HomeMy WebLinkAboutContract 46848 CITY SECRETAW g CONTRACT NO. Developer and Project Information Cover Sheet: Developer Company Name: Pine Meadows Development Company LLC Address, State,Zip Code: 5137 Davis Blvd Phone: 817-281-3509 E-Mail: terry@sandlin.com Authorized Signatory/Title: Terry Sandlin Manager Project Name and Brief Description: Pine Meadows Ph 1 Project Location: 11500 Oak Grove Rd Plat Case No.: FP-14-071 Plat Name: Pine Meadows Ph 1 Mapsco: Council District: 2 City Project No : 02516 CFA:' 2015-035 DOE: 7397 To be complete y sta Received by: Date: 1234 � ' ? Q� 9 OFFICIAL RECORD RECEIVED CITY SECRETARY JUL 162415 w FT.1IPORTH,TX CITY OF FORT WORM CITY SECRETARY < n q £ Z COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Pine Meadows Phase 1 ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the Project. NOW,THEREFORE,For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer acknowledges that the said acceptance process requires the Developer's -contractor(s) to submit. an 2 affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub-contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City- approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) X. Sewer (A-1) X_, Paving (B) X , Storm Drain (B-1) X _, Street Lights & Signs (C)X_ E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer . awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii. To require its.contractor to furnish to the City a payment and performance . bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the tern of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of 3 Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed .contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the 4 community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and fixture improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account.of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death-or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all-claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, 5 damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share - of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIlV 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its 6 agreement with its contractor or other related agreements. ill. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet Project Name: Pine Meadows Phase 1 CFA No.: 2015-035 DOE No.: 7397 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $274,714 2.Sewer Construction $248,123.00 Water and Sewer Construction Total $ 522,837.30 B. TPW Construction 1.Street $ 513,823.04 2.Storm Drain $ 371,953.70 3.Street Lights Installed by Developer $ 70,707.80 TPW Construction Cost Total $ 956,484.54 Total Construction Cost(excluding the fees): $ 1,479,321.84 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 10,456.75 D. Water/Sewer Material Testing Fee(2%) $ 10,456.75 Sub-Total for Water Construction Fees $ 20,913.50 E. TPW Inspection Fee(4%) $ 35,431.07 F. TPW Material Testing(2%) $ 17,715.53 G.'Street Light I6sp9ection Cost $ 2,828.31 H. Street Signs Installation Cost Sub-Total for TPW Construction Fees $ 55,974.91 Total Construction Fees: $ 76,888.41 Financial Guarantee Options Choose one Amount Mark choice Bond= 100% $ 1,479,321.84 Completion Agreement= 100%/Holds Plat $ 1,479,321.84 Cash Escrow Water/Sanitary Sewer=125% $ 653,546.63 Cash Escrow Paving/Storm Drain= 125% $ 1,195,605.68 Letter of Credit= 125%w/2yr expiration period $ 1,849,152.30 x 8 EXHIBIT A -o C •a C C C N W E o A u a Ln o L r a- ;E u FO a O r0 s Q U p ?� cwl rct u Q = v co oMM LL V e-1 t0 Q N n mW-i 40 O to qr � C Cj p d0 s. •-+ O �[ C 0 p '° � 41i u La c co h p 0N 3c 41 L 0 to as to 2 C •--1 m cm-f co N C 0 E m Q a a, a o E a s p v L ° o41 a L- p c! a L OLn 44 �' Y Q .0 �p � A U Q) m N ary fl, � O n Co i, U O m D a 41 CO ` LnCDC m 3 N t O r+ al ei O O U ri �t � n C O co vm CA Q, c u .� a t a -0 3 0 +' m Y N N Z3 a N' O "Q a1 a7 a! vi a2 dco 7cN Ln ►00 n.�4 OQ cn mtA "a mtN ai Md L -Q .O -0 0 O0 C N NLn C to y O O 0 L 2 cv p O w 0- CD c ,SE 06 E _ fi" (U ami aa'i Y v C] A u p .Q v 3 a v v v d a m ate+ C1 1 0 m aa a n a ++ J A C a7 V U Q fl_ OL m Ln t U U U p Y d D Ln v LA LAOu t0 Ln Ln Ln Ln m O C F- m O a N Q w W to LO W u 3 Z > v Ln Ln Ln to O 41 cr OC ocL1] d a/ N _V 7 w m Y Y _J w W W J J _C E v O 3 J J J J d t CL s J C C _O %Abo N C C O C C Q .`1 N N N 1 L fY 10 C T V E C ^ m CL V -2 to 7 ~ m A 7 Fu E C O Y� m m O s Ln -� LO J c wd m „ mjs .� a� c u0 en o Sr14 N g o'ao o ai s 00 OL E CL 00 a u' `S { 3 C 7 C C c rl 77 COL ft fa nno ro go z z 0 ]� c W Z M C .. U G! U t? W r1 F c c c c C C C C u m 3 � � � � CHISOS TRAIL r�Ryi� c,�oA W 4q'9p z .O I � Z a o Lj¢ JENNY LAKE TRAIL � J A 1 z N.T.S. O Q 0 N. TARRANT PARKWAY w z 0 z = Li U PROJECT a 0 LOCATION m THOMPSON ROAD z 4'104 HEFITA E WA,t C=RI�� z LIQ APPLEYARD DR v i M svw n� o '�tq I ' o 0 0 W DR Z r_ Ln ' a' 'Y p z _���1 vzi LZ I a D SUMMERVIELDS BOULEVARD im D.O.E. NO. 7387 WATER NO. P265-604150251683 SANITARY SEVER Na P275-704130251683 LOCATION MAP STREET/STORM DRAM) NO. W-2356 CITY PROJECT NO. 02516 "PINE MEADOWS - PHASE 1" x-22974 WELCH ENO O. INC. CONSUL TING ENGINEERS c�106i IQ's [laii � RIM ,w 100% DEVELOPER'S COST I ( 10- ANO 8' WATER LIDS. FIRE HYDRANTS. GATE VALVES AND ASSOCIATED - I APPURTENANCES war s-r FF war. rw SCALE: 1'=2aO'— wrP. ? I j PEACH B: Lu — - - - - - I o d I _ -- -- Y L oOlc I _ _ .._ . ---� � Pans. e' 13'*- ?~ -use t'71T TF7' rir —1 D.O.E. NO. 7397 EXHIBIT "A" WATER NO. P265-6041502516x3 SAMTARY SEWER NO. P275-704130251OW WATER IMPROVEMENTS STREET/STORM DRAMI NO. W-2356 TY"PINE MEADOWS -- PHASE 1" X 229774 NO, 02516 WEx,cH Erie p, INC. CONSUL 77NG ENG/NE-ERS 00 42 43 DAP-BID PROPOSAL Page I of SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM 4/27/2015 PINE MEADOWS,PHASE 1 RI UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No Description Specification Unit of Bid Unit Price Bid Value Section No. Measure Quantity UNIT I:WATER IMPROVEMENTS 3311.0161 6"Water Pipe 33 11 12 LF 87 $30.0 $2,610.0 331 1.0261 8"Water Pipe 33 11 12 LF 4,368 $23.30 $101,774.4 331 1.0341 10"Water Pipe 33 11 12 LF 124 $43.0 $5,332.0 3312.3002 6"Gate Valve 33 1220 EA 8 $925.0 $7,400.0 3312.3003 8"Gate Valve 33 1220 EA 16 $1,300.0 $20,800.0 3312.3004 10"Gate Valve 33 1220 EA 2 $1,950.0 $3,900.0 , 3312.4107 8"x 12"Tapping Sleeve&8"Gate Valve 33 12 25 EA 2 $3,700.0 $7,400.0 3312.0117 Connect.to Existing 12"Water Main 33 1225 EA 2 $1,300.0 $2,600.0 33120001 Fire Hydrant 33 1240 EA 8 $2,870.0 $22,960.0 3311.0001 Ductile Iron Water Fittings 33 11 11 TON 3 $2,650.00 $7,950.0 3305.0109 Trench Safety 3305 10 LF 4,579 $0.10 $457.9 3312.2003 1"Water Service 33 12 10 EA 112 $665.00 $74,480.0 0241.1000 Remove Concrete 0241 15 Sy 180 $1 0.00 $1,800.0 0241.0100 Remove Sidewalk 0241 13 SF 40 $2.00 $80.0 3213.0150 10"Concrete Pavement 33 13 13 SY 180 $75.00 $13,500.0 3213.0301 4"Concrete Sidlewalk 32 1320 SF 40 $8.00 $320.0 0241.1511 Salvage 3/4"Water Meter 0241 14 EA 6 $225.00 $1,350.0 TOTAL UNIT I:WATER IMPROVEMENT $274,714.30 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 0042 43-RKM BID CONTRACT BID DAP PINE MEADOWS PHASE I-BID TIEMS .201302A-07-09-15 jk� \ £9L 2 % ! § 2 c 2 = - * . - _ - - 2 � 9 9 in § b § CD cl x { ) § x � { � \ � � { d 2 � ( i - � - � \ F � \ § < < < 22 ■ > [ / / « E \ d 2 auj - ! 2f 2 ) § [ ( 0 - ® IL§ a [ ] § ■ k § � k J ` ! � W� c � ■ ® � � k ( W / § \ � � � ■ k § � } � ) �- �k Q ;ce . u _3 - ! $ - ■ a 7 � E - S F - _ § / 5 5 �'§ / 0" % F- RM t1 P-ss "pram a-ss FOSSIL TREE LANE I i - r F Ej ,ROADin LLA twa I z r _ _ MOLLY BRc?01< LANE moor '- PROP s-ss i THOA PEON ROAD c 100% DEVELOPER'S COST B' SANITARY SEWER LINES AND ASSOCIATED APPURTFNANCES SCALE: ,`--OC,' D.OZ NO. 7387 HMIT ::A'—"1 99 WATER NO. P265-504150251583 SANITARY SEWER NO. P275-704130251683 SANITARY SERVER IMPROVEMENTS STREE7/sTORM DRAIN NO. W-23M OJE "PINE MEADOWS -- PHASE lm p 2297 CT N0. 02316 WELAcH EWC)WEMRIN0, I WC. CONSUL TYIVG ENGWEEWS s 00 42 43 DAP-BID PROPOSAL Page 2 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM 4/27/2015 PINE MEADOWS,PHASE 1 RI UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item No Description Specification I Unit of Bid Unit Price Bid Value Section No. Measure Quantity UNIT II:SANITARY SEWER IMPROVEMENTS 3331.41 15 8"Sewer Pipe 33 31 20 LF 2,786 $27.00 $75,222.0 3331.4116 8"Sewer Pipe,CSS Backfill 33 11 10 LF 142 $39.00 $5,538.0 3331.4201 10"Sewer Pipe 33 31 20 LF 806 $34.00 $27,404.0 3331.4202 10"Sewer Pipe,CSS Backfill 33 11 10 LF 106 $45.00 $4,770.0 3339.1001 4'Manhole 33 39 20 EA 13 $2,885.0 $37,505.0 3339.1002 4'Drop Manhole 33 39 20 EA 2 $4,685.0 $9,370.0 3339.1003 4'Extra Depth Manhole 33 3920 VF 43 $100,0 $4,300.0 3305.0107 Manhole Adjustment,Minor 3305 14 EA 1 $2,950.0 $2,950.0 3331.3102 4"Sewer Service,Two-way cleanout 3331 50 EA 110 $535.0 $58,850.0 3331.3202 6"Sewer Service,Two-way cleanout 33 31 50 EA 1 $780.00 $780.0 3301.0002 Post-CCTV Inspection 3301 31 LF 3,840 $1.00 $3,840.0 3301.0101 Manhole Vacuum Testing 330130 EA 14 $100.00 $1,400.0 3339.0001 Epoxy Manhole Liner 33 3960 VF 12 $250.00 $3,000.0 3305.0109 Trench Safety 3305 10 LF 3,840 $0.10 $384.0 3305.01 13 Trench Water Stops 3305 10 EA 8 $550.00 $4,400.0 0241.2011 Remove 4"Sewer Line 0241 14 LF 30 $12.00 $360.0 0241.1000 Remove Concrete Pavement 0241 15 Sy 36 $10.00 $360.0 0241.0100 Remove Sidewalk 0241 13 SF 39 $2.00 $78.0 3213.0105 10"Concrete Pavement 33 13 13 Sy 36 $75.00 $2,700.0 3213.0301 4"Concrete Sidewalk 32 1320 SF 39 $8.00 $312.0 0241.0402 Remove Asphalt Drive 0241 13 Sy 29 $10.00 $290.0 3201.0117 10'Wide Asphalt Pavement Repair,Residential 3201 17 Sy 29 $40.00 $1,160.0 0241.2101 4"Sewer Abandonment Plug 0241 14 EA 7 $450.00 $3,150.0 TOTAL UNIT II:SANITARY SEWER IMPROVEMENT $248,123.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 00 42 43-R-KM BID CONTRACT BID DAP PINE MEADOWS PHASE I-BID TIEMS -201302A-07-09.15 x _ < x o .o C, I r N M G ~ � Y 1� x Con _ c 04 i c I� - Z 04 y < 14 cn z — � U. _ z G � � 7 Ix c4 - cSL a _ IL J _ - - i d - - C C O ♦ 4 O •~ 4 G 'i c NQM N N N N r. -- r Ui O D ri r c rr o LU - !q ~ r W = a ul ri O r 0- C3 -o z vdi - O ? K CL t g z 4n e 3 J _ a u u x 0 v A 4 t Y � 0 LL jt L b 6 a. SSIL 2EANrE —J 'T11 1� 22'e-8 0-1111 PEACH BLOSSOM ROAD g � w_ O d fTf ITj . f a HOLLY BROOK LAME I -- �.—� i_. y , THOMPSON ROAD 1 =OOX DEVELOPER'S COST 6" PAVEMENT W/2% CROSS SLOPE ON 6" LIME SUBGRADE 100% DEVELOPER'S COST 7" PAVEMENT W/2X CROSS SLOPE ON 8' LIME SUBGRADE SCALE: 1"-200' EXHIBIT "B" WAM NO. 7397 ATFR N0. P265-604150251583 SAWARY SEVER NO. P275-704130251683 PAVING IMPROVEMENTS S7RU'Y/STORM DRAIN NO. W-23W "PINE MEADOWS - PHASE 1" CITY x-22997474 No. 02516 WELcH ENonqnaRvqo I Nc. CONSUL 77NG ENGINEERS 00 42 43 DAP-BID PROPOSAL Page 4 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM 4/27/2015 PINE MEADOWS,PHASE I RI UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item No Description Specification Unit of BidSection No. Measure Quantity Unit Price Bid Value UNIT IV: PAVING IMPROVEMENTS 3213.0101 6"Conc Pvmt 32 13 13 SY 9,399 $32.00 $300,768.0 321 1.0501 6"Lime Treatment 32 11 29 SY 10,010 $3.15 $31,531.313 321 1.0400 Hydrate Lime 32 11 29 TN 150.15 $175.00 $26,276.0 3213.0102 7"Cone Pvmt 32 13 13 SY 2.720 $37.00 $100,640.0 3211.0502 8"Lime Treatment 32 11 29 SY 2,897 $3.50 $10,138.8 3211.0400 Hydrate Lime 32 11 29 TN 57.96 $175.00 $10,143.8 3213.0301 4"Concrete Sidewalk 32 1320 SF 150 $4.00 $600.0 3213.0506 Barrier Free Ramp-Type P-1 32 1320 EA 4 $1,250.00 $5,000.0 3213.0501 Barrier Free Ramp-Type R-1 321320 EA 12 $925,00 $11,100,0 3441.4003 Furnish&Install Ground Mount Sign Post and Sign 3441 30 EA 8 $650.00 $5,200.0 3217.0501 24"Solid White Stop Bar Paint(W) 32 1723 LF 24 $35.00 $840.0 9999.0002 Street barricade(street dead ends) 31 3600 LF 60 $61.00 $3,660.0 0241.0100 Remove Sidewalk 0241 13 SF 128 $8.00 $1,024.00 0241.1000 Remove Concrete Pavement 0241 15 SY 380 $8.00 $3,040.00 3213.0301 4"Concrete Sidewalk 32 1320 SF 327 $4.00 $1,308.00 3213.0150 10"Concrete Pavement 33 13 13 LF 1 1 1 $23.00 $2,553.00 TOTAL UNIT IV: PAVING IMPROVEMENTS $513,823.04 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 00 42 43-RYM BID CONTRACT BID DAP PINE MEADOWS PHASE I-BID TIEMS -201302A-07-09-15 K 4. N as 'S O x O to — F cr — In 1 'S In f. N `O r oC N — M C — r x — ... ? J rl rl C r — ? i L ' N .�i O t J L C raj N Ii0 M — o " In L x ' _ rt r p Z N N�r F � _ N 7� G N O rn _ N � V O— lc> N N f7 N N N r, _ _ U I G �— cc a r+t a _ F- G, LL JQ _ I � � N ry N N• rl N ry r _ U3AI U z __ a e C J < d C> L O 2 i J c LU .i 9 E C =x p IL 2 O o a c _ a c cl o a r o p2i o - o Q Z a ••• ,� 4" 01 WON FOr LOPY wAft 4,sm7FjF - w ,I4 - ♦1'Rol i I c — EACH POSL ROD � I - HOLLY SFOCW LANE � CL THOMPSON ROAD 1 , 10', 15, OR 20' INLET-, T 100% DEVELOPER'S COST STORM SEWER AND INLET ANO ASSOCIATEP APPLWITENANCES SCALE: $"-200' EXHIBIT "H_1_" w�TM NO.NO. 'P�zE5604150251W3 STORM DRAIN IMPROVEMENTS SANITARY SEWER NO. P275-704130251883 STREET/STORM DRAW NO. W-23M "PINE MEADOWS -- PHASE 1" CITY PROJECT NO. 02515 X-22574 Wax ENOn�O, I NC. CONSUL 77NG ENGINEERS 00 42 43 DAP-BID PROPOSAL Page 3 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM 4/27/2015 PINE MEADOWS,PHASE I RI UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No Description Specification Unit of Bid Section No. Measure Quantity Unit Price Bid Value UNIT III:DRAINAGE IMPROVEMENTS 3305.0109 Trench Safety 3305 10 LF 2169 $0.30 $650.7 3341.1201 5'x 3'Box Culvert 3341 10 LF 63 $255.0 $16,065.0 3341.0409 48"RCP,Class 111 334110 LF 721 $151.0 $108,871.0 3341.0404 42" RCP,Class 111 3341 10 LF 561 $123.0 $69,003.0 3341.0311 36"RCP,Class 111 3341 10 LF 170 $100.0 $171000.0 3341.0302 30"RCP,Class 111 3341 10 LF 317 $70.00 $22,190.0 3341.0209 27"RCP,Class 111 3341 10 LF 32 $66.00 $2,1 12.0 3341.0205 24"RCP,Class 111 3341 10 LF 305 $54.00 $16,470.0 3349.7001 4'SQ.Y-Inlet 33 49 20 EA 1 $3,800.00 $3,800.0 3349.0002 5'Storm Junction Box 3349 10 EA 3 $4,400.00 $13,200.0 3349.0006 Storm Junction Structure 3349 10 EA 1 $4,600.0 $4,600.0 3349.5001 10'Curb Inlet 33 49 20 EA 4 $3,000.0 $12,0000 3349.5002 15'Curb Inlet 33 49 20 EA 5 $3,300.00 $16,500.0 3349.5003 20'Curb Inlet 33 49 20 EA I $3,500.00 $3,500.0 9999.0001 �3',TXDOT 4:1,SETB-CD Safety End Treatment 33 49 40 EA 1 $4,600.0 $4,600.0 9999.0002 48 and 2-36",TXDOT 4:1,SETB-CD Safety End 33 49 40 EA 2 $1 0,000.0c $20,000.0 Treatment HW 9999.0003 DuaH�1 48"-TXDOT 4:1,SETB-CD Safety End Treatmen 33 49 40 EA 1 $8,000.0 $8,000.0 9999.0004 6"Depth Concrete Flume,6"x6"WW'M(3,500 psi) 32 1320 SF 2,500 $8.00 $20,000.0 3137.0104 Medium Stone,Riprap,dry 31 3700 SY 216 $6100 $13,392.0 TOTAL UNIT ill:DRAINAGE IMPROVEMENT $371,953.70 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 00 42 43-RKM BID CONTRACT BID DAP PINE MEADOWS PHASE I-BID TIEMS -201302A-07-09-15 o a R 0 M D ^ N kn — r1 — K v — N N �C in ri r s Y• i s. i c Ge C cy. }( L en �O oC N M E.y G lLL� C� 2 — a 1 r ry v� N r ri z re 7 vy — ti D g G Z .7 O O O O G_ O O n C O_ ry nl ry e c n c a Ju r n n ru e+l ..� M O < c a < ~ S m Oui a Z 3 g 3 N 0 z o K c 9 � s v o ., CD N p D .` u _ F ° s a mW el :r p 77 E_ LLI 6 C £ er @ O NOC. pia+ bQry r8e. Qp 8N r� rpQ• 1f q O r1 C C CC g 1 F SI E 1 1 1 t`� F�O f I L- —� -- Oui S$OM K JL VOL, Y e#aOOK LANE Y — T r THc>w+aSO�r ROAD I — PROPOSED STREET LIGHT (100% DEVELOPER'S COST) PROPOSED STREET SIGN (IOOX DEVELOPER'S COST) ■ -- PROPOSED GROUND 80X (IGO% DEVELOPER'S COST) SCALE: 200' "C„ WAD.O.E. No. 7397 EXHIBIT WATER N0. P265-804150251583 SANITARY SEWER NO. P275-704130251683 STREET LIGHTS STREET/STORM DRAIN NO. W-2356 "PINE MEADOWS — PHASE 1 " CITY PROJECT N0. 02518 x-2zs7a WE3.cH E rice o, I Nc. CONSUL TING ENGINEERS w < Y - �„ f c L 4 C c a s - i 10 1 O e! C ca � F _ :t O F S 4 f G L X z d b x f Q c E- z CY N N .J P < < ¢ 4 � c K L o > v e O o rr Q 7 � M M M N M 4 4D 1 v: Z i a e �a e9 {) a W 3 v r 9 t e4 a ` O e a a C lz E 4 Ziai IL m o � s IL e 00 42 43 DAP-BID PROPOSAL Page S or 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM 4/27/2015 PINE MEADOWS,PHASE 1 RI UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No Description Specification I Unit of Bid Unit PriceBid Value Section No. Measure Quantity 7 UNIT V:STREET LIGHTING IMPROVEMENTS 3441.1502 FumishAnstall Ground Box,Type B 3441 10 EA 16 $555.00 $8,880.0 9999.0000 Rdwy Ilium Assembly TY D-25,70W LED Single 3441 20 EA 16 $2,300.00 $36,800.0 3441.3301 FumishAnstall Rdwy Illum Foundation TY I,2 and 4 3441 20 EA 16 $1,050.00 $16,800.0 2605.3015 2 Inch Conduit PVC SCH 80(T) 26 05 33 LF 653 $9.85 $6,432.0 3441.3401 6-6-6 Triplex Alum Electric Conductor 3441 10 CLF 653 $2.75 $1,795.7 TOTAL UNIT V:STREET LIGHTING IMPROVEMENT $70,707.80 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 00 42 43-RKM BID CONTRACT BID DAP PINE MEADOWS PHASE 1-BID TIEMS -201302A-07-09-15 00 42 43 DAP-BID PROPOSAL Page 7 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM 4/27/2015 PINE MEADOWS,PHASE I RI UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No Description Specification Unit of Bid Unit Price Bid Value Section No. I Measure Quantity Bid Summary UNIT I:WATER IMPROVEMENTS $274,714.30 UNIT II: SANITARY SEWER IMPROVEMENTS $248,123.00 UNIT III: DRAINAGE IMPROVEMENTS $371,953.70 UNIT IV: PAVING IMPROVEMENTS $513,823.04 Total Construction Bidl $1,408,614.04 Contractor agrees to complete WORK for FINAL ACCEPTANCE 90days working days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 00 42 43-RKM BID CONTRACT BID DAR PINE MEADOWS PHASE 1-BID TIEMS .201302A-07-09-IS e IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said p per has execute(thisU instrument in adruplicate, at Fort Worth, Texas this � day of t 20 . CITY OF FORT WORTH-Recommended by: Water Department Transportation & Public Works Department ''CWendy Chi- bulal, EMBA, P.E. ouglas W. Wiersig, P.E. Development Engineering Manager Director Approved as to Form &Legality: Approved by City Manager's Office Douglas W. Black Fernando Costa Assistant City'' ((Attorney Assistant City Manager M&C No. �j Date: ATTEST: 0 o � Mary J. Kaye City Secretary r1�Xp1s ATTEST: DEVELOPER: Pine Meadows Development Co LLC L ' S I tA- wD�-I Signature Signatu (Print)Name: Print Name:Terry Sand Iin Title: Manager OFFICIAL RECORD CITY SECRETARY F;.WORTH;Tx Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ❑ Location Map ❑ Exhibit A: Water Improvements ❑ Water Estimate ❑ Exhibit A-1: Sewer Improvements ❑ Sewer Estimate ❑ Exhibit B: Paving Improvements ❑ Paving Estimate ❑ Exhibit B-1: Storm Drain Improvements ❑ Storm Drain Estimate ❑ Exhibit C: Street Lights and Signs Improvements ❑ Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 10