Loading...
HomeMy WebLinkAboutContract 46040-A1 AMENDMENT NO. 1 TO AGREEMENT FOR ARCHITECTURAL DESIGN SERVICES FOR THE CONCRETE PADS AT THREE CITIZEN'S DROP-OFF STATIONS STATE OF TEXAS § § CITY SECRETARY CONTRACT NO. COUNTY OF TARRANT § WHEREAS, The City of Fort Worth ("City") and Alliance Geotechnical Group, Inc. "At GGI made and entered into City Secretary Contract No. 46040 (The Contract)which was administratively authorized and executed in the amount of$7,725.00 plus up to$0.00 in reimbursable fees for Preliminary Design Services and cost estimates.: NOW THEREFORE, City and Alliance Geotechnical Group, Inc., ("Engineer"), collectively (the "Parties") acting by and through their duly authorized representatives, enter into the following agreement 1. Article 1.1, SECTION 1—SERVICES OF THE ARCHITECT, a paragraph is added to read as follows: "Provide additional materials testing services additional required compaction tests.. The Total cost of these additional services is$425.00, The scope of services are described more fully in the following Alliance Geotechnical Group letter: Attachment "A" dated June 1, 2015 subject: Construction Materials Testing Services, Citizens Drop-off Stations Collection Pads, Fort Worth, Tx., and made a part of this Agreement." 2. Paragraph 1 of SECTION V-COMPENSATION TO ARCHITECT, is amended as follows: "The total compensation for all of the assignments to be performed by Architect to complete the Projects as described in CHARACTER AND EXTENT of ENGINEER'S SERVICES as addressed in City Secretary Contract No. 46040 and Amendment 1 with attachment"A" and hereof shall be $8,150.00, hereinafter referred to as the'total fee', plus up to$0.00 in reimbursable expenses." 3. All other provisions of this Contract which are not expressly amended herein shall remain in full force and effect EXECUTED this the dday of ,2015, in Fort Worth,Tarrant County,Texas. i Alliance Geotechnical Gr u , Inc. APPROVED: By: i'f's— By: 7�i;" Robert Nance, President Fernando Costa Branch Manager Assistant City Manager ��_F 01? L APPR ALR OMMENDED RECORDED: ,` ILO ° By: By: gyne Corum, Interim Director, ? Mary J. K er $, Property Management Dept. City Secretary `1%.0000000S APPROVED AS FORM AND LEGALITY: M&C C- No M&C Re uired c Contract Authorization M By: , o Grant Jordan Date: Assistant City Attorney z o OFFICIAL RECORD CITY SECRETARY fat Amendment No. 1 FT. WORTH TX Page 1 of 1 Drop-off Stations Concrete Pads I June 2015 AW IG�N� • GEOTECHNICAL ENGINEERING ��.i.1J II 1 � ENVIRONMENTAL CONSULTING �ro CONSTRUCTION MATERIALS ENGINEERING AND TESTING V11�JW CONSTRUCTION INSPECTION June 1,2015 Proposal Pio.: P15.121 Mr.Ronald Clements Property Management Department City of Fort worth 401 West 13*Street Fort Worth,Texas Subject: Construction Materials Testing Services Citizens Drop-off Stations Collection Pads Fort Worth,Texas Dear Mr.Clements: Alliance Geotechnical Group(Alliance)is submitting this change order for construction materials testing for the above referenced project. COMPENSATION $ 425.00 for additional Testing services as requested rendered during construction at the Hemphill location has been determined. Please indicate your approval of the change order. We appreciate the continued opportunity to provide you with our services. If you have any questions or wish to discuss any aspect of our proposal,please call us. Sincerely, Alliance technical Grou LonnieJohnso ,C. Josh Dav' ,C. . Project Manager Branch Manager City of Fort Worth agrees to the Scope of Services described in this proposal and the Alliance Geotechnical Group General Conditions attached and incorporated herein. CITY OF FORT�WORTH 6Z" UVFICIAL AECORD Title: yslT ,,ff 1l CITY SECRETARY (.�'�, / iw,�as�y�� FT. WORTH, TX Date: Gfl'y�/S Fort Worth - Dallas - Frisco - Longview - Huntsville - Harrah, OK 3761 N. Beach Street - Ft.Worth,Texas 76137 Tel: 817-595-4565 - Fax:8t7-595-1033 - www.aLggcngr.com ++.•••