Loading...
HomeMy WebLinkAboutContract 26802-A6 AMENDMENT NO. 6 STATE OF TEXAS S CITY SECRETARY CONTRACT NO.p2�-AG (M&C Required) COUNTY OF TARRANT 8 WHEREAS, the City of Fort Worth (City) and GSWW, Inc. (Engineer) made and entered into City Secretary Contract No. 26802, (the Contract) which was authorized by the City Council by M&C C-18597 on the 22nd day of May 2001 and subsequently revised by five previous amendments; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of Sanitary Sewer Rehabilitation Contract LXIII (63) . WHEREAS, it has become necessary to execute Amendment No. 6 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I, of the Contract is amended to include the additional engineering services specified in M&C C-23426, adopted by the City Council on 7th day of April, 2009 and further amplified in a proposal letter dated January 5, 2009, copies of which are both attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $37,141.00. 2. Article II, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $140,855.55. OFFOAL RECORD CITYSECRErARv ORIGINAL FT.WOWS TX 06-03-09 P02 :32 I i, 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the day of `mss.. 2009, in Fort Worth, Tarrant County, Texas. ATTEST: Contract Authoriaatiox Marty Hen ix City Secretary D APP O REC NDED: APPROVED: S. Frank Crumb, P.E. Fernando Costa Director, Water Department Assistant City Manager GSWW, Inc. Engineer By: Name:Dr. Steven D. Sanders, P.E. Vice President 3950 Fossil Creek Blvd. , Ste 210 Fort Worth, TX 76137 APPROVED AS TO WRM AND LEGALITY: r ' Assistant Cit ey -2- OFFICIAL RECORD QTY SECRETARY FT.WORTH,TX G S WW January 5, 2009 ■■ • ",.,,,i BURGESS a N�PIE Mr. Roberto Sauceda City of Fort Worth Engineering Department 1000 Throckmorton Fort Worth, TX 76102-7631 Reference: Contract 63 Parts 1 and 2 DOE No. 3358 Amendment No. 6 Dear Mr. Sauceda: The purpose of this letter is to request authorization to perform additional services for the wastewater collection project Contract 63, Parts 1 and 2 as described herein, and broken out in detail in Attachment 1 in the amount of$37,141.00 Update of Contract Documents (Design Drawings and Specifications) for Parts 1 and 2. This task includes fees necessary for the update services for the following parts: Part 1 -This portion of the project consists of approximately 4,916 L.F. of sanitary sewer lines that will be rehabilitated utilizing open cut and pipe enlargement technology. Final plans were submitted to the City of Fort Worth in 2004. Funding constraints did not allow the project to be constructed during this time period. The City has subsequently tasked GSWW, Inc. to move forward and re-activate the project for a target construction date during 2009. Due to the time difference between when the project was placed on hold and the current re-activation, several additional tasks will need to be completed. These are as follows: 1. The plans will require a field check by a professional engineer. The primary focus is to note any substantive changes since 2004 that would impact the current design. Any substantive changes will be incorporated into the revised design drawings. 2. The plans and specifications will need to be reviewed and modified to incorporate the current drafting and format. 3. The City of Fort Worth requires traffic control plans. These were not part of the 2004 design efforts. Part 2 -This portion of the project consists of approximately 3,075 L.F. of sanitary sewer lines that will be rehabilitated utilizing open cut and pipe enlargement technology. Final plans were submitted to the City of Fort Worth in 2004. Funding constraints did not allow the project to be constructed during this time period. The City has subsequently tasked GSWW, Inc. to move forward and re-activate the project for a target construction date during 2009. Dua4e-the-Vrri6'_ iffere' ce between when the project was placed on hold and current re-activation, � , $eve � U ill need to be completed. These are as follows: �� C9'f1� Y TX i FT.'W� Mr. Roberto Sauceda Page 2 1. The plans will require a field check by a professional engineer. The primary focus is to note any substantive changes since 2004 that would impact the current design. Any substantive changes will be incorporated into the revised design drawings. 2. The plans and specifications will need to be reviewed and modified to incorporate the current drafting and format. 3. LopezGarcia/URS completed L-563 under contract with Wade/Ch2H-Hill and is not included in this amendment. A summary of the total project is as follows: CONTRACT DESCRIPTION FEE Original Contract Contract 63, Sanitary Sewer Rehabilitation $67,704.00 Amendment No. 1 Additional Survey& Easements $14,557.55 Amendment No. 2 Sanitary Sewer Lateral L-558 Re-design $8,765.00 Amendment No. 3 Design of Sewer Services $3,590.00 Amendment No. 4 Edwin Street Sewer Design $7,229.00 Amendment No. 5 Additional Easements for Services $1,869.00 Amendment No. 6 Update and Re-activation $37,141.00 TOTAL PROJECT $140,855,55 If you have any questions or require additional information, please do not hesitate to contact me. Sincerely, GSWW, INC. Dr. Steven D. Sanders, P.E. Vice President SDS/sjb OFRCLAL RECORD Ci� ARY City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 4/7/2009 - Ord. No. 18538-04-2009 DATE: Tuesday, April 07, 2009 REFERENCE NO.: **C-23426 LOG NAME: 60SS63A6-GSWW SUBJECT: Authorize Amendment No. 6 in the Amount of$37,141.00 to City Secretary Contract No. 26802, an Engineering Agreement with GSWW, Inc., for Sanitary Sewer Rehabilitation in the Mistletoe Heights and Berkeley Place Neighborhoods and Adopt Appropriation Ordinance RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer of$43,141.00 from the Water and Sewer Fund to the Sewer Capital Projects Fund in the amount of$43,141.00; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Sewer Capital Projects Fund in the amount of$43,141.00, from available funds; and 3. Authorize the City Manager to execute Amendment No. 6 in the amount of$37,141.00 to City Secretary No. 26802, an Engineering Agreement with GSWW, Inc., for Sanitary Sewer Rehabilitation in the Mistletoe Heights and Berkeley Place Neighborhoods, for additional engineering services thereby increasing the contract amount to $140,855.55. DISCUSSION: On May 22, 2001, (M&C C-18597) the City Council authorized the City Manager to execute an Engineering Agreement (Agreement) with GSWW, Inc., in the amount of$67,704.00 for Sanitary Sewer Rehabilitation Contract LXIII (63). The Agreement was subsequently revised by five previous amendments totaling $36,010.55 as follows: . Amendment No. 1 in the amount of$14,557.55, administratively approved by the City Manager on November 27, 2001, provided for additional survey on the project; . Amendment No. 2 in the amount of$8,765.00, administratively approved by the City Manager on June 30, 2003, provided additional engineering services in order to convey sewage from previously unknown basement services in the immediate vicinity of sewer lateral L-558; . Amendment No. 3 in the amount of$3,590.00, administratively approved by the City Manager on August 26, 2003, provided additional design for the reroute of alleyway sewer services to the proposed sewer proposed in street right-of-way which extends from Page Boulevard; . Amendment No. 4 in the amount of$7,229.00, administratively approved by the City Manager on November 25, 2003, provided additional design services on L-483 in order to provide adequate sewer service to residents located on Edwin Street; and Logname: 60SS63A6-GSWW Page 1 of 2 . Amendment No. 5 in the amount of$1,869.00, administratively approved by the City Manager on February 20, 2004, provided for the preparation of 18 permanent easements needed for this project. Amendment No. 6 will provide compensation for the following: . Revisions to the project plans and specifications to meet current City design criteria; and . The preparation of traffic control plans. GSWW, Inc., proposes to perform the necessary additional design work for a lump sum fee of$37,141.00. City staff considers this fee to be fair and reasonable for the scope of services proposed. In addition to the amendment amount, $6,000.00 is required for real property services and utility coordination. This project is located in COUNCIL DISTRICT 9, Mapsco 76A, G, K, L, P, Q, V and 90J. FISCAL INFORMATION /CERTIFICATION: The Financial Management Services Director certifies that upon approval of the above recommendations and the adoption of the attached ordinance funds will be available in the current capital budget, as appropriated, of the Sewer Capital Projects Fund. FUND CENTERS: TO Fund/Account/Centers FROM Fund/Account/Centers 1&2) P258 476045 7011701257ZZ $43.141.00 1) PE45 538040 0709020 $43.141.00 2) P258 531200 709170125733 $37.141.00 3) P258 531200 709170125733 $37.141.00 2) P258 531350 709170125741 $2,000.00 2) P258 531350 709170125742 $2,000.00 2) P258 531350 709170125773 $2,000.00 CERTIFICATIONS: Submitted for City Manager's Office by- Fernando Costa (6122) Originating Department Head: S. Frank Crumb (8207) Additional information Contact: Roberto Sauceda (2387) ATTACHMENTS 1. 60SS63A6-GSSW.pdf (Public) 2. 60SS63A6-GSWW FAR.pdf (CFW Internal) 3. 60SS63A6-GSWW.doc (Public) 4. D00001.pdf (CFW Internal) 5. PE45 Sewer Cap Projects.doc (CFW Internal) Logname: 60SS63A6-GSWW Page 2 of 2