Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 46804
Developer and Project Information Cover Sheet: Developer Company Name: Cook Children's Medical Center Address, State,Zip Code: 801 7`h Avenue Fort Worth, Texas 76104 Phone, E-Mail:682-885-4000, Stan.Davis@cookchildrens.org Authorized Signatory/Title:Stan Davis, Vice President Facilities and Ancillary Services Project Name and Brief Description: 7`h Avenue Paving Improvements Project Location:801 7`h Avenue, Fort Worth, Texas 761.04 Plat Case No.N/A Plat Name: 7`h Avenue Paving Improvements Mapsco: Council District: 9 City Project No: 02417 CFA: 2015-042 DOE: 7366 To be complete a by sta": Received by. AIM` Date. t OFFICIAL RECORD CITY SECRETARY FT. WORTH,TX 1 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. "ku—L WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as 7th Avenue Paving Improvements ("Project") within the City of Fort Worth, Texas (`City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement (`CFA" or"Agreement") in connection with the Improvements and the Project. NOW,THEREFORE, For and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. �o M B. Developer shall provide financial security in conformance with paragraph 6, M M < Section II, of the Policy and recognizes that there shall be no reduction in the M o collateral until the Project has been completed and the City has officially z accepted the Improvements. Developer acknowledges that the said co acceptance process requires the Developer's contractor(s F� t ORD 2 CITY SECRETARY FT.WORTH,TX affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub-contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City- approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (AZX , Sewer (A-1)_X_,.Paving (B) X , Storm Drain(B-I)—X- E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section lI, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section Il, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. 3 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein. 1. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. 4 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whet/ter or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its kers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the Cite or caused as a result of said 5 contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. 6 iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) 7 Cost Summary Sheet Project Name: 7h Avenue Paving Improvements CFA No.:2015-042 DOE No.: 7366 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1 Water Construction $99,619.0 2.Sewer Construction $1,225.00 Water and Sewer Construction Total $ 100,844.00 B. TPW Construction 1 Street $ 335,402.00 2.Storm Drain $ 20,373.00 3.Street Lights Installed by Developer TPW Construction Cost Total $ 355,775.00 Total Construction Cost(excluding the fees): $ 456,619.00 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 2,016.88 D. Water/Sewer Material Testing Fee(2%) $ 2,016.88 Sub-Total for Water Construction Fees $ 4,033.76 E. TPW Inspection Fee(4%) $ 14,231.00 F. TPW Material Testing(2%) $ 7,115.50 G. Street Light Inspsection Cost H. Street Signs Installation Cost(Total of 7@$245 each) Sub-Total for TPW Construction Fees $ 21,346.50 Total Construction Fees: $ 25,380.26 Choice Financial Guarantee Options,choose one Amount ck one Bond=100% $ 456,619.00 Completion Agreement=100%/Holds Plat $ 456,619.00 Cash Escrow Water/Sanitary Sewer=125% $ 126,055.00 0401 Cash Escrow Paving/Storm Drain= 125% $ 444,718.75 ✓ Letter of Credit=125%w/2yr expiration period $ 570,773.75 8 IN TESTIMONY WHEREOF,the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed,and saj4 Developer has executed this instrument in quadruplicate, at Fort Worth, Texas this . day of On 20 . CITY OF FORT WORTH-Recommended by: Water Department Transportation & Public Works Department 5W5Wy Chi- abulal, EMBA, P.E. Douglas W iersig, P.E. opment Engineering Manager Director Approved as to Form&Legality: Approved by City Manager's Office gs�,A _5z:" � L�-- Douglas W. Black Fernando Costa Assistant City Attorney Assistant City Manager M&C No. N Date: L Rr ATTEST: �� O �-� L_$ $= ENOM&C REQUIRED Mary J. Kayser % City Secretary 0, City rtXA� ATTEST: DEVELOPER: Cook Children's Medical Center PU Signature Signature (Print)Name: Print Name: Stan Davis Title:Vice-President,Facilities and Ancillary Services KFT- IAL RECORD SECRETARY 9 WORTH,TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Location Map ® Exhibit A: Water Improvements ® Water Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Estimate ® Exhibit B: Paving Improvements ® Paving Estimate ® Exhibit 13-1: Storm Drain Improvements ® Storm Drain Estimate ❑ Exhibit C: Street Lights and Signs Improvements ❑ Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 10 .� _ "O Park ��_ / —� c - SC I T I n ty P k - ,{y`�� \L Up ter f J �/ � �✓��� � PROJECT SITE � r _ -I ' fl I W -ft 5 } 1 I 0 Fo—t Palk o fl se < �— 8 8 S VICINITY MAP a NOT TO SCALE a 7TH AVENUE PAVING IMPROVEMENTS a N DOE # 7366 FILE # K-2337 CITY PROJ ECT # 02417 A%V3 I DUNAWAy ID 550 Bailey Avenue•Suite 400•Fort Worth,Texas 76107 Tel:817.335.1121 • Fax:817.335.7437 c (TX REG.F-1114) FW F 9 a W > rx X I- yj ................................................................ ....................... m q-4 .... ....... r% ... .......... ............. .. ................. ............ z o 00 Go 31 II II EXISTING 12- WA TER 1 01 LL. LINE (REF DOE (7112) o _� 11 PROPOSED 12" WA ER LINE 11A PROPOSED 2'p WATER METER a y w ujZ - SOUTH TOWER � 2W 0: IM (BY SEPARATE CONTRACT) oo X < * 0 _j I I PROPOSED 2" WA ER LINE 0 cc 0 PROPOSED FIRE HYDRANT ol tun! E _j 0 PROPOSED 8" WA LINE > EXISTING FIRE HYDRANT TO BE REMOVED :2 E Eq II EXISTING 12" WA TER LINE (REF DOE #6533) A-V syg EX-T MP -4 II W T E RF ' 1 AVIE J - -— — — — — — — — — cn -mv..Tm LEGEND PROPERTY BOUNDARY 600 EXISTING MAJOR CONTOUR 602 EXISTING MINOR CONTOUR EX-W— EXISTING WATER LINE m EX-SS---- EXISTING SANITARY SEWER —EX-GAS— EXISTING GAS LINE i4 -EX-FO- EXISTING FIBER-OPTIC CABLE —EX-UE— EXISTING UNDERGROUND ELECTRIC 8 EXISTING STORM DRAIN 0 40 80 EXISTING SANITARY SEWER MANHOLE 0 PROPOSED WATER LINE m PROPOSED GATE VALVE 5. 04 ------ PROPOSED STORM DRAIN SCALE: V'= 40 ft. 0 F EXHIBIT 'A' AZ" bUNAWAY A WATER LINE EXHIBIT 3: 550 Bailey Avenue -Suite 400-Fort Worth,Texas 76107 Tel:817.335.1121 7TH AVENUE [TX REG.F-1114) 00 42 43 DAP-BID PROPOSAL Pap 10r5 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No.I J I Description Specification Section No. Unit of Bid Unit Price Bid Value Measure Quantity UNIT I:WATER IMPROVEMENTS 1 0241.1012 Remove 6"Water Line 0241 14 LF 9 $115.00 $1,035.00 2 0241.1015 Remove 12"Water Line 0241 14 LF 219 $38.00 $8,322.00 3 0241.1302 Remove 6"Water Valve 0241 14 EA 1 $485.00 $485.00 4 0241.1218 4"-12"Water Abandonment Plug 024114 EA 1 $1,355.00 $1,355.00 5 0241.1510 Salvage Fire Hydrant 0241 14 EA 1 $990.00 $990.00 6 3305.0109 Trench Safety 330510 LF 268 $4.00 $1,072.00 7 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 1.5 $5,810.00 $8,715.00 8 3311.0141 6"Water Pipe 33 11 10,33 11 12 LF 6 $78.00 $468.00 9 3311.0441 12"Water Pipe 33 11 10,33 11 12 LF 223 $129.00 $28,767.00 10 3312.0001 Fire Hydrant 331240 EA 1 _ $4,120.00 $4,120.00 11 3312.0117 Connection to Existing 4"-12"Water Main 331225 EA 2 $2,120.00 $4,240.00 12 3312.2204 2"Private Water Service 33 12 10 LF 39 $113.72 $4,435.00 13 3312.2801 3"Water Meter and Vault 33 12 11 EA 1 $19,175.00 $19,175.00 14 3312.3002 6"Gate Valve 33 12 20 EA 1 $1,350.00 $1,350.00 15 3312.3003 8"Gate Valve 33 12 20 EA 1 $1,730.00 $1,730.00 16 3312.3005 12"Gate Valve 331220 EA 4 $3,340.00 $13,360.00 TOTAL UNIT I:WATER IMPROVEMENTSI $99,619.00 �0 Q cu.k CLO �'R i Irak Shu C CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Vcaioe April 2,2014 PAIS �u a cc o, 1:. :::..:.:::::::::...:::.::::.:::::.: ::....... ... :......... :........ .....: � � o mO II . . ..:::: :::::::::::::: :::::::........... ........... : .:::::::::..... ::::::::::. .:.:.:.:.:.:.:.:.:.:. ................... ^ wo3U II II I Y o 1 ' I l II ADJUST EXISTING SANITARY SEWER o II ; — — MANHOLE TO NEW GRADE W' " SOUTH TOWER N � 0 0 W a � I BY SEPARATE CONTRACT � U � Y y a I = J N O Q Y a m I 0 °o =1 I w �I > w �I I II W E II N ao II l 8 J - —� EX-I nC W TTE RE L AVE N UU s LEGEND PROPERTY BOUNDARY — 600 EXISTING MAJOR CONTOUR a — — 602 _ -- EXISTING MINOR CONTOUR EX-W EXISTING WATER UNE EX-SS EXISTING SANITARY SEWER v EX-GAS EXISTING GAS LINE ^' EX-FO EXISTING FIBER-OPTIC CABLE EX-UE EXISTING UNDERGROUND ELECTRIC _ — EXISTING STORM DRAIN 0 40 80 v - --•- EXISTING SANITARY SEWER MANHOLE PROPOSED WATER LINE F ---- PROPOSED GATE VALVE --—- -— PROPOSED STORM DRAIN SCALE; 1°- 40 ft. 0 f bUNAWA EXHIBIT 'A1' l WASTEWATER EXHIBIT 550 Bailey Avenue •Suite 400•Fort Worth,Texas 76107 7TH AVENUE iz Tel:817.335.1121 m (TX REG.F-1114) 0 FW nF 7 d 00 42 43 DAP-BID PROPOSAL Pg2of5 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Section No. Unit of Bid Unit Price Bid Value Measure Quantity UNIT II:SANITARY SEWER IMPROVEMENTS 1 3305.0107 Manhole Adjustment,Minor 330514 EA 1 $1,225.00 $1,225.00 TOTAL UNIT It:SANITARY SEWER IMPROVEMENTS $1,225.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Vadm April 2,2014 00 42 43 Bid Pmpoed_DAP.As x W VENTAS REALTY,LP I LOT 14 w 9 10350 ORMSBY PARK PL 0 N'S D a STE 300 ER e z LOUISVILLE,KY 40223 LOT OT 15 DDITION W COOK CHILDREN'S MEDICAL CENTER 91 > GRANDVIEW ADDITION 10 Q VOL.63,PG.29,P.R.T.C.T. LOT 16 ; LvT3U1�i � `` J COOK CHILDREN'S Uj MEDICAL CENTER cc Q PROPOSED FORT WORTH,TX 76104 cc LOT 37 7' CONCRETE BLOCK 9,LOT 17R } { B IDEWALK i - 7 E N i (1 it o, —_ — . + . a I a � PROPOSED W 7 %2" 3600 PSILU K � DC N CONCRETE ; 7 v Y Az x SOUTH TOWER (BY SEPARATE CONTRACT) h 8 g f ®: s NOTES: s 1. SUBGRADE FOR CONCRETE PAVING TO FOLLOW RECOMMENDATIONS IN s GEOTECHNICAL REPORT 121-12-15 ADDENDUM #2. CONTRACTOR TO EITHER USE 8" LIME STABILIZATION (42 LBS/SY) OR 8" SUITABLE FLEXBASE (TXDOT ITEM 247, TYPE A, GRADE 1). LEGEND a `� ++■� PROPERTY BOUNDARY g — - EXISTING MAJOR CONTOUR a EXISTING MINOR CONTOUR ^J PROPOSED CURB O bO 120 a PROPOSED 71/2"3,600 PSI PORTLAND CEMENT CONCRETE W/#3 BARS @ 18"O.C.E.W. (SEE NOTE 1 FOR SUBGRADE INFORMATION) f + + + + + SCALE: 1"= 60 ft. > ++++++++++ PROPOSED 4"CONCRETE SIDEWALK f EXHIBIT 'B' ``DUNAWAy 7TH AVENUE PAVING HIT 3. 550 Bailey Avenue • Suite 400•Fort Worth,Texas 76107 1 OF 2 Y Tel:817.335.1 121 8 (TX REG.F-1114) 4 a J o • © - • ♦����♦ � �������������i� i�i�i�i���i�i�i� ■ ���c�- ♦♦ ��. ♦♦ � ■ �►���>�♦ � -���.�♦ �++++'+>+++�I� +iii:'♦+iii �i�i:9�i�i� -�i�i'��i�i�i� +�+++++++`+� II . ►������• • � ♦����♦ I ��������������� 1 1������������ �������������• � � � ,t ►������ •�����������ta� � ����������1���I � ������� �■ •. ♦� �i !�;- /� -� � ��s � r� 00 42 43 DAP-BID PROPOSAL POW 4 0f 5 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item No. Description Specification Section No. Unit of Bid Unit Price Bid Value UNIT IV:PAVING IMPROVEMENTS 1 0241.0100 Remove Sidewalk 0241 13 SF 2927 $3.50 $10,244.50 2 0241.0300 Remove ADA Ramp 0241 13 EA 4 $500.00 $2,000.00 3 0241.0401 Remove Concrete Drive 0241 13 SF 106 $22.00 $2,332.00 4 0241.1100 Remove Asphalt Pvmt 0241 15 SY 1087 $26.00 $28,262.00 5 0241.1300 Remove Conc CurbBGutter 0241 15 LF 607 $17.00 $10,319.00 6 0241.1506 2"Surface Milling 0241 15 SY 2423 $9.50 $23,018.50 7 3211.0123 8"Flexible Base,Type A,GR-2 32 11 23 SY 755 $56.00 $42,280.00 8 3212.0302 2"Asphalt Pvmt Type D 32 12 16 SY 2423 $18.00 $43,614.00 9 3213.0302 5"Conc Sidewalk 32 13 20 SF 3628 $13.00 $47,164.00 10 3213.0504 Barrier Free Ramp,Type M-2 32 13 20 EA 4 $2,675.00 $10,700.00 11 3441.4108 Remove Sign Panel and Post 3441 30 EA 1 $580.00 $580.00 12 3471.0001 Traffic Control 3471 13 MO 2 $12,300.00 $24,600.00 13 9999.0001 7 1/2"Conc Pvmt 32 13 13 SY 684 $132.00 $90,288.00 TOTAL UNIT IV:PAVING IMPROVEMENTS1 $335,402.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Va April 2,2014 00 42 43 Bid Pmpml._DAP_ds W VENTAS REALTY, LP I 10350 ORMSBY PARK PL x STE 300 m LOUISVILLE, KY 40223 FX�F LOT 30R3 PROPOSED 21"— EX-UE m STORM DRAIN ?- COOK CHILDREN'S MEDICAL CENTER LOT 37 j w IyDV1EV►!AnI�I N_ — W VOL. 63, PG. 29 LOT 38 EXIST 8'X4' JB m P.R.T.C.T. EXIST 30" RC D z-uE BLOCK 9 DOE # 6157 FO EX-GA - --- FX-FO W EX F0 — w —� — -- X—EX-W w — EX-SS EX-FO_ a � H W II LU \ o, II W o CLI {} > IIri rn PROPOSED 21 Q I I STORM DRAIN J w COOK CHILDREN'S SOUTH TOWER 125 MEDICAL CENTER — GRANDVIEW ADDITIO XW CAB. B, SLIDE 720 $ I I (BY SEPARATE CONTRACT) P.R.T.C.T, II LOT 711111, BLOCK 411 g g s LEGEND o PROPERTY BOUNDARY — 600 - EXISTING MAJOR CONTOUR a - — — - 602 - — EXISTING MINOR CONTOUR EX-W --- - EXISTING WATER UNE a EX-SS - EXISTING SANITARY SEWER m EX-GAS EXISTING GAS LINE ' EX-FO EXISTING FIBER-OPTIC CABLE 0 40 80 a EX-UE - EXISTING UNDERGROUND ELECTRIC EXISTING STORM DRAIN N v EXISTING SANITARY SEWER MANHOLE PROPOSED WATER UNE sPROPOSED GATE VALVE SCALE 1"= 40 ft. i 8 --—-—- - PROPOSED STORM DRAIN c 0 M " DUNAWA EXHIBIT 'B1' 1 STORM DRAIN EXHIBIT 550 Bailey Avenue •Suite 400•Fort Worth,Texas 76107 7TH AVENUE Y Tel:817.335.1121 °0 (TX REG.F-1114( 0 FW F 1 00 42 43 DAP-BID PROPOSAL Page 3 45 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRIG BID Bidder's Application Project Item Information Bidder's Proposal Bidlist[tem No. Description Specification Section No. Unit of Bid Unit Price Bid Value Measure Quantity UNIT 111:DRAINAGE IMPROVEMENTS 1 0241.3013 Remove 18"Storm Line 0241 14 LF 50 $47.00 $2,350.00 2 0241.3017 Remove 30"Storm Line 0241 14 LF 6 $59.00 $354.00 3 0241.4001 Remove 10'Curb Inlet 0241 14 EA 2 $925.00 $1,850.00 4 3305.0109 Trench Safety 33 05 10 LF 37 $20.00 $740.00 5 3341.0201 21"RCP,Class 111 3341 10 LF 31 $121.00 $3,751.00 6 3341.0302 30"RCP,Class 111 3341 10 LF 6 $168.00 $1,008.00 7 3349.5001 10'Curb Inlet 33 49 20 EA 2 $5,160.00 $10,320.00 TOTAL UNIT III:DRAINAGE IMPROVEMENTS1 $20,373.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Fo m Varna Apri12,2014 00 42 43_Bid Pmposal_DAP.xb 00 42 43 DAP-HID PROPOSAL Page 5 of i SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Section No. Unit ofBid Unit Price Bid Value Measure Quannty Bid Summary UNIT I:WATER IMPROVEMENTS $99,619.00 UNIT II:SANITARY SEWER IMPROVEMENTS $1,225.00 UNIT III:DRAINAGE IMPROVEMENTS $20,373.00 UNIT IV:PAVING IMPROVEMENTS $335,402.00 Total Construction Bid $456,619.00 Contractor agrees to complete WORK for FINAL ACCEPTANCE within calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Farm Version Apnl 2.2014 00 42 43_Hid Proposal_DAP Js