Loading...
HomeMy WebLinkAboutContract 46786 Developer and Project Information Cover Sheet: Developer Company Name: Address, State,Zip Code: Phone&Email: Authorized Signatory, Title: Project Name and Brief Description: Project Location: Plat Case Number: Plat Name: Mapsco: r Council District: I City Project Number: CFA Number: � DOE Number: taffRTo be completed by staff.- Received eceived by: Date: ' tp OFFICIAL RECORD City of Fort Worth,Texas CITY SECRETARY Standard Community Facilities Agreement FT WORTH TX CFA Official Release Date:06.01.2015 t o Page 1 of 10 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 49 9 (0 WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer acknowledges that the said acceptance process requires the Developer's contractor(s) to submit an affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement CFA official Release Date: 06.01.201 s CITY SECRETARY Page 2 of 10 FT,WORTH,TX contractor has paid any sub-contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A)M, Sewer (A-1)M, Paving (B)M, Storm Drain (B-1)M, Street Lights & Signs (C) A E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state- City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 06.01.2015 Page 3 of 10 approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City- issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 06.01.2015 Page 4 of 10 account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the allemed negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. City of Fort worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 06.01.2015 Page 5 of 10 ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. it. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 06.01.2015 Page 6 of 10 Cost Summary Sheet Project Name: CFA No.: — DOE No.: - An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 292,109.00 2. Sewer Construction $ 319,049.45 Water and Sewer Construction Total $ 611,158.45 B. TPW Construction 1. Street $ 740,937.80 2. Storm Drain $ 444,162.45 3. Street Lights Installed by Developer $ 50,476.20 TPW Construction Cost Total $ 1,235,576.45 Total Construction Cost(excluding the fees): $ 1,846,734.90 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 12,223.17 D. Water/Sewer Material Testing Fee(2%) $ 12,223.17 Sub-Total for Water Construction Fees $ 24,446.34 E. TPW Inspection Fee(4%) $ 47,404.01 F. TPW Material Testing (2%) $ 23,702.01 G. Street Light Inspsection Cost $ 2,019.05 H. Street Signs Installation Cost $ 2,940.00 Sub-Total for TPW Construction Fees $ 76,065.06 Total Construction Fees: $ 100,511.40 Choice Financial Guarantee Options,choose one Amount Mark one Bond= 100% $ 1,846,734.90 Completion Agreement= 100%/Holds Plat $ 1,846,734.90 Cash Escrow Water/Sanitary Sewer= 125% $ 763,948.06 Cash Escrow Paving/Storm Drain= 125% $ 1,544,470.56 Letter of Credit= 125%w/2yr expiration period $ 2,308,418.63 City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 06.01.2015 Page 7 of 10 ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Fernando Costa Assistant City Manager N e: ue Title: Date: 6 Z+ �S Date: �? S Recommended by: ATTEST: (Only if required by Developer) Wendy Chi-Ba ulal, EMBA, P.E. Develn�ment Engineering Manager Signature Water Department Name: I ? Douglas W/. Wiersig, P.E. Director Transportation & Public Works Department Approved as to Form & Legality: ATTEST: i Douglas W. Black Assistant City Attorney J. ays 0 City Secret 000 M&C No. _ AIA �' "to °70 0 Date: o 0 000�o AS City of Fort Worth, Texas OFFICIAL RECORD Standard Community Facilities Agreement CITY SECRETARY CFA Official Release Date: 06.01.2015 Page 8 of 10 FT.WORTH,TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment . Attachment 1 - Changes to Standard Community Facilities Agreement . Location Map . Exhibit A: Water Improvments . Water Cost Estimate . Exhibit A-1: Sewer Improvements . Sewer Cost Estimate . Exhibit B: Paving Improvements . Paving Cost Estimate . Exhibit B-1: Storm Drain Improvements . Storm Drain Cost Estimate . Exhibit C: Street Lights and Signs Improvements . Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 05.01.2015 Page 9 of 10 ATTACHMENT"1" Changes to Standard Agreement Community Facilities A Bement City Project No.ig City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 06.01.2015 Page 10 of 10 PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE STEADMAN FARMS PHASE 2 1 170 E J U KE E -HASLET-RUNK F T WMIU- IMIT KruFp-HQ1T 170 SITE CITY LIMIT I TIM R 44L........___ N N T R z ER R- M CITY IMIT ar Cre LOCATION MAP NOT TO SCALE D,O.E. NO. 7437 BID CITY PROJECT NO. 02559 TEW RECMEW DEIVGA&FRIIJGR]RMF W WATER PROJECT NO. P265-6071502559xx SEWER PROJECT NO. P275-7071302559xx W-Tm?fw Tit orhme-m FILE NO. K-2365 FaM2%uu APRIL 2015 - SHEET 1 L FINAL PLAT STEADMAN FARMS PHASE 2 RESIDENTIAL LOTS BLOCK M, LOTS 17-32; BLOCK N, LOTS 8-18, 20-30, 36X-38X; BLOCK 0, LOTS 1-32,33X-34X; BLOCK P. LOTS 1-30; BLOCK Q, LOTS 1— 26,27X; BLOCK R, LOT 1 X 44.281 ACRES OUT OF THE JOSE CHIRINO SURVEY, ABSTRACT NO. 265 CITY OF FORT WORTH TARRANT COUNTY, TEXAS STEADMAN FARMS, LLC OWNER / DEVELOPER 3001 Knox Street, Suite 207 (214) 445-2211 Dallas, Texas 75205 JBI PARTNERS, INC. SURVEYOR/ENGINEER 16301 Quorum Drive, Suite 200 B (972) 248-7676 Addison, Texas 75001 D_0.E=. NO. 7437 �' s► CITY PROJECT NO. 02559 TEW RFXLSnMWFl�1�RWFMMF4M WATER PROJECT NO. P26W71502559xx mooan.iaYe,a�a2om SEWER PROJECT NO. P275-7071302559xx Ad1°r��001 Tat 9T124NO FILE NO. K-2365 F U2-21at414 APRIL 2015 — SHEET 2 L ru aa�ae I I �,-d• f I � � I •I ^an4r —&TOW, -anmr x w� a mow. o x PLAT MAP SC ALE: 1"-400• PLANS FOR THE CONSTRUCTION OF WATER, B' SERER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE STEADMAN FARMS,PH 2 (D.aE KU 7437) TEXAS RMSTEPMENKINWM FMMr4A Adf m,Tm7W T.terase.mre F=01-M414 APRIL 2015 — SHEET 3 L t (AOM t ! ' • • e ¢VU wr•��, •�tt YR 1■ ■� Q A6N9URN NAr CONNECT TO E%6'Yil • • STEADMAN FARMS PN 1 • Y 4 CONNECT TO E%6'W, AN, We. t D.O.E.NO.7029 Q STEADMAN FARMS PN 1 D M 21.1• 7• P265-6021502109-00 ewo �$ D.O.E.NO.7039 , , , • t P265-602150 2109-00 • ' A anE 1 ete Y I • a w • . . n • m • • f . a •A WAIERSTONE ROAD eta� 7-1 mom OAK .�. I • .Dau } f � ew » • I ��O nS'1�" n118ERLANO BOULEVARD i R d■NNi1e •o' w.eta ,�N ��'Sr wwu7r,oa". • ! • • • ! t . • ! ! • , R .�5 APl nm ttA■1 F WAY IALAGE 30- • �p.� • 6'NATER CS • S A A FRS• CONNEDI,ANTFAtEYS PNWi D.O.E.NO.7039 b w » • I]. .E. 7 7 We■ » E P265-60215D2109-DD • 2 • » � NINOSTONE OR a WA N Gltn•.IM Aq• •D■ • "iL:L446'• � M KIACEs a uxD FNASE e4 CnON 1 ai uv- M K Es a NW NAND SPRN M WLl s a w.A,x E ene • w* n Au s[ 1DN 1 NOOOIAIo An nn ,,.,, 1,SE nON 2-e CA6.4 a e2De LEGEND PROP. WATERLINE '• PROP. OFFSITE WATERLINE WATER SC ALE: 1"=300' �— PROP. VALVE EXHIBIT A PROP. FIRE PLANS FOR THE CONSTRUCTION OF RATER, "—� HYDRANT SEWER, PAYING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS — —�— — EXIST. WATER LINE Tosam lip & VALVE STEADMAN FARMS,PH 2 TEXAS RBGffrERFDENG EIItMFWNF438 (D.01NM7437) iW Ckn n D*&b 2= PROPOSED WATER AdimTm7W LINES ARE 8■ UNLESS Tttms OTHERWISE INDICATED. FmcgT12EE444t4 APRIL 2015 — SHEET 4 L CFA WATER COST ESTIMATE UNIT PRICE BID Project Item Information Bidder's Proposal Bidlist Item Specificati Unit of Bid No. Description on Section Measure Quantity Unit Price Bid Value UNIT 1:WATER 11"ROVEMENTS 3311.0001 Ductile Iron Water Fittings w/ 33 11 11 TON 7.74 $ 3,925.00 $ 30,379.50 Restraint 3311.0261 8"PVC Water Pie 33 1112 LF 6,175 $ 19.70 $ 121,647.50 3312.0001 Fire Hydrant 33 1240 EA 8 $ 2,760.00 $ 22,080.00 3312.2003 V Water Service(copper) 33 12 10 EA 126 $ 625.00 $ 78,750.00 3312.3002 6"Gate Valve 33 1220 JEA 8 $ 835.00 $ 6,680.00 3312.3003 8"Gate Valve 33 1220 EA 15 $ 1,082.00 $ 16,230.00 3312.0117 Connect water pipe after Poly Pig 33 1225 EA 7 $ 645.00 $ 4,515.00 is removed,complete in place 3312.0117 Remove Plug&Connect to 33 1225 EA 2 $ 527.00 $ 1,054.00 Existing 8"WTR Line 3202.0614 Traffic control,signage,and 3471 13 EA 1 $ 650.00 $ 650.00 barricading during water construction,complete 3305.0109 Trench Safety 3305 10 LF 1 6,175 $ 0.25 1 $ 1,543.75 OFFSITE 3311.0261 8"PVC Water Pipe(Offsite) 33 11 12 LF 205 $ 19.70 $ 4,038.50 3311.0001 Ductile Iron Water Fittings w/ 33 11 11 TON 0.26 3,925.00 $ 1,020.50 Restraint(Offsite) 3312.4107 Connect to Existing 12"WTR 33 1225 EA 1 $ 3,469.00 $ 3,469.00 Line; 12"x8"Tapping Sleeve& Valve(Offsite) 3305.0109 Trench Safety(Offsite) 3305 10 LF 1 205 $ 0.25 1 $ 51.25 UNIT 1:WATER IMPROVEMENTS-ONSITE $ 283,529.75 UNIT 1:WATER IMPROVEMENTS-OFFSITE $ 8,579.25 UNIT 1:WATER IMPROVEMENTS BID SUMMARY $ 292,109.00 END OF SECTION STEADMAN FARMS,PHASE 2 CITY OF FORT WORTH DOE 7437 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS . L L_L I-J •. E wrcr m ac r ! p srt•aw rwr wl f 0.QC.LL tOL . I IpF 0• e iK. • - IY I1.RR•IC ,gR[Yn� r a • �� ww 'i' awasr"m Ci r_rotuo M 0.06 MO tit eS�.S •�°w n�mafawn r nw Y- yr •-strr —sr:vr ♦ n,w L L H •s, I I I-IT LEGEND PROP. S.S. LINE • PROP. S.S. MH Y 1"mono PROP. OFFSITE S.S. LINE SANITARY --i— EXHIBIT Al PROP. OFFSITE S.S. MH PLANS FOR THE CONSTRUCTION OF NATER, dBI _ —C— — EXIST. S.S. MH SERER, PAVING, STREET LIGHTING, do EXIST. S.S. LINE DRAINAGE IMPROVEMENTS 9 TO SERVE � STEADMAN FARMS,PH 2 TEXAS REOISTEREDII1"M MtNG RRMF 436 (D.O.E NO.7437) PROPOSED SANITARY Ie QU=Dd^&a m SEWER LINES ARE 8' MdmTm7w UNLESS OTHERWISE Tet V2.M&7M INDICATED. FKV2.l&uu APRIL 2015 — SHEET 5 L CFA SANITARY COST ESTIMATE UNIT PRICE BID Project Item Information Bidder's Proposal Bidlist Item Specificati Unit of Bid No. Description on Section Measure Quantity'UNIT 2: SANITARY SEWER Unit Price Bid Value T 3301.0002 Post-CCTV Inspection 3301 31 LF 5,224 1.15 $ 6,007.60 3301.0101 Manhole Vacuum Testing 33 01 30 EA 19 142.00 $ 2,698.00 3331.4115 8" Sewer Pie 33 1110 LF 4,973 25.45 $ 126,562.85 3331.4117 8" Sewer Pipe,CSS Backfill 33 11 10 LF 230 71.00 $ 16,330.00 330.0001 8" Sewer Pipe,Concrete Encasement 03 30 00 LF 40 40.00 $ 1,600.00 3339.1001 4'Manhole all depths) 3339 10 EA 19 2,529.00 $ 48,051.00 3331.3102 4" Standard sanitary lateral with 2- 33 31 50 EA 126 547.00 $ 68,922.00 Way Cleanout 3201.0614 Concrete pavement repair,residential, 3201 29 SY 23 85.00 $ 1,955.00 complete in place 9999.0002 1 Connect to Existing Manhole 0 EA 1 764.00 $ 764.00 3305.0109 Trench Safe 33 OS 10 LF 5,243 0.25 10 1,310.75 OFFSITE 3301.0002 Post-CCTV Inspection Offsite) 3301 31 ILF 1,103 1.15 $ 1,268.45 3301.0101 Manhole Vacuum Testing Offsite 33 0130 EA 4 142.00 $ 568.00 3331.4115 8" Sewer Pie Offsite 33 11 10 LF 1,004 25.45 $ 25,551.80 3331.4117 8"Sewer Pipe,CSS Backfill 33 11 10 LF 80 71.00 $ 5,680.00 Offsite 3339.1001 4'Manhole(all depths-Offsite) 3339 10 EA 4 2,529.00 $ 10,116.00 9999.0003 Connect to Existing Pie(Offsite) 0 EA 1 543.00 $ 543.00 3202.0614 Traffic control,signage,and 3471 13 EA 1 850.00 $ 850.00 barricading during sanitary improvements construction,complete in place Offsite 3305.0109 JTrench Safety(Offsite) 13305 10 ILF 1 1,0841 0.25 1 $ 271.00 UNIT 2:SANITARY SEWER.IMPROVEMENTS-ONSITE $ 274,201.20 UNIT 2:SANITARY SEWER IMPROVEMENT -OFFSITE $ 44,848.25 UNIT 2:SANITARY SEWER IMPROVEMENTS BID SUMMARY $ 319,049.45 END OF SECTION STEADMAN FARMS,PHASE 2 CITY OF FORT WORTH DOE 7437 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Li1W WLpYK ,i R■[i Lj . ■ ■ ■ M • f f f , f • f P•I • M a A < '-■ r n •iCA M fADVAtt157410[l.MAK 1 DDC.ND. [ ,a • I • s • f l r � , , • WATERSTONE ROAD , •�m ggggQQ ■ , y a r r r • r ,Du S�EtS EL rm, TIMBERLAND 9000VARp • y�j iv [ ! _ �.�ra• ADD111171 I Nm RI Q EDGEBRDDN WAY II r r n • , f n a � D. E. 7 7 `� r I VINDSTONE DRIVE rY r s i• a� f • . IE r Drr r l l[ST CAYIOR ROAD • M WLA*El 7'"11 D l/I•NO3 GSL 4XU 91170 n v wn M SMA!N,KCT I��l r M�ILADCS OI CAL 4 ADC 1111 [IDDDIAIID SPR•IDS Et IMAK 1.K"W 2-0 CAL A ADE WM m•.nn _ s AAr�. iPXui W .a1PPn yr,rLLnr mD l.ms.S.�.9 4r•se r•[iYiW , nam ,••nut A,v u�>-a1 �.[t„cmiia M 110iD■IIMLCDrCi■10 r[Ner�c[■rl.l N 1•AOCN SCALE: 1"=300' PAYING EXHIBIT B PIANS ANS FOR THE CONSTRUCTION OF RATER, SERER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE �fxas BEMs a3a STEADMAN FARMS,PH 2 1R'gt Doom DiMB,srB ma (D.O.E Na 7437) AdfMTas=l Td 912.21SM Faun APRIL 2015 — SHEET 6 L CFA PAVING COST ESTIMATE UNIT PRICE BID Project Item Information Bidder's Proposal Bidlist Item Description Specificati Unit of Bid Unit Price Bid Value No. I Ion Section I Measure I Quantity UNIT 4: PAVING IMPROVEMENTS 3213.0101 6"Conc Pvmt;Complete In Place 32 13 13 SY 19,700 $ 30.80 $ 606,760.00 3211.0501 6"Lime Treatment;Complete In 32 11 29 SY 21,059 $ 3.00 $ 63,177.00 Place 3211.0400 Lime;Complete In Place 32 1129 TN 316 $ 163.00 $ 51,508.00 #30/SY 3213.0301 4"Conc Sidewalk 32 1320 SF 556 $ 5.80 $ 3,224.80 3213.0501 4'Barrier Free Ramp,Type R-1 32 1320 EA 12 $ 1,200.00 $ 14,400.00 3471.0003 Traffic Control LS 1 $ 100.00 $ 100.00 3213.0101 Connect to existing concrete street 0 LF 221 $ 8.00 $ 1,768.00 pavement UNIT 4: PAVING IMPROVEMENTS BID SUMMARY $ 740,937.80 END OF SECTION STEADMAN FARMS,PHASE 2 CITY OF FORT WORTH DOE 7437 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS A 8$ [[ _...■ '��Wr a CONNECT E%RTMC ANF 1 ASE f 12'TO RCB �$ NO. 11• 71 STEAOYAN FARMS PH D M ME g , • + • • • • • • • • ■ E.N0,7038 CJ L A.SLIDE 1.1. - Y •ATERSTONE ROAD 27 RCP d FUTURE CONNECTION 95 NTH 36'RCP Br17 CONCURRENT PROJECT • • • - Br OR D.O.E.N0.THE7S331 �r�^ -a����•��i CONNECT TO TIMBERLAND BOULEVARD CONCURRENT PROJECT 1'x1'RCB BY OTHERS „•per-p1•y D.O.E.NO.7333 E••n e•um im — iYYa1 we•n oT�o,• tm • � • . • ! a , , a • • • • s ,OIN tNE „q E BR WAY J YY. VOL 32-$L • PAGE 1 w.•arm� • � S6 RCP ' a� SC F ;- S- . - . - - MTNDSTONE DR r N + 21'RCP TIE WIACES W NIOULAND NGS ' •NAx Y Cl"1 THE NtA s a s TNF KL CS tX W.A E mus UA • ASE IA K MN 1 ,ea. tODRA,D tMiG ca.A 1176 T,Q IDN 2-t Cl1t.A G E @M SCALE: 1"=300' LEGEND STORM DRAINAGE EXHIBIT B1 o PROP. INLET 6BI . . PLANS FOR THE CONSTRUCTION OF WATER, o EXIST. INLET SEWER. PAVING, STREET LIGHTING, k �..� DRAINAGE IMPROVEMENTS PROP. ONSITE STORM DRAIN TO SERVE TM S EE ISTmID HMIL43a STEADMAN FARMS,PH 2 >moommdaaeWrwoe = _ EXIST. STORM DRAIN (D.OLENM7437) Adh^T�r= Tat 02-2&7M PROP. OFFSITE STORM DRAIN Fu 972-M414 APRIL 2015 — SHEET 7 L� CFA STORM DRAIN COST ESTIMATE UNIT 3: STORM DRAIN BIPROWMENTS 3317.0101 Special Riprap[8"- 12"rock 31 37 00 SY 106 $ 92.00 $ 9,752.00 ri ra 6"bedding; 18" Dee 3317.0102 Special Riprap[18"-24"rock 31 3700 SY 120 $ 105.00 $ 12,600.00 ri ra 9"bedding;30"Dee 3341.0201 21"RCP,Class III 3341 10 LF 225 $ 44.90 $ 10,102.50 3341.0205 24"RCP,Class III 3341 10 LF 1,191 $ 54.05 $ 64,373.55 3341.0208 27" RCP,Class III 3341 10 LF 484 $ 60.40 $ 29,233.60 3341.0305 33"RCP,Class III 3341 10 LF 138 $ 78.65 $ 10,853.70 3341.0309 36"RCP,Class III 3341 10 LF 229 $ 87.75 $ 20,094.75 3341.0309 42"RCP,Class III 3341 10 LF 586 $ 118.50 $ 69,441.00 3341.0309 60"RCP,Class III 3341 10 LF 111 $ 228.35 $ 25,346.85 3341.1103 4x4 Box Culvert 3341 10 LF 32 $ 178.80 $ 5,721.60 3349.0001 4'X4'Storm Junction Box 3339 10 EA 5 $ 3,453.00 $ 17,265.00 Manhole 3349.0001 51X5'Storm Junction Box( 33 39 10 EA 1 $ 4,981.00 $ 4,981.00 Manhole 3349.5001 10'Curb Inlet 33 49 20 EA 11 $ 3,725.00 $ 40,975.00 3349.5002 I5'Curb Inlet 33 49 20 EA 6 $ 4,681.00 $ 28,086.00 3305.0112 27"X42"Concrete Collar 3305 17 EA 1 $ 650.00 $ 650.00 3305.0112 27"X36"Concrete Collar 3305 17 EA 1 $ 650.00 $ 650.00 3305.0112 42"x60"Concrete Collar 3305 17 EA 1 $ 650.00 $ 650.00 3305.0I 12 2403"Concrete Collar 3305 17 EA 1 $ 650.00 $ 650.00 3305.0112 24x27"Concrete Collar 3305 17 EA 1 $ 650.00 $ 650.00 9999.0004 SETP-CD Headwall,60" 0 EA 1 $ 6,283.00 $ 6,283.00 9999.0005 Outlet Structure at 4'x4'RCB 0 EA 1 $ 4,868.00 $ 4,868.00 3125.0101 Inlet erosion Protection(2stages), 31 2500 EA 17 $ 108.00 $ I,836.00 complete in place 9999.0007 Connect to Existing 0 EA 1 $ 566.00 $ 566.00 3471.0003 Traffic control,signage,and 3471 13 LS 1 $ 850.00 $ 850.00 barricading during drainage improvements construction, complete in place 9999.0008 Dewatering Device&Outfall 0 0 2 $ 13,078.00 $ 26,156.00 Basin w/Removal 3305.0109 Trench Safety 3305 10 LF 2,996 $ 0.10 $ 299.60 OFFSITE 334I.0309 36"RCP,Class III Offsite 3341 10 LF 498 $ 87.75 $ 43,699.50 3349.0001 41X4'Storm Junction Box 33 39 10 EA 1 $ 3,453.00 $ 3,453.00 Manhole-Offsite 9999.0006 CH-PW-0 Headwall(Offsite) 0 EA 1 $ 4,025.00 $ 4,025.00 3305.0109 Trench Safety Offsite) 3305 10 1 LF 498 $ 0.10 $ 49.80 UNIT 3: STORM DRAIN IMPROVEMENTS-ONSITE $ 392,935.15 UNIT 3: STORM DRAIN IMPROVEMENTS-OFFSITE $ 51,227.30 UNIT 3: STORM DRAIN IMPROVEMENTS-BID SUMMARY $ 444,162.45 END OF SECTION STEADMAN FARMS,PHASE 2 CITY OF FORT WORTH DOE 7437 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS wwl[Rw[we m � I rTN � A is �� ■ AWML WAY Y 6 STE YAN f ASE t • p„ •� MD, ala Ta ,E 1 • . • • • • • • w • • 9 r �• �• UIL A SLDE 1•1, E Y w w WATERSTONE ROM , v b i v • w �� . M v • • ` TINKRLAND eauYARD % OFORYIO.K /� _ (rAC,i�4![•LA0 ( '_'� • . •!A ! 1 . , a • ' • 1 YOv Y wY:p @ily1,R wAY wAw 0 , i w]•34 Y-- OS WAY nwwrY^Y I •' � I ( ' . n r r r r r r b � S A F Sr b •NDS70NE D Y i Ndil W IOOOwvR Y weIW MAKS OF�$GPLANO b MAW R CO 1 MAR M VRL 5 a AND Y�� � M a CAO.A RTO A Yi[r�n AR S A ON, ,�i A'[• WDCCL Y A RTO L CAO.A 6'PJ• 1 SC ALEw 1"=300' LEGEND ,]BEEI LIGHTS EXHIBIT C LUMINAIRE PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, do BI 4! lip 0-0 EXISTING DRAINAGE IMPROVEMENTS LUMINAIRE TOSEWE STEADMAN FARMS,PH 2 TEw REasTmMENaNEMM FMMF 4M (D.O.E NO.7437) 18901 demo w^8de= Ad&^Tmw7W Td6P1,4&70 APRIL 2015 — SHEET 8 Fu 072-2&1414 L CFA LIGHTING COST ESTIMATE UNIT PRICE BID Project Item Information Bidder's Proposal Bidlist Item Description Specificati Unit of Bid Unit Price Bid Value No. Ion Section Measure Quantity UNIT 5: STREET LIGHTING 3441.3101 Install ATBO-30LED-TYPE2- EA 29 $ 615.00 $ 17,835.00 70W-NW Install only) 3441.3301 Foundation Type 1 EA 29 $ 720.00 $ 20,880.00 3441.3011 2"CONDT PVC SCH 80 T) LF 1,452 $ 5.25 $ 7,623.00 3441.1410 NO 6 Insulated Alum Elec Condr LF 4,356 $ 0.95 $ 4,138.20 UNIT 5: STREET LIGHTING BID SUMMARY Is 50,476.20 STR ET_MN AWROVEMENTS Street Name sign EA 1 12 $ 245.001 $ 2,940.00 END OF SECTION STEADMAN FARMS,PHASE 2 CITY OF FORT WORTH DOE 7437 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS � s FQ ,r ! 'wf _ i i • ! i . O i O i i ' . YJf, I » • f �3 i • " v • v • »Oi ■•4 S • D. .E. 7 7 "�' � • _ — _ „-s- Y I � w i .. f y y i • g .. LEGEND STREET SIGNS i"=300' EXHIBIT Cl �I1• PROPOSED SIGN BLADE PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, do DRAINAGE IMPROVEMENTS ;,jTop PROPOSED STOP SIGN TD SERVE STEADMAN FARMS,PH 2 TOM RE)0lSlEREDEKKM,0MM FMAF438 (D.oE W 7347) IM Ono Dft&&9008 r dAWT=7M01 Tt orhl%&TB70 FmC07E2OW4 APRIL 2015 — SHEET 9 L.