holly Water Treatment Plant which where requested by the plant. Item 1. Galvanized Steel Stairway at North Holly Raw Water No. 1 Valve Vault. The requested that a stairway be installed at the RW41 Valve Vault. Currently assess is limited to the unimproved road at the top of the levee making assess is difficult and dangerous during wet weather. The Stairway will allow assess from the a lower parking area. The Water Department agrees with your recommendation that the contractor price proposal of $8,138.88 for this item should be accepted as the cost provided is fair and reasonable. Item 2. Modify North Holly Raw Water 2 & 3 Post Chemical Application Vault Lid. Current assess is through a standard 24-inch manhole rim (and cover) using a ladder. This is to small to allow assess for personnel when using an airpack. The plant has requested that the vault lid be modified to install a larger aluminum (Bilco) hatch and to install a safety ladder in the vault. The Water Department agrees with your recommendation that the contractor price proposal of $5,375.89 for this item should be accepted as the cost provided is fair and reasonable. Item 3. Remove Portion above of North Holly Sedimentation Basin 41 Wall. The plant requested that a portion of the North Holly Sedimentation Basin 41 Wall be removed (above elevation 551.0) to allow visual inspection of the chemical storage area from the road. The Water Department agrees with your recommendation that the contractor price proposal of $2,714.32 for this item should be accepted as the cost provided is fair and reasonable. The Water Department understands that total cost of all three items is $16,229.06. Further, the Water Department understands that while this PCM does not include additional contract time, should it not be approved before December 6, 1996, additional costs (overhead costs) and additional contract time may be required. RE: PCM-022: North Holly Safety Related Improvements North and South Holly Water Treatment Plant Backwash Facilities Modification and Chlorine and Ammonia Rehabilitation Project Nos. PW77-060770500020 & PW77-060770500030 Date : October 16, 1996 Page 2 Therefore, this office will recommend to the City Council (and/or the City Manager's Office), the approval and acceptance of this additional cost in the form of a change order to be prepared and submitted by you to this office. For ac ountin u os s, this PCM will be paid from PW77-060770500030. David R. Townsend, P.E. cc: Frank Crumb Files Freese Simon W.Freese,P.E. 19041990 Marvin C.Nichols,P.E. 18961%9 AND MIC OIs,INC. CONSULTING ENGINEERS October 15, 1996 Mr. David Townsend, P.P. City of Fort Worth Water Department P.O. Box 870 fort Worth,Texas 76102 1:e: North and South holly (Vater Treatm-at Plant Backwash Facilities Modifications ani Chlorine and Ammonia Facilities Rehabilitation PIV77-M770500020 and 1`1 774)607705N030 PCM-022 North Holly Project C Safety Related Irnproveme,its Item 1;Provide a galvanized steel stairway,at North]lolly Raw No. 1 Val%•e Vault. Item Z.Modify the North Holly Raw 2&3 Post Cliemical Application Vault l.id Item 3;Remove the wall above D 551.0 on the east side of theabandoned sedimentation basin Dear Mr.Towmend: Transmitted herewith please find a copy of Cajun's Octol><r 8, 1996, price propor,a for the referenced PCM. This PCM consists of three safety, related items for the North Holly plant which have been requested by the plant staff. Item 1 provides new stairs at the North Holly Raw No. 1 valve vault.. Currently access is limited to the unimproved road on top of the levee which has traffic ability' problems during wet weather or up a steep grass slope from the lower parking area. Item 2 modifies the existing access manhole on top of the North Holly Raw 2&3 Post Chemical Application Vault to be an access hatth and ladder. Currently there is no ladder into the vault and the manhole is too small to enter easily when personnel are wearing an air pack. Item 3 lowers the east wall of the existing North Holly abandoned sedimentation basin by deleting the upper wall section. Removal of this wall improves plant visibility into the new chemical storage area. We have reviewed the price proposal and recommend the City authorize this additional work and issue a Change Order.The costs associated with these items are$ 8,138.88,$5,375.89, and$ 2,714.32;the total cost of all three items is S 16,229.06. Mr.David Townsend October 15,1996 Page 2 No additional Contract Time has been requested if approval is granted by the City by December 6,1996.Cajun has advised us that due to lead time on the Item 1 stairs and the Item 2 hatch and ladder that they will need additional Contract Time and overhead costs as these items will become critical path activities if approval is received after December 6th. We concur with Cajuns assessment of their schedule. Please advise if the Nater Department desires this PCM, or any portions of it, to be incorporated into a Change Order. Sincerely, FREESE AND NICHOIS, INC. G. E. Gay, P.E. xc: Charly Angadicheril Randy Romack Coy Veach file FTW95312.4.41.022/4.43.004 [F M"312P..WOLLYCJMGEMMNPCMZZRCM.GEO CAJUN CONTRACTOM October 8 , 1996 Freese & Nichols, Inc . 4055 International Plaza, Suite 200 Fort Worth, Texas 76109-4895 Attention : Ted Gay RE : North and South Holly Water Treatment Plants City of Fort Worth, Texas PCM-022 Dear Mr . Gay : In accordance with PCM-022 , please find attached our proposal to provide a galvanized steel stairway at North Holly Raw No. 1 Valve Vault, modify one (1) each post chemical application vault lid, and remove the wall above El . 551 . 0 on the east side of the abandoned sedimentation basin from the southeast corner north to the double access stairs . Work described shall be in accordance with the attached details . If approval of this proposal is received before December 6 , 1996, then no change in the contract time will be required. However, if we do not received approval by December 6 , 1996 , then we must revise our proposal to include additional time and overhead cost . This is due to fabrication and delivery time of the material required for this work . HOME OFFICE, DALLAS OFFICE, HOUSTON OFFICE, LAKE CHARLES OFFICE, NEW ORLEANS OFFICE: Post Office Box 104 Post Office Box 59367 Post Office Box 890809 Post Office Box 1487 Post Office Box 11207 Baton Rouge,LA 70821.0104 Dallas,TX 75229 Houston,TX 77289-0809 Lake Charles, LA 70602.1487 New Orleans, LA 70181-1207 (504)753.5857 (214)323.9333 (713)479.5554 (318)625.3773 (504)734.3100 FAX(504)751.9777 FAX(214)323.9555 FAX(713)479-0309 FAX(318)625.3817 FAX(504)734.9900 Freese and Nichols, Inc. October 8 , 1996 RE: PCM-022 Page Two Sincerely, CAJUN CONTRACTORS, INC. Chris Thompson Project Manager File 1 . 21 (d) (95028) Field N HI +"lC7 f+ I N LOOln T . � a rr N O Sia S a�N 0 o N C o T LUL .0 CCovo 0 uil a � LL.! la I' I i I I oc,I� :,r- COa I m a eo I I I co m I I I I I I I I I I o�$�$I � I � � o Cy W i W, LOIV C5 Rr '1) j F—, C ICV lc 0 to'cYi 1 N T J d h olo 000 o •�� ml� 0;010) � i I o' UJ II II I P i III wVA I it I N 00 } 0 O W u _ a � •[ a v n r T t o r o c t 7• 0-2 n t .� n n n c c c n OCT 14 '96 0'5:37P;I CAJUII COI ITRACTORS P.2 DIRECT FIELD COST ESTIMATE Unit Unit Total Total 1 Tx'd N-Tx'd Unit Tx'd N-Tx'd Total Loc. Dea�tion Oty �.Ung Mail .[ M- Labor Mat'I I Mat'I Labor AL $1`E1=C STA RW-T AY i 01 0 C _ PURCHASE STAIRWAY �I __ 1 11L_S 5.270,00 0 5,270 _0_ r UNLOAD AND STORE 2M'1HRS ~ -~`- P 2:1 Pw1H I 10.00 01 0- 20 i HAND EXCAVATE FOR PAD 2M`3HRS 6 t`Nlql 10.00 Oi-- 0 6L '� PURCHASE REBAR 1 LS Ii 75.00 —_ - 0; 75 0 :PURCHASE FORMS:__ _ ^ 00_ r PLYWOOD1 LS •1 80,0— 80 0 _ C it FRAMING 1 IS 40.001 __ 40 0 C �. )'INSTALL FORMS/kEBAR FOR SIRS 2.1 aH�R 6 bni� 10.00 0 0 — 6C QIP!kCE AND FINISH SLAB 2M'2HR5 _ 1; 4 N+i 10.00 _ 0 0 40 —_�lINSTALL FORMS/REBAR FOR WALLS 211`CrI' 12 NIH 10.00 0 0 — 120 PLACE/FINISH WALLS AND SLAB 2M'1 A_R_ 2_NISI ._ 1 _ 1000 0 _ 0_ _ 2C 'POINT AND PATCH WALLS 2M,2HRS 6-C-Y--I- till c CC 'C CO C 2� @0 _ PURCHASE CONCRETE 2 00 Gv I7E:_C__ C _C WRECK FORMS AND CLEA,N.P »HR, 6 hl-; 1C GO FINE GRADE AREA 2N1'2HRS 4 NI-I 1C OC 0 4C ERECT STAIRS AND PLATFORM 2%1.5-iRS 0 M 0 D 1 C __---_ 1 CRANE TO UNLOAD/SET Pi A'�OP g' ---�F a N;$_ I 5C GG 200 C _C OPERATOR _; 4 NIS i —_ -4 CC _ _-�l--- 5d SMALL TOOLS 2 DyS 35 CO 7J C S''6TOTAL- --- - --- ---- 320 5.521_ 676 _jR_EMOVESOIL 2M-2HRS 4 %IH 1000 0 G 40 r- 14EMOVE RING AND SPACERS 2M-3HR5 7_ 6 NI�_�_ — 10 GC _ _ C _ 60 I AIR COMPRESSOR ANC CH PPtNG HAMM 1 LS 23 00 _ 23, 0 SAW CUT TOP ��7 LF 75N __ _ __ _ _ 525'- —_ -7 C REMOVE RUBBLE 2M'1HR 2 %Ir 10 OC G 20 _:ROUGHEN VERTICAL SURFACES 1W3-IRS_ 3_M- 1C CC 0 0 33 AIR COMPRESSOR AND BUSH HA.MVER _ 1. LS 2?OO _ 23 0- C .1. IDRILL AND EPDXY DOWELS 2' 4HRS a NI-� I 'Coo 0 0 _ 40 PURCHASE EPDXY 1 l5 _ ^_GC CC C P,O _ C PURCHASE DOWELS — 1 _LS ! 2C CC _ 0 20 C FORM ELEVATED BOTTOWEDG'c 2h1't1HRS 16_hlh - 10 OC 0 0 _160 I PURCHASE PLYWOOD �� 1_LS L a0GO 401 0 C j T PURCHASE FRAMING 1 _LS 6C 00 _ _ 60 0 C 1 FORM CURB 2M'8HRS 00 _ 0 0 -120 _ ;,DRILL/GROUT DOWELS FCR CURBS 2M`4mR S I- — 10 0C _ 01 0 _ 80 1: PURCHASE EPDXY 60 CC 0' 0^ 0 PURCHASE DOWELS __ 20 CC 01 0 _0 i_PURCHASE/PLACE CONCRETE _2 00 C:Y F 76 CO 3300 01� 152 70 -1WRECK FORMS AND CLEAN UP 2M`aHRS 6 _h1M_�� 10.OG OI- 0 _ 80 1 �IPURCHASEANSTALL HATCH iE.A _ 545.00 60 CC 0 645 _ _ 50 PURCHASE LADDER I 1' E'A 1,300.00 0, 1.300_ 0 1INSTAL�DER 2M•4HRS 8 MH 10 C0 0 i— C 80 INSTALL BOLLARDS I_ i �0�l G __ 0 _ I EXCAVATE 2M'.5HRS'2EA 2'; NIH�— 01 0 0 ' r PLACE CONCRETE .25CY•2EA _ _ _ _ r � 0.50.1 f:Y � 76.00 20.00 0 38 10 I SET BOLLARDS 21 EA _ 15.00 OI 0 30 j PURCHASE BOLLARDS_ 2iEA 1 117,00 _ 0 234 0 TOP COAT BOLLARDS �2 EiA _ 10.00 i 15.00 0 2'. 3 _ !SMALL TOOLS Lr b,!DYS 1 3500 175 0 0 t-_ SUBTOTAL - _ 846 2 389' SCO SAW CUT WALL I 83.251 Lf11 35.00 2.214 0_ 0 DELETE VERTICAL CUTS 12, LF 35.00 420 0. O HAULING AND DISPOSAL FEES ;07 LS 520.00 620 _ 0' 0 I- SUBTOTAL 2 314 01 0 TOTAL 3.550 89 7 0 =15:7 6 ITEM:..PCt= JOB: N&St1S'11 LY WATER TREATMENT PLANZA SHT. 0i1 SEP-19-96 FRI 8 :42 P. 01 La Fer & Associates, Inc. 9601 WHItt ROCK TRAIL * SuI2s 212 * DALLAS, TEXAS 75238 + (214) 348-9814 + TAX (214) 348-7297 THIS BID QED BY A WOMEZVA BUSINESS EN-1ERPRISE 70: Cajun Contractors ATTN: Chris Thompson FAX NO. : 323-9555 DATE: 9/12/96 Gentlemen: We propose to furnish but not install materials for the project listed below. In preparing this bid we have seen Addenda # ----- ---•- PRGUDCT NAME: North & South Holly W.T.P . -- Fort Worth, Texas Quantities shown in our scope are estimates by the Seller and do not replace actual job requirements. Prices quoted are based on these estimated quanti- ties and are made F.O.B. trucks our plant with full freight allowed. Prices quoted do not include state or local sales or use taxes should such apply and remain valid for 90 days. Terms are NET 30 DAYS, NO )eLNINAGE, with 11% per month late charge for ac- cxxznt past 30 days. Terms apply to partial shipments. Payments are to be made at 9601 White Rock Trail, LB 25, Dallas, Texas 75238. This offer stipulates delivery be made not later than the 4 to 6 weeks after 1n brie or mare shipments. receipt of order We appreciate your confidence in us as a supplier and look rward to serving you on this project. OUR SCOPE AND PRICING: PER DETAILS SUPPLIED - 1 Ea. Hatch, Alum. DID AMT. $ 545 . 00 - 1 Ea. Ladder, Alum. w/Stainless Steel Hdwr . BYD AMT. 11 , 300 . 00 - 2 Ea. Bollards, Prime Coated BID AMT. $ 234 , 00 - 1 Ea. Catwalk & Staircase Complete, Galy. BIP AMT. $5, 270 . 00 w/Hdwr , MOTE: Above are priced separately by request. Ili Ftlz Ff�9S31t _ 'nmwft LETTER OF TICANSNITI T0: �a�� / aLc�Yl S e ri DATE: 9�0 -- FP.OJECT E'0: ATTENTION: Ok'NER:P4177-060170506... 20&30 OWNBR:City of Fort >�lorth F/N: FT4I95312 Project:North_& South Holly Vater Treatment Plant Backwash & Chlorine & Ammonia Facilities We are sending you VKAttached 0 Under Separate Cover VIA the. following items: 11 Daily Construction Reports Ko. 0 Flans D Specific;ltions ❑ IIFI No. D CO Pio. U Addendum, No. D Pieroo.i�o. _ C� PCM 1�o.^per__ U Change Order >\o. 0 Field Order 10 . D Pay Iteq . D Submittal No. 0 Other - — Copies Ref -No. II<<cription 1 These :ire transmitted for your: U Us ❑ f. Co,'imcnt D 111forr:at ion 10 Approval 0 Uistrit"itioa to 1'ar tics D Response D I;ecord ❑ Ott•er Itcnarl:s : Copies to: P.oute To: Dy: Telephone 817/735-7300 Fax 817/735-7491 Metro 817/429-190( 4055 International Plaza, Suite 20D, Fort Worth, TX 76109-4895 I-0' rile rrAS312 /A.4I/U22 PROPOSED CONTRACT MODIFICATION PROJECT:HOLLY WTP Chlorine & Ammonia/Backwash Facilities PROJECT NUMBER OWNER:City of Fort Worth PW77-060770500020 § 30 CONTRACTOR: Cajun Contractors 95028 ENGINEER: Freese and Nichols, Inc FTW95312 PCM DESCRIPTION: Project C; North Holly Chemical Building Improvments PCM NO. 022 NOTIFICATION TO CONTRACTOR: The Owner proposes to make the additions, -.odificat:cns or deletions to the 4,or described in the Contract Doc,.-T-ents as she-n. in ttac:.;:ent "A:" . y;e req,lest that you take the following action within 10 calendar days: ❑ Notify us that you concur that this change does not require a chanoe in Contract time or amount. A Field Order will be issued. x . Submit a Price Proposal with detailed cost brea,.dowm of labor, materials, equipment, all other cost related to this chance and a revised schedule for performing the described change. ❑ Proceed with the change. Paynent will be made at the unit price bid. Proceed with the change under the time and materials provisions of the ; Contract. Authorization to proceed with chances must be approved by Field Order or Change order in accordance with the Contract Dcc,_=ents. CONTRACTOR'S RESPONSE: We respond to your request as fc11c-,.s: ❑ We concur that this is a no cost or time chance. Issue Field Order. ❑ We submit the attached Price Proposal with detailed cost breakdown and revised schedule for performing the described change. C3We are proceeding with the change at the unit price bid. ❑ W are proceeding with the orange under the time and materials provisions of the Contract. By: Date: ACTION TAKEN: ❑ Proposed Contract Modification rejected. Contractor is hereby notified NOT to ,proceed: By: Date: ❑ Field Order issued: No. Date! By: ❑ Change Order issued: No. Date: By: Me r W95312 14.411 022 PROPOSED CONTRACT MODIFICATION PCM-022 ATTACHMENT A PROJECT: HOLLY WTP Chlorine & Ammonia/Backwash Facilities PROJECT NUMBER OWNER: City of Fort Worth PW77-060770500020 & 30 CONTRACTOR: Cajun Contractors 95028 ENGINEER: Freese and Nichols, Inc. FTW95312 PCM DESCRIPTION: Project C; North Holly Chemical Building Improvments NO. 022 The Owner proposes to make the following additions, modifications or deletions to the work described in the Contract Documents. Authorization to proceed with these changes must be approved by Field Order or Change Order in accordance with the Contract Documents. NORTH HOLLY CHLORINE AND Fu`!OtiIP., PP.OJZCT C Item 1; Provide a galvanized steel stairway at North Holly Raw No. 1 Valve Vau_:. in accordance with the attached details. Item 2; Modify the North Holly Raw 2 & 3 post the-.cal application vault lid :.. accordance with the attached details. Iter 3; Remove the wall above El 551 .0 on the east side of the abandoned sedimentation basin from the southeast corner north to the double access stairs. By; Date: � rG %al ko / " O 1E't rp ' In � 1 I y y n If 1>4 t N , r Project Title: }�o.�/yam li1�F� '" A10 Date: Account ,No. : FTk/ Z Designed: Subject: �4�✓ �� � yv%� �Q��f Checked: = NOTES: 1. See Specification Section 05500 for stair fabrication and installation. 2 . Specification for: STEEL GRATING A_*ID STAIR TREADS: Steel crating and stair treads shall be Pressure Locked rectangular design, T}-pe S, as r,anufactured by IKG Industries . Main bars shall be 1" by 3/16" spaced 1-3/16" center to center. Cross bars shall be of a rectang-,ilar cross section, flush top and spaced S" center to center. Main bars and cross bars shall be slotted at their intersection so as not to remove excessive material from the load sustaining members . Main bars shall be dovetail slotted and have their slots solidly filled by the cross bars . Finish shall to hot -dipped galvanized. Grating ands treads shall be resigned for a minimum uniform dis.-ributed live load of 100 psf with a deflection cf less than 0.25" . Treads s-,-,all have a depth of tread of 12-1/5" and include a checkered plzte nosing. Attachment of grating and treads to the stringers sha'_1 he by either bolting or weldine per m.anufac_urer' s reccrrmencaticns . OF T r y _ JvANTONIO DIAZ { 32713 ............ s' PAf7P 'e n . Project Title: %70 I/y /V"tX P/0J- Date Account No; FrK19s3/2 Calc. No: Designed: Subject C�e�?,co/ ZnChecked: 8-•4- S "°" REFERENCE I I I _ I - . I 5 - /V/k.s / Aemo//vc Sol/ �a /�,�Pase T� o� S/1o�. //Qc�. ✓e -.rs� � �4nhe/ R;- 01: .PQccr-J. - �Cc.lCca 7 Qnd Ae"no Yc /a� ..S/o6 .ec/iq/ O-r -SA 0w"li Ao Pre✓/o% Ale Pe urn /`70,13o le Cc ve r �o W n c r. l P L A N ago IOU Project Title: Na��Y W7�P Date Account No: FTIn/95312 Calc. No: Designed: Subject C�en.�ca �hie���a.. Datil,.<< m,odi f,1-4- '0Checked: _ REFERENCE A/c ROUGHEN EXPOSED VERTICAL CONCRETE SURFACE. INSTALL 94 DOWELS (MINIINILJN1 EMBEDMENT = 5 INCHES) AT LOCATIONS INDICATED IN THE SLAB USfN`G HILTI C-100 HIT ANCHORING SYSTEM. APPLY BONDING AGENT TO ROUGHENED VERTICAL CONCRETE SURFACE PRIOR TO PLACING CONCRETE. 2 SECT I oN INL PLT - L C f ffimm Was Project Title: !�a y WT1" Date Account No; FTW 9S3/-Z Calc. No: Designed: Subject ����e'^��� :E-h le,-41-,, manWe mod4le-,241 ti Checked: 4� REFERENCE u = _ Co we�S rle✓ °� I SCCTONAL PIAN ArMs Project Title: !�o Y 1�Ti° Date Account No: f'Tlti/9S3/2 Calc. No: Designed: Subject C/Slyyec-`Ie., lnf. " /1'�.c�i 'cQ?�io., Checked: REFERENCIE o h Y O I Qo load - F, ' oncrc . G — — — — — — -- --� (-r P o l + Project Title: /yoDate Account No; F714/F5312 Calc. No: Designed: Subject —. Checked: - REFERENCE Checked: REFERENCE TY F. - I 5EC7-10^1 ( EX/Srl"16 F•o..,c. 12 1 SEC770Al (przO) yo QED) Project Title: �1v y 1-✓TP Date Account No; /CT ls/9S3/Z Calc. No: Designed: Subject . Chem e-4� jec��e� f4O1)Aole IV"cli>lrca/I Checked:, 30" 30" 1414.4ck u/ REFERENCE ala l FraTM�:• (�e� QJSOO� Z.OS, 1 Ir _ •_ r i c n 2-,,PP q.;51 4 V ect Title, l A WT .r ..,or f� n�onT `. , Y�� :/i�. _ ' p(o , Account NO.. 7k Ca1c. NO: Pesi.ped:,m &J4 le Subject Checked:. — -7 nEFERENCE'- lu -3 v - try--- - ��' \ \ Li .' Izz 46 112 S/ � Project Title: f-�oy Wr/D A&IZ /0/,Q^f Date: Account ,No. : �"rL✓ 9$�iz '' // Designed: Subject i /faw lu'(4r� va A VdL /f Checked: = NOTES: 1. See Specification Section 05500 for stair fabrication and installation. 2 . Specification for: STEEL GRATING AND STAIR TREADS: Steel grating and stair treads shall be Pressure Locked rectangular design, Tyre B, as manufactured by IKG Industries . Main bars shall be 1" by 3/16" spaced 1-3/16" center to center. Cross bars shall be of a rectanaalar cross section, flush top and spaced 4" center to center. Main bars ar.d cross bars shall be slotted at their intersection, so as nct to remove excessive material from the load sustaining members. Ma'-n bars shall be dovetail slotted and have their slots solidly filled by the cross bars. Finish shall be hot-dipped Galvanized. Grating ands treads shall to designed for a minimum unifor:a dis_ributed live load of 100 psf with a deflection of less than 0 .25" . Treads have a depth of tread of 12-1/6" and include a checkered plate nosing. Attachment of crating and treads to the stringers sha'_1 be by either bolting or welding per manufacturer' s reccmmm,erdaticns . _ Page Of Z ° �, 1. ►, � o IN�� moo ' ZO Ira q yw oYF- C Lz � o ,� oZ c Iv 471 o X V i o Project Title: �a MY /V° Date: Account ,No. : 145 7 ,/ 953/7- Designed: Subject; Raw &j,(I,— Va l✓e Vad1f Checked: '= NOTES: 1. See Specification Section 05500 for stair fabrication and installation. 2 . Specification for: STEEL GRATING AND STAIR TREADS: Steel grating and stair treads shall be Pressure Locked rectangular design, Type B, as manufactured by IKG Industries . Main bars shall be 1" by 3/16" spaced 1-3/16" center to center. Cross bars shall be of- a rectangular cross section, flush top and spaced 4" center to center. Main bars and cross bars shall be slotted at their intersection so as not to remove excessive material from the load sustaining members. Main bars shall be dDvetail slotted and have their slots solidly filled by the cross bars. Finish shall be hot-dipped galvanized. Grating ands treads shall be designed for a minimum uniform distributed live load of 100 psf with a deflection of less than 0 .25" . Treads shall have a depth of tread of 12-1/6" and include a checkered .plate nosing. Attachment of grating and treads to the stringers shall be by either bolting or welding per manufacturer' s recommendations. - - - Page Of PREPARED BY -ANO.-AMAIPAIR AM MdOwAgh APAMWW M=r P A O D U C T S APPROVED SY DATE_- - VEET._t�cr _ �1. FObF 5E51-T tci,l gl✓_-1 'e CEMf N� s 7 B. • �A. WA'f 1s. : �,-- ' ca• w�•t 15. I 1 19. rZ 4" (TYP.) • - SYMM ETR`( 116x.1T zo. - 21; : < UEC:,AT Y'E) CPosiTtVe 22 pLar 23, 23' _ 27. =� 07 '�2. I t � � � I CSP.) G•, � � ' . . i (NEGATtYE) . CPp51TtVE� , Fioject Title: h'o 11✓ W7-10 Date Account No; FTG✓9S3(Z Calc. No: Designed: Subject Checked: Y REFERENCE X1 t i �� Project Title: h'o//ii 1-17-20 Date . Account No; Calc. No: Designed: Subject �zeroica� T.Jec�io� /r�,r„�t�' %�u4t,'c�,�io., Checked: REFERENCE t r_ Project Title: �/O ,, �✓rP , Date L Account No; FTIn/g53(Z Calc. No: Designed: Subject Clz�.ti��Q/, zChecked: Y REFERENCi t r5, " 1 v ov to i J 0 1 x ,Illy? - Project Title:_ A IZ /VoDate: Account ,No. : FTW g_T3/Z Designed: Subject: /f�ow &tfcl_ Uo A V4 u11 Checked: i = NOTES: _ _ 1. See Specification Section 05500 for stair fabrication and - installation. 2 . Specification for: STEEL GRATING AND STAIR TREADS: Steel grating and stair treads shall be Pressure Locked rectancular design, Type B, as manufactured by IKG Industries . Main bars shall be 1" by 3/16" spaced 1-3/16" center to center. Cross bars shall be of. a rectangular cross section, flush top and spaced 4" center to center. Main bars and cross bar's shall be slotted at their intersection so as not to remove excessive material from the load sustaining members. Main bars shall be dovetail slotted and have their slots solidly filled by the cross bars . Finish shall be hot-dipped galvanized. Grati.^.c ands treads shall be desianed for a minimum uniform distributed live load of 100 psf with a deflection of less than 0.25" . Treads &,..all have a depth of tread of 12-1/8" and include a checkered _plzte nosing. Attachment of grating and treads to the stringers shall to by either bolting or welding per manufacturer' s reccrmne-Ida tions. . _ 0 F 7•F (� t " • ANTONIO DIAZ :...........................:... 2713 +FSG�STER Page Of _