Developer and Project Information Cover Sheet:
Developer Company Name: Pine Meadows Development Company LLC
Address, State,Zip Code: 5137 Davis Blvd
Phone: 817-281-3509 E-Mail: terry@sandlin.com
Authorized Signatory/Title: Terry Sandlin Manager
Project Name and Brief Description: Pine Meadows Ph 1
Project Location: 11500 Oak Grove Rd
Plat Case No.: FP-14-071 Plat Name: Pine Meadows Ph 1
Mapsco: Council District: 2 City Project No : 02516
CFA:' 2015-035 DOE: 7397
To be complete y sta Received by: Date:
1234 � ' ?
Q� 9
OFFICIAL RECORD RECEIVED
CITY SECRETARY JUL 162415 w
FT.1IPORTH,TX CITY OF FORT WORM
CITY SECRETARY
< n q £ Z
COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, the undersigned Developer ("Developer") desires to make certain
specific improvements as described below and on the exhibits attached hereto
("Improvements") related to a project generally described as Pine Meadows Phase 1
("Project") within the City of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the
Improvements or Project; and
WHEREAS, any future City participation in this CFA is subject to the availability
of City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community
Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the
Project.
NOW,THEREFORE,For and in consideration of the covenants and
conditions contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth, as amended, is
hereby incorporated into this Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder and to cause all
contractors hired by Developer to comply with the Policy in connection with
the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the Improvements. Developer acknowledges that the said
acceptance process requires the Developer's -contractor(s) to submit. an
2
affidavit of bills paid signed by its contractor and consent of surety signed
by its surety to ensure the contractor has paid any sub-contractors and
suppliers in full. Additionally, the contractor must also provide in writing
that the contractor has been paid in full by Developer for all the services
provided under their contract.
C. Developer agrees to cause the construction of the Improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City-
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A) X.
Sewer (A-1) X_, Paving (B) X , Storm Drain (B-1) X _, Street Lights &
Signs (C)X_
E. The Developer shall award all contracts for the construction of the
Improvements in accordance with Section II, paragraph 7 of the Policy and the
contracts shall be administered in conformance with paragraph 8, Section II, of
the Policy.
F. For all Improvements included in this Agreement for which the Developer .
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being prequalified, insured,
licensed and bonded to do work in public streets and/or to perform
water/waste water construction as the case may be.
ii. To require its.contractor to furnish to the City a payment and performance .
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the Improvements, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the Improvements valid for a period of two (2) years from the date of
final acceptance insuring the maintenance and repair of the constructed
infrastructure during the tern of the maintenance bond. All bonds to be
furnished before work is commenced and to meet the requirements of
3
Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer-awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the Certificate of Insurance
(ACORD or other state-approved form) supplied by the contractor's
insurance provider and bound in the construction contract book.
iv. To require its contractor to give at least 48 hours' advance notice of intent
to commence construction to the City's Construction Services Division so
that City inspection personnel will be available; to require the contractor to
allow the construction to be subject to inspection at any and all times by
City inspection forces, to not install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed .contract documents
submitted to the City in order to schedule a Pre-Construction Meeting. The
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City-issued
Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer shall provide, at its expense, all engineering drawings and
documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the Improvements contemplated herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
4
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the
City harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and fixture improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to any
property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said
Developer, his contractors, subcontractors, officers, agents or employees,
or in consequence of any failure to properly safeguard the work, or on
account.of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such injuries, death-or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and
hold harmless the City, its officers, agents and employees from and against
any and all-claims, suits or causes of action of any nature whatsoever,
whether real or asserted, brought for or on account of any injuries or
damages to persons or property, including death, resulting from, or in any
way connected with, the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees. Further, Developer will require its
contractors to indemnify, and hold harmless the City for any losses,
5
damages, costs or expenses suffered by the City or caused as a result of said
contractor's failure to complete the work and construct the improvements
in a good and workmanlike manner, free from defects, in conformance with
the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the
Improvements, Developer will assign to the City a non-exclusive right to
enforce the contracts entered into by the Developer with its contractor along
with an assignment of all warranties given by the contractor, whether express or
implied. Further, Developer agrees that all contracts with any contractor shall
include provisions granting to the City the right to enforce such contracts as an
express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share - of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIlV 2 YEARS
i. Developer shall complete the Improvements within two (2) years,
provided, however, if construction of the Improvements has started within
the two year period, the developer may request that the CFA be extended
for one additional year.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
6
agreement with its contractor or other related agreements.
ill. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements
if at the end of two (2) years from the date of this Agreement (and any
extension period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the Improvements or to cause the payment
of costs for construction of same before the expiration of two (2) years if
the Developer breaches this Agreement, becomes insolvent or fails to pay
costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Cost Summary Sheet
Project Name: Pine Meadows Phase 1
CFA No.: 2015-035 DOE No.: 7397
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $274,714
2.Sewer Construction $248,123.00
Water and Sewer Construction Total $ 522,837.30
B. TPW Construction
1.Street $ 513,823.04
2.Storm Drain $ 371,953.70
3.Street Lights Installed by Developer $ 70,707.80
TPW Construction Cost Total $ 956,484.54
Total Construction Cost(excluding the fees): $ 1,479,321.84
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 10,456.75
D. Water/Sewer Material Testing Fee(2%) $ 10,456.75
Sub-Total for Water Construction Fees $ 20,913.50
E. TPW Inspection Fee(4%) $ 35,431.07
F. TPW Material Testing(2%) $ 17,715.53
G.'Street Light I6sp9ection Cost $ 2,828.31
H. Street Signs Installation Cost
Sub-Total for TPW Construction Fees $ 55,974.91
Total Construction Fees: $ 76,888.41
Financial Guarantee Options Choose one Amount Mark choice
Bond= 100% $ 1,479,321.84
Completion Agreement= 100%/Holds Plat $ 1,479,321.84
Cash Escrow Water/Sanitary Sewer=125% $ 653,546.63
Cash Escrow Paving/Storm Drain= 125% $ 1,195,605.68
Letter of Credit= 125%w/2yr expiration period $ 1,849,152.30 x
8
EXHIBIT A
-o
C •a C
C C N W
E o
A u a Ln
o L
r a- ;E u
FO a
O r0 s Q U p
?� cwl
rct
u Q = v co
oMM
LL V e-1 t0
Q N n mW-i 40 O
to
qr � C
Cj p d0 s. •-+ O �[
C
0 p '°
� 41i u
La c
co
h
p 0N 3c 41
L
0 to as to 2
C
•--1 m cm-f co N C 0
E m Q a a, a
o E a
s p v L ° o41
a
L- p c! a L OLn
44 �' Y
Q .0 �p � A U Q) m
N ary fl, � O n
Co i, U O
m D a 41 CO `
LnCDC m 3 N t O r+
al ei O O U
ri �t � n C O co
vm CA Q, c
u .� a t
a -0 3 0 +' m Y
N N Z3 a
N'
O "Q a1 a7 a! vi a2
dco
7cN Ln ►00
n.�4
OQ cn mtA
"a
mtN
ai Md L -Q .O -0 0 O0
C N NLn C to y O O 0 L 2
cv p O w 0- CD
c
,SE 06
E _ fi" (U ami aa'i Y v C]
A u p .Q v 3 a v v v d a m
ate+ C1 1 0 m aa a n a ++ J
A C a7 V U Q fl_ OL m
Ln t U U U p Y
d D Ln v LA LAOu t0 Ln Ln Ln Ln m O
C F- m
O a N Q w W to LO W u
3 Z > v Ln Ln Ln to
O 41 cr
OC ocL1] d a/ N
_V 7 w m Y Y _J w W W J J _C
E v O 3 J J J J d t
CL s
J C C _O %Abo
N C C O
C C Q .`1 N N N 1 L fY
10 C
T V E C ^ m
CL V -2 to 7 ~ m A 7
Fu
E C O Y� m m O
s Ln
-� LO
J c wd m „ mjs
.�
a� c u0 en o Sr14 N g o'ao
o ai s 00
OL
E CL 00
a u' `S {
3 C 7 C C c rl
77 COL ft fa
nno ro
go z z 0
]� c
W Z M C .. U G! U t? W r1
F c c c c C C C C u m
3 � � � �
CHISOS TRAIL r�Ryi� c,�oA
W 4q'9p
z .O I
� Z
a
o Lj¢ JENNY LAKE TRAIL
� J A
1
z
N.T.S.
O
Q
0 N. TARRANT PARKWAY w
z
0
z =
Li U
PROJECT a
0 LOCATION
m
THOMPSON ROAD z
4'104
HEFITA E WA,t C=RI��
z LIQ APPLEYARD DR v
i
M
svw n� o '�tq I ' o 0 0
W
DR
Z r_
Ln ' a' 'Y p z
_���1 vzi
LZ I a
D SUMMERVIELDS BOULEVARD im
D.O.E. NO. 7387
WATER NO. P265-604150251683
SANITARY SEVER Na P275-704130251683
LOCATION MAP STREET/STORM DRAM) NO. W-2356
CITY PROJECT NO. 02516
"PINE MEADOWS - PHASE 1" x-22974
WELCH ENO O. INC.
CONSUL TING ENGINEERS
c�106i IQ's [laii �
RIM ,w
100% DEVELOPER'S COST
I ( 10- ANO 8' WATER LIDS. FIRE HYDRANTS.
GATE VALVES AND ASSOCIATED
- I APPURTENANCES
war s-r
FF
war. rw SCALE: 1'=2aO'—
wrP.
? I j
PEACH B:
Lu — - - - - - I o
d I
_
-- -- Y
L
oOlc
I _ _ .._ .
---� � Pans. e'
13'*-
?~ -use t'71T TF7'
rir
—1
D.O.E. NO. 7397
EXHIBIT "A" WATER NO. P265-6041502516x3
SAMTARY SEWER NO. P275-704130251OW
WATER IMPROVEMENTS STREET/STORM DRAMI NO. W-2356
TY"PINE MEADOWS -- PHASE 1" X 229774 NO, 02516
WEx,cH Erie p, INC.
CONSUL 77NG ENG/NE-ERS
00 42 43
DAP-BID PROPOSAL
Page I of
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM 4/27/2015
PINE MEADOWS,PHASE 1 RI
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item No Description Specification Unit of Bid Unit Price Bid Value
Section No. Measure Quantity
UNIT I:WATER IMPROVEMENTS
3311.0161 6"Water Pipe 33 11 12 LF 87 $30.0 $2,610.0
331 1.0261 8"Water Pipe 33 11 12 LF 4,368 $23.30 $101,774.4
331 1.0341 10"Water Pipe 33 11 12 LF 124 $43.0 $5,332.0
3312.3002 6"Gate Valve 33 1220 EA 8 $925.0 $7,400.0
3312.3003 8"Gate Valve 33 1220 EA 16 $1,300.0 $20,800.0
3312.3004 10"Gate Valve 33 1220 EA 2 $1,950.0 $3,900.0 ,
3312.4107 8"x 12"Tapping Sleeve&8"Gate Valve 33 12 25 EA 2 $3,700.0 $7,400.0
3312.0117 Connect.to Existing 12"Water Main 33 1225 EA 2 $1,300.0 $2,600.0
33120001 Fire Hydrant 33 1240 EA 8 $2,870.0 $22,960.0
3311.0001 Ductile Iron Water Fittings 33 11 11 TON 3 $2,650.00 $7,950.0
3305.0109 Trench Safety 3305 10 LF 4,579 $0.10 $457.9
3312.2003 1"Water Service 33 12 10 EA 112 $665.00 $74,480.0
0241.1000 Remove Concrete 0241 15 Sy 180 $1 0.00 $1,800.0
0241.0100 Remove Sidewalk 0241 13 SF 40 $2.00 $80.0
3213.0150 10"Concrete Pavement 33 13 13 SY 180 $75.00 $13,500.0
3213.0301 4"Concrete Sidlewalk 32 1320 SF 40 $8.00 $320.0
0241.1511 Salvage 3/4"Water Meter 0241 14 EA 6 $225.00 $1,350.0
TOTAL UNIT I:WATER IMPROVEMENT $274,714.30
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version April 2,2014 0042 43-RKM BID CONTRACT BID DAP PINE MEADOWS PHASE I-BID TIEMS .201302A-07-09-15
jk� \
£9L
2 %
! §
2 c 2 = -
* . - _ - -
2 � 9 9 in
§ b §
CD
cl
x {
)
§
x �
{
� \
�
� {
d
2
� ( i
-
�
-
� \ F
� \ §
< < <
22 ■
>
[
/ / «
E \ d
2 auj
- !
2f 2 )
§ [ ( 0 - ®
IL§ a [ ] § ■ k
§ � k
J ` !
� W� c � ■ ® � � k (
W / § \ � � � ■ k § �
} � ) �-
�k
Q ;ce . u _3 - ! $ -
■ a 7 � E - S F - _
§ / 5 5 �'§ / 0" %
F-
RM
t1
P-ss
"pram a-ss FOSSIL TREE LANE I
i - r
F Ej ,ROADin
LLA
twa
I z
r _ _ MOLLY BRc?01< LANE moor '-
PROP s-ss
i
THOA PEON ROAD
c
100% DEVELOPER'S COST
B' SANITARY SEWER LINES
AND ASSOCIATED APPURTFNANCES
SCALE: ,`--OC,'
D.OZ NO. 7387
HMIT ::A'—"1 99 WATER NO. P265-504150251583
SANITARY SEWER NO. P275-704130251683
SANITARY SERVER IMPROVEMENTS STREE7/sTORM DRAIN NO. W-23M
OJE
"PINE MEADOWS --
PHASE lm p 2297 CT N0. 02316
WELAcH EWC)WEMRIN0, I WC.
CONSUL TYIVG ENGWEEWS
s
00 42 43
DAP-BID PROPOSAL
Page 2 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM 4/27/2015
PINE MEADOWS,PHASE 1 RI
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
Bidlist Item No Description Specification I Unit of Bid Unit Price Bid Value
Section No. Measure Quantity
UNIT II:SANITARY SEWER IMPROVEMENTS
3331.41 15 8"Sewer Pipe 33 31 20 LF 2,786 $27.00 $75,222.0
3331.4116 8"Sewer Pipe,CSS Backfill 33 11 10 LF 142 $39.00 $5,538.0
3331.4201 10"Sewer Pipe 33 31 20 LF 806 $34.00 $27,404.0
3331.4202 10"Sewer Pipe,CSS Backfill 33 11 10 LF 106 $45.00 $4,770.0
3339.1001 4'Manhole 33 39 20 EA 13 $2,885.0 $37,505.0
3339.1002 4'Drop Manhole 33 39 20 EA 2 $4,685.0 $9,370.0
3339.1003 4'Extra Depth Manhole 33 3920 VF 43 $100,0 $4,300.0
3305.0107 Manhole Adjustment,Minor 3305 14 EA 1 $2,950.0 $2,950.0
3331.3102 4"Sewer Service,Two-way cleanout 3331 50 EA 110 $535.0 $58,850.0
3331.3202 6"Sewer Service,Two-way cleanout 33 31 50 EA 1 $780.00 $780.0
3301.0002 Post-CCTV Inspection 3301 31 LF 3,840 $1.00 $3,840.0
3301.0101 Manhole Vacuum Testing 330130 EA 14 $100.00 $1,400.0
3339.0001 Epoxy Manhole Liner 33 3960 VF 12 $250.00 $3,000.0
3305.0109 Trench Safety 3305 10 LF 3,840 $0.10 $384.0
3305.01 13 Trench Water Stops 3305 10 EA 8 $550.00 $4,400.0
0241.2011 Remove 4"Sewer Line 0241 14 LF 30 $12.00 $360.0
0241.1000 Remove Concrete Pavement 0241 15 Sy 36 $10.00 $360.0
0241.0100 Remove Sidewalk 0241 13 SF 39 $2.00 $78.0
3213.0105 10"Concrete Pavement 33 13 13 Sy 36 $75.00 $2,700.0
3213.0301 4"Concrete Sidewalk 32 1320 SF 39 $8.00 $312.0
0241.0402 Remove Asphalt Drive 0241 13 Sy 29 $10.00 $290.0
3201.0117 10'Wide Asphalt Pavement Repair,Residential 3201 17 Sy 29 $40.00 $1,160.0
0241.2101 4"Sewer Abandonment Plug 0241 14 EA 7 $450.00 $3,150.0
TOTAL UNIT II:SANITARY SEWER IMPROVEMENT $248,123.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version April 2,2014 00 42 43-R-KM BID CONTRACT BID DAP PINE MEADOWS PHASE I-BID TIEMS -201302A-07-09.15
x _ <
x o .o C,
I r N M
G ~ �
Y
1�
x Con _
c
04
i
c
I� -
Z
04
y <
14
cn
z —
� U.
_ z
G � �
7
Ix
c4 - cSL
a _
IL J _ - - i d - - C C O ♦ 4 O •~ 4 G 'i c
NQM N N N N r. -- r Ui O D ri r c rr o LU -
!q ~ r W =
a ul
ri O
r
0-
C3
-o
z vdi -
O ? K
CL
t
g z
4n e
3 J _
a u u x
0 v A 4 t
Y � 0
LL jt L b 6
a.
SSIL 2EANrE —J
'T11
1�
22'e-8
0-1111 PEACH BLOSSOM ROAD
g �
w_ O d
fTf
ITj .
f a
HOLLY BROOK LAME I --
�.—� i_.
y ,
THOMPSON ROAD
1
=OOX DEVELOPER'S COST
6" PAVEMENT W/2% CROSS SLOPE
ON 6" LIME SUBGRADE
100% DEVELOPER'S COST
7" PAVEMENT W/2X CROSS SLOPE
ON 8' LIME SUBGRADE
SCALE: 1"-200'
EXHIBIT "B" WAM NO. 7397
ATFR N0. P265-604150251583
SAWARY SEVER NO. P275-704130251683
PAVING IMPROVEMENTS S7RU'Y/STORM DRAIN NO. W-23W
"PINE MEADOWS - PHASE 1" CITY x-22997474 No. 02516
WELcH ENonqnaRvqo I Nc.
CONSUL 77NG ENGINEERS
00 42 43
DAP-BID PROPOSAL
Page 4 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM 4/27/2015
PINE MEADOWS,PHASE I RI
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
Bidlist Item No Description Specification Unit of BidSection No. Measure Quantity Unit Price Bid Value
UNIT IV: PAVING IMPROVEMENTS
3213.0101 6"Conc Pvmt 32 13 13 SY 9,399 $32.00 $300,768.0
321 1.0501 6"Lime Treatment 32 11 29 SY 10,010 $3.15 $31,531.313
321 1.0400 Hydrate Lime 32 11 29 TN 150.15 $175.00 $26,276.0
3213.0102 7"Cone Pvmt 32 13 13 SY 2.720 $37.00 $100,640.0
3211.0502 8"Lime Treatment 32 11 29 SY 2,897 $3.50 $10,138.8
3211.0400 Hydrate Lime 32 11 29 TN 57.96 $175.00 $10,143.8
3213.0301 4"Concrete Sidewalk 32 1320 SF 150 $4.00 $600.0
3213.0506 Barrier Free Ramp-Type P-1 32 1320 EA 4 $1,250.00 $5,000.0
3213.0501 Barrier Free Ramp-Type R-1 321320 EA 12 $925,00 $11,100,0
3441.4003 Furnish&Install Ground Mount Sign Post and Sign 3441 30 EA 8 $650.00 $5,200.0
3217.0501 24"Solid White Stop Bar Paint(W) 32 1723 LF 24 $35.00 $840.0
9999.0002 Street barricade(street dead ends) 31 3600 LF 60 $61.00 $3,660.0
0241.0100 Remove Sidewalk 0241 13 SF 128 $8.00 $1,024.00
0241.1000 Remove Concrete Pavement 0241 15 SY 380 $8.00 $3,040.00
3213.0301 4"Concrete Sidewalk 32 1320 SF 327 $4.00 $1,308.00
3213.0150 10"Concrete Pavement 33 13 13 LF 1 1 1 $23.00 $2,553.00
TOTAL UNIT IV: PAVING IMPROVEMENTS $513,823.04
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version April 2,2014 00 42 43-RYM BID CONTRACT BID DAP PINE MEADOWS PHASE I-BID TIEMS -201302A-07-09-15
K 4.
N as 'S O x O to — F
cr — In 1 'S In f. N `O r oC N —
M C — r x —
... ? J rl rl C
r —
? i
L '
N
.�i
O
t
J
L
C
raj N Ii0 M — o
" In L
x ' _
rt r
p
Z N
N�r
F � _
N
7� G
N O
rn
_ N �
V
O— lc> N N
f7 N N
N r,
_ _
U I G
�—
cc
a r+t a
_ F-
G,
LL
JQ _ I � � N ry N N• rl N ry r _
U3AI
U
z __ a
e C
J <
d
C>
L
O 2 i J
c
LU
.i 9 E C =x p
IL 2 O o
a c _ a c cl o a r o p2i o - o Q
Z
a ••• ,�
4"
01 WON
FOr LOPY wAft
4,sm7FjF
-
w
,I4 -
♦1'Rol
i
I
c — EACH
POSL ROD
� I
- HOLLY SFOCW LANE �
CL
THOMPSON ROAD
1 ,
10', 15, OR 20' INLET-,
T 100% DEVELOPER'S COST
STORM SEWER AND INLET
ANO ASSOCIATEP APPLWITENANCES
SCALE: $"-200'
EXHIBIT "H_1_" w�TM NO.NO. 'P�zE5604150251W3
STORM DRAIN IMPROVEMENTS SANITARY SEWER NO. P275-704130251883
STREET/STORM DRAW NO. W-23M
"PINE MEADOWS -- PHASE 1" CITY PROJECT NO. 02515
X-22574
Wax ENOn�O, I NC.
CONSUL 77NG ENGINEERS
00 42 43
DAP-BID PROPOSAL
Page 3 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM 4/27/2015
PINE MEADOWS,PHASE I RI
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item No Description Specification Unit of Bid
Section No. Measure Quantity Unit Price Bid Value
UNIT III:DRAINAGE IMPROVEMENTS
3305.0109 Trench Safety 3305 10 LF 2169 $0.30 $650.7
3341.1201 5'x 3'Box Culvert 3341 10 LF 63 $255.0 $16,065.0
3341.0409 48"RCP,Class 111 334110 LF 721 $151.0 $108,871.0
3341.0404 42" RCP,Class 111 3341 10 LF 561 $123.0 $69,003.0
3341.0311 36"RCP,Class 111 3341 10 LF 170 $100.0 $171000.0
3341.0302 30"RCP,Class 111 3341 10 LF 317 $70.00 $22,190.0
3341.0209 27"RCP,Class 111 3341 10 LF 32 $66.00 $2,1 12.0
3341.0205 24"RCP,Class 111 3341 10 LF 305 $54.00 $16,470.0
3349.7001 4'SQ.Y-Inlet 33 49 20 EA 1 $3,800.00 $3,800.0
3349.0002 5'Storm Junction Box 3349 10 EA 3 $4,400.00 $13,200.0
3349.0006 Storm Junction Structure 3349 10 EA 1 $4,600.0 $4,600.0
3349.5001 10'Curb Inlet 33 49 20 EA 4 $3,000.0 $12,0000
3349.5002 15'Curb Inlet 33 49 20 EA 5 $3,300.00 $16,500.0
3349.5003 20'Curb Inlet 33 49 20 EA I $3,500.00 $3,500.0
9999.0001 �3',TXDOT 4:1,SETB-CD Safety End Treatment 33 49 40 EA 1 $4,600.0 $4,600.0
9999.0002 48 and 2-36",TXDOT 4:1,SETB-CD Safety End 33 49 40 EA 2 $1 0,000.0c $20,000.0
Treatment HW
9999.0003 DuaH�1 48"-TXDOT 4:1,SETB-CD Safety End Treatmen 33 49 40 EA 1 $8,000.0 $8,000.0
9999.0004 6"Depth Concrete Flume,6"x6"WW'M(3,500 psi) 32 1320 SF 2,500 $8.00 $20,000.0
3137.0104 Medium Stone,Riprap,dry 31 3700 SY 216 $6100 $13,392.0
TOTAL UNIT ill:DRAINAGE IMPROVEMENT $371,953.70
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version April 2,2014 00 42 43-RKM BID CONTRACT BID DAP PINE MEADOWS PHASE I-BID TIEMS -201302A-07-09-15
o
a R
0
M D ^ N kn — r1 — K v — N N �C
in
ri
r
s
Y•
i
s.
i
c
Ge C
cy.
}( L en �O oC N
M
E.y G
lLL�
C�
2 —
a
1 r ry v� N r ri z
re 7
vy —
ti
D
g
G Z .7 O O O O G_ O O n C O_ ry nl ry e c n c
a
Ju r n n ru e+l
..� M
O < c
a < ~ S
m Oui
a Z 3 g 3
N 0 z o K
c 9 � s
v o .,
CD N p D .`
u
_
F ° s
a
mW el :r p
77 E_
LLI
6 C £ er @ O NOC. pia+ bQry r8e. Qp 8N r� rpQ• 1f q
O r1 C C CC g
1
F SI E 1 1
1 t`�
F�O
f
I L-
—� -- Oui
S$OM
K JL
VOL, Y e#aOOK LANE
Y — T
r
THc>w+aSO�r ROAD
I
— PROPOSED STREET LIGHT (100% DEVELOPER'S COST)
PROPOSED STREET SIGN (IOOX DEVELOPER'S COST)
■ -- PROPOSED GROUND 80X (IGO% DEVELOPER'S COST)
SCALE: 200'
"C„ WAD.O.E. No. 7397
EXHIBIT
WATER N0. P265-804150251583
SANITARY SEWER NO. P275-704130251683
STREET LIGHTS STREET/STORM DRAIN NO. W-2356
"PINE MEADOWS — PHASE 1 " CITY PROJECT N0. 02518
x-2zs7a
WE3.cH E rice o, I Nc.
CONSUL TING ENGINEERS
w < Y -
�„ f c
L 4
C
c a
s
- i
10 1 O
e! C
ca
� F _
:t O
F
S
4
f
G
L
X z
d
b
x f
Q
c
E-
z
CY
N N
.J P
< < ¢ 4
� c K
L o > v e O o rr
Q 7 � M M M N M
4
4D 1 v: Z i
a e
�a
e9 {) a
W 3
v r 9 t
e4 a ` O e a
a C lz E 4
Ziai
IL m o
� s
IL e
00 42 43
DAP-BID PROPOSAL
Page S or 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM 4/27/2015
PINE MEADOWS,PHASE 1 RI
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item No Description Specification I Unit of Bid Unit PriceBid Value
Section No. Measure Quantity 7
UNIT V:STREET LIGHTING IMPROVEMENTS
3441.1502 FumishAnstall Ground Box,Type B 3441 10 EA 16 $555.00 $8,880.0
9999.0000 Rdwy Ilium Assembly TY D-25,70W LED Single 3441 20 EA 16 $2,300.00 $36,800.0
3441.3301 FumishAnstall Rdwy Illum Foundation TY I,2 and 4 3441 20 EA 16 $1,050.00 $16,800.0
2605.3015 2 Inch Conduit PVC SCH 80(T) 26 05 33 LF 653 $9.85 $6,432.0
3441.3401 6-6-6 Triplex Alum Electric Conductor 3441 10 CLF 653 $2.75 $1,795.7
TOTAL UNIT V:STREET LIGHTING IMPROVEMENT $70,707.80
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version April 2,2014 00 42 43-RKM BID CONTRACT BID DAP PINE MEADOWS PHASE 1-BID TIEMS -201302A-07-09-15
00 42 43
DAP-BID PROPOSAL
Page 7 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM 4/27/2015
PINE MEADOWS,PHASE I RI
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item No Description Specification Unit of Bid Unit Price Bid Value
Section No. I Measure Quantity
Bid Summary
UNIT I:WATER IMPROVEMENTS $274,714.30
UNIT II: SANITARY SEWER IMPROVEMENTS $248,123.00
UNIT III: DRAINAGE IMPROVEMENTS $371,953.70
UNIT IV: PAVING IMPROVEMENTS $513,823.04
Total Construction Bidl $1,408,614.04
Contractor agrees to complete WORK for FINAL ACCEPTANCE 90days working days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version April 2,2014 00 42 43-RKM BID CONTRACT BID DAR PINE MEADOWS PHASE 1-BID TIEMS .201302A-07-09-IS
e
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said p per has execute(thisU
instrument in adruplicate, at Fort Worth, Texas this � day of t
20 .
CITY OF FORT WORTH-Recommended by:
Water Department Transportation & Public Works Department
''CWendy Chi- bulal, EMBA, P.E. ouglas W. Wiersig, P.E.
Development Engineering Manager Director
Approved as to Form &Legality: Approved by City Manager's Office
Douglas W. Black Fernando Costa
Assistant City'' ((Attorney Assistant City Manager
M&C No. �j
Date:
ATTEST: 0 o �
Mary J. Kaye
City Secretary
r1�Xp1s
ATTEST: DEVELOPER: Pine Meadows Development Co LLC
L ' S I tA-
wD�-I
Signature Signatu
(Print)Name: Print Name:Terry Sand Iin
Title: Manager
OFFICIAL RECORD
CITY SECRETARY
F;.WORTH;Tx
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
❑ Location Map
❑ Exhibit A: Water Improvements
❑ Water Estimate
❑ Exhibit A-1: Sewer Improvements
❑ Sewer Estimate
❑ Exhibit B: Paving Improvements
❑ Paving Estimate
❑ Exhibit B-1: Storm Drain Improvements
❑ Storm Drain Estimate
❑ Exhibit C: Street Lights and Signs Improvements
❑ Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)