Regarding contract 117251 for OFF-SITE WATER& SANITARY SEWER IMPROVEMENT as required by the
WATER DEPARTMENT as approved by City Council on N/A through 1\i&C N/A the direaor of the
WATER DEPARTMENT upon the recommendation of the Assistant Director of the Transportarion& Public Forks
Department has accepted the project as completi[RE-C
--
Original Contract Prices: $216,356.00
Amount of Approved Change Orders JUL 07 2015 NQ 1
Revised Contract Amount 5216,356.00
Total Cost Work Completed: 5216,356.00
Less Deductions:
I
Liquidated Damages: Days Q 5210.00/Day
Pavement Deficiencies:
Total Deduction Amount $0.00
Total Cost Work Completed: 5216,356.00
Less Previous Payments:
Final Payment Due 5216,356.00
Recommended for Acceptance Date
Asst. Director, TPW - Infrastructure Design and Construction
- , c--) - 7-
AcceptedDate
Director, IA� DEPAR T _
7/1�[/S _
Asst. Oty Manager Dat4
Comments: FUND ACCP P265-60715023W/P275-7071302300
OFFICIAL RECORD
CITY SECRETARY
�� F1',WdRTH,TX
�
FORTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name OFF-SITE WATER AND SANITARY SEWER 134PROVEMENTS TO SERVE
Contract Limits FEDEX GROUND ALLIANCE LOT 1 BLOCK I WORLD WIDE ADDITION
Project Type WR"I"ER&SEWER
City Project Numbers 02300
DOE Number 7251
Estimate Number 1 Payment Number 1 For Period Ending 6/15/2015
CD
City Secretary Contract Number 117251 Contract Time 16CD
Contract Date 8/1112014 Days Charged to Date 205
Project Manager Long Contract is 100.00 Complete
Contractor C-CON SERVICES,INC.
2230 JOE FIELD RD
DALLAS, TX 75229
Inspectors GREGORY / BOWERS,J
Thursday,June 11,2015 Page I of 5
cfolf
City Project Numbers 02300 DOE Number 7251
Contract Name OFF-SITE WATER AND SANITARY SEWER IMPROVEMENTS TO SER Estimate Number I
Contract Limits FEDEX GROUND ALLIANCE LOT I BLOCK I WORLD WIDE ADDII70 Payment Number 1
Project Type WATER&SEWER For Period Ending 6/1512015
Project Funding
UNIT I:WATER 13,4PROVEMENTS
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 3305.0005 12"WATERING LOWERING I EA $6,181.00 $6,181.00 1 $6,181.00
2 33005.0109 TRENCH SAFETY 1533 LF $1.00 $1,533.00 1533 $1,533.00
3 3305.0202 IMPORTED EMBEDMENT/BACKFILL 10 CY $40.00 $400.00 10 $400.00
CSS
4 3311.0001 DUC7TLEIRON WATER FITTING 2 TN $769.00 $1,538.00 2 $1,538.00
W/RESTRAINT
5 3311.00614"PVC WATER PIPE 20 LF $17.00 $340.00 20 $340.00
6 3311.01616"PVC WATER PIPE 18 LF $19.00 $342.00 18 $342.00
7 3311.0361 10"PVC WATER PIPE 125 LF $30.00 $3,750.00 125 $3,750.00
8 3311.0461 12"PVC WATER PIPE 1375 LF $32.00 $44,000.00 1375 $44,000.00
9 3312.0001 FIRE HYDRANT 3 EA $2,621.00 $7,863.00 3 $7,863.00
10 3312.22032"WATER SERVICE 3 EA $3,877.00 $11,631.00 3 $11,631.00
11 3312.28013"WATER METER AND VAULT I EA $11,789.00 $11,789.00 1 $11,789.00
12 3312.3002 6"GATE VALVE 3 EA $875.00 $2,625.00 3 $2,625.00
13 3312.3004 10"GATE VALVE 4 EA $1,979.00 $7,916.00 4 $7,916.00
14 3312.3005 12"GATE VALVE 3 EA $2,067.00 $6,201.00 3 $6,201.00
15 9999.0001 9800 Wei INTELLIGENT FLUSING 1 EA $16,610.00 $16,610.00 1 $16,610.00
DEVICE
Sub-Total of Previous Unit $122,719.00 $122,719.00
UNIT II:SANITARY SEWER IMPROVEMENTS
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Qoauity Total Quanity Total
1 3301.0002 POST CCTV INSPECTION 1524 LF $1.00 $1,524.00 1524 $1,524.00
2 3301.0101 MANHOLE VACUUM TESTING 8 EA $150.00 $1,200.00 8 $1,200.00
3 3305.0109 TRENCH SAFETY 1524 LF $1.00 $1,524.00 1524 $1,524.00
4 3305.0202 IMPORTED 14 CY $40.00 $560.00 14 $560.00
EMBEDMENT/BACKFILL,CSS
5 3305.1102 16"CASING BY OTHER THAN OPEN 70 LF $235.00 $16,450.00 70 $16,450.00
CUT
6 3305.3002 8"SEWER CARRIER PIPE 70 LF $54.00 $3,780.00 70 $3,780.00
7 3331.41014"SEWER PIPE 33 LF $16.00 $528.00 33 $528.00
8 3331.4115 8"SEWER PIPE 1421 LF $27.00 $38,367.00 1421 $38,367.00
Thursday,June 11,2015 Page 2 of 5
i
City Project Numbers 02300 DOE Number 7251
i
Contract Name OFF-SITE WATER AND SANITARY SEWER M PROVEMENTS TO SER Estimate Number 1
Contract Limits FEDEX GROUND ALLIANCE LOT l BLOCK 1 WORLD WIDE ADDITIO Payment Number 1
Project Type WATER&SEWER For Period Ending 6/1512015
Project Funding
9 3339.1001 4'MANHOLE 8 EA $3,104.00 $24,832.00 8 $24,832.00
10 3339.1003 4'EXTRA DEPTH MANHOLE 60.9 VF $80.00 $4,872.00 60.9 $4,872.00
Su b-Total of Previous Unit $93,637.00 $93,637.00
Thursday,June 11,2015 Page 3 of 5
City Project Numbers 02300 DOE Number 7251
Contract Name OFF-SITE WATER AND SANITARY SEWER DAPROVEMENTS TO SER Estimate Number 1
Contract Limits FEDEX GROUND ALLIANCE LOT 1 BLOCK 1 WORLD WIDE ADDITIO Payment Number I
Project Type WATER&SEWER For Period Ending 6/15/2015
Project Funding
Contract Information Summary
Original Contract Amount $216,356.00
Chanl?e Orders
Total Contract Price $216,356.00
Date �../ Total Cost of Work Completed $216,356.00
otract Less %Retained $0.00
/7-6 Earned
Net Earned $216,356.00
Date Earned This Period $216,356.00
Inspection Supervisor
t Retainage This Period $0.00
Date 7C�.J Less Liquidated Damages
Project M
/ Days @ /Day $0.00
Date LessPavement Deficiency $0.00
ctor W-Infiastrucdne Design and Construction Less Penalty $0.00
�", („� to Less Previous Payment $0.00
I r n 0Plus Material on Hand Less 15% $0.00
? 7 `-
Balance Due This Payment $216,356.00
Thursday,June 11,2015 Page 4 of 5
D �� ►�uv
gut o 7 2015 }� 0 a3o 0
City Project Numbers 02300 By
DOE Number 7251
Contract Name OFF-SITE WATER AND SANITARY SEWER LMPROVEMINI'S TO SER Estimate Number i
Contract Limits FEDEX GROUND ALLIANCE LOT 1 BLOCK 1 WORLD WIDE ADDITIO Payment Number 1
Project Type WATER&SEWER For Period Ending 6/15/2015
Project Funding
Project Manager Long City Secretary Contract Number 117251
Inspectors GREGORY / BOWERS,J Contract Date 8/11/2014
Contractor C-CON SERVICES,INC. Contract Time 160 CD
2230 JOE FIELD RD Days Charged to Date 205 CD
DALLAS, TX 75229 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
--------------------------------------
Total Cost of Work Completed $216,356.00
Less %Retained $0.00
Net Earned $216,356.00
Earned This Period $216,356.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $216,356.00
Thursday,June 1.1,2015 Page 5 of 5
FORT WORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: FEDEX Ground-Offsite Water and Sanitary Sewer Imp.'s
PROJECT NUMBER: CPN 02300
DOE NUMBER: 7152
WATER
PIPE LAID SIZE TYPE OF PIPE LF
Water 4" PVC 20
Water 6" PVC 18
Water 10" PVC 125
Water 12" PVC 1,375
FIRE HYDRANTS: 3 VALVES(16"OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
NONE
DENSITIES: ALL PASSED
NEW SERVICES: 2" COPPER 40
3" COPPER 20
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
SANITARY SEWER 4" PVC 33
SANITARY SEWER 8" DIP 70
SANITARY SEWER 8" PVC 11421
PIPE ABANDONED SIZE TYPE OF PIPE LF
NONE
DENSITIES: ALL PASSED
NEW SERVICES: NONE
TRANSPORTATION AND PUBLIC WORKS
�i < The City of Fort Worth• 1000 Throckmorton Street-Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817) 392-7845
alston
C O N S T R U C T I O N
June 5, 2015
City of Ft. Worth
1000 Throckmorton St.
Ft. Worth, TX 76102
Re: FedEx Ground Distribution Center—Fort Worth, TX
No Liquidated Damaged pursue with C-Con Services, Inc.
Attn: Joseph Rogers
Via E-Mail (Joseph.RogersQfortworthtexas.gov)
Mr. Rogers,
This letter will serve as notice that Alston Construction, Inc. does not intend to charge GCon
Services, Inc. with liquidated damages on the FedEx Ground Distribution Center project in Fort
Worth, TX. The construction project was impacted by weather and did extend past the initial
completion date set forth in the community facilities agreement, but C-Con Services, Inc. was not a
cause for this delay.
Should you have any questions, please feel free to contact me.
Sincerely,
ennifer ooker
Project Director
Alston Construction, Inc.
Cc: Danota Meek—C-Con Services
Keith Flowers —Alston Construction
File
10000 N.Central Expressway,Suite 1450 Dallas,Texas 75231 Page 1
C-Con Services, Inc.
2230 Joe Field Road Office (972) 243-5455
Dallas,Texas 75229 Metro(972)988-0200
AFFIDAVIT Fax (972) 243-5227
STATE OF TEXAS
COUNTY OF DALLAS
Before me, the undersigned authority, a notary public in the state and county
aforesaid, on this day personally appeared Earl Cotton, of C-Con Services, Inc., known to
me to be a credible person,who being by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other organizations
furnishing lab and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort Worth has
been paid in full;
That there are no claims pending for personal injury and/or property damages;
On Contract described as; FedEx Alliance,Fort Worth, Texas.
Contract Description; Site Utilities.
B
Earl Co on—President
Subspribeo and sworn before me on this the 1st day of June, 2015.
DAKOTA KAYE MEEKS
otary Public MY COMMISSION EXPIRES
'rf
Dallas County,Texas January31,2018
CONSENT OF OWNER
SURETY COMPANY ARCHITECT
TO FINAL PAYMENT CONTRACTOR
SURETY
AIA DOCUMENT G707 OTHER
Bond No. DSACSU629343
PROJECT: FedEx Ground Alliance-Off-Site Water and Sanitary Sewer Improvements
(name,address) Ft Worth TX
TO(Owner) [ City of Fort Worth ] ARCHITECT'S PROJECT NO:
1000 Throckmorton Street
Fort Worth,TX 76102-6312 CONTRACT FOR: Construction
[ ] CONTRACT DATE: 6/3/2014
CONTRACTOR: C-Con Services,Inc.
2230 Joe Field Road
Dallas, TX 75229
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the
(here insert name and address of Surety Company)
Allegheny Casualty Company
One Newark Center,20th Floor
Newark NJ 07102 , SURETY COMPANY,
on bond of(here insert name and address of Contractor)
C-Con Services,Inc.
2230 Joe Field Road
Dallas,TX 75229 , CONTRACTOR,
hereby approves of the final payment to the Contractors,and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to(here insert name and address of Owner)
City of Fort Worth
1000 Throckmorton Street
Fort Worth,TX 76102-6312 ,OWNER,
as set forth in the said Surety Company's bond.
IN WITNESS WHEREOF,
the Surety Company has hereunto set its hand this 1st day of June , 2015
Allegheny Casualty Company
Surety Company
i " " l Signature of Authorized Representative
Attest:
(Seal): _Debra Lee Moon Attorney-In-Fact
Title
NOTE: This form is to be used as a companion document to AIA DOCUMENT G706,CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS,
Current Edition
AIA DOCUMENT G707 CONSENT OF SURETY COMPANY TO FINAL PAYMENT APRIL 1970 EDITION AIA ONE PAGE
1970 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 New York Ave.,NW,WASHINGTON,D.C. 20006
i
Tel(973)624-7200
POWER OF ATTORNEY �
INTERNATIONAL FIDELITY INSURANCE COMPANY
ALLEGHENY CASUALTY COMPANY
ONE NEWARK CENTER,20TH FLOOR NEWARK, NEW JERSEY 07102-5207
KNOW ALL MEN BY THESE PRESENTS: That INTERNATIONAL FIDELITY INSURANCE COMPANY,a corporation organized and existing under
the laws of the State of New Jersey, and ALLEGHENY CASUALTY COMPANY a corporation organized and existing under the laws of the State of
Pennsylvania,having their principal office in the City of Newark,New Jersey,do hereby constitute and appoint
SAMMY JOE MULLIS JR, ROBERT DONALD HURST, WILBERT RAYMOND WATSON, TROY RUSSELL KEY,
DEBRA LEE MOON, JOHN WILLIAM NEWBY, CAROLYN J. GOODENOUGH, SANDRA LEE RONEY,
ANDREA ROSE CRAWFORD
Addison,TX.
their We and lawful attomey(s)-in-fact to execute,seal and deliver for and on its behalf as surety,any and all bonds and undertakings,contracts of indemnity
and other writings obligatory in the nature thereof, which are or maybe allowed,required or permitted by law,statute,rule,regulation,contract or otherwise,
and the execution of such instrument(s)) inpursuance of these presents,shall be as binding upon the said INTERNATIONAL FIDELITY INSURANCE
COMPANY and ALLEGHENY CASUALTY COMPANY, as fully and amply, to all intents and purposes,as if the same had been duty executed and
acknowledged by their regularly elected officers at their principal offices.
This Power of Attorney is executed,and may be revoked, pursuant to and by authority of the By-Laws of INTERNATIONAL FIDELITY INSURANCE
COMPANY and ALLEG11ENY CASUALTY COMPANY and is granted under and by author of the following resolution adopted by the Board of Directors
of INTERNATIONAL FIDELITY INSURANCE COMPANY at a meeting duly held on the 20th day of July,201D and by the Board of Directors of ALLEGHENY
CASUALTY COMPANY at a meeting duly held on the 15th day of August,2000:
'RESOLVED,that (1)the President,Vice President,Executive Vice President or Secretary of the Corporation shat)have the power to appoint,and to revoke
the appointments of,Attorneys-in-Fact or agents with power and authority as defined or limited in their respective powers of attorney,and to execute on behalf
of the Corporation and affix the Corporation's seal thereto,bonds,undertakings, recognizances, contracts of indemnity and other written obligations in the
nature thereof or related thereto; and(2)any such Officers of the Corporation may appoint and revoke the appointments of joint-control custodians,agents
for acceptance of process,and Attomeys-in-fact with authority to execute waivers and consents on behalf of the Co ration;and t3)the signature of any
such Officer of the Corporation and the Corporation's seal may be affixed by facsimile to any power of attorney or certification given ffor the execution of any
bond,undertaking,recognizance contract of indemnity or other written obligation in the nature thereof or related thereto,such signature and seals when
so used whether heretofore or Hereafter, being hereby adopted by the Corporation as the original signature of such officer and the original seal of the
Corporation,to be valid and binding upon the Corporation withthe same force and effect as though manually affixed.'
IN WITNESS WHEREOF, INTERNATIONAL FIDELITY INSURANCE COMPANY and ALLEGHENY CASUALTY COMPANY have each executed and
attested these presents on this 12th day of March,2012.
STATE OF NEW JERSEY G At C
County of Essex �`
SEAL 193619134 �
?� ROBERT W.MINSTER
` ++�} Executive Vice President/Chief Operating Officer YLvpN1�
(International Fidelity Insurance Company)
and President(Allegheny Casualty Company)
On this 12th day of March 2012, before me came the individual who executed the preceding instrument,to me personally known,and, being by. me duly
swom, said he is the therein described and authorized officer of INTERNATIONAL FIDELITY INSURANCE COMPANY and ALLEGHENY CASUALTY
COMPANY; that the seals affixed to said instrument are the Corporate Seals of said Companies;that the said Corporate Seals and his signature were
duly affixed by order of the Boards of Directors of said Companies.
IN TESTIMONY WHEREOF, I have hereunto set m hand affixed my Official Seal,
at the City of Newark,New Jersey the day and year first above written.
Ctiy11 Vqr
ices
ua� dU13"N •'ed t A NOTARY PUBLIC OF NEW JERSEY
ors
� My Commission Expires Mar.27,2014
CERTIFICATION
1,the undersigned officer of INTERNATIONAL FIDELITY INSURANCE COMPANY and ALLEGHENY CASUALTY COMPANYdo hereby certify that I have
compared the foregoing copy of the Power of Attomey and affidavit,and the copy of the Sections of the By-Laws of said Companies asset forth in said
Power of Attomey, with the originals on file In the home office of said companies, and that the same are correct transcripts thereof,and of the whole
of the said originals,and that the said Power of Attorney has not been revoked and is now in full force and effect
IN TESTIMONY WHEREOF, 1 have hereunto set my hand this ; day of x �!tib_ I �C)� •--J
MARIA BRANCO,Assistant Secretary
IMPORTANT NOTICE AVISO IMPORTANTE
To obtain information or make a complaint: Para obtener information o para someter una queja:
You may call International Fidelity Insurance Usted puede Ilamar al numero de telefono gratis de
Company's toll-free telephone number for information International Fidelity Insurance Company's para
or to make a complaint at: informacion o para someter una queja al:
1-800-333-4167 1-800-333-4167
You may also write to International Fidelity Insurance Usted tambien puede escribir a International Fidelity
Company at: Insurance Company:
Attn: Claims Department Attn: Claims Department
One Newark Center,20`h Floor One Newark Center,20'h Floor
Newark,NJ 07102 Newark,NJ 07102
You may contact the Texas Department of Insurance Puede comunicarse con el Departamento de Seguros de
to obtain information on companies,coverages,rights Texas para obtener informacion acerca de companias,
or complaints at: coberturas,derechos o quejas al:
1-800-252-3439 1-800-252-3439
You may write the Texas Department of Insurance: Puede escribir al Departamento de Seguros de Texas:
P.O.Box 149104 P.O.Box 149104
Austin,TX 78714-9104 Austin,TX 78714-9104
Fax:(512)475-1771 Fax:(5I2)475.1771
Web:htln://www.tdi.state.tx.us Web:http://wivw.tdistate.tx.us
E-mail:ConsumerProtection@tdistate.tx.us E-mail:ConsumerProtection@tdi.state.tx.us
PREMIUM OR CLAIM DISPUTES: DISPUTAS SOBRE PRIMAS O RECLAMOS:
Should you have a dispute concerning your premium Si tiene una disputa concerniente a su prima o a un
or about a claim you should contact the(agent) reclamo,debe comunicarse con el(agente)(la
(company)(agent or the company)first.If the dispute compania)(agente o la compania)primero.Si no se
is not resolved,you may contact the Texas Department resuelve la disputa,puede entonces comunicarse con el
of Insurance. departamento(TDI).
ATTACH THIS NOTICE TO YOUR BOND: UNA ESTE AVLSO A SU FIANZA DE GARANTIA:
This notice is for information only and does not Este aviso es solo para proposito de informacion y no
become a part or condition of the attached document. se convierte en parte o condition del documento
adjunto.
FORTWORTHREV:02/20/07
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
1) CONTRACTOR&PROJECT DATA
Name ojContractor Project Name
C-Con Services,Inc. FEDEX Ground-Offsite Water and Sanitary Sewer Im .'s
DOE Inspector DOE Number
Joe Rogers 7I52
DOE Inspector Project Manager
2 Water[✓ waste water Storm Drainagto Pavement Aaron Lon
Initial Contract Amount Project Difficulty
$216,356.00 Q Simple Q Routine O Complex
Final Contract Amount Date
$216,356.00 6/10/2015
11)PERFORMANCE EVALUATION
0-Inadequate I-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
I Submission of Documents 2 Y 3 8 6
2 Public Notifications 5 N
3 Plans on Site 5 Y 3 20 15
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 3 60 45
8 Traffic Control Maintenance 15 N
9 Daily Clean Up 5 Y 4 20 20
10 Citizen's Complaint Resolution 5 N
I I Property Restoration 5 Y 4 20 20
12 After Hours Response 5 N
13 Project Completion 5 Y 3 20 15
TOTAL ELEMENT SCORE(A) 301
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 301
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 328
Rating(ITS/MSI " 100%) 301 / 328 = 92%
Performance Category t
<20%=Inadequate 20%to<4 0=Defeient 40%to<60%=Standard 60%to<80%=Good 2:80%=Excellent
:1
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature DOE Inspector Signature Contractor
Signature DOE Inspector's Supervis d/
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
FORTWORTHREV:02/22/07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
1)PROJECT INFORMATION Date: 6/10/2015
1Nome oJContractor Project Name
�C-Con Services,Inc. FedEx Ground-Offsite Water and Sanitary Sewer
DOE Inspector Project Manager
Joe Rogers Aaron Lon
DOE Number Project Diicalty Tvpe of Contract
7152 0 Simple OQ Routine 0 Complex 0 water0 waste water Storm Drainagr Pavement
Initial Contract Amount Final Contract Amount
1$216,356.00 1$216,356.00
In PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent
jELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION IPLANS&SPECIFICATIONS
i 1 Availability of Inspector I 1 Accuracy of Plans to Existing Conditions
2 Knowled a of Inspector ly 12 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities 13 Applicability of Specifications y
14 Display Of Professionalism 14 Accuracy of Plan Quantities
5 Citizen Complaint Resolution y PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processing Time 3 Communication
2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe
III)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
i
FORTWORTH rev 03/05/07
TRANSPORTATION & PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:I - FINAL
NAME OF PROJECT: Offsite Water and Sanitary Sewer Improvements to serve FEDEX Ground Alliance Lot 1,I31k 1
PROJFCT NO.: CPN 02300 CONTRACTOR: C-Con Services, Inc.
DOE NO. 7152
PERIOD FROM 041,108,,14 TO: 03/31/15 FINAL INSPECTION DATE: 10-Apr-15
WORK ORDER EFFECTIVE:9/8/2014 CONTRACT TIME: 160 WQi CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
I. 16.
2. 17,
3. 18.
4. 19.
5. 20.
6. 21.
22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
1 S. 30.
31.
SAT,SIX RAIN,TOO WET, UTILITIES OTHERS * DAYS TOTAL
& HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS
THIS
PERIOD
PRF.VIOL'S
o05
PERIOD
TOTALS 205
TO DATE
*REMARKS: 98'14-Notice to Proceed;3/31,'15- I imc Stopped;4:10 15-Final Inspection w;'Putsch List;
4 13%15- Punch List completed;5121/15-Auto Flusher tesetd and passed per Leo Montemayor Wtr Dept.
15-Received Letter from Developer that No LD's would be charged against the C-Con Services,Inc.
for exceedin!the original contract d
CONTRACTOR DACE 1NSP O DATE