HomeMy WebLinkAboutContract 27797-A3 AMENDMENT NO. 3 TO CITY SECRETARY CONTRACT NO. 27797 STATE OF TEXAS § § CITY SECRETARY CONTRACT NO. a-119-1 — A3 COUNTY OF TARRANT § WHEREAS, the City of Fort Worth ("City") and Camp Dresser & McKee, Inc. (CDM) ("Engineer") made and entered into City Secretary Contract No. 27797 (the "Contract")which was authorized by City Council via M&C C-19114 on the 41 day of June 2002; and WHEREAS, the Contract involves engineering services for the following project: Village Creek Wastewater Treatment Plant Trinity River Pipeline Crossing (Parallel Siphon) Project No. P171-070171300040 (City Project No. 00186) WHEREAS, it has become necessary to execute Amendment No. 3 to said Contract to increase the scope of services and/or the maximum fee. NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement that amends the Contract: 1. Article I, of the Contract is amended to include the additional engineering services specified in the Engineer's proposal letter dated August 13, 2009 and attached hereto. The cost to City for the additional services to be performed by Engineer total $154,990.00. . OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX -1- 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of$879,432.00. 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the 26th day of Janua , 2010, in Fort Worth, Tarrant County, Texas. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) -2- ATTEST: CITY OF FORT WORTH M L-tAjA— �'avo�4�I— Marty Hendrix Fernando Costa City Secretary Assistant City Manager I ICY C A "o�41040 /a(e��p APPROVAL RECOMMENDED: a�pppp 00WOpyo 0 o o�d o o %a 000 o°*AY S. Frank Crumb, P.E., Director 000 Water Department A�Rosa�44' APPROVED AS TO FORM AND LEGALITY: Amy J amsey Assistant City Attorney ENGINEER: Camp Dresser& McKee, Inc. (CDM) Rodney Ch in, P.E. Vice President OFFICIAL RECORD -3- CITY SECRETARY FT. WORTH, TX CDM 777 Taylor Street,Suite 1050 Fort Worth,Texas 76102 tel: 817 332-8727 fax: 817 332-6870 August 13,2009 Ms. Madelene Rafalko,P.E. Project Manager,Water Department City of Fort Worth 1000 Throckmorton Street Fort Worth,Texas 76102-6311 Subject: Village Creek Wastewater Treatment Plant, Trinity River Pipeline Crossing(Parallel Siphon) Project Number P171-070171300040, CIP 00186 Engineering Services Fee-Requested Amendment No. 3 Dear Madelene: CDM has prepared an amendment for additional services associated with the Village Creek Wastewater Treatment Plant, Trinity River Pipeline Crossing (Parallel Siphon) Project. The amendment covers services for the following items: • Additional professional services due to the construction duration allowed in the contract documents was longer than anticipated when the original engineering scope was established and the fact the contractor has been allotted additional time due to unforeseen ingress/egress stoppage by the landowner. �• Additional construction representative representation services due to the construction duration allowed in the contract documents was longer than anticipated when the contract was established and the fact the contractor has been allotted additional time due to unforeseen ingress/egress stoppage by the landowner • Construction administration and field visits for M/WBE subconsultant to review and inspect work at junction Boxes D, DD, and EE. These items are discussed in detail below consulting•engineering•construction•operations Ms. Rafalko, P.E. August 13,2009 Page 2 1. Construction Administration Services-During the design,it was established that the construction duration for the Parallel Siphon project was going to be set for 15 months. Near the end of the design, the project was placed on hold from March 2006 to September 2007. Prior to bidding the project,Maebelle Brown,City of Fort Worth Water Department,increased the construction duration to allow the winning contractor two independent dry weather periods to build the project. CDM's original contract was scoped to provide professional services (construction administration and resident project representation) for a 15-month contract duration. The following is a summary of major items necessary for the additional construction administration: o Project manager and/ or construction manager to prepare meeting agendas, attend onsite bi-weekly meetings, complete and distribute meeting minutes throughout the duration of the project- anticipated project completion date October 2009. o Project manager and/ or construction manager to answer RFIs and project change documentation throughout the duration of the project-anticipated project completion date October 2009. o Review shutdown procedures for 1.The removal of M280 and M338 inside junction Box DDD,2. Cleaning of the existing siphons,3. Rehabilitation of junction boxes D, DD, E, and EE 4. Barscreen building III flume removal and pipe slice. o Provide Cadd exhibits as needed throughout the duration of the project- anticipated project completion date October 2009. o Conduct bi-weekly filed visits. o Assists resident project representative on 24-hour shutdowns. These additional services resulted in additional engineering costs of$42,140.00 2. Additional Services for resident project representative. CDM will provide a resident project representative to monitor the construction of the Parallel siphon project 32-hours per week from May 2009 to October 2009 (26 weeks) and 60-hours per week during the two week shutdown of Barscreen building III. In addition,CUM will provide clerical and Cadd assistance to the resident project representative. This additional service resulted in addition costs of$101,350.00 Ms. Rafalko,P.E. August 13,2009 Page 3 3. Construction Administration for Junction Box D,DD,and EE. During the design,the rehabilitation of junction Boxes D, DD, and EE were placed into the bid tab as "Alternative bid items". The design of these items was paid for previously,but the construction administration and resident project representation were excluded in the event that the City chose not to accept the Alternative bid items. This additional service resulted in addition costs of$11,500.00 The proposed amendment to CDM's engineering contract for performing the additional services is detailed on the attached spreadsheet. The total amendment is $154,990.00 which results in a new not-to-exceed limit for the contract of$879,432.00 Shown below is the original contract amount and the previous and requested amendments. Original Contract $ 299,630.00 Amendment Number 1 $ 333,112.00 Amendment Number 2 $ 91,700.00 Amendment Number 3 $ 154,990.00 Total $ 879,432.0.0 Please contact me if you have any questions or need any additional information. We are available to meet with you to discuss our requested amendment at your convenience. Very trul yours, 41-- ouglas L. arner,P.E. Client Services Manager Camp Dresser &McKee Inc. cc: File: 0515-34653 amendment#3 CL CL O O O. N � Q N 0 J r f7 Ln iv F H 0 N o m N p b4 ,t O 60:�60). U) �? U m its 00 1 �t O_ N O U � O r EA 64 b4 aD N O.LQ_z R N O) O � t 0 2 W c w N '�t E 0 v 0 a 2 0 o co o Rm cow H N O CL O w 2 V O p i Q 0 U 2 O O 0 V ` d � s 0 ` o . a x d 0 0 0 v i d c � 'opo aW x v d 0 0 0 m a � o c o a` ca 2 000 or `o m m v � o m o apx LU w c - m .. m i W pC iE 0- LU — x N N_ O t = gym C U y i O N tC O Q m a0 d LL w � O O N • - m o0o rt U FL C-4 r; ' Page 1 of 2 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 1/26/2010 DATE: Tuesday, January 26, 2010 REFERENCE NO.: **C-24040 LOG NAME: 60CDM SIPHON AMEND 3 SUBJECT: Authorize the Execution of Amendment No. 3 in the Amount of$154,990.00 to City Secretary Contract No. 27797, an Engineering Agreement with Camp, Dresser and McKee, Inc., for the Design of the Trinity River Pipeline Crossing at the Village Creek Wastewater Treatment Plant Located at the Northwestern Boundary of the Village Creek Wastewater Treatment Plant at the Trinity River(COUNCIL DISTRICT 5) RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 3 in the amount of$154,990.00 to City Secretary Contract No. 27797, an Engineering Agreement with Camp, Dresser and McKee, Inc., for the design of the Trinity River Pipeline Crossing at the Village Creek Wastewater Treatment Plant located at the northwestern boundary of the Village Creek Wastewater Treatment Plant, thereby increasing the contract cost to $879,432.00. DISCUSSION: On June 4, 2002, (M&C C-19114) the City Council authorized the execution of an Engineering Agreement with Camp, Dresser and McKee, Inc., in the amount of$299,629.00 for the design and preparation of construction documents for a third parallel siphon pipeline under the Trinity River to the Village Creek Wastewater Treatment Plant and an upstream siphon interconnection structure and the preparation of applications for United States Corps of Engineers permits. Amendment No. 1, in the amount of$333,113.00, included additional design phase services and the addition of construction management services for the project. Amendment No. 2, in the amount of $91,700.00, compensated the engineer for condemnation assistance related to obtaining the upstream easement, compliance with the City's newly adopted tree ordinance, additional effort for coordinating the United States Corps of Engineers River Crossing Permit, additional design and construction management services for the rehabilitation of existing downstream junction boxes and the addition of materials testing services to the contract. Proposed Amendment No. 3 compensates the Engineer for additional construction administration services necessary due to changes in construction contract duration. At the time of advertisement, the Water Department changed the construction contract time to span two summer(dry weather) periods to provide adequate time for the contractor to complete the specified work. This increased the construction contract time from the allocated time established in the Engineer's Construction Management Agreement (Amendment No. 2). The construction contract time was further modified by Construction Contract Change Order No. 1, extending the completion time by 30 days for a completion date of October 15, 2009. Camp, Dresser and McKee, Inc., is in compliance with the City's M/WBE Ordinance by committing to an additional seven percent M/WBE participation on this Amendment No. 3. The City's goal on this amendment is seven percent. Tha Villarge Creak Wastewater Trgatmant Plant ig InrratPri in C01 INrll DI-STRICT 5 and cPn/Pc Al I COUNCIL DISTRICTS. http://apps.cfwnet.org/ecouncil/printrnc.asp?id=12555&print=true&DocType=Print 1/29/2010 Page 2 of 2 FISCAL INFORMATION /CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Sewer Capital Projects Fund. FUND CENTERS: TO Fund/Account/Centers FROM Fund/Account/Centers P274 531200 701300018680 $154.990.00 CERTIFICATIONS: Submitted for City Manager's Office by� Fernando Costa (6122) Originating Department Head: S. Frank Crumb (8207) Additional Information Contact: Madelene Rafalko (8215) ATTACHMENTS 1. 60CDM AMEND 3 SIPHON MWBE.pdf (CFW Internal) 2. 60CDM AMENDS MAP.pdf (Public) 3. 60CDM SIPHON AMEND 3 BFT.pdf (CFW Internal) 4. Fund Availabilily.pdf (CFW Internal) http://apps.cfwnet.org/ecouncil/printmc.asp?id=12555&print=true&DocType=Print 1/29/2010