Loading...
HomeMy WebLinkAboutContract 21476-CO8 110N: ( 1 WIVE--•ILE � O=U CITY OF FORT WORTHCANARY-COKyIRUCTION FILE A 4 PINK-PROJECT MANAGER CHANGE ORDER REQUEST . GOLDENROD-CONTRACTOR CHANGE ORDER NO. DATED.O.E.NO. PROJECT NO. _ 8 PW77-060770500020&PW77-060770500030 PROJECT DESCRIPTION: North and South Holly Water Treatment Plants CITY SECRETARY CONTRACT Backwash Facilities Modifications and Chlorine and Ammonia Facilities Rehabilitation NO. 21476 ORIGINAL CONTRACT AMOUNT..........................................$ 7,747,000.00 S-6 78V 9$7 0o630 4 $.�y EXTRAS TO DATE...............................................$ 217,349.87 Jr CREDITS TO DATE..............................................$ 0.00 CONTRACTCOST TO DATE..............................................................................................................................................................$ 7,964.349.87 AMOUNTOF PROPOSED CHANGE ORDER....................................................................................................................................$ 14.140.06 REVISEDCONTRACT AMOUNT.......................................................................................................................................................$ 7,978,489.93 TOTAL FUNDS APPROVED BY COUNCIL.......................................................................................................................................$ 7.979,410.00 IN ACCORDANCE WITH THIS CHANGE ORDER,THE CONTRACTOR SHALL:Modify and change the contract as shown below to provide a complete, functional and operational laboratory.These changes are listed below:Further descriptions and information is shown on attached material: PCM-021:NHWTP CHLORINE BUILDING EXISTING_FOUNDATION REMOVAL $ 2,881.47 The Contractor was directed to remove the existing concrete foundation walls for the Chemical Lines Trench slab on the south and west sides of the North Holly Chlorine Building.The abandoned foundation walls had to be removed to allow the installation of the chemical lines concrete trench from the Chlorine Bldg to the chemical storage area.The Contractor has provided a cost breakdown of$2,991.47 for this work. PCM-024: SOUTH HOLLY CHLORINE PIPING MODIFICATIONS $ 17,183.31 The Contractor shall install modify the chlorine liquid piping between the load station and the SHWTP bulk chlorine storage tanks, by deleting one 1-inch liquid line and changing the other line to 1-1/2 inch for each tank.This modification is required by DPC,the Chlorine Supplier.The Contractor has provided a cost proposal of$17,183.31 for this work and requests 15 additional calendar days be added to the contract time PCM-025: SOUTH HOLLY PIPE BOLLARDS $ 4,857.03 The Contractor shall install 17 additional pipe bollards at the South Holly Water Treatment Plant at the request of the plant staff. These pipe bollards is to protect the new chemical line pipe chase and the stairs to chemical storage tanks and sedimentation tanks,from moving vehicles.The Contractor has provided a cost proposal of$4,857.03 for this work and requests 10 additional calendar days be added to the contract time PCM-027: SOUTH HOLLY BACKWASH CLARIFIER RETURN FLOW PUMPS $ 1,393.45 The Contractor was directed to modify the return flow pump locations at the South Holly Backwash Clarifier.The electrical plans and mechanical plans were in conflict.The Contractor has provided a cost breakdown of 1,393.45 for this work. COSTS FOR CONTRACTOR'S TEMPORARY CONSTRUCTION POWER AT SOUTH HOLLY CHEMICAL BUILDING $(12,175.20) The contractor shall reimburse the City for electric costs for temporary construction power taken from the South Holly Chemical building MCC. By agreement,a temporary power meter was installed. The power used was 136,800 kwh and the plants power cost is$0.089/kwh. The cost of power used for temporary construction power is$12,175.00. THE TOTAL COST FOR CHANGE ORDER NUMBER 410 IS $ 14,140.06 The contract time of completion was February 27, 1997 and is revised to be March 25, 1997 It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both in time and money)for all costs arising out of,or incidental to,the Change Order. ORIGINAL CONTRACT TIME ADDITIONAL APPROVED TIME TO DATE APPROVED CONTRACT TLNE TO DATE ADDITIONAL TIME FOR THIS CHANGE ORDER 450 Calendar Days 10 Calendar Days 460 Calendar Days 25 Calendar Days CONTRACTOR DATE FIELD ENGINEER DATE O Cajun Contractors,Inc. G.E.Gay, .E. reese&Nich �In ol MANAGER/CONST. & DATE DIRECTOR/MA A DATE David R.Townsend,PE,Facilities 02eer 1 7 'CITY SECRETARY DIRECTOR/CONTRACTING DEP DATE f l% CITY ATrom d WORTHY TX DATE Lee C.Br ley,Jr.,PE,Water Director CITY M AN I DATE COUNCIL ACTION(IF REQUIRED): DATE RECEIVED JUN 16 2M 11 APPROVED 11 DISAPPROVED Q OTHER CHANGE OR EXTRA WORK ORDER PROJECT: NQS Holly Chlorine/Ammmonia/Backwash Facilities OWNER: City of Fort Worth PROJECT NO. PW770607705-00020 & 30 CONTRACTOR: Cajun Contractors, Inc. PROJECT NO. 95028 ENGINEER: Freese and Nichols, Inc. PROJECT NO. FTW95312 CHANGE ORDER NO. : Eight (8) DATE: March 13, 1997 CHANGE OR EXTRA WORK TO BE PERFORMED In accordance with previous discussions and negotiations, summarized below are the changes or evtr.a work to be performed in the above referenced project. REFERENCE FCM-021 8a) Remove the existing concrete foundation walls to 6" below bottom of chemical trench slab on the south side of the North Holly Chlorine Building. The abandoned foundation walls of the original chemical building have been found to be in conflict with the proposed concrete chemical. trench. This work was completed under a time and materials work directive. No additional Contract Time was requested. 1 ADD $ 2, 881.47 REFERENCE PC24-024 8b) Modify the chlorine liquid piping between the load station and the bulk storage tanks by deleting one 1" liquid line and by changing the other liquid line to 1 1/2". This modification is required by DPC, the City' s chlorine supplier. An additional fifteen days of Contract Time has been requested. ADD $ 17,183.31 REFERENCE PCM-025 8c) This PCM is -for 17 additional pipe bollards requested by the plant staff to be installed at South Holly. An additional ten days of Contract Time has been requested . ADD $ 4,857 .03 Change Order #8 March 13, 1997 REFERENCE PCM-027 8d) This PCM was issued to Cajun as a Time and Material work directive to modify the return flow pump locations as there was a discrepancy between the electrical drawings and the mechanical drawings. No additional Contract Time has been requested. Add $ $ 1, 393. 45 Be) In accordance with the November 16, 1.995 Project Coordination Meeting No. 1, plant coordination it;ern 9, Cajun requested permission to take temporary construction power from the South Holly Chemical Building MCC to the clarifier area for construction power. Temporary power and meter were installed December 19, 1995 and the meter was removed in late December 1996. The power meter reading of 136, 800 kwh was calculated by the plant' s power usage power cost of $ 0. 089/kwh. The cost of power used by Cajun totals a credit to the City $12, 175.20. Deduct $ 12, 175.20 It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of or incidental to, the above described change order. Original Contract Amount $ 7, 747, 000.00 Previous Contract Modifications (C.O. #1) $ 64, 348.57 Previous Contract Modifications (C.O. #2) $ 9,508.04 Previous Contract Modifications (C.0'. #3) $ 47, 913.35 Previous Contract Modifications (C.O. #4) $ 14,594.32 Previous Contract Modifications (C.O. #5) $ 51, 985.11 Previous Contract Modifications (C.O. #6) $ 14, 096.86 Previous Contract Modifications (C.O. #7) $ 14, 903. 62 Present Contract Amount $ 7, 964,349.87 Net Increase in Contract Amount $ 14, 140.06 Revised Contract Amount $ 7, 978, 489. 93 Change Order #8 March 13, 1997 Original Contract Time FEBRUARY 18, 1997 Previous Change in Contract. Time of Final. Completion (C.O. #1) 0 DAYS (C.O. #2) 0 DAYS (C.O. #3) 0 DAYS (C.O. #4 ) 0 DAYS (C.O. 1F5) 0 DAYS (C.O. #6) 0 DAYS (C.O. 0 ) 10 LAYS Present ChIncte• in C,^nt-,-.A:t Tin,,_ I r PinaI Comp IF-tion (C.O . ii b ) DAY S Net Increase in Contract. 'I'.ime of Final Compl(--Adoti 35 DAYS F:evised Contract Time I or I•'i naI Co:nplet .ic)n NiARCIIi 2.5, 199.7 Recommended by by FF',EE S1, Rt Fay t-- !'�� _- ���%-s�- Fid - --� -- - - ---��`-- Datc CITY 01.' 1'(1-)1:'1-' 0JOY"'I I > t_F I�ttachments: Proposed Contract Modification-021 Proposed Contract 11odifi.cation-024 Proposed Contract Modification-025 Proposed Contract Modification-02.7 Temporary Power Credit. P:\focme\admin\eo.oe cc INTER-OFFICE CORRESPONDENCE TO: Ted Gay,Freese &Nichols, Inc. . FROM: David Townsend,Facilities Engineer Water Department DATE: January 14, 1997 SUBJECT: PCM-021:NHWTP Chlorine Building Existing Foundation Removal North and South Holly Water Treatment Plants Backwash Facilities Modification and Chlorine and Ammonia Rehabilitation Project Nos. PW77-060770500020& PW77-060770500030 This office has reviewed your correspondence dated January 9, 1997„ on the proposed contract modification (PCM-021) concerning work directive to the Contractor for the removal of existing concrete foundation walls for the Chemical Lines Trench slab on the south and west sides of the North Holly Chlorine Building. The abandoned foundation walls (from a structure predating the current plant) had to be removed to allow the installation of the chemical lines concrete trench from the Chlorine Building to the chemical storage area. The contractor had been previously authorized to do this work ("time & materials"). The Water Department agrees with your recommendation that the contractor price proposal of$2,881.47 should be accepted as the cost provided is fair and reasonable. This office will recommend to the City Council (and/or the City Manager's Office), the approval and acceptance of this additional cost in the form of a change order to be prepared and submitted by you to this office. For accounting purposes,this PCM will be paid from PW77-060770500030. David R. Townsend, P.E. cc: Frank Crumb Files Freese Simon W.Freese,Nichols, P.E. 1900-1%9 C Marvin C.Nichols,P.E. 18961%9 AND Nichols,INC. CONSULTING ENGINEERS January 9, 1997 Mr. David Totiyiisend, P.E. Facilities Design and Construction City of Fort Worth Water Department P.O. Box 870 Fort Worth, Texas 76102 Re: North and South Holly Water ] teatment i'lant Backwash Facilities Niodifi:ations and ClLlorine aIld Aninionla Facilities itehalfilitation PI'V77-060770 00020 and MV77-060770500130 PCM-021; North I lolly Chlorine Building Yxistin`y Foundation Removal Dear Mr. Townsend: Transmitted herewith please find a copy of Cajun's January 7, 1997 price proposal for the referenced PCM. This PCM was issued as a v%-orl: directive to remove existing concrete foundation Nvalls to 6" below the bottom of chemical trench slab on the south and Kest sides of the North Holly Chlorine Building.The abandoned foundation walls of the original chemical building have been found to be in conflict with the proposed concrete chemical trench.Cajun was previously authorized to proceed with their removal under the time and materials nTethod of payment. We have reviewed the price proposal and recommend the City authorize this additional work and issue a Change Order in the amount of ca 2,881.47. No additional Contract Time has been requested. Please advise if the Water Department desires this PCM to be ia,7orporated into a Change Order. S:;tconply FREESE AND NTICHOLS,INC. G.E.Gay, P.E. xc: Charly Angadicheril Coy Veach file FT'W95312.4A1.021/4A3.06 tFM5312P..NliOLLY`CtUWOESIPCM,PCN121 RCM.GEO TELEPHONE 817.735-7300 0 4055 INTERNATIONAL PLAZA,SUITE 200 FORT WORTH,TEXAS 76109-4895 • METRO 817-429-1900 • FAX 817-735-7491 CAJUN CONTRACE(W January 7, 1997 Freese&Nichols, Inc. 4055 International Plaza, Suite 200 Fort Worth, Texas 76109-4895 Attention: Ted Gay RE: North and South Holty Water Treatment Plants City of Fort Worth, Texas PCM-021 Dear Mr. Gay: Please find attached our cost for PCM-021. Work for this order includes removal of an existing foundation below grade located at the North Holly Chlorine and Ammonia Budding. This foundation was not shown on the contract plans and was in conflict with the proposed pipe chase. This change does not require a change in the contract time. Sincerely, CAJUN CONTRACTORS, INC. Chris Thompson Project Manager File 1.21 (d)(95028) Field HOME OFFICE: DALLAS OFFICE: HOUSTON OFFICE: LAKE CHARLES OFFICE: NEW ORLEANS OFFICE. Post Office Box 104 Post Office Box 59367 Post Office Box 890809 Post Office Box 1497 Post Office Box 11207 I'mon Rouge,LA 70821.0104 Dallas,TX 75229 Houston,TX 77289.0809 Lake Charles,LA 70602.1487 New Orleans,LA 70181.120; (504)753-5857 (214)323-9333 (713)479-5554 (318)625-3773 (504)734-3100 FAX(504)751.9777 FAX(214)323.9555 FAX(713)479.0309 FAX(318)625.3817 FAX(504)734.9900 r Q c co cct O oc N69 �. N z Un 0 9 100 r- N zz m co co a � FQ-- N N w o o °0 co 0 H N N LLo Z ul 0I aVLL M He OW) m1 � o Nw Nr o L� 60 L ' Ci z N rn C14 J_ F" 0 I 0 Q U p i to 0 0 �1 � ili coLO co 0 00 4 z o w z 2 rn li 0) O a X W } Q) 0 0 J N C W �- x w � m o I o z IX o - - W Z ca Q 0 3 } p 0 p t6 F- = 0 IL o E ° LL N � LL E rn O F- V c Q O 2z y . F- Z W C Osj u o V) LL O � U 0 zQ o}c f=- z � q oQ w � za u) L. L NORTH AND SOUTH HOLLY WATER TREATMENT PLANTS PCM-021 - EXISTING FOUNDATION DEMO, NORTH HOLLY CHLORINE/AMMONIA BUILDING TOTAL MATERIALS: $250.00 DESCRIPTION AMOUNT NOTES Haul Off 200.00 2 loads @ 2hours each =4 hours 50/hr Disposal Fees 50.00 2 loads @$25/ea $250.00 NORTH AND SOUTH HOLLY WATER TREATMENT PLANTS PCM-021 - EXISTING FOUNDATION DEMO, NORTH HOLLY CHLORINE/AMMONIA BUILDING TOTAL EQUIPMENT: $950.00 TOTAL EQUIPMENT NAME DURATION UNIT RATE/UNIT AMOUNT Backhoe 12 hrs 50.00 600.00 Air Compressor 10 hrs 35.00 350.00 TOTAL $950.00 NORTH AND SOUTH HOLLY WATER TREATMENT PLANTS PCM-021 - EXISTING FOUNDATION DEMO, NORTH HOLLY CHLORINEIAMMONIA BUILDING TOTAL DIRECT LABOR: $568.00 STRAIGHT TIME OVERTIMESTRAIGHT TIME OVERTIME TOTAL EMPLOYEE NAME HOURS HOURS RATE $AMOUNT $AMOUNT AMOUNT Jesse Nava 8.0 15.00 120.00 0.00 120.00 Felip Perez 8.0 8.00 64.00 0.00 64.00 Sam Garcia 12.0 15.00 180.00 0.00 180.00 Lorenzo Quinonez 12.0 8.00 96.00 0.00 96.00 Rafeal Ramirez 12.0 9.00 108.00 0.00 108.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.001 0.00 0.00 TOTAL $568.00 EXTRA WORK ORDER ❑ Paa 0&%-Bnt 104 Date: 9—A,�`Z x Bawn VtMW u 70821-0104 Phone(SOU 753.5857 Fax(5%)751-9777 Job No: 2 �- CAJUN ❑ PmOffin Box 59367 13 PO.Box 1058 ' ' r Dullu,T7( 75229 pwe.T%T,531 �? r Phone(214)32}9333 Phone(409)265-0032 Issued To:y/�"t�d AF, 4�a e -/� Fax(214)323.9555 Fax(409)265.6751 CV//,�NTWTON ❑ PON Office Box 890809 ❑Pod Office Box 1487 SHIM halzR•'DALLAS.116uStON Howon.TX 77289.0809 Lake Charles.LA 7o6u2.1487 Phone(713)4`9.5554 Phone(318)625.3773 Fax(713)479-0309 Fu<318>625•3817 ❑ LUMP SUM ❑ COST PLUS Scope Of Work: a a /ce rid fiLw.WA-r'.10 r. P/•a C T,,ee wit Li i OCT - 71996 �I Ji Lump Sum Amount$ CAJUN CGN,RF,,F,1 is UMLLJIV For Cost Plus,list hours and materials, 1%A td Contract Time Extension - days r�i li3�l. f! Authorized by: cc"-*-'.Office Owner/Subcontractor , . Jy - Field�.-°:,..�• . . - - . EXTRA WORK ORDER ❑ PO4 011im&u 104 Date: 9 L B.wn Rouge.u Mul-OVA 53-5857 Fax(%4)751 9'M Job No:2.4w A rd CAJUN ❑ Prix 0lfice Bos 59367 aut Bo:1058 Drina 21 7523- Phw T.(77531 _ Phone"(2 4)323.39333 Phone(.09)165 0032 Issued To�. I�� .e /� ���/� Pu(1l4)3139555 Fax(409)165.6751 Q CVM B MON ❑ Pon Ofrwe Bax 890.09 ❑Post ORke Bas 1487 SA70N%OWE•DM1L1l.HOLTMH 1Loumn.TX 772894M Lake Qurk%LA 70602-1487 Phone(713)479.5554 Phare(31s)625.3773 Fax(713)479-0309 Fax(318)6253817 ❑ LUMP SUM ❑ COST PLUS Scope of Work: 6:1-o O! / TiC��tnc.� 11019-C -0-Y -.. Lump Sum Amount$ OCT - 7 1996 0111 CAJUN CQNTRACTOhb,INC DALLAS For Cost Plus,list hours and materials' Te /'✓K.S AAd=ti Z.41) Ad V,#,,- Z.._ $ 1✓.CS 1 eZ.E Gr z„a.cess".4 6 55S A.a P �.GS Contract Time Extension - • days Autfio&ed by: 7. Field EXTRA WORK ORDER • ❑ Wtna Omar Box 104 Date: 7 " 7 d Baton Rcwpr,U 701321-0104 Phone(504)753-M57 -_-,_ Fax 1504)751-9777 Job No:_ CAJUM Ytxna Of TX 7Box52 5930' �P.O ]iox 1058 .. . ... , Dallas,1X 75229 Clue.7l"531 � Phone(214)323-9333 Phone 1409)?05 0032 Issued To:t;xei s'e- A),o r_L ,+ �-U1 Fax(214)323.9555 Fax(409,265-6-51 CON MUM o Pana office Bnx 89wo o Punt ORcx Box 1487 EATON ROUGE•DALLAS-HOUSTON Kw ion,TX 7-289-0809 lake Chark<.u '0602x98'1-.._ ; Phone(713)4795554 Phone 1+18)625-3-73 Fix(7)3)4.9-0309 Fax 1318,625-3817 fi• )' ( �'. ❑ LUMP SUM ❑ COST PLUS Scope of Work: • 5 'L Lump Sum Amount$ For Cost Plus,list hours and materials:: 4-pSSP /Jn VA Contract Time Extension / days -Authorized by: cc: Office Owner/Subcontractor Field EXTRA WORK ORDER p p Pua My&>x 101 Date: /Z> —7+ — 7 L Balch 1hxi8e,la 7082]-0100 � 0emx00ex�nan�0�a lax (WOnft0751 S-9}M J`S' Job No: S22a CAJUH ❑ WiL O(TX box 59367 p Y.O.bc+x I-5 Pha ft 21 75229 CJ08e. 14 --531 / �'G..B 1� :� ✓1J�Oit7 Yax(2(113)c."55 33 fa x441,19,%5-0032 Issued To:�•�•�j � '+ ���/� j�a Fax 1210 323.9555 fax 1090 265.6751 CON T RACTON p Yua olrce boa 890" p FOR OlrO.e Baa 1.187 lATM ROUGE•DN.]A!•HOWTON houmon,7X T,289.0809 lake ctme..Lk 70602.1.387 Phone(713)41%5554 Phone 0181625-3773 Fax(713)479.0309 Fax 13183 6253817 ❑ LUMP SUM ❑ COST PLUS Scope of Work: �'- Lump Sum Amount$ ... �� "• +. ",." .. r5-•+ i •1 For Cost Plus,list hours and materials- ,,71 A v ,ate -A,.- elNAGS Contract Time Extension days Authorized by: cc Office Owner/Subcontractor Field DEC-17-1995 14:15 Pr-ME'ELECTRIC B175344940 P.01/01 yME Ej.E4 TR IC ICUMpany ELECTRICAL CONTRACTORS December 17,1996 C 0UI1 Contractors P.O.Box 55+367 Dallas,Texas 73229 Atteation: Chris Thompson Ref: City of Fort Worth,Texas Nordisouth Holly W WTp PCM-21 Foundation Demo Gendemcn: This is in response to above mentioned reference; uinmeni Backhoe $50."hour 2 hours $140.00 Air Compressor S35/hour 2 hours $ 75.00 Total Equipmem$175.00 labor Jim Keith $12/hour 2 hours $ 24.00 Stone} Stearns $11/hour 4 hours S 34.00 Jesus Martinez S13/hoar 4 hours S 5200 Tota!Labor $120.00 52%Labor Burden $62.40 Sub-total $357.40 15%0&P 1 5 .61 Total Bffon 5411.01 If you have any questions call nit(817)654-1618 Ext,227. Respectfully, Hector Zarnora cc: Ronny Brown ACME Marvin Maly ACME Sally Walker ACME Job File 2280-44.DOC 4703 MARTIN STREET - FORT WORTH.TEXAS 76119 - METRO(8171654-161A - FAX(917)RA4.4W TOTAL P.01 EXTRA WORK ORDER o PO4o(ii�Bim:,« Date: B'Aoo Rouge,LA 70821-0104 Phone(504)7Si-%57 2 O r FIX(%4)751.9717 Job No: e. .O.Box 1058 CAJUN O ��+ 9 33 ❑PPhonee(409�5-0032 Issued To: ' 751 CCINM-1 MUM o PON Office Boa WV 0,9 ❑PM OMKV B.1487 EATON]1U7GE.DAIAM•11WSTON How"%,77C'r 2P9-0(109 Oke CJu'1es,LA 70602-14117 Phone(713)4794554 Phone(318)6213773 a FAX(713)179-0309 FAX(318)6213817 ❑ LUMP SUM El PLUS Rcmc h7aa . Scope of Work: /J'Pxa D fd pt o!y IF/(v fi-'t" )V' /fj /-j A2 b ,fyc, I INI OCT - 71996 CAJUN CONTI. iGF INN. Lump Sum Amount DALLAS TX For Cost Plus,list hours and materials• /air C'or-�.F 'e sura Contract Time Extension - days /4� L t f c Aj • 6 LI .'W.~_�O* ',.T.,.._��. __ .. 11.4___.- ___ - =_ ..-v _ 7. Owner/Subcontractor• ;i''3 ,.• Field 4 ' File fh195312 /1.11/011 PROPOSED CONTRACT MODIFICATION' PROJECT:HOLLY WTP Chlorine & Ammonia/Backwash Facilities PROJECT NLMER OWNER:City of Fort Worth PW77-060770500020 & 30 CONTRACTOR: Cajun Contractors 95028 ENGINEER: Freese and Nichols, Inc FTW95312 PCM DESCRIPTION: NH Chlorine Building Existing Foundation Removal PCM N0. 021 NOTIFICATION TO CONTRACTOR: The Owner proposes to make the additions, modifications or deletions to the Work described in the Contract Documents as shown in Attachment "A". We request that you take the following action within 10 calendar days: O Notify us that you concur that this change does not require a change in Contract time or amount. A Field Order will be issued. Submit a Price Proposal with detailed cost breakdown of labor, materials, equipment, all other cost related to this change and a revised schedale for performing the described change. ❑ Proceed with the change. Payment will be made at the unit price bid. x Proceed with the change under the time and materials provisions of the Contract. Authorization to proceed with changes must be approved by Field Order or Change Order in accordance with the Contract Documents. By: Date: CONTRACTOR'S RESPONSE: We respond to your request as follows: ❑ We concur that this is a no cost or time change. Issue Field Order. ❑ We submit the attached Price Proposal with detailed cost breakdown and revised schedule for performing the described change. ❑ We are proceeding with the change at the unit price bid. ❑ We are proceeding with the change under the time and materials provisions of the Contract. By: Date: ACTION TAKEN: ❑ Proposed Contract Modification rejected. Contractor is hereby notified NOT to proceed: By: Date: ❑ Field Order issued: No. Date: By: 0 Change Order issued: No. Date: By: f File FM.5312 MW 021 PROPOSED CONTRACT MODIFICATION PCM-021 ATTACHMENT A PROJECT: HOLLY WTP Chlorine Ammonia/Backwash Facilities PROJECT NUMBER OWNER: City of Fort North PW77-060770500020 30 CONTRACTOR: Cajun Contractors 95028 ENGINEER: Freese and Nichols, Inc. FTW95312 PCM DESCRIPTION: NH Chlorine Building Existing Foundation Removal NO. , 021 The Owner proposes to make the following additions, modifications or deletions to the work described in the Contract Documents. Authorization to proceed with these changes must be approved by Field Order or Change Order in accordance with the Contract Documents. NORTH HOLLY CHLORINE AND AMONIA, PROJECT C 1. Remove the existing concrete foundation walls to 6" below bottom of chemical trench slab on the south side of the North Holly Chlorine Building. The abandoned foundation walls of the original chemical building have been found to be in conflict with the proposed concrete chemical trench. Removal of existing foundation walls on the west and north side of the North Holly Chlorine Building may be required; if so Cajun is authorized to proceed with their removal under the time and materials method of payment with the Resident Engineer's approval. ', By: Date: S' fl INTER-OFFICE CORRESPONDENCE TO: Ted Gay,Freese&Nichols,Inc. . FROM: David Townsend,Facilities Engineer Water Department DATE: February 26„ 1997 SUBJECT: PCM-024: South Holly Chlorine Piping Modifications' North and South Holly Water Treatment Plant Backwash Facilities Modification and Chlorine and Ammonia Rehabilitation Project Nos. PW77-060770500020&PW77-060770500030 This office has reviewed your correspondence dated February 25, 1997 on the proposed contract modification (PCM-024 ) concerning the replacement of the four 1-inch (2 per tank) chlorine fill lines from the South Holly WTP Fill Station to the South WTP Chlorine Tanks, with two 1-1/2-inch lines. After completion of the chorine system at the South Holly WTP, DPC (Chlorine Supplier) requested that the chlorine tank fill lines be 1-1/2" to facilitate the chlorine loading (or they would not load chlorine in the future). The Water Department agrees with your recommendation that the contractor's cost proposal of$17,183.31 for this item should be accepted as the cost provided is fair and reasonable. In addition, the Water Department accepts your recommendation that 15 additional days of contract time for final completion of the project be added to the contract. Therefore, this office will recommend to the City Council (and/or the City Manager's Office), the approval and acceptance of this additional cost in the form of a change order to be prepared and submitted by you to this office. David R.Townsend,P.E. cc: Frank Crumb Files Frame Simon W.Freese,P.E. 190-411900r` C Marvin C.Nichols,P.E. 1896-1969 AND Nichols,INC. CONSULTING ENGINEERS Februmy 75,1997 Mr.David Towivend,P.F. City of Tort Worth Water DepartmM:tt P.O. Box 870 Dort Worth,Texas 76102 Re: North and South I lolly Water Treatrivmt Plant Backwash facilities Modifications and Chlorine and Ammonia Facilities Rehabilitation PiV77-060770300020 and PIV77-05770;00O30 PCM-024 South l lolly C.'lllorine Piping MuJificzti10.1t.. Dear Mr.Townsend: Transmitted herewith please final r. ropy of Ce.,;!m's Pebmetry 18, 1997, price proposal for t1w referenced PCM. 71iis PCM is for deletiv& two 1" liquid lines and installing one 1-1/2" liquid line from the South Iiolly chlorine load station to each of the two hulk chlorine storage tanl:s. 'I1iis modification is required by DPC, the City's chlorine supplier. Attached is a copy of DPC's June 25, 1996 letter advising that this correction is required. We note that this modification was not lmown to he required during the design of the systern and was brought to the City's attention during first filling of the chlorine tants in May 1995. We have reviewed the Price Proposal and recommend the City authorize this additional work and issue a Change Order in the amount of $ 17,183.31. Cajun has requested 15 days of additional Contract Time; we recommend the City giant this time extension request. I'lease advise if the Water Department desires this I'CNI to tv incorporated into a Change Order. Sincerely, FREY SE AND NICHOUS, INC. G.L'.C ay I'E. xc: Charly Angadicheril Randy Romack Coy Veach file FT1v95312.4.41.024/4A3.008 tFf W9S3121"101LY1OtMOFEWM,f CMZ4ROM.OFA TELEPHONE 817.735-7300 • 4055 INTERNATIONAL PLAZA,SUITE 200 FORT WORTH,TEXAS 76109-4895 • METRO 817429-1900 • FA K 817.735.7491 DPC INDUSTRIES, INC. C 601 West Industrial Blvd.(76031) R 0.Box 59 Cleburne,Texas 76033 (817)641.4712 Metro(817)558-0660 Fax(817)641-4799 June 25, 1996 Mr. Ted Gay Freese and Nichols , Inc . 4055 International Plaza, Suite 200 Fort Forth, Texas 76109-4895 Ref : South Holly Bulk Chlorine Project Dear Ted : Following up to our meeting of June 6th , DPC has reviewed the issues regarding the bulk Chlorine storage and piping project at the South Holly plant . Please find our requested course of action as follows . 1 . DPC has no objection to your, request that Cajun Contractors repaint our bulk Chlorine storage tanks . As discussed , we request that all labels and stenciling on tanks be masked prior to painting. The painting would be done at no cost to DPC. 2 . With regard to your request to cut a six inch hole in the dome of cacti tank to accomodate the scrubber system, DPC will allow the holes to be cut providing that the City of Fort Worth agrees in writing to repair the domes prior to the return of each tank . 3 . For purposes of safety and consistency, UPC requests that the piping from the fill station to the angle valves of cacti tank be replaced within the next 30 days to conform with the attached drawing. DPC will supply the required pressure gauges for this set of piping only. Thank you for your assistance and please call should you require any additional information. Sincerely, Collins King Account Representative CC: Charly Angadicheril - City of Fort Worth Gary Little - DPC --1 ALL PIPE VALVES FTPNOGS TO CUDORM VTTH CKOONE WSTITUTE GUIDELDAES ALL PPDG MO EDUPMCNT TO DE CLEANER PER CHLORTA DNSTITUTE DODEiDCL QEE CRIVIM INSTITUTE PMIPN.ET D f) i ALL PPOP DG TO RE PROPERLY SUPPOMTEG(NO PIPING WEIGHT PERMTTER ON STORAGE T"CEINNECTUIRS)L NO WELDING TO TANK FOR PIPDG SUPPORTS) f-SRER EIP^W=CWIMDER ML NO LM ClAimm TO Be TRAPPED IN E)D'"mm CMAK" VEIN RUPTURE DISC AND HOLDER 9 ACCESS 10 tTOMfi TAMC FOR PRODUCT DElIVERT TO DE HARD LEVEL,ALL WEATHER SWAM ' C PRODUCT DELNEAY MAY NOT K MADE LMTIL ALL VENS AG'McLEYL3 ?.PLEASE CALL OPC DMDUSTRUES 7 YOU RAVE ANT ADDITMW-WESTIDNS. LIRUTD LDC TD/FROM STORAGE TAW 1 LC 4 ENEREDCT C ROT MIST K AVALLADLE AT STORAGE TALK LDCAT>01 VAPOR LD(YO/FROM STORAGE I Y V ACIAAM CSCM CYPANU M OMMI[D WTTN R.PTUE DISC AND IRDER--1 \\ 7 CONNECTION m TDA STORAGE TANK R O� STORAGE IARK 1 IF2' KJ1 �ANK IWIVAT SEE DETAIL D FOR ELEVATILM VILV 1' Li ILAr r VIVATTDM VDCV LIDUDD LDCIL TFROM STORAGE TAMC VAPOR LDC TO/FROM STORAGE TAM( IE'TAL D PRESSUAE"ALIR,M PRESSUE/VACUOM U1 LD' r GAM GMIGC PN VIEW TAM!TRUCK U/OADOMG CORRECTION POINT ELEVATIDN VQV WE WYAL A FOR ELEVATION VIEV DETAIL A TAMC TRIICR UNLOADDG COKEtTDOM PmNT TANK TRUCK UNLOADING PIPING SCHEMATIC ID DCALE �DYM iR CAJUN CONTRACT(M February 18, 1997 Freese&Nichols, Inc. 4055 International Plaza, Suite 200 Fort Worth, Texas 76109-4895 Attention: Ted Gay RE: North and South Holly Water Treatment Plants City of Fort Worth, Texas PCM-024 Dear Mr. Gay: Please find attached our cost for PCM-024. Work for this order includes piping modifications from the fill stations to chlorine tanks one and two at South Holly. This change requires a time extension of fifteen(15) days. Sincerely, CAJUN CONTRACTORS, INC. Chris Thompson Project Manager File 1.21 (d)(95028) Field HOME OFFICES DALLAS OFFICEe HOUSTON OFFICEi LAKE CHARLES OFFICES NEW ORLEANS OFFICE, Post Office Box 104 Post Office Box 59367 Post Office Box 890809 Post Office Box 1487 Post Office Box 11207 Baton Rouge,LA 70821.0104 Dallas,TX 75229 Houston,TX 77289.0809 Lake Charles,LA 70602.1487 New Orleans,LA 70181.1207 (504)753-5857 (214)323.9333 (713)479.5554 (318)625-3773 (504)734.3100 FAX(504)751.9777 FAX(214)323.9555 FAX(713)479.0309 FAX(318)625.3817 FAX(504)734.9900 Ci i OD 00 a O � b's e Z � O O� Q Df � co co /� H� 0 r V- U.W to 0 COP)Z M LU e U L. N wt O to m Q Q •— A 04 LL O � Z to c0 O p v m (V N 0 C4 a to co co ag LO d o 0 � o � W g o � O to F a to O p N m O O � � N bi 2 %ve q sa O u U O a � w r DIRECT FIELD COST ESTIMATE Link UnH Total Total Tied N-Titd Link Tied N-Tkd Total LOC. Do Unit Marl Marl Labor Man Man Labor 301JTH HOLLY PIPEd 0 0 0 REMOVE 1-PIPE-3M-ISHRS 48 MH 12.70 0 0 610 jHAUI.OFFOSPOSE OF REMOVED MATERSAL 1 LS 162.38 162 0 0 INSTALL PIPE: O 0 0 3M'80MH 240 MH 12.70 0 0 3,048 1-STEEL TEE 2 EA 10.00 VA 0 20 0 1'X 1 1/2'STEEL BELL REDUCER 4 EA 9.00 VA 0 32 0 1 112'UNISTRUT CLAMPS 20 EA 4.00 VA 0 so 0 1 11Y STEEL 45 BENDS 2 EA 10.00 VA 0 20 0 1 1R-STEEL 90 BENDS 15 EA 7.50 VA 0 113 0 1112-STEEL LHOINS 2 EA 50.00 VA 0 100 0 1-STEEL PLUG 2 EA 3.50 VA 0 7 0 1 112'STEEL PIPE 350 FT 4.00 VA 0 1,400 0 1112'STEEL COUPLINGS 20 EA 6.00 0 120 0 RENT PIPE THREADER 1 MO 1 649.50 _ 650 0 0 CIliTM OIL,DIES.MISC. 1 LS 108.25 108 0 0 ST,CLEAN,PURGE PIPE: _ 0 0 0 3M'40HRS 120 MH 12.70 0 0 1,524 RENT STEAM CLEANER 2 WKS 378.88 758 0 0 PURCHASE NOTROGEN 1 LS 666.00 666 0 0 MISC TESTING MATERIALS 1 LS 64.13 54 0 0 0 0 0 MALL_1001-5 15 DYS 75.00 1,125 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 O 0 0 0 0 0 0 0 0 0 0 O O 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL =i� 3,723 1,892 5,182 ITEM:._PCM-024 SOUTH HOLLY PIPING CHANGES JOB: N&S HOLLY WATER TREATMENT PLANTS SHT. JA , 02/16/1997 09:52 972-323-1437 DOBBS COATING SYST. PAGE 02 `'• (214) 323-1345 WBBS • Factory Mixed Appliratorr Fax; (214)323.137 COATING • Sand Blasting 1810 Edjccliff Cort SYSTEMS • Technical Coating Csrrotlwa,Tec".73006 February 18, 1997 Cajun Contractors, Inc. 1504 E. Beltline Road Carrollton, TX 75006 Att: Chris Thompson Re: North& South Holly WTP Backwash Facility& Chlorine/Anunonia Fac. Gmtlenlen: As requested, the following is our proposal for the surface preparations and coatings of 350 LF of additional 1 1/2" steel pipe at the above project site. All surface preparations and coatings to be completed as per existing project specifications. Total add .N.N1.... .I.M.......N.........H..................N.............. S 1,210.00 As always,should you require additional information or have any questions at all, 1 can be reached at(972)323.1345, Sincerely, I Walter Lorenz Estimator �� J' stir'•' 7Y .•{'i �. *'. M ,e,= -'°Y'�r",. .a '•r.;• -:�:... c�3. V}���ly./.'Y.'.`.i1.S`.sY•'i: ^!rri!^._ .� H!%w••"�,.,]I�+Mv�"• �+��1-::.M'ib �..• •�1V!•i^5.::.:. •f.� .••fir..}.•+ . � �!a••'^i�sl.Atd vi.vi ✓ r! r ._ ~ � ia LBTTBR OF TIMNSHIT1TAL TO: SAL iknCDS'rOrr. C-4-ac's DATE: / � PROJECT NO: ATTHNTION.-Xjzm =cj MMM:FW71-06077050E OWNER:City of-Fort Worth F/N: W9 312 • Projeet:North_L South Nolle Vater Treatment Plant Backwash L Chlorine t Ammonia Facilities W.e are sending you 0 Attached 0 Under Separate Cover VIA the- following items: j D Dally Construction Reports No. 0 Plans ❑ Specifications ❑ RFI No. D C0 No. U Addendum No. 0 tieroo.hor—"-- -_ PCM No. U Change Order t;o. _ ❑ Field Order No 0 Pay Req. ❑ Submittal No. 0 Other Copies Hef .No. Description I 1 These etre transmitted fo► your: U Use 0 ltevicY. f. coilmcnt ❑ Itrforr.�tion j 0 Approval ❑ Distribution to i+aitics Response 10 l;ecord 0 Other Remarks : 1 Copies tot i Vk(t Route To: CA TYr By:. Telephone".817/735-73DD;.;r ,•Fax 817/fi35-7491 , :: °• 4444ietro 617/42�'19DD 4055 International. Plata� Suite 200 Fort Worth,`W 76109-4895 �. `ftir;;�7a,�'}iR12'fr. .r'. .• .� t•t.tb.-. .. .'�t:' .t''r�'.r:.�t.��T'?). ..i'.. + xfL �.:4" s., Z ... f1I• f7M9S)12/1.11/021 PROPOSED CONTRACT.MODIFICATION PROJECT:HOLLY WTP Chlorine & Ammonia/Backwash Facilities PROJECT NUMBER OWNER:City of Fort_Worth PW77-060770500020 & 30 CONTRACTOR: Cajun Contractors 95028' ENGINEER: Freese and Nichols, Inc FTW95312 PCM DESCRIPTION: South Holly Chlorine Unloading Station Piping Modifications PCM NO. 029 NOTIFICATION TO CONTRACTOR: The Owner proposes to make the additions, r..c^ifications or deletions to the Work described in the Contract Documents as shown in Attachment "A". We request that you take the follo.,ring action within 10 calendar days: Notify' us that you concur that this change does not require a change in Contract time or amount. A Field Order will be issued. x Submit a Price Proposal with detailed cost breakdown of labor, r..aterials, equipment, all other cost related to t::is change and a revised schedule :or performing the described chance. Proceed with the change. Pa,,:-+ent r;.'__ be ma-`e at the unit price bid. Proceed with the change under the tine and materials provisions of the Contract. Authorization to proceed with changes must be ap!roved by Field Order or Change Order in accordance with the Contract Documents. by: Date: CONTRACTOR'S RESPONSE: We respond to your regsest as follows: ❑ We concur that this is a no cost or time change. Issue Field Order. ❑ We submit the attached Price Proposal with detailed cost breakdown and revise-4 schedule for performing the described change. ❑ We are proceeding with the change at the unit price bid. ❑ We are proceeding with the change under the time and materials provisions of the Contract. By: Date: ACTION TAKEN: ❑ Proposed Contract Modification rejected. Contractor is hereby notified NOT to proceed: By: Date: ❑ Field Order issued: No. Date: By: ❑ Change Order issued: No. Date: By: 'Cow". �p r7 �H k f }fib ( ,�ptiis i ;� .`?_� r' -" '. .i;.'j. '•'lam tr+ $,fr +8 ' ": i' 'yq ' T. ' ..�; fllc ��i�:�l:�i•6if PROPOSED CONTRACT MODIFICATION PCM-024 ATTACHMENT A PROJECT:HOLLY WTP Chlorine-& Ammonia/Backwash Facilities-PROJECT `NUMBER" OWNER:City of Fort Worth PW77-060770500020 & 30 CONTRACTOR: Cajun Contractors 95028 ENGINEER: Freese and Nichols, Inc FTW95312 PCM DESCRIPTION: South Holly Chlorine Unloading Station Piping Modifications PCM NO.024 The Owner proposes to rnake the following additions, modifications or deletions to the work described in the Contract Documents. Authorization to proceed with these changes must be approved by Field Order or Change Order in accordanoe with the Contract Documents. 1. Yodify the chlorine liquid piping between the load station and the bull: storage tanks by deleting one 1" liquid line and by changing the other liquid line to 1 By: Date: �` • - � ,�;�,ti,k� •IJof� -�I sz Ike. 1" CL` .� :... , �. ,,�, . . ,. ,. vha klo. rr_-p- t{- ------ --------------------------- '�-° �` - o. �� IAfL N /�r,gie l/a(cie I-CL-8S' p' f/2-CL-8s C '. 1-c0-BS :. r..� -CC-BS' � i=CG-BS W'T' 5000 CAL. a j_IL-Lit 1 vl f,Ls, a� CHLORWE T"jV j p!N q/ frI t3 j c vl I� 1 p;rl.ZJ�ci tin ,Of A' 7�,. fg a Lo/j I- P+ r Pt r It/y a--las i</-CL BS f -L 1 L EVAPORATOR 1 P, P+ �Fp�yf (10,000 ppd) 1-CL-BS I � r 1 a I-CL-BS `O 1-CC-BS i r r; s-t pr tit) +'= 1-CL-BS Lrel Or leer i. 1-CL•BS � � i ,W 0'b L%L- L,Z of tuLl 1-CC-13S 5000 CAL, r P , �` r• T CINLORINE TAti1C,c Z i i /'1 ",� P,v' Qt to -I i EVAPORATOR (00ppd)1-CL-B , 00 SCRUODE0 AIR OUTLET TO I 1-CL-BS ATMOSPHERE ( , EVA ------ ---------------------- fir All , LEVEL OVERFLOW SICHT SODIUM `r TUBE HYDROXIDE TON CONTAtER TA1rK VAYWAY i R00M ' v i ------ ---- - //------------- — - ---------- s c > i �-----�h SAMPLE TAP � , DRAN /w7 42 r _`- CHLORINE SCRUBBER SYSTEM x{ FLY"' WATER BULx sTORA.GE Am 1171X sc 'SS£R AREA �'• / /J 4 �v�L. 14-CSD-o- FRP -----------------------------------------------------------------------------_ r , . N0TESj /I s� ie",.—.. . . - 1 VENTURITYPE SCRUBBER IS SHOWN ON PROCESS # F DUIGRAM.ALTERNATE TYPE SCRUBBER SYSTEMS MAY REQUIRE MODIFICATIONS TO PROCESS DIAGRAM. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL .:. SUCH 1i00fFICATI0NS. ra r 2 MANUFACTURER SHALL BE RESPONSIBLE FOR, ; DES" OF CHLORINE SCRUBBER PMC, i INTER-OFFICE CORRESPONDENCE TO: Ted Gay, Freese &Nichols, Inc. . FROM: David Townsend, Facilities Engineer Water Department DATE: February 14, 1997 SUBJECT: PCM-025: South Holly Pipe Bollards North and South Holly Water Treatment Plant Backwash Facilities Modification and Chlorine and Ammonia Rehabilitation Project Nos. PW77-060770500020 & PW77-060770500030 This office has reviewed your correspondence dated February 11, 1997 on the proposed contract modification (PCM-025 ) concerning the installation of 17 additional pipe bollards at the South Holly Water Treatment Plant. The purpose of these pipe bollards is to protect the new chemical line pipe chase and stairs (to chemical storage tanks and sedimentation tanks) from moving vehicles (primarily grass mowers). The Water Department agrees with your recommendation that the contractor's cost proposal of $4,857.03 for this item should be accepted as the cost provided is fair and reasonable. Therefore, this office will recommend to the City Council (and/or the City Manager's Office), the approval and acceptance of this additional cost in the form of a change order to be prepared and submitted by you to this office. David R. Townsend, P.E. cc: Frank Crumb Files FY�C^ Marvi W.Freese,P.E. 1900.1990 Marvin C.Nichols,P.E. 18961%9 AND 1is ols INC. CONSULTING ENGINEERS February 11,1997 Mr.David Toimsend,P.I:. City of Fort North Water Department P.O. Box 870 Fort Worth,Texas 76102 PC. North and South Holly Water Treatment 1'lant Baclavash Facilities Modifications and Chlorine and Ammonia I'aciliti^s Rehabilitation P1M-W770300020 and PIV77-060770700030 I'CNI-023 South Boll), Additi-mal Pipe Fallards Dear Mr. Toi.wend: Transmitted herewith please fund et copy of CEijurl's February 10, 1997, price hropo5al for the referenced PCIA. This PCh4 is for 17 additional pipe bollards requested by tllc plant staff to Ix installed at South I Iolly. We have reviewed the price proposal Fuid tine extension and tecornmen.l t1w Ci'.y Fiutlionz(l this additional work and issue a Change Order in the amowit of 5 4,857.03. An additional tens days of Contract Time has been requested and we recommend this additional Contract Time be granted. Please advise if the Water Department desires this PCL1 to be incorporated into a Qlange Order. 6i;�,erely, FREESE AND NTICHOLS, INC. G.E.Gay, P.li. xc. Charly Angadicheril Randy Romack .. Coy Veach f ile I-BM312.4.41.023/4.43.006 i m312)D\ti6LLyctL1,4ciu CM,F'CM2SRcm.oEO TELEPHONE 817-735-7300 • 4055 INTERNATIONAL PLAZA,SUITE 200 FORT WORTH,TEXAS 76109-4895 • MFTRn aIT_A10 10An - C-� CAJUN CONTRACTUM February 10, 1997 Freese & Nichols, Inc. 4055 International Plaza, Suite 200 Fort Worth, Texas 76109-4895 Attention: Ted Gay RE: North and South Holly Water Treatment Plants City of Fort Worth, Texas PCM-025 Dear Mr. Gay: Please find attached our cost for PCM-025. Worl, for this order includes adding miscellaneous b000ards throughout the site. This change requires a time exterLsion of ten (10) days. Sincerely, CAJUN CONTRACTORS, INC. Chris Thompson Project Manager File 1.21 (d)(95028) Field HOME OFFICEt DALLAS OFFICEi HOUSTON OFFICE: LAKE CHARLES OFFICE, NEW ORLEANS OFFICE: Post Office Box 104 Post Office Box 59367 Post Office Box 8908;9 Post Office Box 1487 Post Office Box 11207 Paton Rouge, LA 70821.0104 Dallas,TX 75229 Houston,TX 77289-0809 Lake Charles, LA 70602.1497 New Orleans,LA 70181.120 (504)753.5857 (214)323.9333 (713)479-5554 (318)62 5-377 3 (504)734-3100 FAX(504)751.9777 FAX(214)323.9555 FAX(713)479-0309 FAX(318)625-3817 FAX(504)734-9900 �azra���--�.�aascr;anrrrssa�.eesxvz R.•:»a.=-....;; , - .: ._ ._,..-.. �.:-:,t--•:.-�-..-��.avr_c�-....-.-�:ma�,�zx^rs+��,aac�+.c�a. � ,. ...—......,-...�...,�... _,.,.......�-- FEB 06 '97 07:56AM CAJUN CONTRACTORS P.2 CAJUN CONTRACTORS, INC, FIELD WORK SHEET DATE. JANUARY 4, 1997 P.O, BOX 104 NORTH/SOUTH HOLLY Y.T.P. EATON ROUGF„ LA: CAJUN 108 NO, 95028 PROPOSED CONTRACT MODIFICATION NC. 2S 70821 CITY Of FORT WORTH FREESE t NICHOLS EN6INEERS DESCRIPTION: ADDITIONAL PIPE BOLLARDS I SOUTH HOLLY PLANT. I sass:rssssa:ss:ai::xxll9wr42carrarrt♦rrrc se ctrxsrrt cc 1929999 cc::rs::::::::::rr:: SUB 1 UNIT i UNIT i iOTAI TOTAL DESCRIPTION ;CTY, ;UNIT;CONTRACTCR ; MATERIAL i LABOR ; MATERIAL ; LA80R a4::a-arcrxaatarrtaCCU::a%s::c::::::ass:rasa::r:::c::c::::::.:::::::::::::::::::cr:s;acag%zxvI CIG HOLES FOR BOLLARDS 1 17 ; EA ; 0.00 D,00 ; I-so ; 0.00 ; 25150 UNLOAD PIPE 1 ' LS ; O.CO ' D.00 ; 2.00 ; 0.00 ; 2,00 CUT PIPE BOLLARDS ; 17 ; EA ; 0.00 0,00 O' D ; 0.00 ; 8.5? !ET I BRACE BOLLARDS ; 17 ; EA ; 0.00 1D.00 ! 1,00 ; 170.00 POUR BOLLARD FOUNDATION' 17 ; EA ; O.CO 20.00 ; 1.00 ; ,'•40.00 1.7.011) FILL BOLLARD, N EA ; 0.0 10,00 1.(O ; 170.00 ; 17.0) CISP(SE OF EXCESS DIRT 1 i LS i 0.00 0.00 ; 4.00 ; 0.07 ; 4.00 x CLEAN BOILAROS 17 ; EA ; O.CO $.00 ; 1,00 ; 85.00 FAINT BOLLAROS ; 1 ; LS ; 255.00 ! 0.00 ; 0.00 0.00 0.0'.1 FURCHASE PIPE ; IDS ; LF ; O,CO ' 4.60 ; 0.00 ; 453.00 ; 0.00 i DELIVERY 1 l5 ; O.CO 5),00 ; 0.00 SO.CO ; 0.0 $ 580 BACKHOE 1 ;OAY ; 0.00 103,0) ; 0,011 ; 100,00 ; 0.0 x CLEAN' UP 1 ; LS ; O.CO 25,00 ; 8.00 ; 25.00 ; 6.0) t SMALL TOOLS ` 5 ;DAYS; O.CO 35,00 ; 0.00 ; 175,00 0100 O,CO i 0.00 i 0.00 C.05 0.0) f I i IABOF i i i i 11.6,00 MANHOUR RATE ; ; 12,7" t I TOTAL BARE LAB)R ; ; ; 1,473.2) BURDEN t 51.68 I i TOTAL LABOR ; ; ; 2,234,55 TOTAL MATERIAL ; 1,543,00 ; 1,59E,00 TOTAL SUBCONTRACTS ; '• 2SS.CO ' ; ; 2S5.00 TAX Q 7-3/4x(535.00) ; ; ; ; ; ; ; 41.46 SUBCONTRACT BONDS Y 2% I I I I _`, --------- • t I I I ! TOTALS: GENERAL CONTRACT; ; ; ! ; 3,679.11 SUBCONTRACTORS I r i 255.00 1 1 I I 1 r I r I 1 I --•'^'-^' SUBTOTAL INSUPANCE 1 1,671 69,04 I I I I I r I SUBTOTAL i i ; i i i 4:203,15 15% CH 4 P - CAJUN ; ; ; ; ; ; $92.22 10% CH & P - SUBS ; i i i i 25.50 I I I 1 I .....------ I I 1 1 I I , SUBTCTAI E040 a ,751) i i 36.1E I I I I I I I ----------- 1 I I 1 I I i TOTAL. ! 4,857.03 xs:c:::::,: = TAXIBLE MATERIALS EXTENSION OF CONTRACT TIME - tW (1) DAYS 12/24/1996 11:47 972-323-1437 DOBBS COATING SYST. PAGE 02 (214) 323-1345 DOBBS • Factory Trained Applicators Fax: (214) 323-1437 COATING • Sand Blasting 1810 Edgediff Covc SYSTEMS • Technical Coating Carrollton, Teras 75006 December 2421996 Cajun Contractors, Inc. 1500 E. Beltline Road Carrollton, TX 75006 Att: Billy Haynes Re: North& South Holly WTP Backwash Facility& Chlorine/Ammonia Fac. Gentlemen: As requested, the following is our proposal for the surface preparations and coatings of 17 additional pipe bollards at the above project site. All surface preparations and coatings to be completed as per existing project specifications. Totaladd .......................................••1...1....1........1..........• S 255.00 As always, should you require additional information or have any questions at all, I can be reached at(972)323-1345. Sincerely, Walter Lo Estimator JAN. 6.1997 3:48PM SOUTHWEST PIPE FAX# 817 831 2173 NO.els P.1/2 OUTHWEST PIPIT 6SUPPLY OO., Nd. 5205 Elliott Reeder Rd. Fort Worth, Texas 76117 (817) 631.3821 - Metro 589.0412 . FAX: 1-817-831-2173 or ( Including Cover Sheet) To: Attn: a6AVAJ From: STEVE EVE O ' PELT rC1AL ARD G0,Tjqq • M r r I r 41F •Y. The information contained in this confidential inf faX message is privileged and ormat f#on, intended only for the use of the individual or entity named above. If the message isn't the intended reel ient reader of this fax that you are in the 1'� , You are hereby on notice Please immediatelour possession of confidential information: inadvertent: recei tntify the sender by telephone-of P and destroy the information you have received. r Please notify us if all pages are not received. JAN. 6.1997 3:49PM SOUTHWEST PIPE FAX# 817 831 2173 N0.815 P.22 AMST.,i QUOTATION L s PATE 140 ; A Joe To LOCAT{ON .. .. r__. - r. ..,, ..�....-., ...... .,.. ... .r..w... .._.._r> w vwr.YR+.:+.+_.x.4.wvy..wR?w•t-. , 3#�t\q�}�'siwwA.M.l]Foaw .... ' . . � +�}�g1��Ee,,SS`1�. ''} it',~+ :��•cq.Y � . . . �,.' ,. p.�,jJ/{ -x ys�T:Mtlnfs►ra�,;+ .. + }k:;�^rr=• '�': �k[ to .ivy:, Me FTO95312l4.411025 PROPOSED CONTRACT MODIFICATION: PROJECT:HOLLY FITP Chlorine & Ammonia/Backwash Facilities PROJECT NUMBER OWNER-.City of Fort Worth PW77-060770500020 & 30 CONTRACTOR: Cajun Contractors 95028 ENGINEER: Freese and Nichols, Inc FTW95312 PCM DESCRIPTION: South Holly Additional Pipe Bollards PCM NO. 025 NOTIFICATIO:. TO CONTRACTOR: The Owner proposes to make the a:]- itions, moaifications or deletions to the described in the Contract Locu Qents as sho.m in 1:ttachLment 'V," . We request that you take the following action within 10 calen;i_r days: Notify us that you concur that this Chang;: does not require a change in Contract time or aio•ant. 1, Field Order will be issued. x Submit a Price Troposal with detaile cost f-reakdovin of labor, naterial.,, equipment, all other cost related to this c},ange and b revised schedule fc: perforning the described change. Proceed with the change. Pay:r,ent will be rade at the unit price bid. Proceed with the change under the tine and materials provisions of the Cont r-Ect. Mthorization to proceed with changes rust I)e roved hay F'Jold Ord-, car Order in eccordLnce w]th ttie CCT1traCt I ocu.encs. I;y: � fl V,e respond to your request as follo,s: D We concur that this is a no cost or time change. Issue Field Order. ❑ We submit the attached Price Proposal with detailed cost breakdown and revised schedule for performing the described change. ❑ We are proceeding with the change at the unit price bid. C] We are proceeding with the change under the time and naterials provisions of the Contract. By:_ Date: ACTION TM,"- 4: E] Proposed Contract Modification rejected. Contractor is hereby 'notified NOT to proceed: • it � F;y: Irate: 13 Field Order issued: No. Date: By: 13 Change Order issued: No. Date: By: .: r .� i�.,ta T.,�w' TrF t: rv;1 ' x� A. n "T .. tib.!_ •.! . . :.. ... ,. ... _ - .. .i, r.:.. File FlM312A.41.b2b PROPOSED CONTRACT MODIFICATION PCM-025 ATTACHMENT A PROJECT:HOLLY WTP Chlorine 6: Armonia/Backwash Facilities 'PROJECT'NUMEiiR� 0T+A'h'ER:City Of Fort Worth PW77-050770500020 & .30 CONTRACTOR: Cajun Contractors 95028 ENGINEER: Freese and Nichols, Inc FTW95312 PCM DESCRIPTION: South Holly Project A and B Additional Pipe Bollards P*4 N0.025 The Owner proposes to make the following additions, modifications or deletions to the work described in the Contract Documents. Authorization to proceed with these changes must be approved by Field Order or Change Order in accordance with the Contract Docirrlents. 1'roject A; 1 . Add two 4" pipe bollards at bac}:wash Clarifier stairs as referenced on dra,,ir.n G-10 attached. Project b; 1. Add five additional 41' pipe i)oilelds �:t &!? Chlorine D"lildirro cum as referer:ce;i on drawing CS-15 attached. 2. Add ten 6" pipe bollards at SH C:nenical Storage l.rea stairs as referenced o:r drawin? CS-10 attached. Genera) : 1 . S" Pipe Bollards shall l,e in accordance grit'", the attached detail. By: Date:_ Y .711 •� Yb 'LTMV4�l•'M'ia'JP..W-,�petl9�1 xnCtt c� r, - n ,cam �` 4Q !;.: i s... O ?l.+y ,�-�-i..• 12-S•PVC WR AP METER N S a �+ IER SLUDGE P' • STATION d ` BA ,<WASH PET. IN 0ACKWW1 TRANSFER PU• ST/J1ON METER \ UT D/. 2- PVC { `.._� a f IY•FtCC SEE NOTE 1 _ ° t ..._._._.—.—/ v CK1YI.SH f :TURtl r. VE7ER IAH 326 4- 2-PW-PVC l ! c ' Y)�) Inc 13tAV4 U f E)ISTN3 SEWt1T/,TIN ©ASINS s I ). Hodlfy st.eeCs G-9• G-IG, and i-1C ty Gelctc1; t.o Luue.i 1/2 r1—%a,,_ valves from the Si: Stade Hlxer C1 vacuum sail; {1,ellre e- �from tr.e S5 C ]oJrctron K.��ole CI vseuum avprly 1•lpelice v icr arc c,rrcJ.;ly Tic rear t c ac�tt.east for r.tt ct Stolmentation ]asiT. Yo. 3. 4811 17ILTER WASTE LINE /�//S �2,�6' ►;oaf= �. frlo r: TO Pfill UNSEEP h• METER Y JLT TOC.EL`.' 42.5 SJR�'E iT "'t 10C E r T JC EL.b .0 t l •.b r �a;Cir �..t;r S r v�.•.,.. a :�.t., 1 1. � •ri E.1.+ -• OAC /ISN�i k�� �. t z 2 .00 f. / ii ,V ki ♦ dt \/ A 10, \\ \\\\ \\i\ \\\i\\ \\\\\\ \ \ i \\\\ \\ \\\ \\ \ ► \\\\\\\\\\\\\\\ !• \\\ /\/ •• . % :!•.i FAUCET UNDERGROUND /\/ ► ., ► •. /;%.. ► ELECTRIC !/ CHLORINE AND AMMO' /\/ •!r '.r�1: r, i ' ': �'"�, ► UP DING ELECTRIC MOTOR ' ,0,,, CO"CFlll PAD ' 31 PYC CtFtfl :•'O� C O JVJ T Y 1'I ET / F4i /. c TE,REVOYE1,M. O D IRAfi1C5 � 2 FEET EEYOND CURB EDGE.GID F AXjj G SHALL EE RACED L4 A NEAT VU ADJACENT TO E7('STNG TRACK ON WEST S;DE OF NEW _ _ ---- DAYEAtEH2._-RfJlANt4f, iRhGK_11�TEF..Al_S2ll1L. 6E DISPOSED OF. 71- f L 7 �,l�F C C 1',� MEA PI-144 CONCRETE PA' FLEX {� .•a. �- .T«;ti «-f�fy7.�:• ''1�,'Y:q Y;'faj'..•�+ YS'•SA�n.-.;—r-�a-yawn••-•.. . ..�..,�y,.��.. ... .�.;:::�C:�.�::�• � .. � t' .. i `T p451i •� � .'vi+Ii���[i6C11�115.`ii � r}��A•� Q(:.}YJ3(v:f„i � .a� d .as 91 .o sc X J� d h n V j n � . 4 L NF w 0:,�, t p N ei V1 Y rn s L I 5' � o N O w I n .0-29 4 j _ •.�, _ -..�. - ,fir•.:✓�• �i•i.y:?%Iv'i•,:`::=i::,.. �.+•` 't:{i:Y��vV'�id w"�lrlivVi+' .�,,•1'i•'i •'�� �" •'•• �.'L F: 1 r•• ♦� w$s•� � ` , %;�c�6tii►'w"•. -...t..+�.^ ,..� ...••.r ': ht.' �I• r��:s }..,\�<%�i eL*t`4t��C' •r PRESSURE gRELIEF .V'ALVE t- S .,T :y-eft ++� �• �� i M} i .r.I ,r fi PRESSURE REDUCING ;- '� VALVE ; t L `'i i ^ f f t ,; t i. n �t v y� �•, Lori,L t�}��f-:i;Y. , NOTES " ; i;�' s.'+i2 '��, .�,,►, , �•- �: [[ .EOM ' � .S x ') • ,.J✓� i *�yaw r" k 1.YALYES AND APPURTENANCES SFtAt.t ~ PAD 1.1ENT NAVE FLANGED CONNECTIONS. ; "`X z 'tt '_ '� 1♦ ELEVATION, } -s'• -r+•t•-'�^..77i•hr•l'LY./Y1CM i.iW�.P1 'I�IJ..� 'PICAL PIPING LAYOUT FOR P<uc -TEE t J )STIC A14D FLUORIDE PUMPS c� CL SME _ �r.ott .► z 1—. SIOORAKDE O w l L TIM (TYP. CONCRETE (4j Q 1 x LL [k f120 PFf0 --430311 C/C (TYP.) S (Y_ ►— w J- 0 — O J . j LL L — —i !! U �--o-�� o Q 0 o E SITE GAUGE DET/4L ,\CEMENT SUCTION �F_) "'T•� N MMM CAP PAxT EXPOSED PORTION Z W SAFETY YELLOW F— a: 4" SCREV, D PLUG W/ fEIA 'E LW (/ 00EED SOLD Z C) %c c s WALK •[ TOP OF EMST.PAVEMXT v $ a °• O OR SURRUNDiMO SOL s_ I � o _, •, � ;�; �;.��trf�r jet� .• •" �; ,'.I a �c•. •• r:;;,F>���� � _ n:ijl.iii.^....r_,, •.tu. A` t NOMI►t�f�CttETE ;= :� L n y1t 1 i w Q• t � j� ;Ci. '� � is �A !OUT-'-DETAIL E • ` 30L LARD -LDFT/�1i�1�r:: 5%�,l t.,1• __;'.3. • Ir. . r A 1 1 r -- INTER-OFFICE CORRESPONDENCE TO: Ted Gay, Freese&Nichols, Inc. . FROM: David Townsend, Facilities Engineer Water Department DATE: January 31, 1997 . ., SUBJECT: PCM-027: Backwash Clarifier Return Flow Pumps North and South Holly Water Treatment Plant Backwash Facilities Modification and Chlorine and Ammonia Rehabilitation Project Nos. PW77-060770500020 & PW77-060770500030 This office has reviewed your correspondence dated January 21, 1997 on the proposed contract modification (PCM-027 ) concerning the modification of the return flow pump locations at the South Holly Water Treatment Plant Backwash Clarifier. The electrical plans and the mechanical plans where in conflict. As the electrical system was installed first, the mechanical (pump location) had to be modified. The contractor was directed to modify the pump location. The Water Department agrees with your recommendation that the contractor's "time & material" cost of$1,393.45 for this item should be accepted as the cost provided is fair and reasonable. Therefore, this office will recommend to the City Council (and/or the City Manager's Office), the approval and acceptance of this additional cost in the form of a change order to be prepared and submitted by you to this office. David R. Townsend, P.E. cc: Frank Crumb Files .f ry �.,c, 1 Freese Simon W,Freese,P.E. 1906- 90 19 Marvin C.Nichols,P.E. 18961969 AND Nic o s INC. CONSULTING ENGINEERS January 21,1997 Mr.Dai id Townsend,P.E. City of Fort Worth Water Department P.O. Box 870 Fort Worth,,Texas 76102 Re: North and South Holly Water Treatment Plant Backwash Facilities Modifications and Chlorine and Ammonia Facilities Rehabilitation PIN77-060770500020 and PIV77-060770500030 PCM-027 Backwash Clarifier Return flow Pumps Dear Mr.Townsend: Transmitted herewith please find a copy of Cajuns January 16, 1997, price proposal for the referenced PCM. This PCM was issued to Cajun as a Time and Material work directive to modify the return flow pump locations as there was a discrepancy between the electrical drawings and the mechanical drawings. No additional Contract Time has been requested. We have reviewed the price proposal and recommend the City authorize this additional work and issue a Change Order in the amount of $ 1,393.45. Please advise if the Water Department desires this PCM to be incorporated into a Change Order. Sincerely, FREESE AND NICHOLS, INC. � ,� G. E.Ga P�E. xc: Charly Angadicheril Randy Romack Coy Veach file FTW95312.4.41.027J4A3.W6 tFrW"31210.MLLrCHANOE"CMMKM 7RCMOE:O TELEPHONE 817-735-7300 • 4055 INTERNATIONAL PLAZA,SUITE 200 FORT WORTH,TEXAS 76109-4895 • METRO 817.429-1900 • FAX 817-735-7491 CAJUN CON?RACTUM January 16, 1997 Freese &Nichols, Inc. 4055 International Plaza, Suite 200 Fort Worth, Texas 76109-4895 Attention: Ted Gay RE: North and South Holly Water Treatment Plants City of Fort Worth, Texas PCM-027 Dear Mr. Gay: Please find attached our cost for PCM-027. Work for this order included changing Return Flow Pump 1 to the smaller (OHP pump and Return Flow Pump 3 to the larger 35HP pump. This change does not require a time extension. Sincerely, CAJUN CONTRACTORS, INC. Chris Thompson Project Manager File 1.21 (d)(95028) Field HOME OFF10Er DALLAS OFFICE, HOUSTON OFFICE, LAKE CHARLES OFFICE. NEW ORLEANS OFFICE= Post Office Box 104 Post Office Box 59367 Post Office Box 890809 Post Office Box 1487 Post Office Box 11207 Baton Rouge,LA 70821.0104 Dallas,7X 75229 Houston,TX 77289-0809 Lake Charles,LA 70602-1437 New Orleans,LA 70181-1207, (504)753.5857 (214)323.9333 (713)4795554 (318)625.3773 (504)734-3100 FAX(504)751.9777 FAX(214)323.9555 FAX(713)479-0309 FAX(318)6253817 FAX(504)734 9900 CO) z m M .. n zto CI-4 69 � r r ocv'� o M u °n° w QVLL Ow F- V' m $ $ � W 0 ci �LL 0 r- � Z W v v Opco m g � Vk m 0 Go0 � m sg R Z o Z W 5 w a U9 z ry C-li W I a h � LU0. O U 0 0 � a � 3 h Wk QN +� Q ZO 3 D 0. FQ- Xw N to 0 p Z o � QLL Q � O c z } � Q � Q ne W z � NORTH AND SOUTH HOLLY WATER TREATMENT PLANTS PCM-027-CHANGE BACKWASH FLOW PUMPS TOTAL DIRECT LABOR: $372.00 STRAIGHT TIME I OVERTIME STRAIGHT TIME OVERTIME TOTAL EMPLOYEE NAME HOURS I HOURS RATE AMOUNT AMOUNT AMOUNT Jesse Nava Carl Robertson 6.0 14.00 84.00 0.00 84.00 Guadalupe Montoya 6.0 11.25 67.50 0.00 67.50 Santos Serrano 6.0 7.00 42.00 0.00 42.00 Israel Gonzalez 6.0 6.50 39.00 0.00 39.00 Pedro Lopez 6.0 8.75 52.50 0.00 52.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TOTAL $372.00 NORTH AND SOUTH HOLLY WATER TREATMENT PLANTS PCM-027-CHANGE BACKWASH FLOW PUMPS TOTAL MATERIALS: $22.50 NDORISUPPLIER DESCRIPTION AMOUNT NOTES Cord&Mon Matefials 3 GA-lags of Grott 22.50 lNon-Tauble TOTAL $22.50 NORTH AND SOUTH HOLLY WATER TREATMENT PLANTS PCM-027 -CHANGE BACKWASH FLOW PUMPS TOTAL EQUIPMENT: $600.00 TOTAL EQUIPMENT NAME DURATION JUNIT IRATEIUNIT AMOUNT 22 Ton Horolic Owns 61 hrs 100.00 600.00 TOTAL $600.00 EXTRA WORK ORDER Q p 1ve orthr Bat Io+ Date: .. 1 Llton buw.LA 709214101 Yiorw 130)1733.9957 95 V _) A ►a.1501,-1Wn Job No:— "367 14aa orrr.Dm"367 p P.O.&M 1041 GAWIN � "KwwMai.01 7523- aue.Tx 77531 _ . CtY. I Fax U14) 3 Fax 3i0-6751M-M3: Issued To:_ i v •CONTRACTOM p Ibe Ofrww Das p Paw ocwe 1ba 1497 Yr rJ,� WZQH WL=-DALLAS•11 MON Ha mwk TX 77b1 OM Lake Qurin.LA 70602-iw l C) 15wrw 1713)47'9-"% ►haw 131x1625-3773 . ►a:(713)4740309 ha OM 625-391' ❑ LUMP SUM [COST PLUS Scope of work: S(1 CTC-F) -S AT- 1 AE PAF' S-TANDOO Lump Sum Amount$ For Cost Plus,list hours and materials- 1")AV R NRS, up+t ARwQt r�6NTo�A - Cf N-Tc z µed �SQAELGONIRLC- Z LPA �RcP KRS. P w�-o LOPE Z LAgo R�2 t��S raa -rnrJ GRwy; P1C'E 0 1-185 Contract Time Extension / days Authorized by: cc: Office hL E 1.zt (�(CO'JL , Ownor/Subcontractor w. Field h� FI!: gS3lI @ran LETTER OF VANSMITY TO: DATE: PROJECT NO: ATTENTION: 0'&WM:PW77-06077050E • 20&30 OWNHR:City of Fort Worth FIN: M-795312 ProjectWorth '& South Holly Water Treatment Plant Backwash & Chlorine & Ammonia Facilities Ve are sending you 0 Attached 0 Under Separate Cover VIA the. following items: 0 Daily Construction Reports No. 0 flans 0 Specifications ❑ RFI No. _ 0 CKR No. 0 Addendum No. ❑ FCM NO. 0 Change Order �o. 0 Field Order 0. 10 Pay Req. _ 0 Submittal No. ❑ Other Copies Hef.No. Description f These are transmitted for -our: Use 0 1"eview t C07.1mectt ❑ Infoir.ation ❑ Approval 0 Distribution to fatties ❑ ItesDci�e ❑ Record 0 Other i remarks : I Copies to: P.aute 70: -D. ` Telephone 617/735-7300 Fax 617/735-7491 Retro 617/429-190( 4055 International Plaza, Suite 200, fort Worth, 7'X ,76109-4695 Page 1 rhly r7ons /4.<1/6r 'PROPOSED C0 'T.w^= x3D:=:CA=I0N PR}�OJECT:Y.OL.:JY WTP Chlorine & A_ -..ash Fac`_'_=ties PROJECT NiJN3ER O;rJhER:Cit- Orf F-crt W--rt ' P/.77-Jc,770530320 d 4J CO�•R. .._O'. Ca-:;^ Cc::t_ sem•.._ _N':_\__<., -ease and NJ chols, 1 3_2 PC`V: D���:.:_ \: 32��:wa5: Ci�� `iEr ?.E: - c« ^s NOTIFICATION TO CONTRACTOR: Tie vCwner _ roposes -:ake :-:e PC;•:- --vn5, no0___ca=_Gn5 Gr de_E-ions :G ^e res:___^.e.;: t.^.e ccn:. ra:.. :Y :.E =S as s :c'r.': in ye:. ta::e :ne :cilc;::rc ac=icn .._:zi.. 10 calendar `otif-, i:s that vcu concur that Lras chance ;:065 nOL re_-%.:ire a c.^.arxe in � Co_ntracc :---e or a_:.ou^:. iz Field Order will ce iss ed. S -}--- a price pr csal ',ft'- a4eta:' ccs- -- - em•:Pme^.=, all o`ver cost relate: -C -his .:a. ;e and a revise'; s:...-..-_- -_- Er_C^ Lne ^.escribEc Cance . �rCCcE� hi _^e &arae. pav-,ne:- w__'_ Ge _lace at --'-e anf: price X Prcceea mit: l� file rT-M312.4./1.'CZ7 PROPOSED CONTRACT MODIFICATION P02-027 ATTACHMENT A PROJECT:HOLLY WTP Chlorine & Ammonia/BacY-,iash Faci14ties PROJECT M.J}-SER OWNER:City of Fort Worth P'n77-060770500020 & 30 CONTRACTOR: Cajun Contractors 95028 ENGINEER: Freese and Nichols, Inc FW95312 PC4 DESCRIPTION: Backwash Clarifier Return Ficw F-=os PCY- N0.027 The Owner proposes to make the following additions, modifications or deletions to the work described in the Contract Docunnents. Authorization to proceed with these changes must be approved by Field Order or Change Order in accordance with the Contract Documents. t Project A; _. N.ojifiy Drawing BC-04 tc in,4`cate Ret::rn .7_cw P-=p Ne. _ (the west r;,=o; ::s zne smaller 10 HP pump and Return Flow Pump No. 3 (the east pu:=)) is one c`_ the _wc large 35 HP pLunps. By: Dat,: f Simon W Freese,P.E. 1900-1990 Freese Marvin C.Nichols,P.E. 1896-1% AND Nichols,INC. CONSULTING ENGINEERS Febmwy 25,1997 Mr.Uoyd Tacldtt Cajun Contractors,Inc. 1590 E.Belt]ine Carrollton,Texas 75005 Re: City of Port Worth Water Department North and Soulh I lolly WIT' Backwash Facilities Modifications and Chlorine and Ammonia Facilities Reltabilitation P 177-060770500020 and PIN 77-060770:100030 Project A:South Holly l3acl:wash Clarifier Area Temporary Electrical Po«-er Cost_, Dear Mr.Tackitt: In accordance with the November 16, 1995 Project Coordination Meeting No. 1, plant coordination item 9, Cajun requested permission to take temporary construction power from the South holly Chemical Building MCC to the clarifier area for construction power. 'This request was approved providing a power meter was set at ilio MCC. The temporary power and ineter were installed December 19, 1993 and the meter was removed in ]ate Docemt-^r 1996. Attached is a copy of my memo to Mr.Charly Angadicheril dated January 2, 1997 advising the power meter reading of 136,800 kwh (the meter is still in my-office) and requesting the plant's cost of power. The plant's power usage and calculated power cost for fiscal 1995 is attached, the plant's cost Nvas $ 0.089/1,wh. I7►c cost of power used by Cajwi totals $1'2,175.20. 'I1ie cost of this temporary constriction power "ill be deducted from the Project A Contract Amount by future C1tange Order. Sincerely, I'TZLI E Al-lll NICHO S,INC. G.E.Gay;P.133. xc: David Tbi%ytsend Charly Angadicheril Coy Veach rile FAV95312A.11 tE-rw95312)c\ttoc.L.Y\t.MnER\caJVN\I-EMPUoWP crc TELEPHONE 817-735-7300 • 4055 INTERNATIONAL PLAZA,SUITE 200 FORT WORTH,TEXAS 761094895 • METRO 817.429-1900 • FAX 817-73S-7491 41, 7 MMORA DVM TO: Charley A*>gaadicher__ MON: ed Gay Freese and Nic:nc_s, -,;,TE: vanuary %, 19-97 SCIBJ:C? . 'north and South v G;:: Backwash Faci'_ es a-._. C. :' 4� No. F.W953:_ Te-'.ocrar V F:e _: _ c: :cr,E= Cajun lias removed their- te~:perary rc,e: s,;r);'ly at t}le ProjeC_ P. Clarifier. Their po,.rer meter measuring tempera:y r.struction power taken frc.- the South Fiolly Chem, F�Jildl J 11 � reaJ1T,C) was . iL 'rlth a mult1vlvirlg iacte of 80 kWh per unit; thErefoIe raiu!,' & LE•.^'UO!CIV C,O''Wtr usaoe frorr. plarlt poriel sources was 131, 800 kwh. Please adv15E the C1zC'illirl0 IatE Ic! tennc:a: '; power supplied to Cajun so that a rec=ificatio:. C};a-:ge Order Can t.e preparev. 1 .1a cA b� ��c' � • •F-�„v �� '�Jc1 �• 1-��� � � 9 � p�Y �,�,1•U 1'� . \ 3G Soo XV 0 . 0 99 ' 1c) 1 5 , 2 0 ---------------- xc: Dave Townsend Randy Romack Chris Thompson Joe Klien Coy Veach file FTW95312.4.43.07 CTLUr*031�MG n.ASS/A0 .. _ .. EP-18-96 WED 09:25 TU ELECTRIC CS&h FAX N0. 8172156837 P. 03/06 98 0914 99 4 511/FORT WORTH 76102 ACTY S HOLLY PLANT PREM-ST ARM CA-C A CITY OF FORT WORTH * ON 12 12 12 RATE 540 REV 04 SIC 9823 RHKD RMKH RMKA CRIT CONT RDAT MNTB MORE 31 800 11580 1 09:19A DEMI - DEMAND H I STORY 09 18 96 -RM DATE TN DESC KWH ON/PK CONT/KW A/KW B/KW D ELEC AMT 08 08 96 99 RE- 542,640 ' 0 5,200 2,645 0 48,491.74 07 07 96 99 RE 843,720 0 5,200 3,869 0 -6 06 -06 96 99 RE 401,760 0 5,200 2,448 0 35,838.33 05 05 96 99 RE 296,280 0 5,200 1,056 0 21,629.23 04 04 96 99 RE 86,040 0 5,200 778 0 6,292.05 03 03 96 99 RE 110,040 0 5,200 960 0 8,042.09 02 02 96 99 RE 195,720 0 5,200 1,123 0 14,287.49 01 01 96 99 RE 535,200 0 5,200 1, 123 0 38,975.42 12 12 95 99 RE 178,680 0 5,200 2,573 0 13, 017.91 11 11 95 99 RE 130,800 0 5,200 955 0 9,541.95 10 10 95 99 RE 124, 680 0 5,200 403 0 11,119.00 09 09 95 99 RE 347, 040 0 5,200 2,803 0 30,932.45 08 08 95 99 RE 1, 180, 080 0 5, 200 2,899 0 105, 112.92 07 07 95 99 RE 1,177,800 0 5,200 2,683 0 104,856.86 WH 44833 DEM 22.04000 WH 40311 DEM 32 .24000 WM 120.00 DM 120. 00000 TRAM BEST VI W I� i SEP-16-96 VIED 9:24 Ali 8172156837 P. 3