Loading...
HomeMy WebLinkAboutContract 46879 X23 4 56? 8 CCITTY�TSECRETAW NL �Oyo G� CONTRACT Nil. DO s 413 19Sb £ Z %V STORM WATER FACILITY MAINTENANCE AGREEMENT THIS AGREEMENT, made and entered into this day of v V 1 d' OU119 , by and between CentrePort Business Park, LLC, acting by and through CentrePort TRS Venture, Inc. hereinafter referred to as "Landowner", and the City of Fort Worth, hereinafter referred to as "City". WITNESSETH WHEREAS, the Landowner is the owner of certain real property described as an approximately 1.232 acre tract located in the Vincent J. Hutton Survey, Abstract 681, Tarrant County, Texas according to the deed recorded in Volume 2008, Page 243; and Volume 2037, Page 567, Deed Records, Tarrant County, Texas, hereinafter called the "Property". WHEREAS, the Landowner is proceeding to build on and develop the Property according to the Site Plan/Subdivision Plan known as Water, Sewer, Paving, Drainage and Street Lighting to Serve FAA Boulevard and CentrePort Drive hereinafter called the "Plan", which is expressly made a part hereof, as approved or to be approved by the City and the Landowner provides for management of storm water within the confines of the Property; and WHEREAS, the City and the Landowner, and their successors and assigns, agree that the health, safety and welfare of the residents of the City of Fort Worth, Texas require that on-site Storm Water Management Facilities be constructed and maintained on a portion of the Property; and WHEREAS, the City requires that on-site Storm Water Management Facilities ("Facility") as shown on the Plan be constructed and adequately maintained by the Landowner, its successors and assigns, the location and dimensions of which is shown OFFICIAL RECORD STORM WATER FACILITY MAINTENANCE AGREEMENT CITY SECRETARY Rev.09/10/2012 FT.WORTH,TX 1 and more particularly described by metes and bounds in the attached Exhibit "A" ("Facility Property"); and NOW, THEREFORE, in consideration of the foregoing premises, the mutual covenants contained herein, and the following terms and conditions, the parties hereto agree as follows: 1. The Landowner, its successors and assigns, shall adequately construct and maintain the on-site Storm Water Management Facility ("Facility") at no expense to the City of Fort Worth in accordance with the design specifications for the Facility, attached as Exhibit "B", and the current standards then in force and effect in the City of Fort Worth and with the Operations and Maintenance Plan attached to this Agreement as Exhibit "C". The Storm Water Facility includes all pipes, channels or other conveyances built to convey storm water to the facility, as well as all structures, improvements, and vegetation provided to control the quantity and quality of the storm water. Adequate maintenance is herein defined as good working condition so that these facilities are performing their design functions. The Storm Water Structural Control Maintenance Checklists, attached to this Agreement as Exhibit "D", are to be used to establish what good working condition is acceptable to the City. 2. The Landowner, its successors and assigns, shall inspect the Facility and submit an inspection report to the City annually. The purpose of the inspection is to assure safe and proper functioning of the Facility. The inspection shall cover the entire Facility, berms, outlet structure, pond areas, access roads, etc. Components of the Facility, which need maintenance or replacement to perform their design function, shall be noted in the inspection report along with the corrective actions to be taken. 3. The Landowner, its successors and assigns, hereby grant permission to the City, its authorized agents and employees, to enter upon the Property and to inspect the Facility Property whenever the City deems necessary. The purpose of inspection is to follow-up on reported deficiencies and/or to respond to citizen complaints. The City shall provide the Landowner, its successors and assigns, copies of the inspection findings and a directive to commence with the repairs if necessary. STORM WATER FACILITY MAINTENANCE AGREEMENT 2 Rev.09/10/2012 4. In the event the Landowner, its successors and assigns, fails to maintain the Facility in good working condition as specified herein, the City, its authorized agents and employees, may enter upon the Facility Property and take whatever steps necessary to correct deficiencies identified in the inspection report and to charge the costs of such repairs to the Landowner, its successors and assigns. It is expressly understood and agreed that the City is under no obligation to routinely maintain or repair said Facility, and in no event shall this Agreement be construed to impose any such obligation on the City, such obligation is Landowner's. 5. The Landowner, its successors and assigns, will perform the work necessary to keep the Facility in good working order as appropriate. In the event the City pursuant to this Agreement, performs work of any nature, or expends any funds in performance of said work for labor, use of equipment, supplies, materials, and the like, the Landowner, its successors and assigns, shall reimburse the City upon demand, within thirty (30) days of receipt thereof for all actual costs incurred by the City hereunder. In the event that Landowner or its successors or assigns fail to pay the City for the costs incurred under this section, the City shall impress a lien for the costs of such work upon other lots owned by the Landowner. Such lien shall be perfected by filing in the office of the County Clerk of Tarrant County, Texas an affidavit identifying the property to be charged with such lien, stating the amount thereof, and making reference to this Agreement. 6. This Agreement imposes no liability of any kind whatsoever on the City. THE LANDOWNER AGREES TO HOLD THE CITY HARMLESS FROM ANY LIABILITY IN THE EVENT THE FACILITY FAILS TO OPERATE PROPERLY. LANDOWNER COVENANT AND AGREE AND DOES HEREBY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY OF FORT WORTH, ITS AGENTS, SERVANTS AND EMPLOYEES FROM AND AGAINST ALL COSTS, EXPENSES, LOSSES, DAMAGES, CLAIMS OR CAUSES OF ACTION WHATSOEVER ARISING, OR WHICH MIGHT ARISE, FROM THE FAILURE OF LANDOWNER OF THE ABOVE FACILITITY PROPERTY TO MAINTAIN THE FACILITY, INCLUDING, BUT NOT LIMITED TO THE BED AND BANKS OF THE DETENTION POND; ANY DAMAGES CAUSED TO PERSON OR STORM WATER FACILITY MAINTENANCE AGREEMENT 3 Rev.09/10/2012 PROPERTY DUE TO (1) FLOODING OF THE POND AND ITS BANKS, (2) SLOPE FAILURE OF THE BANKS OF THE POND, OR (3) FAILURE OF THE POND OR ITS BANKS TO OPERATE IN A MANNER CONSISTENT WITH CITY OF FORT WORTH CRITERIA TO PERFORM ANY OTHER DUTIES OR OBLIGATIONS HEREUNDER. 7. Landowner covenants and agrees that no habitable building shall be erected within the drainage easement outlined on Exhibit "A" but this paragraph shall not preclude construction of other improvements within the drainage easement, which do not impede drainage. Landowner covenants and agrees that no habitable building shall be erected on the above property abutting such easement which shall have a finished floor at an elevation less than two feet above the maximum depth of water in the detention pond which would occur during a 100 year frequency flood. 8. This Agreement shall be recorded among the land records of Tarrant County, Texas, shall constitute a covenant running with the land, and shall be binding on the Landowner, its administrators, executors, assigns, heirs and any other successors in interests, including any property owners association. [SIGNATURE PAGE FOLLOWS] STORM WATER FACILITY MAINTENANCE AGREEMENT 4 Rev.09/10/2012 Executed this f)-day o 2015. Landowner City of Fort Worth arty air Fernando Costa Vice President Assistant City Manager Approved as to Form and Legality ,,-- Assistanf City Attorney �ORr ovO ATTEST 0 Flow 8= .,. L—N® MJ&C RB:QUIR�-D OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX STORM WATER FACILITY MAINTENANCE AGREEMENT 5 Rev.09/10/2012 STATE OF TEXAS § COUNTY OF TARRANT § This instrument was acknowledged before me on �,l,l U��. -� 01-S by Fernando Costa, Assistant City Manager of the City of Fort Worth, on behalf of the City of Fort Worth. °o�""I�'► LINDA M.HIRRLINGER S T: MY COMMISSION EXPIRES Notary Public, State of Texas 3i}" February 2,2018 STATE OF TEXAS § COUNTY OF TARRANT § Before me, the undersigned authority on this day personally appeared LarrV Blair, Vice President, known to me to be the person whose name is subscribed to the foregoing instrument and acknowledged to me that the same is the act of Manager, and that he executed the same as its Land Owner and as the act of such Manager and for the purposes and consideration expressed in the foregoing instrument. Notary Public, at of Texast!!7- .T � KAROLINA AZIEWICZ Ui NOTARY PUBLIC STATE OF TEXAS Jr COUNDMON E7(/IRE9: OF,; 7—'B 8-201 5 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX STORM WATER FACILITY MAINTENANCE AGREEMENT 6 Rev.09/10/2012 EXHIBIT "A" Exhibit and Legal Description of Pond Final Plat STORM WATER FACILITY MAINTENANCE AGREEMENT Rev.09/10/2012 N.. PAGE 1 OF 3 DRILL SITE Al INST. N0. 0207309359 CITY OF FORT WORTH VOL. 2008. PG. 243 6 VOL. 2037. PG. 567 D.R.T.C.T. CITY OF FORT WORTH Qg� VOL. 2008. 2PG. 2 43 6 2037, PG. 567 D.R.T.C.T. 0 0 � ao- PBOp ON k+D�"E Mzo H a o V: ✓�W Q�.2tiGt w �y POINT OF a COIDONCING A p DRILL SITE A2 FNO 5/9'IR H_ C4 5.01 ACRES �: ty INST. ND. 0207309359 po W C.C.R.T.C.T. R.a r4 Sgt• z= � W a 3S44'17'27"E 9 x'995 N45'55'39"E �` C)-1 ° 14.56' o N o a' 13.77' o mtt; a CITY OF FORT WORTH CITY OF FORT WORTH ti ^ VOL. 22037.8 .25676 VOL. 2008. PG. 243 & VOL. 2037, PG. 567 co D.R.T.C.T. D.R.T.C.T. A= 10'16' 14" R=1075.00' T=96.61' S POINT OF L=192.70' �04 A= 12'40' 12" BEGINNING S06'24'53"E R=1231.00' T=136.67' Lc=192.44' L=272.22' 53,880 S.F N07'08'40"W 1.232 AC. A= 4'50'18" Lc=271.66' R=1075.00' T=45.42' A= 2'54'34" S13'58'10"E T=311.26.26'' R= 0' N16 '23' 19"W Lc=90.75' 22' L=62.51' 16. '23' 19"E BASIS OF BEARING IS CITY OF FORT WORTH GPS N14'56'02"W N 16.22' MONUMENTATION BASED ON TEXAS STATE PLANE Lc=62.50' 61 '23' 19"W m o m COORDINATE SYSTEM (SURFACE). 14. 14' �, W , p ovo� 504"a-yoiNP°w S73'36'41"W gym m¢oNti Nws'ei� 136.01' 0¢ LOT 1, BLOCK 107 CABINET A. SLIDE 11474 P.R.T.C.T. EXHIBIT A BEING A [,nn 53,669 SQ.FT/1.232 ACRE SCALE: 1"=300' SITUATED IN THE VINCENT J. HUTTON SURVEY, ABSTRACT NO. 681, Graham Associates,lnc. TARRANT COUNTY, TEXAS . CONSULTING ENGINEERS a PLANNERS 600 StX FLAGS DRIVE, SUITE 500 ARLNGTON. TEXAS 76011 b17) —8535 810 TBPE frau: F-1191/nwLs 10153a-D° JANUARY 2015 Page 2 of 3 EXHIBIT A METES AND BOUNDS DESCRIPTION 1.232 ACRES VINCENT J. HUTTON SURVEY, ABSTRACT NO. 681 CITY OF FORT WORTH, TARRANT COUNTY, TEXAS BEING a 1.232 acre tract of land situated in the Vincent J. Hutton Survey, Abstract No. 681, Tarrant County,Texas,being a portion of a tract of land conveyed by deed to City of Fort Worth as recorded in Volume 2008, Page 243 and Volume 2037, Page 567, Deed Records, Tarrant County, Texas. Said 1.232 acre tract of land being more particularly described by metes and bounds as follows: COMMENCING at a found 5/8 inch iron rod for the southwest corner of Centreport TRS Venture, Inc., as recorded in Instrument No. D214199734, County Clerk Records, Tarrant County, Texas, and being in the existing east right-of-way line of State Highway 360 (having a variable width R.O.W.); THENCE South 62'30'18" East, leaving said existing east right-of-way line, a distance of 1399.50 feet to a point for the POINT OF BEGINNING, said point being in the proposed east right-of-way line of the southbound lane of Centreport Drive (having a variable width R.O.W.), and being the most southerly point of a corner-clip; THENCE North 45055'39" East, leaving said proposed east right-of-way line, and along said corner-clip, a distance of 13.77 feet to a point for corner; THENCE South 87°34'06"East, a distance of 136.21 feet to a point for corner, said point being the most westerly point of a corner-clip; THENCE South 44'17'27" East, along said corner-clip, a distance of 14.56 feet to a point for corner, for the beginning of a non-tangent curve to the left having a radius of 1075.00 feet and a central angle of 10'16'14" and a long chord which bears South 06°24'53" East, 192.44 feet, said point being in the proposed west right-of-way line of the northbound lane of said Centreport Drive; THENCE along said proposed west right-of-way line, and along said non-tangent curve to the left an arc distance of 192.70 feet to a point for corner, for the beginning of a compound curve to the left having a radius of 1075.00 feet, a central angle of 4'50'18", and a long chord which bears South 13°58'10" East, 90.75 feet, said point being in the existing north right-of-way line of Sovereign Road (having a variable width R.O.W.); THENCE along said existing north right-of-way line, and along said compound curve to the left, an arc distance of 90.78 feet to a point for corner; THENCE South 16'23'19" East, continuing along said existing north right-of-way line, a distance of 16.22 feet to a point for corner; Page 3 of 3 THENCE South 28°34'45" West, continuing along said existing north right-of-way line, a distance of 14.13 feet to a point for coiner; THENCE South 73°36'41" West, continuing along said existing north right-of-way line, a distance of 136.01 feet to a point for corner; THENCE North 61'23'19" West, continuing along said existing north right-of-way line, a distance of 14.14 feet to a point for corner; THENCE North 16°23'19" West, continuing along said existing north right-of-way line, a distance of 16.22 feet to a point for coiner, for the beginning of a tangent curve to the right having a radius of 1231.00 feet, a central angle of 2°54'34", and a long chord which bears North 14°56'02" West, 62.50 feet; THENCE continuing along said existing north right-of-way line, along said tangent curve to the right, an are distance of 62.51 feet to a point for corner, for the beginning of a compound curve to the right having a radius of 1231.00 feet, a central angle of 12'40'12", and a long chord which bears North 07°08'40" West, 271.66 feet, said point being in the proposed east right-of-way line of the southbound lane of said Centreport Drive; THENCE along said proposed east right-of-way line, and along said compound curve to the right, an are distance of 272.22 feet to the POINT OF BEGINNING and CONTAINING 53,669 square feet, 1.232 acres of land,more or less. \\.OF TF co i M.L PETERSON .......................... 5999 a• oa J w, �s 3e U r7 I.]QPQ4a REmmo �o - wo Q a p RidFp �w? xFz IS waW xw a oa a�� ma �g!a � o .V-•i aF m4�ScFaacoamg asZQ Jig 5 8R Be c� 82 -9��i m a�saa-jaa8,apseR _ m - 9:Spm I ¢� I w off. \ I s�3AIHU tl�tI0 d813J.N3J �� e ,y c = rx SN k 4 a NA3 Ip gg as :Dm 53� T 9 H� y8 O) .... . ...... Us ------- ........ ....... .... . ....... rT ..... oo . ..... ---- - .... . ... ........ . . . . FqE�j Ell . ....... . . . ........ ......... OWN L - TH, gampm 2 . ......... ......... . . ....... . .... ... ................ . ....... - - - . .. . .... . ... . . . ..... . .... . ...... . . ........... - . . . ....... . . ... . .. . ... . ... . ... . ... --- --- - ----- -n -- ------- ---- - . . . . . . . .... . .. . . ... . .. . .. . .. .. W' n F.- am- Ea.. UWE ; .... . . . ..... . . ... .... ---- ----- ---- .. ...... .... ..... .... . ..... . . . ..... . . .... . . ..... .... ..... . . 48 _ fie _ . . .... ... ..... ... ..... .... ... .. . ... .. ... .. .. ... ...... .. ... .. . .. ... ..... ... ..... . ... . .. ...... ...... ... Ya px . ..... .. 1 P5 Zoe T! 1 P! 5 E- !Qd .. . ..... . .... - - - -- - - ------ ------ . .. . . ... . . ..... . . ... . . . ..... . .. . .. ... . . .. . .... ... . .. .. ..... .. . ...... .. I. .... . . ..... ...... . - . ... . . . . ... . .... .. .... . .... oil) a 11 Ell 8 ...... . .. . . ...... . . ... �h E 08 "M QQ� ATE At sm" "W5 M h E VE -.-2mz . .... . . .. ..... . ..... ... .k. . . .... . o ..... -- ---- ....... .. ... . . a.m. al Phu '"h . . . ....... ... ... . . . .... .. .... �NK_' t Exhibit "B" Excerpt from the Construction Plans for FAA Boulevard and Centreport Drive Pertaining to the Drainage Facilities STORM WATER FACILITY MAINTENANCE AGREEMENT Rev.09/10/2012 Ln ma H 2 o � � -'8 S -8=G vaeBDR ac 55 ye'-R ye g 8!po aa89� p�9Rg gyp? $'o p!E 8•A� 8x4,Sc 97 808 4$' �AMRIs 9 DxdDF� aa:AR ��a �9iaSzm Poe:RR 8S m 6 �sp,a $ass gD6asAo e? �II:o q�o.a �oAR=B o= 3 � a ,Qx'as:a �R3<R ItssE aDPe $Ag #� 'penia §j$e gse ae D' sera aRe.R: e ia;,aa3? R',x; ea aD,s .a a $;ax;a baa- x3c.aa a Dos IM"el Me-"=s Rr Is y';e xl3 8874 �aa:`o ac yD�R 08:. g'dRa ?"s= RFK,"se "_:1 :ex �3pE 2RP. xa^.ad _ 041 4 !k! age��D4 RR I' !a piaaar. Rxss��� :s Ro,a Ra> 1Ra^#o - �gi;Y A'ia •S�d �Ae`.�Se _ D�BD� JRmRR 9P ieAA a"s= sa:jRo '" a<oa daa Iwo 'dpas$a ��is^ s: goae ;,a sxr#K �= o• 918Ro S$aa ae:,Ro _S gao8 Ra- ! I s! s 9 11 AN Ra9�s. d� Re � 1a .9 a^ R'a $ ?2e vo,4, 9 €§ _;ego IDAa In �ao::Re ax $$ a s•ze �Omc 5g Y�R E € sAia 1�x RalTri $' Ro d Yr'.o !1., Rr. tib£g p s��eR:a ggaxs yy�Qs.Ige �a RRa:s g�a,o kk;d�ko 'o gfiE¢ = �oA_ 8g8Se gea.8e RR g8ex= Sg Rm gee:ge AD iqi� i � R$xo $ri: Rsa:�#e sg R� Rig 8aoe3te `S� aIMP jdx'a w a ;leiI* �e;aJe$IeF �,E=€ynig@. w JI, cr n $ i 4� c hi 2 'QA'd ` I y i '------ ------ I-W I ' � z \ �. 561 a L m� 0 w3 � W � a o � � a � 5 0 g a� IR a Fe a 0 a � � a10 2 Z o T W Ln O $ m m a O (1 s adkn IJ ry Y1 SN U 3 ^i� ;�- SR8R ^AI-M-'8SC ,a-:tl�R'N�.� 8+ ^eEr'iN�ge aR»4FJ� ^8to�^ \ vn.9-�0. ±ry A' A, @@96P q NW F8•Jp61LL3 } An 8988 998 ddo a 5 aaaaaaaaaa, a gallasses aaaaaaa ssssssss sss assess ss s sasses s 8889883 8888 sss C o �� ��... .�. � •y �" �k4kifk Li������Sif �� : ky��$�� s4$$��' s$'���s�' 88 Inmal0 m d emVol uss odm m an d omd^ mm d ��sa 8RR s =e a Pegg s sa s RFs �gasssea s a �RF9 .ssR as =g 2 psi^8ssa o„o R R masa as s a Q o n . '<u RO �'�$ 'd2am iSg % _ -_.•. Mo � O Q��o x m $ a k a f f tltl O w IX y y y y y y + iio 1 � lit If EM F pp@ 2 F _ J 4 W uRi pp� N �,a �i 4• � 0� I � �s§iw4* U if 0CL MOM x o_ o„ MUM � HM �s �e89222 Ps101,001s �� MOM RBsF m $ � � ��.. � ry 6 ri m-- +t •io�r++r m mryn 181 axgse� It =" a1 I mm � � naa" aay aaa h3 _ Baa - - m -- assesses ys".s oo�00000 e�. >+ 00000000 t �om00000 fi�CCo RRRRRRR � RRRRRRR MUM AAAAoAAAeAAA 'e AAAAA A AAA AA - - + a a 3 dao6 16 6 � Ifs�aax$n z�R a�assas�saPssmae�a .s.��m:ex e �o ,nm- •$ Eoo8m mm s s nm rz t-,a m6 . 0oao0 0e �etRp§ 6mm » so- r fin- vgRRRRRRRRRR $' aases.a.�s QFQ�QQx4 og< 4a� �098a88-8�8®� sa;atg088a8Sm �$s daa3ssaas . na o3a8sss�ffism �x8- 8 888888 9 8 8 8 $588 �3E o�a`�888S0oSS88 ev� s s s s g S w J"a €4 t O > " F�ma' =g wY s ;;'ni o g :far°. =58P:, � .�; � � z oho dial€ G aE sm€ LL = Ya So °N�w mkH�ww 4 w Mn I &pNOF .'7 'SF U > 8 F W 8 �__ E- m O 4 n z Ioymra �s�� ���'ssy a a lllll}�IIIII�'ll�l� 1,1 it a o e 41 \ \o$qq R'„id HITOS93AOSSO210 21 � � � •7' I1O II I � II 1� II lid O G � _ \`\1 oma¢u, z LL &a zow dm�� zwm _"3 ab:g o m o a�L° 4 f»�y g°y .d 8 sF =°fid sego Q N L) S �aQ a wrar o�_� 3 I 1 I Gtti$� I -I �li I N f 0. o On / FII 00'9tS 9'Jb!F,C] H1nOS a3AOSSOao —/ m s iu w cl , r FI I I `H ��<sv'ss�•e>a.x,t] o J I III 04 uj I� � •I \ g I II �t � � � vii vpi v v � � � �e f J I I i', d C��,� I Z 8 i m'sx•e7b.v.c] I J I � (tr 0-AV 3dLL M1'JH`ISxO] A o� \ HlaoN 83noss080LLI. co3 / -- -- W � O I �lw s. I' w v'ni vpi a a r�'i rpi N 4 Z |2 § a . � o ZNR | ' , � fk, !!�| .!®■ ,222 2 ! |! q Jl,z � 7 /! k b ` § � & ) b \ �� kS �2 IN: ■ � / � � � § �| | & ■ ��_ § - | |ate | � --- � � § L IL w - � �� Exhibit "C" CITY OF FORT WORTH STORM WATER FACILITY OPERATION AND MAINTENANCE PLAN The only responsibility the City of Fort Worth has in the operation and maintenance of this Facility is inspection. General Maintenance Procedures The structural and functional integrity of the Facility shall be maintained at all times by removing and preventing drainage interference, obstructions, blockages, or other adverse effects into, through, or out of the system. Periodic silt removal shall occur when standing water conditions occur or the pond's storage volume is reduced by more than 10%. Silt shall be removed and the pond/basin returned to original lines and grades shown on the approved engineering plans. In addition, corrective measures are required any time a basin does not drain completely within 72 hours of cessation of inflow. NO STANDING WATER IS ALLOWED in basins designed for dry detention purposes. Accumulated litter, sediment, and debris shall be removed from the ponds and from the connecting drainage structures every 6 months or as necessary to maintain proper operation of the basin. Disposal shall be in accordance with federal, state and local regulations. Detention facilities shall be mowed monthly between the months of April and October or anytime vegetation exceeds 12-inches in height. Re-vegetation will be performed when existing sod/grass deteriorates to the point that 30% or more of the area is left unprotected. Embankments forming the sides of the detention pond shall be repaired as necessary to maintain proper operation of the basin. Damaged or deteriorated structures, including the vertical pond walls and drainage structures between the ponds will be repaired and/or replaced as necessary to maintain proper operation of the basin. To prevent debris from entering and clogging the downstream storm sewer system a wire mesh screen or similar screening device shall be installed over the outlet until final acceptance. STORM WATER FACILITY MAINTENANCE AGREEMENT Rev.09/10/2012 PREVENTIVE MAINTENANCE/INSPECTION • Visual inspections of all components will be conducted every 6 months and after significant storm events (10-year rain event or greater). • A log shall be kept of maintenance actions, and inspections. The log should document the condition of the detention system's primary components, mowing, and silt, litter and debris removal dates. Document aeration of the basin bottoms and replanting to prevent the sealing of the basin bottom. • Written maintenance and repair records shall be maintained by the party or parties signing the attached Agreement and shall be provided to the City upon request. STORM WATER FACILITY MAINTENANCE AGREEMENT Rev.09/10/2012 Exhibit "D" Storm Water Structural Maintenance CHECKLIST FREQUENT REPAIRS REPAIRS INSPECTION DATE REQUIRED MADE NOTES Mowing Remove Trash and debris Inspect irrigation system operation Remove grass clippings Violations Noted MINOR INSPECTION DATE REPAIRS REPAIRS NOTES REQUIRED MADE Condition of Pond Amount of silt in pond Amount of silt in flume Amount of ponded water Amount of wetland vegetation Location of Erosion Percent of vegetation Location of Erosion STORM WATER FACILITY MAINTENANCE AGREEMENT Rev.09/10/2012 MAJOR REPAIRS REPAIRS INSPECTIONS DATE REQUIRED MADE NOTES Structure Condition Culvert 1 (including headwalls Structure Condition Culvert 2 (including headwalls Structure Condition Culvert 3 (including headwalls Structure Condition Pond 2 West Wall Structure Condition Pond 2 East Wall Structure Condition Pond 3 Headwall Southwest corner Structure Condition Pond 3 Headwall Northwest Corner Structure Condition Pond 3 Headwall East side Condition of Rip-Rap All Ponds Berm or Embankment Settlement All Ponds Location of erosion All Ponds Evidence of Animals All Ponds Evidence of Aquatic life All Ponds STORM WATER FACILITY MAINTENANCE AGREEMENT Rev.09/10/2012