Loading...
HomeMy WebLinkAboutContract 27574-A6 AMENDMENT NO. 6 STATE OF TEXAS S CITY SECRETARY CONTRACT NO.Al5-7 (MSC Not Required) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and TranSystems Corporation d/b/a TranSystems Corporation Consultants, (Engineer) made and entered into City Secretary Contract No. 27574, (the Contract) which was authorized by the City Council by MSC 18999 on the 19th day of March 2002 and subsequently revised by five previous amendments; and WHEREAS, the Contract involves engineering services for the following project: Trinity Boulevard Water Main Extension from Greenbelt Road to State Highway 360. WHEREAS, it has become necessary to execute Amendment No. 6 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated June 11, 2010, a copy of which is attached hereto and incorporated herein. The cost to the City for the additional design services to be performed by Engineer total $15,990.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $746,314.00 . OFFICIAL RECORD CITY SECRETARY FT WORTH,T 07 - P02:34 N 3. All other provisions of the contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the day of �� 2010, in Fort Worth, Tarrant County, Texas. as 1:04 aisl ATTE 0000000 004 0000p0004 °04�d p..10 $'A 0 0 Hendrix o00 trt� ty Secretary °° �ij 06 qd aa��h�o����alol APPROVAL RECObfl ENDED: APPROVED: S. Frank Crumb, P.E. , Director Fernando Costa Water Department Assistant City Manager TranSystems Corporation d/b/a TranSystepz_Corporation Consultants ENGINEER By: 'Z NO N[&� REQUIRED Name:Raul Pena III, P.E. , Principal 500 W. 7th Street, Suite 600 Fort Worth, TR 76102 APPROVED AS TOFORM LEGALITY: 4 Assistanti Attorney -2- OFFICIAL RECORD CITY SECRETARY FT.NORTH,TX TranSystems ]1V , systeiiis \ Bank of America Building i 500 West 7 Street Suite 1100 Fort Worth,TX 76102 Tel 817 339 8950 Fax 817 336 2247 www.ftwisystems.com AMENDMENT NO. 6 SUMMARY OF DESIGN FEE June 11, 2010 Rakesh Chaubey, P.E. Department of Engineering City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102-6311 RE: Amendment No. 6 Trinity Boulevard Water Main Extension Part 4—Tarrant Main to SH 360 and Trinity Boulevard Water Project No. P265-605140035287 36"Water Main Easements and Re-routing Dear Mr. Chaubey, We appreciate the opportunity to present this proposal for your consideration. Per the request of the Water Department,this amendment revises the previously approved 36"water main design plans and contract documents. Specifically,this amendment includes the provision of field investigation,survey,design and easements for the proposed 36"water main between stations 251+00 and 266+00. Realignment of the main is required to avoid conflict with future earthwork and structural components associated with a future roadway proposed by the current property owner, Huffines Communities. Specifically,the 36"water main is to be routed along the existing TRA waterline easement that runs within the Huffines property. The existing 24"TRA water line will be removed from the easement in advance of new main construction. These revisions are noted on the Exhibit A,attached. Coordination with the City of Fort Worth Real Property Department will be necessary to secure the easements for the main. Additional survey and engineering services are required for the relocation. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Amn Syst� Mr. Rakesh Chaubey, P.E. June 11, 2010 Page 2 of 2 The cost for survey and design of the water main relocation are listed below. Corresponding personnel and hourly charges for the specific tasks are attached. Topographic Survey and Easement Preparation $ 11,260.00 Water Main Design (TSC) 4,730.00 Total Additional Costs: $ 15,990.00 LUMP SUM TOTAL Original Contract Fee: $379,195.00 Amendment No. 1: $ 51,600.00 Amendment No. 2: $ 24,800.00 Amendment No. 3: $145,324.00 Amendment No.4: $ 94,205.00 Amendment No. 5: $ 35,200.00 Amendment No. 6: 15 990.00 TOTAL CONTRACT $746,314.00 The above work effort will be accomplished for the total lump sum fee of$ 15,990.00. Please contact me should you require any additional information. Sincerely, TranSystems Corporation Consultants Schelibach, P.E. nicipal. Services Manager Attachments OFFICIAL RECORD CITY SECRETARY G:1FW01126431Pro*ftmtContractslamendment6lfttr amendmenL6_R4.doc FT.WORTH,TX O O O p co rn ci o co� CD p (D c0 N Ljr) F— Di v O N' 60* 64Q N O O O O O O O O O O O O O O O O O O -O 9 O O O O O O O O O O O O O O O O O O O O O Iq 0 t` Iq O O O O O O O co +_ e- t` CO O O cD tD to co O — r 3 - - r r r- crl C/) Cl) w O � O U Lo N Lo N E N W co oo U F- O O c j NT co 0 00 o O G7 O � o Q FF- L v w w v w ao co iN., ujl LuU J a Qr a� UJ N ca 4) N N N cm O 0% }' a A E o � O N (� W z � c N LL w O IT N r r IT co N 61y w O ` W N �r O 64 V c-LU co F7 N 3Q D jay Vl 3 co p O N C 3 C i+ - m 0 a) f+0 tT CD V C w t 'o V (D C i (V) c '2 O N C Co d O m N N C O CL W CO C C U C C C d CL 3 w Q L co Qr m rn 3 o c m ; m o w@ c p J y m �L N O U D a� p d c �, �^ a> O O = C C J C �I C N •U i:. C H, V p N Q Q C CD Q Q •_ o o ani a _� (D v co U O O L W 7 F- U- 2 Cn U U` a U a w U J U M N co g ¢ m U Q F- FT.WORTH,TX Trans stems Survey Services 36"WATERLINE GRAND PRAIRIE METER STATION TOPO and EASEMENT P202012643 4-Jun-10 TASKS 1. Prepare an exhibit and description of the proposed meter station 2. Topographic survey of the TRE south of Oncor Substation approximately 100' x 200' 3. Utilities to be located by DIGG TESS Survey PM RPLS Crew Tech $135.00 $115.00 $140.00 $80.00 1. Project setup/supervision 4 2. Working sketch 2 4 3. One call coordination 2 A. Field Ties 2 16 2 5. Drafting 8 8 6. QA/QC 2 7. TRE and Huffines Easement Preparation 8 16 4 24 (5-easements `) Subtotals 16 26 20 40 $11,150.00 EXPENSES Mileage 40mi/day x 3 days @$0.50/mi $60.00 Deed copies $50.00 TOTAL $11,260.00 Deliverables: 1. 3 copies signed and sealed exhibit and description of easement 2. Planimetric and DTM file 3. GeoPak TIN model Easement Summary: TRE-Metering Station TRA-Water Line Transfer to CFW Huffines-Access Huffines-36"Water to east(DFW Airport Property) Huffines-8"Water to west(Village Way) OFFICIAL RECORD CITY SECRETARY FT WORTH, TX —, 9Y L "-,vil � 1 � , j�EXIST 'GRAND PRAIRIE s lk SCALE41 1" - / METERING] ,STATION Zks 717 rt x Ind � 1'. S TENT 1 I I iT l I CAB. 7 I - ' e Will w '� I' •.I "� 9L6 ��. 1 •�, 1',' fit, "^*=. I L'I V A`o y ;.I SAI 4S F)R Nf RTN 2F�•7\4 ' ` \ to 3 E655,PG605 DR'r T.. \ ^� 4 Kik \ \ pA✓,,t I i.i I I I ,t � w I PROPOSED URAND PRAIRIE :v { I I4"(XA FA„kMENY' 9so.ac t6; I MEI ERING STATION II r , IRT SAT — CULVERT� - r EXISTING 24 LEGEND_ WATER LINE 1 (TG GRAND - ---- ROW -PROKR'IY LINES w '�Ca PRAIRIE) ORIGINAL ALIGNMENT Op `yy am^ PROPOSED METER STATION CONNFCTj -TI1 1 F 24 .GRAND PRAIRIE WATER LINE OHE MISCELLANEOUS WATER LINES —� "�— EXISTING SANI TARP SEWER ONES FORT WoRTH ALTERNATIVE ALIGNMENT I I ice, I VI._. WATER LINE CONTRACT