Loading...
HomeMy WebLinkAboutContract 46764 Developer and Project Information Cover Sheet: Developer Company Name: Jackson Shaw/Amstar Parc North.LP by JSC/Parc North GP LLC, itseg, neralpartner Address,State,Zip Code:4890 Alpha Road, Suite 100 Dallas TX 75244 Phone,E-Mail:972.628.7421,jstone@jacksonshaw.com Authorized Signatory/Title:John Stone,Vice President Project Name and Brief Description: Parc North Project Location: SE Corner of NE Loop 820 and IH-35W Plat Case No.:FS-15-003 Plat Name:Northern Crossing West Mapsco: Council District: 4 City Project No: 02557 CFA: 201 -143 DOE: 7V8 To be coplet=yd Received b OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX 1 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 1' �,7&4 WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Parc North ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the Project. NOW,THEREFORE,For and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with m the work performed by said contractors. C-) rn B. Developer shall provide financial security in conformance with paragraph 6, C Section II, of the Policy and recognizes that there shall be no reduction in the zcollateral until the Project has been completed and the City has officially accepted the Improvements. Developer acknowle; the 1d acceptance process requires the Developer's contrac tIt"p fAft 2 FT, WORTH, Tx affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub-contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City- approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (AJX_Sewer (A-1) _X�Paving (B) X ;Storm Drain(B-1) Street Lights & Signs(C)_. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: L To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. 3 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. 4 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not sttch injuries, death or damages are caused, in whole or in ,Hart, by the alleged negligence of the City of Fort Worth, its of vers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said 5 contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. 6 iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT SLANT) 7 Cost Summary Sheet Project Name: Parc North CFA No.:2015-043 DOE No.: 7438 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1, Water Construction $37,340.0 2.Sewer Construction $8,527.00 Water and Sewer Construction Total $ 45,867.00 B. TPW Construction 1.Street $ 83,645.72 2.Storm Drain $ 27,087.00 3.Street Lights Installed by Developer TPW Construction Cost Total $ 110,732.72 Total Construction Cost(excluding the fees): $ 156,599.72 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 917.34 D. Water/Sewer Material Testing Fee(2%) $ 917.34 Sub-Total for Water Construction Fees $ 1,834.68 E. TPW Inspection Fee(4%) $ 4,429.31 F. TPW Material Testing(2%) $ 2,214.65 G. Street Light Inspsection Cost H. Street Signs Installation Cost(Total of 5@$245 each) Sub-Total for TPW Construction Fees $ 6,643.96 Total Construction Fees: $ 8,478.64 Choice Financial Guarantee Options,choose one Amount ck on Bond=100% $ 156,599.72 Completion Agreement=100%/Holds Plat $ 156,599.72 Cash Escrow Water/Sanitary Sewer=125% $ 57,333.75 Cash Escrow Paving/Storm Drain=125% $ 138,415.90 Letter of Credit=125%w/2yr expiration period $ 195,749.65 8 IN TESTIMONY WHEREOF,the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager,attested by its City Secretary,with the corporate seal of the City affixed,and said D per has exe ed this instrument in quadruplicate, at Fort Worth,Texas this day of 20_!� . CITY OF FORT WORTH-Recommended by: Water Department ansportation&Public Works Department � J . endy Chi-Babulal,EMBA,P.E. Douglas .Wiersig,P.E. Development Engineering Manager Director Approved as to Form&Legality: Approved by City Manager's Office �a�u•f JCa- Fernando Costa Assistant City Attorney Assistant City Manager M&C No. I NO U& QUIRE] Date: ATTEST: � F®°Rr� go °'0 ary 1.K s o� City Secreta ° ATTEST: DEVELOPER: Jackson Shaw/Amstar Parc North,LP by JSC/Parc North GP LLC, its general partner Signatur Sign4e (Print)Name:,Jt LL j0A Pyr Y.,v Print Name:John Stone Title:Vice President OFFICIAL RECORD CITY SECRETARY 9 FT.WORTH,TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Location Map ® Exhibit A: Water Improvements ® Water Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Estimate ® Exhibit B: Paving Improvements ® Paving Estimate ® Exhibit 13-1: Storm Drain Improvements ® Storm Drain Estimate ❑ Exhibit C: Street Lights and Signs Improvements ❑ Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 10 ——————————————— I UJI I I I I I I I I I � FOss,C N sq SANDSHELL 3 ago oh r I a ACROSS I Pte/ J J "ERN CROSS NORTHERN I NORTI M 0 Y HILLS U MCLEAN a 35W< MI DL T N PROPOSED U _ SITE I GREAT SOUTHWEST � r a w o z ago a 0w _ _ LEAMSIDE I cR EF,� — I POLARIS MEACHAM -7a I o " I m 1 r d N I I I I a i NOT TO SCALE HALFF DGN: CFA-EXHIBIT-LOCATION MAP.dgn AVO: 30316 78RIO_3,3 DATE: 5/26/2015 PAGE NO.: OF 1 I � 3803 PARK WOOD BLVD.#80000 FPRISCSCO.TEXAS 75034 12141518-4570 I L------------------------------------------ I I N IF 0 50 100 150 200 1 , I ( 82 SCALE: 1"=100' 016PL T ` 3511 = o os — IRRIGATION 4 t METER I � e C�I.aali = EXISTING 12' / WATER LINE Zf 11 �`e Q LOTS',,-3,BL I PROPOSED 2' % �� 1�,12, BLO (t 2 a DOMESTIC METER , ' `;� - oQ R PROPOSED 2' 0 61p�`, AIL 2 , i DOMESTIC METER � , X , I � f PROPOSED 2' DOMESTIC METER { y \ I Q / / PRIVATE OOM a•Rep I 3 / s 0 +: � W pVq ZI ..Lr QLusrJ!IrrrrJri ark-PL uj i I WITH V OR w '* -.-_._. JA KSON-SHAW/AMS AR PA I`°`''°�"�°a'raa � / � � --�------ LIMITED PARTN m ,r� PROPOSED 2' `' ---- T-RA¢ Doc CALLED IRRIGATION METER I a - - Pki OPO$ED W Q ----:-.---- t z , a �LOT 1, J a HERN CROSSING EST -------ADDUJQN---- / I { I g WATER EXHIBIT "A" PARC NORTH BUILDINGS 1-3 i mo■ DGN: CFA-EXHIBIT-WATER TAPS 01.dgn AVO: 30316 ■ a® HALFF I - TBPEFIRM#F-312DATE: 5/26/2015 PAGE NO.:1 OF 2 I 3803 PARKWOOO BLVD..#800 FRISCO,TEXAS 75034(214)6184570 f L——————————————————————————————————————————{ ------------------------------------------I I OL I %- ' I ► � 11 LL " I , lop �/� ( I I' O W � oZ o Z I LO N w O-Wa a cr 0-3 c 1 - 1 0 -�nN3neVit NLO I o 1 a31VMI dlbAlad (JAaI M.e i 4 4 a 1 ► Ell w - I Q 1 I Iw U) Z, I j m ♦^ W i LID aH ax x o I m 10 JO Ute ; �� I I Z'= N� $ C Id wa N d M c� Z a _ c I W , wo ._. 'I I Q � U � I ' T , I I I I I I V/ �a Z Z w I I i I NW I = X m X I i I i O J _ ili� I w M N \ v CL LL Cl : da.a° as �mm ■■ r ■ g i ii I . i I p s i ■■■ I I i I i --co - I W Q a; I aow p aW I ( I I CZ I � �..a N I IT I WJ N ---• 1 ++�oaiao� Ia31bM1 31bAlbd ' AO W II Ii Q 3 1! J VI VAIA I - I n3 fll 1 t��N� UZ I i I44'009 b0 M3 NOW OZ ddd a sap u PZOSdVI831VM-1181HX3-Vd3ks11914x31s1aa4S\CIGVO\9L£OMs0000E\4 ddlVH ZSSL4e Wd S040Z SL9Z/9Z/S L—————————————————————————————————————————— 004243 DAP-BID PROPOSAL Page I or7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlid Nto. Description Specification Section No Measure Quantity Unit of ity Unit Price Bid Value UNIT I:WATER IMPROVEMENTS 1 0241.1118 4"-12"Pressure Plug 024114 EA 2 $500.00 $1,000.00 2 3292.0201 Utility Service Surface Restoration Seeding 3292 13 Sy 350 $2.00 $700.00 3 3305.0109 Trench Safety 330S 10 LF 45 $1.00 $45.00 4 3305.0111 Valve Box Adjustment 33 05 14 EA 3 $100.00 $300.00 5 3311.0001 Ductile Iron Water Fittings w/Restraint 33 11 11 TON 0.05 $3,500.00 $175.00 6 3312.2203 2"Water Service 33 1210 EA 6 $4,500.00 $27,000.00 7 3312.2204 2"Private Water Service 33 1210 LF 40 $28.00 $1,120.00 8 3312.4107 12"x 8"Tapping Sleeve&Valve 33 12 25 EA 2 $3,500.00 $7,000.00 TOTAL UNIT I:WATER IMPROVEMENTS $37,340.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version Apn1 2,2014 0042 4i Bic Proposal_DAP_PARC NORTH Sub Unit Costs 052215rer signbimI, Cry 3hti U— N O m G 00 sr I \1 x (D I y Lii yLU 0000 oW LO � / ;';r�.•'•; Vii/ %j// i I N I I 3�I , 150 V) LLI v I l i w Q1 I I OC)N Ur 11 z -- •/� �w I I ZQ a- ~~ L O Q I i cr2 __ XCLQ _3fll�in-_ ��. m U W N ,� V`dlNVnIAS H12fON = 1- —-- -- -- X O (tl31YM131YMLd (�Mi1M.B I I U > ! I W (N CD v I IZZ rra:: LL N_ j U) U In Q I _Z W M1 W i la gQ QI m J O Q _._ ZF— ui _ --------- ._._._. 1 d: 4 x W ! 1 1 V I 1 JJ I I =m \W ---iLU --.------_. W N fn Z O y' ry 4 ----- --.__.14..Q]L�O 3�._._._. j i >I I I 0 r`)cv) I m Ly = m 53 ; a~ R� ------i ----- a r (� I W Z i p 1 0 -1 I� j QI`a I I Y I'o. LJL ae i a- l �a I I y� _ f1 I I /W � � I—._._— ._.L._ h� ~ / i ._ ! - ._._.1._._._._._ 1 j I Q h S LL F T -- ------- I I QCL o LL W LL0 01 m ! 1 ! ! ! 1 I I I M■. CC) ME co ot C) I I V) J I Q U QO�f d3N.'Z 3 c I aW�2o • — � i � ��` I I ��2 do o� W W Cy En 0 CL Op— is r 7^ ain I O�C CJp lob x� •1 \\ I I _���_� 23 d SS. YINY�lAS I I j =W I S. 4pmm C� M3 S3 NOW 011MOH!S u isaO u y3M3S A8V11NVS-lISIHX9-VdO1s!!4!4=31s1aa4MOOVO\9iCOS1S0000561 ddlVH ZSSL4a NId Lil:094 9LOU9Z/9 00 42 43 DAP-91D PROPOSAL Pngc 2 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item I Desorption Specification Section No. Unit of Bid Unit Price Bid Value No Measttre Quantity UNIT II:SANITARY SEWER IMPROVEMENTS 1 3292.0201 Utility Service Surface Restoration Seeding 3292 13 Sy 260 $2.00 $520.00 2 3301.0002 Post-CCN Inspection 330131 LF 27 $2.00 $54.00 3 3301.0101 Manhole Vacuum Testing 3301 30 EA 1 $50.00 $50.00 4 3305.0109 Trench Safety 33 05 10 LF 27 $1.00 $27.00 5 3305.0112 Concrete Collar 33 05 17 EA 1 $300.00 $300.00 6 3331.4115 8"Sewer Pipe 33 11 10,33 3112,33 3120 LF 27 $38.00 $1,026.00 7 3339.0003 Wastewater Access Chamber 333940 EA 1 $2,000.00 $2,000.00 8 3339 0001 Epoxy Manhole Liner 33 3960 VF 8.5 $175.00 $1,487.50 9 3339 1001 4'Manhole 33 39 10,33 39 20 EA 1 $2,850.00 $2,850,00 10 3339.1003 4'Extra Depth Manhole 33 39 10,33 39 20 VF 2.5 $85.00 $212.50 TOTAL UNIT It:SANITARY SEWER IMPROVEMENTS $8,527.00 CITY OF FORT WORTH STANDARD CONSTRUCI(ON SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Fonn Version April 2.2014 00 42 439id Propoml_DAP_PARC NORTH-Sub Unit Cons 0522 15m% signbloct. 1 LL O M O M Z W I\ � O C7 C) I \�++l� r �? \ Q a N J I 1\ O � o W Y -: to J f.- O C a L:) 'ffi _z - I I ► = F'- _ —_ m O ui IN - 3RN3AV`QIP VA TAT FFA C? CSO LL 6 Ln y -� - ----- --- m Cn U LID Fo I, -aO _ _ �'�m� _•+--- — --' �� ril l Q a I•I r J Q = p + v s ;o W I I X m J---------- � i LL - _ tlJ �N N Z I WQA 'I I Q H) r'2 ��go I I Q U � p< W Z ;t6 — CL ft LL — _ S Q II ,ii o� � e CL JZ2� o> - - - - - - - - - - Q a CL CL -- ----- -- -- ■■■ ' GG MM To L\I QKU i K1 W - o Q Q w ¢yQ�kSVIp�O +� crU V \� `rte •T cn a _ -a O, — a(n --- VIN7/,1A5 3 M-SC AVMHJIH 31b'1S831NI Md Sd NOW 04ZSOHI S u IsaO u P"E)NIAVd-1191HX3-VdO\si19!4x3\s1aa4S\OOVO\91SOC\s00OOE\:I ddlVH Z991,4e WdO:611l SLOZ/9Z/9 0042 43 DAY-BID PROPOSAL Pay•4 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Description Specification Section No. Unit of Bid Unit Price Bid Value No. Measure Quantity UNIT IV:PAVING IMPROVEMENTS 1 0241.1300 Remove Conc Curb&Gutter 02 41 15 LF 771 $16.50 $12,721.50 2 3123.0101 Unclassified Excavation by Plan 3123 16 CY 45 $2.70 $121.50 3 3211.0400 Hydrated Lime 321129 TN 2.7 $165.00 $445.50 4 3211.0501 6"Lime Treatment 321129 Sy 180 $7.50 $1,350.00 5 3213.0104 9"Conc Pvmt 32 13 13 Sy 180 $66.87 $12,036.60 6 3213.0301 4"Conc Sidewalk 32 13 20 SF 5555 $4.85 $26,941.75 7 3213.0402 7"Concrete Driveway 32 13 20 SF 2217 $5.11 $11,328.87 8 3213.0506 Barrier Free Ramp,Type P-1 321320 EA 7 $250.00 $1,750.00 9 3217.1002 Lane Legend Arrow 3217 23 EA 1 $600.00 $600.00 10 3217.0201 8"SLD Pvmt Marking HAS(W) 32 1723 LF 100 $12.00 $1,200.00 11 3217.2102 REFL Raised Marker TY I-C 32 1723 EA 5 $8.00 $40.00 12 3291.0100 Topsoil 329119 Cy 138 $20.00 $2,760.00 13 3292.0100 Block Sod Placement 3292 13 Sy 870 $5.00 $4,350.00 14 3471.0001 Traffic Control 3471 13 MO 2 $1,000.00 $2,000.00 15 3471.0002 Portabic Message Sign 3471 13 WK 4 $500.00 $2,000.00 16 3471 0003 Traffic Control Details 34 71 13 EA 2 $2,000.00 $4,000.00 TOTAL UNIT IV:PAVING IMPROVEMENTS $83,645.72 CITY Of FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWA KDED PROJECTS Foran Version Apnl 2,2014 00 42 43 Bid Proposal_DAP_PARC NORTH-Sub Unil Costs U52215ro%_signblack -------------------------------------------, I I 0 50 100 150 200 N ! l � I SCALE: 1"=100' I ! 35w _ °P° PROPOSED ROCK I RIP RAP PROPOSED SAFETY END TREATMENT SPECIIILWAR TY DEED = �I PROPOSED 36' RCP \` C�SON-S W/A\V AR'P RCI EN NORTH PHASE II I ED PARTNERSHIP AI 3 \ \,TRA 2, CALLED 6.512 ACRES o ` OC.0 R.T.C.T.D214272191 p v I LOTS 4R, 5R, 6R, 7R, 89, I \ \y 9R, 11R,AND 12R, LINE C I I I BLOCK 2,NORTHERN TE I I CROSSING WEST N'RCP I -N�a CAB.A, SLIDE 12675 I P WATE,WATER, 9 n l l I I DOC,N0, 0208172486 ! y _ rII71TTLErLI _ I I O.R.T.C.T. _� � ! i � I I I e ! i i� �C I OF mm I /� 7" If II PFC Qffi I I i BLDG.3 i I -. I _ FFE_62zso -0 w \\ \ 1 X / rowan,iuseer, I PROPOSED TURF REINFORCEMENT w ROP SED ; t LOTIR PROPOSED 48' RCP `\\\ :,:,. ;,:• \\ PROPOSED ROCK a RIP RAP U NORTHERN CROSSING WE ADDITIONX .. _ I I Lor BLOCK!2 \ \\\\ PROPOSED SAFETY ''T . END TREATMENT Ii i I 4CC6t UW61f \\1\\\\ I a DRAINAGE EXHIBIT "B-1" i PARC NORTH BUILDINGS 1-3 DGN: CFA-EXHIBIT-DRAINAGE.dgn AVO: 30316 ■�■ HALFF ■ '■ DATE: 5/26/2015 PAGE NO.:1 OF 1 TBPE FIRM NF-312 3803 PARKWOOD BLVD..#800 PRISCO,TEXAS 75034(214)618�S/L' ———————————————————————————— 00 42 43 DAP-BID PROPOSAL Page 3 of 7 SECTION OO 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Section No Unit of Bid Unit Price Bid Value No. I Measure Quantity UNIT III:DRAINAGE IMPROVEMENTS 1 3137.0102 Large Stone Riprap,dry 31 37 00 SY 90 $75.00 $6,750.00 2 3292.0201 Utility Service Surface Restoration Seeding 32 92 13 Sy 1358 $2.00 $2,716.00 3 3305.0109 Trench Safety 3305 10 LF 79 $1.00 $79.00 4 3341.0309 36"RCP,Class III 33 41 10 LF 32 $75.00 $2,400.00 5 3341.0409 48"RCP,Class III 33 41 10 LF 21 $110.00 $2,310.00 6 3349.3007 36"Straight Headwall,1 pipe 33 49 40 EA 1 $3,500.00 $3,500.00 7 3349.3011 48"Straight Headwall,1 pipe 33 49 40 EA 1 $4,000.00 $4,000.00 8 9999.0001 Turf Reinforcement 99 99 01 NS 1333 $4.00 $5,332.00 TOTAL UNIT III:DRAINAGE IMPROVEMENTS $27,087.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version Apnl 2,2014 00 42 43 Bid Proposal_DAP_PARC NORTH-Sub Unit Costs OS2215— signblock 004241 DAP-BID PROPOSAL Page t of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Description Specification Section No. Unit of Bid Unit Price Bid Value No. Measure Quantity UNIT V:STREET LIGHTING IMPROVEMENTS TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICAI[ON DOCUMENTS-DEVEI.OPER AWARDED PROJECTS Form Version April 2.2015 00 42 43_Bid Proposal_DAP PARC NORTH-Sub Unit Costs OS2215m-_signblock 004241 DAP-BID PROPOSAL Page G of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Section No. Unit ofBid Unit Price Bid Value No, Measure Quantity UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS TOTAL UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRLCTION SPECIFICATION DOCJMENTS-DEVELOPER AWARDED PROJECTS Porn Version April 2.2014 00 42 43_3rd Proposal UAP PARC NORTH-Sub Unit Costs 052215res_signb1m1, 004243 DAP-BID PROPOSAL Paas 7 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bldhst Item Description Specification Section No. Unit of Bid Unit Price Bid Value Nu. Measure Quantity Bid Summary UNIT 1:WATER IMPROVEMENTS $37,340.00 UNIT II:SANITARY SEWER IMPROVEMENTS $8,527.00 UNIT III:DRAINAGE IMPROVEMENTS $27,087.00 UNIT IV:PAVING IMPROVEMENTS $83,645.72 UNIT V:STREET LIGHTING IMPROVEMENTS UNIT VI TRAFFIC SIGNAL IMPROVEMENTS Total Construction Bid $156,599.72 This Bid is submitted on by the entity named below: Respectfully Recipt is acknowledged of the Initial following Addenda: By: o Addendum No.1 ignature) Addendum No.2 Addendum No.3 �AyjD �Oyf}{k Addendum No.4 (Printed Name) Title ��[� 1-)CECcJTj\lF, Company: MYCOil1 6ENE1eAL. Co ate Address: 2-08 F-A-ST L nU 151141V A S79 ZOO Mc llwtiZ�I . �SOta9 State of Corporation: -TX Email: d-b nv o14cL' on M�, !'/ DIV. GOwi Phone 9-2',m — 14 16 Contractor agrees to complete WORK for FINAL ACCEPTANCE within 180 calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Forth Vcrsim April 2,2014 W 42 43 Did Prop—LDAP PARC NORTH-Sub Unit Costs 052215m, ignb)o l;