HomeMy WebLinkAboutContract 44218-CO8 CITY SECRETARY
FORT WORTH City of Fort Worth CONTRACT NO.
Change Order Request
Project Name:I East Rosedale-US287 to Miller Ave I City Sec No.: 44218
Project No.(s): C116-02116021222,C200-205230014283,P253- DOE No. L6316 City Proj.No.: 00142
605170014283,P258-705170014283,P227-205280014283
Project Description: Water-Sewer-Storm Drain-Paving-Street Light-Signal Light-Fiber-Bridge Improvements
Contractor. Jackson Construction,Ltd Change Order# ® Date: 6/10/2015
City Project Mgr.1 Dena Johnson City Inspector: I Randy Horton
Phone Number:1 817-392-2387 Phone Number: 682-432-4037
Dept. Water Sewer TPW Totals Contract Time
(Calender days)
Original Contract Amount $2,149,404.50 $573,715.00 $13,866,014.15 $16,589,133.65 600
Extras to Date $116,555.44 $50,586.55 $216,192.21 $383,334.20 0155
Credits to Date $0.00 $48,811.19 $48,811.19
Pending Change Orders(in M&C Process) $0.00 $0.00 $0.00
Contract Cost to Date $2,265,959.94 $575,490.36 $14,082,206.36 $16,923,656.66 755
Amount of Proposed Change Order $49,903.97 $0.00 $0.00 $49,903.97 040
Revised Contract Amount $2,315,863.91 $575,490.36 $14,082,206.36 $16,973,560.63 795
Original Funds Available for Change Orders $65,000.501 $17,500.00 $497,647.01 $580,147.51
Remaining Funds Available for this CO $0.001 $15,724.641 $281,454.80 $297,179.44
Additional Funding(if necessary) $49,901971 1 $49,903.97
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 2.32%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+257o) $20,736,417.06
The change order will provide for additional traffic control during water main installation across the Miller Avenue/
Rosedale Street intersection. Construction of the water main took three months to complete,necessitating additional
traffic control and switching traffic from one side of the intersection to the other in order to maintain continuous traffic
flow.
Staff concurs with the contractor's request for 40 nal days on the change order.
A Y'b ate°°®° �°�
o °%®
° azo°
J. K r, C y e $ 00
It is understood and agreed that the acceptance of this Cha o or constitutes an accord and satisfaction and represents payment in full(both
time and money)for all costs arising out of,or incidental to,thea rder.
Jackson Construction,Ltd Steve Haberstroh
M
M
:ZE
M
c
z
t�
C= -
"' M&C Number N/A---J M&C Date Approved ?A WKWH,TX
FORT WORTH City of Fort Worth
Change Order Additions
Project Name East Rosedale-US287 to Miller Ave City Sec No.: F 44218
Project No.(s): C116-02116021222,C200-205230014283,P253- DOE No. 6316 00142
605170014283,P258-705170014283,P227-205280014283 City Proj.No.:
Project Water-Sewer-Storm Drain-Paving-Street Light-Signal Light-Fiber-Bridge Improvements
Description
Contractor Jackson Construction,Ltd Change Order:® Date: 6/10/2015
City Project Mgr. I)ena Johnson I City Inspector FRandy Horton
ADDITIONS
1-75 Additional traffic control for Miller Ave.and E.Rosadale St.including Water 1.00 LS $51,203.97 $51,203.97
barricade rental,arrow board rental,portable traffic signals and
resetting barricades
Water $51,203.97
Sewer
TPW
Additions Sub Total $51,203.97
Page 2 of 4
FORT WORTH City of Fort Worth
'�— Change Order Deletions
Project Name East Rosedale-US287 to Miller Ave City Sec No.: 44218
C1 16-02116021222,C200-205230014283,P253-
Project No.(s): 605170014283,P258-705170014283.P227-205200142
05170014283 P258-705170014283 P227-205280014283 DOE No. EEI
City Proj.No.: 00142
Project Description Water-Sewer-Storm Drain-Paving-Street Light-Signal Light-Fiber-Bridge Improvements
Contractor Jackson Construction,Ltd Change Order: El Date 611012015
City Project Mgr. Dena Johnson City Inspector: Randy Horton
DELETIONS
ITEM DESCRA71M DEPT Qty 4tit Unit Cost Tod
1-35 Connection to Existing 6-inch water main Water 1.00 EA $1,300.00 $1,300.00
Water $1,300.00
Sewer
TPW
Deletions Sub Total 1$1,300.00
Page 3 of 4
M/WBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
Co# DATE AMOUNT
Total $0.00
Page 4 of 4
JACKSON CONSTRUCTION LTD.
Force Account Daily Time and Material
County Tarrant Project East Rosedale City Fort Wor01 Highway
Descriptionof Work: Traffic control for Miller Avenue and East Rosedale Sfnet hxkWing move In,barricade and signage rental,arrow board rwW,portalbe traflJc
Date: 14-Apr-15 signal rental and resetting barrkades for ase 2&3.
EQUIPMENT Labor
Description Hrs Rate Amount R HoursO.T. R Rate O.T. Amount
Pmject Manager Pickup 10.00 $ 18.00 $ 180.00 Project Manager 10.00 $ 45.00 $ - $ 450.00
Foreman Pickup 10.00 $ 18.00 $ 180.00 Foreman 10.00 $ 35.00 $ - $ 350.00
$ - Semiskilled 2 20.00 $ 13.00 $ - $ 260.00
$ - Laborer 10.00 $ 10.00 $ - $ 100.00
-
s -
s -
s -
s -
s -
$ -
$ - $ - $ -
$ - $ - $
$ I Is - $
Sub-Totall$ 360.00 Sub-Total $ 1,160.00
15% $ 54.00 55% $ 638.00
Total Equipment: $ 414.00 25% $ 290.00
Total Labor: $ 2,088.00
Material Subcontract
Description Quantity UOM Rate Amount Quanity, UOM Rate Amount
$ - Barricade and Signage Move In 1.00 Ea $ 600.000 $ 600.00
$ - Barriacaide&Signage Rental First Month 1.00 Mo $ 1,800.000 $ 1,800.00
$ Bardacaide&S' nage Rental Additional Month 2.00 Mo $ 1,200.000 $ 2,400.00
$ - Reset Barriades Phase 2 1.00 Ea $ 300.000 $ 300.00
$ - Reset Bardades Phase 3 1.00 Ea $ 300.000 $ 300.00
$ - Arrow Board Rental 2 Each 3.00 Mo $ 1,500.000 $ 4,500.00
$ - Portable Traffic S' nal 3.00 Mo $12,000.000 $ 36,000.00
Sub-Total $ - Sub-Totall$ 45,900.00
2576 $ - 5%1$ 2,295.00
Total Material: $ - Total Subcontract. $ 48,195.00
Summary
Approved: Date 06101/15 Labor $ 2,088.00
JACKSON CONSTRUCTION LTD. Equipment $ 414.00
Date Material $
Subcontract $ 48,195.00
Bond 1% $ 506.97
JACKSON CONSTRUCTION JOB# 3081 ITotal This Sheet $ 51,203.97
_._.. . .
01201510:29AM
Barrie,
TIw<EIC AEarAtDallas 214-748-5791 214-748-3586 Fax
CINTROL jsj ULES Ft Worth 817-838-5791 817-838-3586 Fax
julie.branch@dlbinc.net
Uto a Bsr��'�,.
We propose to furnish,install,service regularly,diassemble and remove upon completion all standard construction signs,
barricades,and battery operated warning lights as required by the approved traffic control plan,Texas M.U.T.C.D.
and/or the Owner on the following project:
TO: 54a Seen Cah S ir"ah ProjecdControl: ,
City/County: t
Street/Road:
aillillia
Short Term: Move-In S 602,60 Long Term: First Month's Rent S I M!. dU
Daily S Additional months S (x,100.00
Clarifications: --******See ectal pricing bet .r=====_ ►c.
� p as �h�S file_/ud�J• (��•r,cad�J •Fiilz /�// �� sir
Rese+of Awe yd �L. 1,11W (gel7U °" �rercl�f}rrtlwSn�c_A•rIJ nc4 ll►cttld�
A GA4,rorTGr unjrSS t'n 1nKrrl s• am rtl or i�ir C .4 �!V- •41, ;;rle
CONTRACTOR WILL BE CHARGED EXTRA FOR SPECIAL SIGNS,AND WE MUST CHARGE A NOMINAL FEE FOR ANY
TRAFFIC CONTROL PLAN CONTINGENT ON THE TIME REQUIRED TO COMPLETE IT. NOTE: The above prices do not include
any daily lane closure labor fees or equipment unless specifically noted here.Exclusions:Changable message centers,flashing arrowboards,
crash attenuator trucks,the furnishing,removal,or placement of any temporary/permanent striping,delineator posts,tubular markers,
pavement buttons,permanent signing,project signs,concrete traffic barrier,guardrail,dead end barricade,traffic cones,traffic switches,steel
plate,portable fight towers,temporary traffic signals,water Tillable barrier,flagging services,IRS or Reboundable devices, or SALES TAX.
DOES NOT INCLUDE TRAFFIC CONTROL FOR OTHER SUBCONTRACTORS,UNLESS NOTED ON BID.
ADDITIONAL RENTAL EQUIPMENT AVAILABLE
Flashing Arrowboard Signs '525.00 per day ea. 11go per day monthly.**********
Changeable message centers IMM per day ea. 575.00 per day monthly.**********
Portable Light Towers $75.00 per day ea. 25.00 per day monthly.**********
Portable Light Balloons7S 0.00 per day ea. 2S 0.00 per day monthly.**********
Portable Traffic Signals 5400.00 Per day per Pair $200.00 per day monthly.**********
Steel Crossing Plates $25.00 Per day ea. $7.50 per day monthly.**********
Crash attenuator trucks $400.00 per day ea.Plus to centsimile S3 500.00 per month. Plus 10 cents\mile
ssaaassan
Above pricing for additional rental eouinment excludes setup,delivery,and pickup fees where applicable.
CONTRACTOR OBLIGATIONS
Contractor shall furnish a certificate of insurance naming Dallas Lite&Barricade,Inc.as an additional insured and loss
payee on all equipment rentals. All prices do not include sales tax.Contractor to figure job duration.
THIS BID ACCEPTANCE IS ALSO CONTINGENT UPON THE"RENTAL AGREEMENT AND CONDITIONS". DALLAS LITE
&BARRICADE,INC RESERVES THE RIGHT TO REMOVE ANY AND ALL OF ITS EQUIPMENT DUE TO NONPAYMENT OF
INVOICES PROVIDED SEVENTY TWO(72)HOURS WRITTEN NOTICE IS PROVIDED.
APPROVALS
Julie Branch Field u ervisor
Accepted by AA Y >or"iizzed/jRep(r�esseentative DALLAS and FT WORTH LITE&BARRICADE,INC.
Date Date
YEYBER
/ jAna++A TGR/TA
t owyef�/MMleq ra..pogo nwa..,.a
r o.pon.e?�.n ga.oa�aglon wu"w un ua,
9S��a 15 Barr/a��e
rnArnc aEMfAIC Dallas 214-748-5791 214-748-3586 Fax
� Aq r SALES Ft Worth 817-838-5791 817-838-3586 Fax
Illll� julie.branch®dlbinanet
ub i Ba11��'�
We propose to furnish,install,service regularly,diassemble and remove upon completion all standard construction signs,
barricades,and battery operated warning lights as required by the approved traffic control plan,Texas M.U.T.C.D.
and/or the Owner on the following project:
TO: �p�CILtr4, [nhs r�►c�h Projeet/Control: ; v—
City/County:
Street[Road•
Short Term: Move-In$ Long Term: First Month's Rent S 12000.00
Daily S Additional months S 1"1006-00
Ckrifleations: ........See tlpp:lal prlclas bdoarwweo� e'S ? r Q
Pow-"V MMeGz _SlinCLIT
CONTRACTOR WILL BE CHARGED EXTRA FOR SPECIAL SIGNS,AND WE MUST CHARGE A NOMINAL FEE FOR ANY
TRAFFIC CONTROL PLAN CONTINGENT ON THE TIME REQUIRED TO COMPLETE IT. NOTE: The above prices do not include
any daily lane closure labor fees or equipment unless specifically noted here.Exclusions:Changtable message centers,Flashing arrowboards,
crash attenuator trucks,the furnishing,removal,or placement of any temporary/permanent striping,delineator posts,tubular markers,
pavement buttons,permanent signing,project signs,concrete traffic barrier,guardrail,dead end barricade,traffic cones,traffic switches,steel
plate,portable light towers,temporary traffic signals,water fillable barrier,flagging services,IRS or Reboundable devices, or SALES TAX.
DOES NOT INCLUDE TRAFFIC CONTROL FOR OTHER SUBCONTRACTORS,UNLESS NOTED ON BID.
ADDITIONAL RENTAL EQUIPMENT AVAILABLE
Flashing Arrowboard Signs2$ 5.00 per day ea. $18.33 per day monthly.**********
Changeable message centers8S 5.00 per day ea. 7S 5.00 per day monthly.**********
Portable Light Towers 12jo per day ea. 2S 5.00 per day monthly.**********
Portable Light Balloons $70.00 per day ea. 520.00 per day monthly.**********
Portable Traffic Signals $400.00 Per day per Pair2S 00.00 per day monthly.**********
Steel Crossing Plates2S 5.00 Per day ea. S7.50 per day monthly.**********
Crash attenuator trucks $400.00 per day ea.Plus 10 cents\mile3 500.00 permonth. Plus 10 cents\mile
Above pricing for additional rental equipment excludes setup,delivery,and pickup fees where applicable.
CONTRACTOR OBLIGATIONS
Contractor shall furnish a certificate of insurance naming Dallas Lite&Barricade,Inc.as an additional insured and loss
payee on all equipment rentals. All prices do not include sales tax.Contractor to figure job duration.
THIS BID ACCEPTANCE IS ALSO CONTINGENT UPON THE"RENTAL AGREEMENT AND CONDITIONS". DALLAS LITE
&BARRICADE.INC RESERVES THE RIGHT TO REMOVE ANY AND ALL OF ITS EQUIPMENT DUE TO NONPAYMENT OF
INVOICES PROVIDED SEVENTY TWO(72)HOURS WRITTEN NOTICE IS PROVIDED.
APPROVALS
Julie Bran Fed Su ervisor
ccepted b A thortzed epresentative DALLAS and FT WORTH LITE&BARRICADE,INC.
L1. _ /S"
Dae Date
TGRJTA
Tb{"OOOd A00"
7t-n�pon�non A�bCl�ibn 111N 1i"I IN IIM7
BI
Fund Appropriation Requests Pagel of 2
Fund Appropriation Requests
* General
Project Number: 00142 Creator: John Kasavich
Project Name: East Rosedale Street[US Status: Pending
287 to IH-820]
Title: FAR for water chg order 8 Creation Date: 06/15/2015 11:52 AM Local
(GMT-6)
Record Number: FAR-00035 Target Completion Date:
Amount Requested: 47,303.97 Effective Date:
Fund Appropriation Request Internal FAR Data Type Code: 2
Type:
Rind rnnriatinn RPn
Remarks:
Explanation:
Comments: FAR for additional traffic control during water main installation at Miller and Rosedale
intersection. Includes 3 months to maintain continuous traffic control.
M&C Required?: No Journal Voucher Required?: No
M&C Number: Description 3(Journal Voucher
No.):
M&C Approval Date:
016
Task Details
From: Task Due Date: Not Applicable -->Task Notes(0)
To: Dan Pepon Task Status: View Only
Cc:
Sent For: 2 Review
Workflow Progress
Step Name Assignee I Company Status Action I Completion Date
1 Creation John Kasavich CFW Completed Send 06/15/2015 11:52 AM Local
GMT-6
2 Review Dan Pe on CFW Not Started
29 Line Item
1 Item(s)
No. FBS Code Funding FAC Short Description 2 WBS Code Total Amount WBS FAC Original FAC
Description
BONDS-
WATERCP-
WATER- A-WATER-
001 WATERPROJ- P253-476045- work phase 83 WATERPROJ- 47,303.97 P253-541200-
P253ERPR 601159990100 17-83-60- 605170014283
476045- 541200-P253
601159990100
Total Amount:$47,303.97
Attachments(0) Linked Records(0) Linked Mail(0)
https://primavera-unifier23.oracleindustry.com/bp/studio/print/open?id=33067&model=ufa... 6/15/2015