Loading...
HomeMy WebLinkAboutContract 44303-FP1 CITY SECP19TAW. . cwRAcT No. r E 1 Depa en of TP 8W Const Services D # Dat Project Vanager Risk Managemen4J. aa ,; T WORTH,.., 'P.?Las- — D.O.E. Brotherton CFA Westerman/Scanned Cl-41 The Pf o=Wb psoo hire b w1 Cadre at corm-hq the rnqusst for rmM vart a hwe rdnnd tale pmod for: +paymn,t &TION AND PUBLIC WORKS ck nwm Conducted By Shameka Kennedy F PROJECT COMPLETION 01� 3 D.O.E.NQ: 6826 Regarding contact U6826 for MORIAH AT TIMBERLAND as required by the WATER DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the WATER DEPARTMENT upon tic recommendation of the Assistant Director of the Transportation&Public Worts Department has accepted the project as complete. Original Contract Priem D E C E M. S294,3W.00 Amount or Approved Change Orders: JUN 26 2015 S9,000.00 NQ 1 Revised Contract Amouat: 5299,303.00 Total Cost Work Completed: 5299,303.00 Less Deductions: Liquidated Damages: Days aQ S210.00/Day Pavement Deficiencies: Total Deduction Amount: 50.00 Total Cost Work Completed: 5299,303.00 Um Previous Payments: $0.00 Final Payment Due $299,303.00 Recommended for Acceptance Date Asst. Director, TPW - Infrastructure Design and Construction G Z e /S— Accepted / Dat Asst. Director, WATER DEPARTMENT Asst. City Manager Date Comments: FUND ACCT:WR'I'ER P265-602140189083/SEWER:P275-702130189083 OFFICIAL RECORD CITY SECRETARY RECEIVED JUL 011015 FT.WORTH,TX � FORT NORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name MORIAH AT TU.4BERLAND Contract Limits Project Type WATER&SEWER City Project Numbers 01890 DOE Number 6826 Estimate Number 1 Payment Number I For Period Ending 5/31/2015 CD City Secretary Contract Number 116826 Contract Time 12ED Contract Date Days Charged to Date 277 Project Manager laafari Contract is 100.00 Complete Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH, TX 76119 Inspectors LAYER / CORDOVA Friday,May 22,2015 Page I of 5 6- ?9. City Project Numbers 01890 DOE Number 6826 Contract Name MORLAHAT TB/MERLAND Estimate Number I Contract Limits Payment Number I Project Type WATER&SEWER For Period Ending 5/31/2015 Project Funding WATER Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total -- ---- ----- - - - ------ — - ------------- I PIPE 16"PVC INSTALL 1745 LF $60.00 6104,700.00 1745 $104,700.00 2 PIPE 12"PVC INSTALL 20 LF $40.00 $800.00 20 $800.00 3 PIPE 6"PVC INSTALL 35 LF $35.00 $1,225.00 35 $1,225.00 4 PEPE 16"DIP INSTALL 120 LF $90.00 $10,800.00 120 $10,800.00 5 30"STEEL CASING PIPE INSTALL 95 LF $140.00 $13,300.00 95 $13,300.00 6 GATE VALVE 16"W/VAULT INSTALL 3 EA $12,000.00 $36,000.00 3 $36,000.00 7 GATE VALVE 12"INSTALL 1 EA $1,400.00 $1,400.00 1 $1,400.00 8 GATE VALVE 6"INSTALL 3 EA $900.00 $2,700.00 3 $2,700.00 9 4"BLOW OFF VALVE&VAULT INSTALL I EA $7,500.00 $7,500.00 1 $7,500.00 10 FITTINGS INSTALL 3.3 TN $3,000.00 $9,900.00 3.3 $9,900.00 11 CONNECT TO EXISTING WATER-INSTALL 2 EA $1,500.00 $3,000.00 2 $3,000.00 12 2"DOM.WATERS ERVICE W/METERBOX- 4 EA $2,800.00 $11,200.00 4 $11,200.00 INSTALL 13 2"IRR WATER SERVICE W/MF.TER BOX 4 EA $2,800.00 $11,200.00 4 $11,200.00 INSTALL 14 HYDROMULCH INSTALL 900 SY $2.00 $1,800.00 900 $1,800.00 15 TESTING INSTALL l LS $2,000.00 $2,000.00 1 $2,000.00 16 TRENCH SAFETY INSTALL 1920 LF $1.50 $2,880.00 1920 $2,880.00 17 EXISTING FIRE HYDRANT RELOCATION(CO I EA $7,500.00 $7,500.00 1 $7,500.00 #I) 18 EXISTING VAULT ADUST(CO#I) 1 FA $1,500.00 $1,500.00 1 $1,500.00 Sub-Total of Previous Unit $229,405.00 $229,405.00 SEWER Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total ----------------------------------- 1 8"PVC INSTALL 337 LF $55.00 $18,535.00 337 $18,535.00 2 8"DIP INSTALL 208 LF $85.00 $17,680.00 208 $17,680.00 3 10"SDR-26 PVC INSTALL 14 LF $80.00 $1,120.00 14 $1,120.00 4 18"STEEL CASING PIPE INSTALL 95 LF $110.00 $10,450.00 95 $10,450.00 5 4'DIA S.S.MANHOLE INSTALL 4 EA $2,500.00 $10,000.00 4 $10,000.00 6 EXTRA DEPTH OVER 6'FOR STD 4'MH 20 VF $200.00 $4,000.00 20 $4,000.00 INSTALL Friday,May 22,2015 Page 2 of 5 City Project Numbers 01890 DOE Number 6826 Contract Name MORIAH AT TIMBERLAND Estimate Number I Contract Limits Payment Number t Project Type WATER&SEWER For Period Ending 5/31/2015 Project Funding 7 CONCRETE COLLARS ON SSMH INSTALL 4 EA $500.00 $2,000.00 4 $2,000.00 8 CONNECT TO EX S.S.LINE INSTALL I EA $1,000.00 $1,000.00 1 $1,000.00 9 TV INSPECTION 559 LF $3.00 $1,677.00 559 $1,677.00 10 VACUUM TEST FOR MH 4 EA $200.00 $800.00 4 $800.00 11 TRENCH SAFETY 559 LF $4.00 $2,236.00 559 $2,236.00 12 HYDROMULCH 200 SY $2.00 $400.00 200 $4-00.00 Sub-Total of Previous Unit 569,898.00 $69,898.00 i I Friday,May 22,2015 Page 3 of 5 City Project Numbers 01890 DOE Number 6826 Contract Name MORTAR AT TQvMERLAND Estimate Number I Contract Limits Payment Number I Project Type WATER&SEPJER For Period Ending 5/31/2015 Project.Funding Contract Information Summary Original Contract Amount $290,303.00 Chante Orders Change Order Number 1 $9,000.00 Total Contract Price $299,303.00 i �' Total Cost of Work Completed Date-� P $299,303.00 Con 0 Less %Retained $0.00 / Net Earned $299,303.00 - Date rP Inspection pery Earned This Period $299,303.00 J Retainage This Period $0.00 U'el a r Date G�z�I 1 �� Less Liquidated Damages Proj Days @ /Day $0.00 i Date - LessPavement Deficiency $0.00 Asst. .rec o nfras lure D and C nstrugion Less Penalty $0.00 ate Less Previous Payment $0.00 Director/Contracting Departm Plus Material on Hand Less 15% $0.00 Balance Due This Payment $299,303.00 Friday,May 22,2015 Page 4 of 5 JUN 2 6 2015 V2c0J, (� City Project Numbers 01890 DOE Number 6826 Contract Name MORIAH AT TIMBERLAND Estimate Number 1 Contract Limits Payment Number 1 Project Type WATER&SEWER For Period Ending 5/3112015 Project Funding Project Manager Jaafari City Secretary Contract Number 116826 Inspectors LAYER / CORDOVA Contract Date Contractor CONATSER CONSTRUCTION TxLP Contract Time 120 CD 5327 WICHITA ST Days Charged to Date 277 CD FORT WORTH, TX 76119 Contract is 000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $299,303.00 Less %Retained $0.00 Net Earned $299,303.00 Earned This Period $299,303.00 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $299,303.00 Friday,May 22,2015 Page 5 of 5 U O, N ON N N d } 2�p O U N V O• ~ N N I J O O WF W O O � O O O O O o .. > e p °U Cpp W o QQ M Z W r 4 0 W va < ci $ z CR 0 0 S o 6 w P m N > • h M h O O M N p a O U Z CLLI LO n co C? }a: Q ONt E U S y � V' co OD 0 QZ Q r m K t a '0 0 0 �' n L) Q o S a U U oU 1— Q Z Z a v �, F X- 2 O U a s WCL O 3` m Q N 41 Q C of o w M w Q C °0 la C ` E p p L (� S S w a co OMO �O F- o d N > OO N M O 1 n 0' Oo w Ch W > s o 0 o ° E y o o ?? u i r 0! n N NH O � U) O O pN vpi N N N O O lO ll�l � N H e o P U W V N cO iN N ON � a lOD O a s O U N N N 0 U � ° O W C Z 0 a w F 0 � U H O LU ~ Q W W Q V w U r- 0= u 0 Q a o S Z F- W W O O a a o p W w a z U 17 O U a s O F o o ° o LL o w < c F U O W M 7t Ia. U) xt Lil W # W w a vU1 N < o ° 'z D r w lL �"_ O Q w W (/I U W Z O j f a� a. U U c� U o � CO ? a o o ° < N Er § ) & z 0F- e � \ 0 < § a.� . # + � . ) & { 2 £ E¥ ( t 2 0.- z\ � � � ) { : oj a. \ } { } a. \ K ii � } . k & j ) m & 2 & 2 r { z ) ( \ O / \ rl - / 6 a < m C3 k E > 3 ) W k \ \ \ < « { / § ° ® u 7 G \ CY ■ / « k } _ .� 2 £ f > } L k \ < w IE: ! § Cd i 2 o f _ w o ! ! 10 )6 � § } FoRTWORTH rev 03/05/07 TRANSPORTATION& PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.: I NAME OF PROJECT: Moriah At Timberland PROJECT NO.: 01890 CONTRACTOR: Conatser Construction P265-602140189083/P275-702130189083 DOE NO.: 6826 PERIOD FROM 05101115 TO: 05/31/15 FINAL INSPECTION DATE: 14-May-15 WORK ORDER EFFECTIVE:6/17/2013 CONTRACTTIME: 120 C) WE* CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. IL 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS THIS 0 0 PERIOD PREVIOUS 277 227 PERIOD - TOTALS 277 227 TO DATE *REMARKS: CONTRACTOR DATE INSPECTOR DATE ENGIN-EERING DEPART LENT The Gt3'of Fort Worth• 1000 Throckmorton Street•Fort\Forth,Th 70)12-6311 (817)392- 7941 •Fax:(817)392-7845 OFFICIAL RECORD CITY SECRETARY FT. WORTH,TX A H REAL ESTq I E COMPANY, LLC June 17, 2015 Mr. Brock Huggins Conatser Construction TX,LP P O BOX 15448 Fort Worth, TX 76119 RE: Moriah at Timberland City of Fort Worth, State of Texas Dear Mr.Huggins, Moriah Real Estate Company,LLC serving as the manager of the property owned by Triangle I-35 Realty, LTD hereby acknowledges that Conatser Construction TX,LP has completed the Water and Paving portions of the above captioned project in a timely manner. Although the contractual time was exceeded Moriah Real Estate Company,LLC will not assess any penalties or liquidated damages due to time extensions. If you have any questions,please feel free to contact our office. Sincerely, r Wes Goteher Vice President 303 W.Wall Street,Suite 1500 • Midland,Texas 79701 p 432.682.2510 s f 432.682.4013 ° vvww.MoriahGroup.net Winkelmann &Associates, Inc. CONSLIT I\*C,CIVIL FNG1NFFPS'St.RNTYORS 0 iUL - I LC.REST PLAZA DR..STF A DALL S,TX FAN 072)490--00 June 17, 2015 iMr. Ron Cordova Inspector City of Fort Worth 8851 Camp Bowie West. ars Floor Fort \,Vorth. TX 76116 Via e-mail: Ro n.Cord o va, ,.fOMVOITII teN as.�Yo RE: _k1oriah at Timberland )A,'wer. Sewer. Paving and Drainage ImproveniCIAS DOE No. 6826 File ho. Cit-y- Project No. 01890 NM r. Cordova: Please be advised that neither kloriah Real Estate Co. LLC. nor \Vinkelmann Associates. Inc. will be seeking liquidated damages from Conaster Construction Texas. L.P. on the above referenced project. Should you have any questions. please give me a call at (972) 490-7090 EXT. 227. Sincerely. Witik-elmami& Associates, Inc. Terei la, P. ea cc. Brock Huggins- Conaster C011SMICtion Z�c Jeremiah Patton- Conaster Construction Wes Gotcher- tMoriall Real Estate Co. LLC G:\—)60'k')6'�EN GIN EE RJ N G\Correspondence\Wate r-Sewev-Pavin gand Drainage Improvements.doe AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a Notary Public in the state and county aforesaid, on this day personally appeared Brock Huggins, Vice-President of Conatser Management Group, Inc.,general partner of Conatser Construction TX, LP, known to me to be a credible person, who being by me duly sworn,upon his oath deposed and said: That all persons, firms, associations, corporations or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth, has been paid in full; and That there are no claims pending for personal injury and/or property damages; On Contract described as: MORL4H at TIMBERLAND Water,Sanitary Sewer,Storm Drain, Paving Improvements DOE#:6826 CITY PRJ#: 01890 CITY OF FORT WORTH STATE OF TEXAS CONATSER CONSTRUCTION TX, LP A"JAS.c 04 Brock Huggbiff Subscribed and sworn to before me this 15'' day of November,2013. �N.E o Bertha Gianulis Notary Public for Notary Public in Tarrant County,Texas State of Texas x, `S ' — My commission expires:0911"15 Liberty Interchange Corporate Center 450 Plymouth Road,Suite 400 Mut11a ,, Plymouth Meeting,PA 19452-1644 SURETY Ph.(610)832-8240 CONSENT OF SURETY TO FINAL PAYMENT To: City of Fort Worth and Lockard Construction 1000 Throckmorton St. Fort Worth, TX 76102 RE: Moriah at Timberland Principal: Conatser Construction TX, LP Obligee: City of Fort Worth and Lockard Construction Contract Number: Project No. 01890&DOE No. 6826 Contract Date: 04/29/13 Contract/Project Description: Paving, Drainage,Water and Sanitary Sewer improvements for Moriah at Timberland In accordance with the provisions of the contract between the Obligee and the Principal described above, LIBERTY MUTUAL INSURANCE COMPANY,a Massachusetts stock insurance company,as Surety(the"Surety"), on the Principal's bond number 022045090 (the"Bond")hereby consents to the final payment to the Principal by the Obligee and agrees that final payment to the Principal shall not relieve the Surety of any of its obligations to Obligee as set forth in the Bond. IN WITNESS WHEREOF,the Surety has hereunto set its hand and seal this 6th day of November 2013 LIBERTY MUTUAL INSURANCE COMPANY (Surety) (Seal) Attorney-in-Fact Glenna S. Davis LMIC-3100 Rev.03104 r THI:i POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. This Power of Attorney limits the acts of those named herein,and they have no authority to bind the Company except in the manner and to the extent herein stated. Certificate No. 5591461 American Fire and Casualty Company Liberty Mutual Insurance Company The Ohio Casualty Insurance Company Peerless Insurance Company West American Insurance Company POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS: That American Fire&Casualty Company and The Ohio Casualty Insurance Company are corporations duly organized under the laws of the State of Ohio,that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts,that Peerless Insurance Company is a corporation duly organized under the laws of the State of New Hampshire,and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana(herein collectively called the"Companies"),pursuant to and by authority herein set forth,does hereby name,constitute and appoint,_Carolyn Maples;Cathy—Vinson—Glenna S. Davis:Greg A.Wilkersom John R Wilson i all of the city of Fort Worth state of Tx each individually if there be more than one named,its true and lawful atlomey-in-fact to make,execute,seal,acknowledge and deliver,for and on its behalf as surety andas its act and deed,any and all undertakings,bonds,recognizances and other surety obfigations,in pursuance of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons. IN WITNESS WHEREOF,this PowerofAttorney has been subscribed by an authorized officer orofficial of the Companies and the corporate seals of the Companies have been affived thereto this 28th day of September 2012 - - American Fire and Casualty Company AN e i� }(� � �w-``4 ��" vti The Ohio Casualty Insurance Company U)Liberty Mutual Insurance Company at p 7-7 ! j/ �� xcclit 9 W' 1 i30a r I �a—J� Peerless Insurance CompanyE West American Insurance Company c By: ���G Gregory W.Davenport,Assistant Secretary STATE OF WASHINGTON ss c COUNTY OF KING O v d On this 28th day of September 2012 before me personally appeared Gregory W.Davenport,who acknowledged himself to be the Assistant Secretary of American Fire and >,U) p Casualty Company,Liberty Mutual Insurance Company,The Ohio Casualty Company,Peerless Insurance Company and West American Insurance Company,and that he,as such,being 0) `m >authorized so to do,execute the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. o a d w IN WITNESS WHEREOF,I have hereunto subscribed my name and affixed my notarial seal at Seattle,Washington,on the day and year first above written. Q M oa C � - O By: F/1 7F O - KD Riley,NotM Public 3 0j O OE O IL x6 This Power of Attorney is made and executed pursuant to and by authorityof the following By-laws and Authorizations of American Fire and Casualty Company,The Ohio Casualty Insurance t c Company,Liberty Mutual Insurance Company,WestAmerican Insurance Company and Peerless Insurance Company,which resolutions are now in full force and effect reading as follows: w R d O IM 4) ARTICLE N-OFFICERS-Section 12.Power of Attorney.Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President,and subject >0 O C to such limitation as the Chairman or the President may prescribe,shall appoint such atiomeys-in-tact,as may be necessary to act in behalf of the Corporation to make,execute,seal, 'C 3 E acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety obligations. Such attomeys-in-fact,subject to the limitations set forth in their respective L w powers of attorney,shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so > "O- executed,such instruments shall be as binding as if signed by the President and attested to by the Secretary.Any power or authority granted to any representative or attomey-in-fact under W ii the provisions of this article may be revoked at any time by the Board,the Chairman,the President or by the officer or officers granting such power or authority w� .> ARTICLE XIII-Execution of Contracts SECTION 5.Surety Bonds and Undertakings.Any officer of the Company authorized for that purpose in writing by the.chairman or the president, Z u and subject to such limitations as the chairman or the president may prescribe,shall appoint such attorneys-in-fact,as may be necessary to act in behalf of the Company to make,execute, 0 0 seal,acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety obligations. Such attorneys-in-fact subject to the limitations set forth in their v e- respective powers of attorney,shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so FO rD executed such Instruments shall be as binding as if signed by the president and attested by the secretary. Certificate of Designation-The President of the Company,acting pursuant to the Bylaws of the Company,authorizes Gregory W.Davenport,Assistant Secretary to appoint such attomey-in-fact as may be necessary to act on behalf of the Company to make,execute,seal,acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety obligations. Authorization-By unanimous consent of the Company's Board of Directors,the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company,wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds,shall be valid and biding upon the Company with the same force and effect as though manually affixed. 1,David M.Carey,the undersigned,Assistant Secretary,of American Fire and Casualty Company,The Ohio Casualty Insurance Company,Liberty Mutual Insurance Company,West American Insurance Company and Peerless Insurance Company do hereby c ertity that the original power of attorney of which the foregoing is a full,true and correct ropy of the Power of Attorney executed by said Companies,is in full force and effect and has not been revoked, A IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed the seals of said Companies this day of Al 6)J-/ ,20_( . By: 442e 11 ,4 ;. Sk+ L David M.Carey,Assistant Secretary POA-AFCC,LMIC,OCIC,PIC 8 WAIC 486 of 500 LMS 12873 041012 FORTWORTHREV:00/07 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR CONTRACTOR&PROJECT DATA Name of Contractor Project Name Conatser Construction Moriah P.Timberland DOE Inspector DOE Number Ron Cordova 6826 DOElnspecwr Project Manager 21 Water Q wastewater[] Storm Drainageo Pavement Khal Jaafari Initial Contract Amount Project Difficulty $290,303.00 O Simple QQ Routine Q Complex Final Contract Amount Date $299,303.00 5/21/2015 II)PERFORMANCE EVALUATION 0-Inadequate I-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(X) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE I Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 Y 4 20 20 3 Pians on Site 5 Y 3 20 15 4 Field Supervision 15 Y 3 60 45 5 Work Performed 15 Y 4 60 60 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 3 60 45 8 Traffic Control Maintenance 15 Y 3 60 45 9 Daily Clean Up 5 Y 4 20 20 10 Citizen's Complaint Resolution 5 Y 3 20 15 11 Property Restoration 5 Y 4 20 20 12 After Hours Response 5 Y 3 20 15 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 388 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 388 III)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating(ITS/MS] `' 100%) 388 / 448 = 87% Performance Category Excellent <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good 2M%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Signature DOE Inspector �-. 0-> �`�— Signature Contractor Signature DOE Inspector's Supervisor CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS '.�` The City of Fort Worth• 1000 Throckmorton.Street•Fort Worth,Thi 76012-6311 (817)392-7941 •Fax:(817)392-7845 FORT WORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Moriah @ Timberland PROJECT NUMBER: 01890 DOE NUMBER: 6826 WATER PIPE LAID SIZE TYPE OF PIPE LF Water line 16" PVC 1745 Water line 16" DIP 120 Water line 12" PVC 20 Water line 6" PVC 35 FIRE HYDRANTS: 0 VALVES(16"OR LARGER) 3 PIPE ABANDONED SIZE TYPE OF PIPE LF N/A DENSITIES: YES NEW SERVICES: 8-2" Copper SEWER PIPE LAID SIZE TYPE OF PIPE LF Sewer Line 8" PVC 337 Sewer Line 8" DIP 208 Sewer Line 10" SDR-26 14 PIPE ABANDONED SIZE TYPE OF PIPE LF N/A DENSITIES: Yes NEW SERVICES: N/A TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax: (817)392-7845 FORTWORTH REV:° 2`°' TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY T)PROJECT INFORMATION Date; 5/21/2015 Name of Contractor Project Name Conatser Construction Moriah Timberland DOE Inspector Project Manager Ron Cordova Khal Jaafari DOENumber Project Do-hy — - - -Tvpe of Contract 6826 O SnnPle Q Routine O complex 21 waberO Wastewater[] Storm Drainage Pavement Initial Contract Amount 'Final Contract Amount $290,303.00 i$299,303.00 II)PERFORMANCE EVALUATION 0-Ind uate 1 -Deficient 2-Standard 3-Good 4_-_Excellent ELEMENT RATING ELEMENT RATING 1 (0-4) INSPECTION EVALUATION PLANS&SPECIFICATIONS I Availability of Ins ctor `j 1 Accuracy of Plans to Existing Conditions J2 Knowledge of Inspector 2 Clarity&Sufficiency of Details 3 Accurac of Measured Quantities 3 Applicability of Specifications 14 Disft Of Professionalism tt 4 Accuracy of Plan Quantities 15 Citizen Complaint Resolution PROTECT MANAGER EVALUATION !6 Performance-Setting up Valve Crews,Labs I Knowled a And/Or Problem Resolution y ADMINISTRATION 2 Availability of Pro,ect M er I CLage Order Processing Time 3 Communication 2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts 3 Bid to Pre-Con Meeting Timeframe `A III)COMMENTS&SIGNATURES COMMENTS Signature Contractor �^ Signature DOE Inspector Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax:(817)392-7845