HomeMy WebLinkAboutContract 27574-A6 AMENDMENT NO. 6
STATE OF TEXAS S CITY SECRETARY CONTRACT NO.Al5-7
(MSC Not Required)
COUNTY OF TARRANT S
WHEREAS, the City of Fort Worth (City) and TranSystems
Corporation d/b/a TranSystems Corporation Consultants, (Engineer)
made and entered into City Secretary Contract No. 27574, (the
Contract) which was authorized by the City Council by MSC 18999 on
the 19th day of March 2002 and subsequently revised by five
previous amendments; and
WHEREAS, the Contract involves engineering services for the
following project:
Trinity Boulevard Water Main Extension from Greenbelt Road
to State Highway 360.
WHEREAS, it has become necessary to execute Amendment No. 6
to said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
1.
Article I of the Contract is amended to include the
additional engineering services specified in a proposal letter
dated June 11, 2010, a copy of which is attached hereto and
incorporated herein. The cost to the City for the additional
design services to be performed by Engineer total $15,990.00.
2.
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $746,314.00 .
OFFICIAL RECORD
CITY SECRETARY
FT WORTH,T
07 - P02:34 N
3.
All other provisions of the contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the day of �� 2010, in Fort
Worth, Tarrant County, Texas.
as 1:04 aisl
ATTE 0000000 004
0000p0004
°04�d
p..10 $'A
0 0
Hendrix o00
trt�
ty Secretary °° �ij
06 qd
aa��h�o����alol
APPROVAL RECObfl ENDED: APPROVED:
S. Frank Crumb, P.E. , Director Fernando Costa
Water Department Assistant City Manager
TranSystems Corporation d/b/a
TranSystepz_Corporation Consultants
ENGINEER
By: 'Z NO N[&� REQUIRED
Name:Raul Pena III, P.E. , Principal
500 W. 7th Street, Suite 600
Fort Worth, TR 76102
APPROVED AS TOFORM LEGALITY:
4
Assistanti Attorney
-2-
OFFICIAL RECORD
CITY SECRETARY
FT.NORTH,TX
TranSystems
]1V , systeiiis \ Bank of America Building
i 500 West 7 Street
Suite 1100
Fort Worth,TX 76102
Tel 817 339 8950
Fax 817 336 2247
www.ftwisystems.com
AMENDMENT NO. 6
SUMMARY OF DESIGN FEE
June 11, 2010
Rakesh Chaubey, P.E.
Department of Engineering
City of Fort Worth
1000 Throckmorton Street
Fort Worth, TX 76102-6311
RE: Amendment No. 6
Trinity Boulevard Water Main Extension
Part 4—Tarrant Main to SH 360 and Trinity Boulevard
Water Project No. P265-605140035287
36"Water Main Easements and Re-routing
Dear Mr. Chaubey,
We appreciate the opportunity to present this proposal for your consideration. Per the request of the Water
Department,this amendment revises the previously approved 36"water main design plans and contract
documents. Specifically,this amendment includes the provision of field investigation,survey,design and
easements for the proposed 36"water main between stations 251+00 and 266+00. Realignment of the
main is required to avoid conflict with future earthwork and structural components associated with a future
roadway proposed by the current property owner, Huffines Communities.
Specifically,the 36"water main is to be routed along the existing TRA waterline easement that runs within
the Huffines property. The existing 24"TRA water line will be removed from the easement in advance of
new main construction. These revisions are noted on the Exhibit A,attached. Coordination with the City of
Fort Worth Real Property Department will be necessary to secure the easements for the main. Additional
survey and engineering services are required for the relocation.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Amn Syst� Mr. Rakesh Chaubey, P.E.
June 11, 2010
Page 2 of 2
The cost for survey and design of the water main relocation are listed below. Corresponding personnel and
hourly charges for the specific tasks are attached.
Topographic Survey and Easement Preparation $ 11,260.00
Water Main Design (TSC) 4,730.00
Total Additional Costs: $ 15,990.00
LUMP SUM TOTAL
Original Contract Fee: $379,195.00
Amendment No. 1: $ 51,600.00
Amendment No. 2: $ 24,800.00
Amendment No. 3: $145,324.00
Amendment No.4: $ 94,205.00
Amendment No. 5: $ 35,200.00
Amendment No. 6: 15 990.00
TOTAL CONTRACT $746,314.00
The above work effort will be accomplished for the total lump sum fee of$ 15,990.00. Please contact me
should you require any additional information.
Sincerely,
TranSystems Corporation Consultants
Schelibach, P.E.
nicipal. Services Manager
Attachments
OFFICIAL RECORD
CITY SECRETARY
G:1FW01126431Pro*ftmtContractslamendment6lfttr amendmenL6_R4.doc FT.WORTH,TX
O O O p co
rn ci o co� CD
p (D c0 N Ljr)
F— Di v O
N'
60* 64Q
N
O O O O O O O O O O O O O
O O O O O -O 9 O O O O O O O O
O O O O O O O O O O O O O
Iq 0 t` Iq O O O O O O O co +_
e- t` CO O O cD tD to co O — r
3 - - r r r- crl C/)
Cl)
w
O �
O
U
Lo
N
Lo N
E
N
W
co
oo U
F- O O c j
NT
co
0
00
o O
G7
O
� o
Q FF- L v w w v w ao co iN.,
ujl LuU
J
a Qr
a�
UJ N ca 4) N N N cm
O 0% }' a
A E
o � O
N
(� W
z �
c N
LL w O
IT N r r IT co N
61y w
O
` W N �r O
64 V
c-LU co F7
N
3Q D jay Vl
3 co p O N
C 3 C
i+ - m 0 a) f+0 tT
CD V C w t 'o V (D C
i (V) c '2 O N C
Co d O m N N C O CL
W CO C C U C C C d CL 3 w
Q
L
co
Qr m rn 3 o c m ; m o w@ c p J y
m �L N O U D a� p d c �, �^ a> O O
= C C J C �I C N •U i:. C H, V p N Q Q C
CD Q Q •_ o o ani a _� (D v co U O O L
W 7 F- U- 2 Cn U U` a U a w U J U M N co g ¢ m U Q F-
FT.WORTH,TX
Trans stems
Survey Services
36"WATERLINE GRAND PRAIRIE
METER STATION TOPO and EASEMENT
P202012643
4-Jun-10
TASKS
1. Prepare an exhibit and description of the proposed meter station
2. Topographic survey of the TRE south of Oncor Substation
approximately 100' x 200'
3. Utilities to be located by DIGG TESS
Survey
PM RPLS Crew Tech
$135.00 $115.00 $140.00 $80.00
1. Project setup/supervision 4
2. Working sketch 2 4
3. One call coordination 2
A. Field Ties 2 16 2
5. Drafting 8 8
6. QA/QC 2
7. TRE and Huffines Easement Preparation 8 16 4 24
(5-easements `)
Subtotals 16 26 20 40 $11,150.00
EXPENSES
Mileage 40mi/day x 3 days @$0.50/mi $60.00
Deed copies $50.00
TOTAL $11,260.00
Deliverables:
1. 3 copies signed and sealed exhibit and description of easement
2. Planimetric and DTM file
3. GeoPak TIN model
Easement Summary: TRE-Metering Station
TRA-Water Line Transfer to CFW
Huffines-Access
Huffines-36"Water to east(DFW Airport Property)
Huffines-8"Water to west(Village Way)
OFFICIAL RECORD
CITY SECRETARY
FT WORTH, TX
—, 9Y
L
"-,vil �
1 � ,
j�EXIST 'GRAND PRAIRIE s lk SCALE41
1" -
/ METERING] ,STATION
Zks
717
rt x Ind � 1'. S TENT
1 I I iT
l I CAB.
7
I -
' e
Will
w '� I' •.I "� 9L6 ��. 1 •�, 1',' fit, "^*=. I
L'I V A`o
y ;.I SAI 4S F)R Nf RTN 2F�•7\4 ' `
\ to 3
E655,PG605 DR'r T.. \ ^�
4
Kik
\ \
pA✓,,t I i.i I I I ,t �
w
I PROPOSED
URAND PRAIRIE :v
{ I I4"(XA FA„kMENY'
9so.ac t6; I MEI ERING STATION
II r
,
IRT
SAT
—
CULVERT�
- r
EXISTING 24 LEGEND_
WATER LINE
1 (TG GRAND - ---- ROW -PROKR'IY LINES
w '�Ca PRAIRIE) ORIGINAL ALIGNMENT
Op `yy am^ PROPOSED METER STATION CONNFCTj
-TI1 1 F 24 .GRAND PRAIRIE WATER LINE
OHE MISCELLANEOUS WATER LINES
—�
"�— EXISTING SANI TARP SEWER ONES
FORT WoRTH ALTERNATIVE ALIGNMENT I I ice, I VI._.
WATER LINE
CONTRACT