Loading...
HomeMy WebLinkAboutContract 27538-A2 AMENDMENT NO. 2 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. S 'n (M&C Not Required) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and RJN Group, Inc. , (Engineer) made and entered into City Secretary Contract No. 27538, (the Contract) which was authorized by the City Council by M&C 18968 on the 19th day of February, 2002; and subsequently revised by one previous amendment; and WHEREAS, the Contract involves engineering services for the following project: Sanitary Sewer Rehabilitation Contract LXV (65) . WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE , City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated March 26, 2009, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $20,760 (Sewer WP33) . 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $269,352 .00. OFFICIAL RECORD CITYSECRETARY FT.VWRI'H,rx ORIGINAL 04-30-09 PO�i :46 IN 3. All other provisions of the contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the day of _ 2009, in Fort Worth, Tarrant County, Texas. ATTEST: Marty HF-,0 M&C REQUIRED endrix City Secretary APPROVAL 1COM► NDED: APPROVED: S. Frank Crumb, P.E . Fernando Costa Director, Water Department Assistant City Manager RJN GROUP, INC. Engineer BY: 1146� Name: Peter Lai, P.E . Vice President 4100 International Plaza, Ste. 460 Fort Worth, TX 76109 APPROVED AS FORM LAND LEGALITY: Assistant ttorney OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX rin www rjncom F r,elleni e *hough 0— wish p March 26. 2009 Roberto C. Sauceda Project Manager Water Department City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102 Re: Amendment No. 2 City of Fort Worth Sanitary Sewer Rehabilitation Contract LXV (65) Dear Mr. Sauceda, The following is a description of the tasks that the ENGINEER will perform as part of Amendment No. 2. Work Includes: Task Cost Basin Services 1. Repackaging of Unit 1 and Unit 2 plans $2,460 3. Monthly Meetings and Reports $4,045 4. Haltom Road Design Plans $3,660 5. Haltom Road Specifications $2,900 6. 1laltom Road Bidding Assistance $2,405 7. Haltom Road Private Service Reroute $665 8. Site Visit _ $1,075 Special Services _ l. Topographic Survey -- -- _ $2,750 2. Printing * $800__ Total ---- -_ ----- ------�— 520,760 *MWBE Participation Detailed explanation of each task is as folloNks: Basic Services: OFFICIALRECORD CITY SECRETARY FT.WORTH,TX rin—gro-L-Ji)) www.rjn.com Excellence through Ownership 1. Repackaging of Unit l and Unit 2 plans. Some segments in Unit 2 have been constructed as emergency projects. RJN will combine Unit 1 and Unit 2 into one package by deleting the projects that have been constructed.No updates will be done to the plans. 2. Monthly Meetings and Reports. RJN has been attending monthly meetings and submitting progress reports as requested by the city for the last 14 months. 3. Haltom Road Design Plans. RJN was requested to prepare the design plan for 7001f of 8" sewer line on Haltom Road. 4. Haltom Road Specifications. RJN was requested to prepare a complete specification book for bidding purpose. 5. Haltom Road Bidding Assistance. Assist in the bidding of the project which includes administration of payment for bidding documents from bidders,answer questions from bidders, prepare addenda as necessary, attend pre-bid, bid opening,and pre-construction meetings. 6. Haltom Road Private Service Reroute. Design of the reroute of the private services. 7. Site visits. Performed site visits to verify location of existing and proposed utilities. Special Services: 1. Topographic Survey. 2. Printing of bidding documents and plans. OFFICIAL RECORD CITY SECRETARY FT WORTH,TX M1WBE Participation. Participation 4100 International Plaza,Overton C- • - '•1 -Fort Worth, 76109 817.546.1113 817.546.1118 s r, n uoup www.rjn.com Excellence through Ownership M/WBE Participation. Participation Task Dollars Percent Printing $800 3.06% M/WBE Firms LA Blueline M/WBE Participation mmary Total Value M/WBE Value M/WBE Percent Original Contract $235,292 $55,295 23.50% Amendment No. 1 $13,300 $3,000 22.56% Amendment No. 2 $20,760 $800 3.85% Total $269,352 $59,095 21.94% Should you have any questions, please give us a call. Sincerely, Peter Lai, P.E. Vice President RJN Group Inc. Attachments: 1. Cost breakdown 2. LOI from LA Blueline for printing. OFFICIAL RECORD MYSECRETARY FT.WORTHM