Loading...
HomeMy WebLinkAboutContract 46270-FP3 F ment of TP&W Const.Services CITY SECRETAW 4� . Dat NTRACT N0.„Hager ��44 �+ DTuanagement J. Page .1Oi�1 i�+�Brotherton 1, �-t � �'sterman/Scanned .� „ J!7�ding people have been c clad concemin thehave released this project for such 8 guest for finalpayment TION AND PUBLIC WORKS e Conducted By Shameka Kennedy PROJECT COMPLETION cS#S1,6 ZV D.O.E.Ns: 7306 Regarding contract 317306 for BLUPMEW'Fk16-STREET LIGHT as required by the - TRANSPORTATION&PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director of the TRANSPORTATION& PUBLIC WORKS upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. Original Contract Prices: $40,914.48 ,Amount of Approved Change Orders: Ns Revised Contract Amount: Total Cost Work Completed: $40,914.48 Less Deductions: Liquidated Damages: Days®$210.00/Day Pavement Deficiencies: Total Deduction Amount: Total Cost Work Completed: $40,914.48 Less Previous Payments: $0.00 Final Payment Due $40,914.48 M M c Recommended for Acceptance Date m Asst. Director, PW - Infrastructure Design and Construction 0 c / I Z i-.J- �.. °O Accepted C= Asst. Director, TRANSPORTATION & PUBLI WORKS Z/ r%-3 ca+ Asst. City Manager Dat Comments: C205-541200-207760237883 OFFICIAL RECORD CITY SECRETARY FT.WORTN, TX FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name BLUFFNAEW PHASE 2 Contract Limits Project Type STREET LIGHT City Project Numbers 02378 DOE Number 7306 Estimate Number 1 Payment Number I For Period Ending 5/158015 CD City Secretary Contract Number 317306 Contract Time ICD Contract Date 9/158014 Days Charged to Date 211 Project Manager Ehia Contract is 100.00 Complete Contractor MISSION SITE SERVICES,LLC 416 INTT:RCHANGE MCKINNEY, TX 75071 Inspectors LAYER / HOUSTON Friday,May 15,2015 Pagel of 4 City Project Numbers 02378 DOE Number 7306 Contract Name BLUFFVIEW PHASE 2 Estimate Number I Contract Limits Payment Number I Project Type STREET LIGHT For Period Ending 5/15/2015 Project Funding STREET LIGHT FACILITIES Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total I GOUND BOX SMALL WILID 8 EA $500.00 $4,000.00 8 $4,000.00 2 COBRA HEAD STYLE LIGHT POLE W/FIXTURE 8 EA $2,455.00 $19,640.00 8 $19,640.00 &POLE BASE 3 2"SCI 140 PVC CONDUIT 268 LF $53.31 $14,287.08 268 $14,287.08 4 #6 XHHW CABLE 804 LF $1.85 $1,487.40 804 $1,487.40 5 PAYMENT PERFORMANCE/MAINENANCE I LS $1,500.00 $1,500.00 1 $1,500.00 BONDS Sub-Total of Previous Unit $40,914.48 $40,914.48 Friday,May 15,2015 Page 2 of 4 City Project Numbers 02378 DOE Number 7306 Contract Name BLUFFVIEW PHASE 2 Estimate Number I Contract Limits Payment Number I Project Type STREET LIGHT For Period Ending 5/15/2015 Project Funding Contract Information Summary Original Contract Amount 540,914.48 Change Orders Total Contract Price $40,914.48 Total Cost of Work Completed 540,914.48 Con Leu %Retained $0.00 Date Z f s Net Earned $40,914.48 Inspection p r Earned This Period $40,914.48 Retainage This Period $0.00 �^ Date A Less Liquidated Damages Days @ Day $0.00 J Project Man / Date AV���sl LessPavement Deficiency $0.00 qDitor torIT?W-/Infrastructure Design and Construction Less Penalty $0.00 ate �' Less Previous Payment $0.00 ontracting De D 14 Plus Material on Hand Less 15% $0.00 411, Balance Due This Payment 540,914.48 Friday,May 15,2015 Page 3 of 4 City Project Numbers 02378 DOE Number 7306 Contract Name BLUFFVIEW PHASE 2 Estimate Number 1 Contract Limits Payment Number 1 Project Type STREET LIGHT For Period Ending 5/15/2015 Project Funding Project Manager Ehia City Secretary Contract Number 317306 Inspectors LAYER / HOUSTON Contract Date 9/15/2014 Contractor MISSION SITE SERVICES,LLC Contract Time 15 CD 416 INTERCHANGE Days Charged to Date 211 CD MCKINNEY, TX 75071 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $40,914.48 Less %Retained $0.00 Net Earned $40,914.48 Earned This Period $40,914.48 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $40,914.48 Friday,May 15,2015 Page 4 of 4 FORTWORTH rev 03/05/07 TRANSPORTATION&PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:1 NAME OF PROJECT: B1aRyiew Phase 11 PROJECT NO.: 2378 CONTRACTOR Mission Site Services,LLC DOE NO.: 7306 PERIOD FROM:10/15/14 TO: 05/13/15 FINAL INSPECTION DATE: 22 May-15 WORK ORDER EFFECTIVE:Oct. 15,2014 CONTRACT TIME: 15 OWDOCD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARDGGD CREDITED MONTH CHARGEDCURINREDITED 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. i 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS* DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS THIS 0 0 0 0 211 211 PERIOD PREVIOUS 0 0 0 0 0 0 PERIOD TOTALS 0 0 0 0 211 211 TO DATE *REMARKS: CONTRACTOR DATE INSPECTO DATE _ ENGINEERING DEPARTMENT The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012,6311 (817)392-7941 •Fax(817)392-7845 POA : 4221097 M SureTec Insurance Company LIMITED POWER OF ATTORNEY Meow All Men by These Presents, That SURETEC LNISURAIdCE COMPANY (the "Company"), a corporation duly nrganizeti and existing under the laws of the State of Texas, and haying its principal once in Houston, Harris County, Texas, does by these presents i male,constit:ate and appoint f Lisa M.Bonnot,Don E.Cornell,Ricardo J.Reyna,V.DeLene,%larshall,Scah,inie Hunter,Pcbbi Meralcs,Kcily A Wostbrock its true and lawful AttDracy-in-fact,with U!power and authority•hereby conferred in its name,piace and stead,to execute,acknowledge and deliver any and all bonds,recogtizances,undertakings or other insi7w-nents or contracts of suretyship to include waivers to the t conditions of contracts and coments of surety for: Five Mi'licn and 001100 Dollars($5,000,000.00) and to bind the Company thereby as fully and to the same extent as if such bond were signed by the.President,sealed with the corporate seal of the Company and duly attested by its Secretary,hercbv ratifying and confirming all that the said Attorney-in-Fact may do in the promises. Said appointment shall continue in force until iI'd t-2o1._� and is made under and by authority of the following j resolutions of the Board of Directors of the SureTec In.L,-"ee Company: Be ii Resolved that the President,sty Vice-President,any Assistant Vicc-Presider;,any Secretary or any Assistant Secretary shall be and is + hereby vcstcd x;th fell power and authority to appoint kmv one or more suE nbie persons as Attorney(s)-in-fact to represent and act for and on behalf of the Company subject to the fallowing provisions: Artorney in-Fact may be given Pill power and authority.or and in the name of and of behalf of tht Company,to exccutc,acknowledge and i deliver,any and all bonds,recogaizances,contracts,agreements or indemnity and other conditional or obligatory undertakings and any and all notices and documents canceling or t=inting the Company's liability then-auuder, and any such insvtunents so executed by any such Attorney-in-Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary. f Be it Rezo ve4 that the signature of any authorized officer and seal of the CamT,ny heretofore or hereafter affixed to any power of anotne)"or any`enifiente rcL^.ling dyercto by facsimile,and any power u`attorney or ceniL•ceie bearing facsimile signature or facsimile seal shall be valid and binding upon the C,omparly with respect to any bond or undcrtakino to which it it aitadicd. (,ldapted at a meering held as 260 e,?prd,, 1999.) I In Witneis Wicregf,SURFTEC LNSUR&NCE COlvPANI'hos ealised thnsa presents to be siped by its President,and its corporate seal j to be hereto affixed this ?!h day at Misch ,A.D. zoic J ,w- SURETEC INSURANCE CON PANY v 5�xahc� - Ely' m j W a E Julio VGX Jr: resident State of Texas ss; r 1 5 County of Hams On this get day of March,A.D. 201.5 before me personalty came John Knox Jr.,to me known,who,being by me duly swarm,did depese and say,that he Rsides in Houston,7•exas, that he is PresldLlrt of SURFTL••C r,SUKANCE COi.SPANY, the company described in and which executed the above insmunent;that he knows the sea]of said Company;that tic seal affixed to said insvamcut is such corporate seal;that it was so affixed by order of the Board of Directors of said Company-,and that he signed his name thereto by like order. JACQUELYN1,V4DONADO f- Notary Public ✓ '\f 1> Seek s ray comm E r 5;i&20+7 Jacq etvn Maldonsda,Notary Public My commission expires May 18,2017 1,M.Brent Beaty,Assistant Secretary of SURETEC INSURANCE COMPANY,do hereby certify that the above and fufegoing IS a true and Correct COPY iof a Power of Atterocy,executed by said Company,which is stili in f ill force and effect;and furthermore,the resolutions of the Hoard of Directors,set out in the power of Attorney are in full force and efft-a ri 1'11,,,, ;utt Given under my hand,and the seal of said Company at Houston,Texas dais r day of + l '• _ <_l t� A.D, f. Bredi Benty,Assistant Ncretary ( Any instmmant issued in excess of the penalty sued above is totally void and without any vaiitilty. 1 For'verification or the authority of this power you may call(713)812-0Ba0 any business day between 8:00 am and 5:00 pm GST. I i CONSENT OF OWNER ❑ SURETY COMPANY ARCHITECT ❑ CONTRACTOR ❑ TO FINAL PAYMENT SURETY ❑ Conforms with the American Institute of OTHER Architects,AIA Document G707 Bond No 4397725 PROJECT: (name, address)BIu'tvie�v Phase 2 Street Lightinq Facility Fort wori11 TX TO (Owner) 7, A ZCHITEC T'S PROJECT NO: ASHTON DALLAS RESIDENTIAL,LLC CONTRACT FOR: 122; P;!n!erstaio 35E.Suite 170 Katviety Phage 2 S!reet L!ghting Facility Lrofiton TX 75Lo6 CONTRACT DATE: CONTRACTOR:MISSION SITE SERVICES. LLC In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (here Insert name and address of Surety Company) SURETEC INSURANCE COMPANY 1330 Post Oak Bivd. Houston TX 77056 , SURETY COMPANY on bond of there insert name and address of Coitractcr) MISSION SITE SERVICES,LLC 416 Interchange Street McKinney TX 75071 , CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to lr'sre v.sert name and address of owns.) ASHTON DALLAS RESIDENTIAL,LLC 1221 N Interstate 35E,Suite 170 Carrollton TX 75006 OWNER, as set forth in the said Surety Company's bond. IN WITNESS,WHEREOF, the Surety Company has hereunto set its hand this 20th day of May,2015 SURETEC INSURANCE COMPANY P . ` 5u�y Company Attest:V.DeLene Marshal: % % (7)L, ! (Seal): Signature of Authorized Representative Sorhinie Hunter Attorney-in-Fact Title NOTE: this form is to be tread as a comoarAon dgtument to AIA DOCUMENT G7:06. CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, Currant Editlon ONE PAGE UNCONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT The undersigned has been paid and has received a progress payment in the sum of S 119,496.40_for labor,services,equipment or material furnished to Ashton Dallas Residential, LLC on the job of Biuffview Ph 2 located at Fort Worth,TX and does hereby release any mechanic's lien,stop notice or bond right that the undersigned has on the above referenced job to the following extent. This release covers payment for labor,services,equipment,or material furnished to Ashton Dallas Residential,LLC through 4/30/2015 only and does not cover any retentions retained before or after the release date;extras furnished before the release date for which payment has not been received;extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release.This release of any mechanic's lien,stop notice,or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment,or breach of the contract,or the right of the undersigned to recover compensation for furnished labor,services,equipment,or material covered by this release if that furnished labor,services,equipment,or material was not compensated by the progress payment. Mission Site Services LLC Contractor Michael Den am Date May 29,2015 Vice President Subscribed and sworn to before me, this-67?9 /y _day of / ' lQ ,2015. A-4L�AA1)J.AA,4 6 F X (Notary Pub] ) Affix Notary Seal: ' E BETTY SPENCER h9Y COMMISSION EXPIRES March 15,2017 t FoRTWORTHREV:02=07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY I)PROJECT INFORMATION Date: 5/22/2015 Name of Contractor Project Nance Mission Site Services,LLC BhdMew Phase Il DOEIn vector Project M—g- CAM Houston Fred Ehia DOENnmrber Project oiffi-l0, 4w of Contract 7306 0 Simple 0 Routine Q Complex ❑Water ❑Waste Water ❑Storm Drainage ❑Pavement Initial Contract Amount Final Contract Amount $40,915.40 $40,915.40 In PERFORMANCE EVALUATION 0-Inadequate I-Deficient 2-Standard 3-Good 4-Excellent EL.ELUNr RATING EIEM&NT RATING (0-4) (0-4) INSPECTION EVALUATION PLANS&SPECIFICATIONS 1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions If 2 Knowledge of Inspector 4 12 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities 3 Applicability of Specifications 4 4 Display Of Professionalism 4 Accuracy of Plan Quantities 5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager 1 Change Order Processing Time 3 Communication 2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timeframe III)COMMENTS&SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth-1000 Throckmorton Street-Fort Worth,TX 76012-6311 / 1 (817)392-7941 -Fax:(817)392-7845 FORTWORTHREV:°V2°/°' TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR CONTRACTOR&PROJECT DATA Name of Contractor Project Name Mission Site Services,LLC Bluffview Phase II DOE&Wector DOENumber Garey Houston 7306 DOE Inspector Project Manager ❑Water ❑Waste Water ❑Storm Drainage ❑Pavement Fred Ehia Initial Contract Amount Project Difficulty $40,914.48 0 Simple OQ Routine 0 Complex Final Contract Amount Date $40,914.48 5/22/2015 In PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE 1 Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 4 60 60 6 Finished Product 15 Y 4 60 60 7 Job Site Safe 15 Y 4 60 60 8 Traffic Control Maintenance 15 Y 4 60 60 9 Daily Clean Up 5 Y 4 20 20 10 Citizen's Complaint Resolution 5 Y 1 4 1 20 1 20 11 Property Restoration 5 Y 4 20 20 12 After Hours Response 5 Y 4 20 20 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 448 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(I'S) 443 III)CONTRACTOR'S RATING Maximum Score(MS)=448 Qr sum of applicable element score maximums which= 448 Rating([IS/MS]*1000%) 448 / 448 — l00% Performance Category Ekcctl at <20%=Inadequate 20%to<40%=Def?elent 4096 to<60%=Standard 60%to<80%=Good >_80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Signature DOE Inspector Signature Contractor Signature DOE Inspector's Supervisor /a4t.J CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS I The City of Fort Worth-1000 Throc)rmorton Street-Fort Worth,'IX 76012-6311 (817)392-7941 -Fax:(817)392-7945 ASHTON WOODS., April 28, 2015 Mr.Jim Diestel City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102 Re: Bluffview Phase 2 DOE 6949 Dear Mr. Diestel: This letter will document that Ashton Dallas Residential LLC (dba Ashton Woods Homes) confirms that Gilco Contracting, Inc., Burnsco Construction, Inc. and Mission Site Services has completed the site development work per the Construction Plans approved by the City of Fort Worth and therefore no liquidated damages will be assessed by Ashton Dallas Residential LLC in connection with said site development work. If you should have any questions, please advise. Regards, - Robert J. Romo Vice President ashtonwoods.com 1800 Valley View Lane,Suite 100,Farmers Branch,TX 75234 P 972 428 5404 F 972 428 5426