HomeMy WebLinkAboutContract 46547-CO1 CITY SECRETAW � FORT WORTH City of Fort Worth CONTRACT N0. Change Order Request Breakdown ProjectNamel Alliance Airport-RTR Duct Bank and TWY H Impvt City Sec# 1 46547 Client Project#(s)l 960 Contractor EAS Contracting, LP PM Ruseena Johnson Inspector Billy Jones Change Order Submittal# Date 5/1/2015 ALeo nt mk0TJ as*2 C6o441 SnrrW-) Dept. Aviation Contract Time Totals CD Original Contract Amount $1,137,690.00 $1,137,690.00 70 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,137,690.00 $1,137,690.00 70 Amount of Proposed Change Order -$9,015.00 -$9,015.00 28 Revised Contract Amount $1,128,675.00 $1,128,675.00 98 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT -0.79% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $1,422,112.50 JUSTIFICATION(REASONS)FCR C . This change order is drafted for changes to the bore that runs under RWY 16L and TWY A.We will installing a 24"HDPE bore and 44"HDPE bore in lieu of the existing bore plan.This plan is illustrated in EAS Bore Proposal 07,dated 4-07-15.The pay item quantities that will not longer be installed have been removed and credited as a part of this change.We have also included a temporary threshold displacement on RWY 16L,cost and time extension for rain delays,and temporary 16L edge circuit repairs. OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX � 56 Q �8 Q � f JUL I N o! � a FOR. r! H City of Fort worth Change Order Additions Project Name I Alliance Airport-RTR Duct Bank and TWY H Im vt City Sec# 46547 Client Project# 1 960 Comractor EAS Contracting,LP PM Ruseena Johnson InspectDrF Bilty Jones Change Order Submittal# Date 511/2015 ADDITIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost I ota Directional ore - on uitswahon 920.00000000 LF $124.00 R#01.2 Directional Bore 4-4"HDPE Conduits Aviation 1,030.00000000 LF $162.00 R#03 Temporary Displaced Threshold Aviation 1.00000000 LS 7,700.00 7,7 R#05 16L Edge Circuit Repairs Aviation 1.00000000 LS $2,600.00 R#06 Remob Cost Aviation 1.00000000 LS $57000.00 $5,000.00, Aviation $296,240.00 Sub Total Additions $296,240.00 Change Order Additions Page 2 of 4 FO 'r WORTH City of Fort Worth Change Order Deletions Project Name I Alliance Airport-RTR Duct Bank and TM H Im vt City Sec# 46547 Client Project# 1 960 Contracw EAS Contracting,LP PMJ Ruseena Johnson Inspector Bilty Jones Change Order Submittal# Date 5/1/2015 DELETIONS ITEM DESCRIPTION DEPT City Unit Unit Cost Total 5 64 Sch 40 PVC Concrete Encased Aviation 147.00000000 LF 765.00 9,555.00 7 Directional Bore 6-4'HDPE Conduits Aviation 190.00000000 LF $130.00 9 Directional Bore 3-14'HDPE Carrier Pipes Aviation 542.00000000 LF $500.00 $271,000.00 Aviation $305,255.00 Sub Total Deletions $305,255.00 Change Order Deletions Page 3 of 4 M/SBE Breakdown for this Change Order M/SBE Sub Type of Service Amount for this CO N/A Total $0.00 Previous Change Orders CO# DATE AMOUNT N/A Total $0.00 CFW Change Order Approval CO-02 Page 2 of 3 FORTWORTHO city of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: 1 Change Order No.: CO-02 Date Started: 2015-05-15 City Sec. No.: 46547 Date Due: 2015-07-04 Project Name: 00960 - AFW RTR Duct Bank and Twy H Impvt 00960 DOE Numbers: Project Numbers: na Project Replacement of RTR Duct Bank and Improvements for Twy H Description: Project Manager: Ruseena Johnson City Inspector: Billy Jones Contractor: EAS COUNCIL ACTION (If Required): M&C Log Name: na M&C Number: M&C Date: COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: Aviation $ -9,015.00 GR14 541200 055218634800 28 Total Cost: $ -9,015.00 Total Requested Days: 28 Approval Status: https://proj ectpoint.buzzsaw.com/_bz_web/Forms/FormPrint.aspx?Siteld=51500&Processld=856... 7/17/2015 CFW Change Order Approval CO-02 Page 3 of 3 Approved: Yes Comments: I have reviewed the content of this change order # 1 and I approve it for further processing User: Billy Jones Date: 2015-05-20 10:40 AM Approved: Yes Comments: I have reviewed the content of this change order # 1 and I approve it for further processing User: James McKenzie Date: 2015-05-21 3:14 PM Approved: Yes Comments: User: Ruseena Johnson Date: 2015-05-22 10:41 AM Approved: Yes Comments: User: Christian Childs Date: 2015-06-08 9:11 AM Approved: Yes Comments: User: Tom Harris Date: 2015-07-07 9:55 PM Approved: Yes NO M&C REQUIRED Comments: User: James Burris Date: 2015-07-13 9:06 AM Approved: Yes Q��� Comments: �o �70 User: Grant Jordan �g $-•� Date: 2015-07-13 1:03 PM $ _ Am y. ��°°0000.1 Approved: Yes ' - .,,L�XA* Comments: User: Fernando Costa Date: 2015-07-16 6:47 PM 1 L'1� $eC eHU7 Action Required: OFFICIAL RECORD CITY SECRETARY FT. WORTH,TX https://projectpoint.buzzsaw.com/_bz_web/Forms/FormPrint.aspx?Siteld=51500&Processld=856... 7/17/2015 INTEROFFICE MEMORANDUM TO: MARY KAYSER, CITY SECRETARY FROM: ANNE-MARIE STOWE, ADMINISTRATIVE ASSISTANT SUBJECT: Change Order#1 EAS Contracting, LP DATE: July 17, 2015 Please find the electronically executed Change Order between the City of Fort Worth Aviation Department and EAS Contracting. • CO #1 & #2 are the same document due to a numbering error (document has been notated) • CO #3 is pending approval from Alliance (waiting Christian Childs to return to the office next week) • CO #4 currently being held by Grant Jordan, pending receipt of 1-3 (see above) • CO #5 is being challenged and could be rejected • CO #6 & #7 was submitted by contractor today and I am currently routing for approval Please send an email to zz_avi accounting(�fortworthtexas. ogv once the document has been uploaded and available to download for files. Should you have any questions or comments please contact me at (817) 392-5415 or send an email to anne-marie.stowe a,fortworthtexas.gov. Thank you Anne-Marie Stowe Sr. Administrative Assistant