HomeMy WebLinkAboutContract 44650-A2 XY SECRETARY CONTRACT NO. AMENDMENT No.2 TO CITY SECRETARY CONTRACT No. 44650 WHEREAS, the City of Fort Worth (CITY) and Freese and Nichols, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 44650, (the CONTRACT) which was authorized by M&C C-26322 on the 9th day of July, 2013 in the amount of $ 164 , 371; and WHEREAS, the CONTRACT involves engineering services for the following project: Evaluation of Stormwater Development Review Policies, City Project No. ; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated July 23, 2015, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $ 75, 712. (See Attached Funding Breakdown Sheet, Page -3-) 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $288, 424. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect . 19 City of Fort worth ` C Professional Services Agreement Amendment Template OFFICIAL RECORD 2j� PMO Official Release 8/1/2012 CITY SECRETARY Page 1 of 3 FT. WORTH,TX � n'SEC�ET,q�R ti`' .._ '68 68 l 9 ; EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER Freese and ivic sols, Inc. Fernando Costa Kell illard, P.E. Assistant City Manager Vice President DATE: ,Z$ 15' DATE: AP OVAL RECOMMENDED: D "r, Wiersig, P.E. Di Transportation and Public Works Department APPROVED AS TO FORM AND LEGALITY: M&C: L Z 3SB���—z 3 Date : r Douglas W. Black Assistant City Attorney ATTEST: Q� VOR?, 2-4, Mary yfrCity Sec ety City of Fort worth OFFICIAL RECORD Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 CITY SECRETARY Page 2 of 3 FT.WORTH, TX FUNDING BREAKDOWN SHEET City Secretary No. 44650 Amendment No. 2 Department Fund-Account-Center Amount TPW PE69 531200 0209207 75, 712 . 00 Total : $75, 712 . 00 City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 3 of 3 s EESE 111'!'71CYOLS 4055 International Plaza,suite 200 a Fort Worth,Texas 76109 • 817-735-7300 • fax 817-735-7491 July 23, 2015 Mr. Greg Simmons, P.E. Transportation and Public Works—Stormwater Division City of Fort worth 1000 Throckmorton Fort Worth,TX 76102 RE: Evaluation of Stormwater Development Review Policies—Amendment No. 2 Dear Mr.Simmons: Through discussions with the City of Fort Worth, it was determined that additional services are required to continue progress in implementing improvements in the drainage development review processes for the City of Fort Worth. We are requesting an amendment for the additional services included in evaluating the efficacy of current processes, implementing revised stormwater criteria documentation, providing internal and external training for reviewers and applicants and implementation of a customer satisfaction survey for applicants. The scope items are discussed briefly below.A fee summary is also included. Scope Addition: 1. In-House Review a. Provide a Senior Advisor for one full business week to observe and evaluate the functions of the City's Stormwater review staff. b. Review City Staff documentation regarding past instances of variance request and/or applicant special meetings. L Research documentation for root cause analysis or consistent trends in variance requests or applicant variance from standard review process. ii. Document consistent causes for variance requests or variance from the standard review process. c. If warranted, provide recommended revisions to review "level of detail",varying by size of development or complexity of project. Specific focus will be on facilitating a simplified review process for smaller or less "hydrologically significant" projects. d. Determine an acceptable average review cost and effort for the program to assess the viability of the current drainage review process. 2. iSWM Drainage Manual update and revisions a. Facilitate City Staff review of proposed changes. Receive one final round of comments from City Staff and incorporate into current draft. b. Incorporate comments and prepare final document for adoption by City. Evaluation of Stormwater Development Review Policies July 23,2015 Page 2 of 2 3. Internal Training a. Develop a format for all drainage reviewers, internal City Staff and 3rd Party reviews meet to share variance requests, variances granted, clarifications to criteria and best practices for review processing. b. Create standard agenda for meetings c. Facilitate and document the first two internal meetings. 4. External Training a. Collect up to 7 sample projects from actual submittals. b. Utilize sample projects to develop guidance for applicants. c. Coordinate with 3 d Party reviewers, internal City Staff and sub-consultants to organize, advertise and facilitate two (2) external training meetings. d. Meetings will be in the format of describing sample projects and answering questions from attendees. 5. Customer Satisfaction Survev a. Create 4-question survey to be automatically submitted to applicants upon completion of an application (final acceptance of application and all requested revisions). b. Coordinate with Halff Associates to automate the survey and incorporate responses into existing review process database. The total fee requested for this contract amendment is $75,712.00. Attachment B includes the fee breakout. We look forward to discussing this work with you further. Please feel free to contact me if you have any additional questions. Sincerely, Kel�Di_ rd, P.E. Principal ATTACHMENT "B" EVALUATION OF STORMWATER DEVELOPMENT REVIEW POLICIES AMENDMENT NO. 2 COMPENSATION AND PAYMENT SCHEDULE A. The Engineer shall be compensated a total project fee of$75,712.00, on a time and materials basis for hours actually worked on the project at the rates shown on the attached compensations schedule. Payment of the hourly fees shall be considered full compensation for the Basic Services described in Attachment "A" for all labor materials, supplies and equipment necessary to complete the project. B. The Engineer shall be paid in accordance with "Exhibit B-1", Supplement to Attachment B. Each invoice from the Engineer shall be verified as to its accuracy and compliance with the terms of this contract by an officer of the Engineer. C. Additional tasks assigned by the CITY not included in Attachment"A" Scope of Services will be billed on an hourly basis. These tasks will not be performed without written authorization from the CITY. A summary of current hourly billing rates is provided in Exhibit "B-2". D. Professional Services Fee summary is provided in Exhibit "B-3". E. A Summary of Total Project Fees including SBE participation percentages is provided in Exhibit "B-3A". F. A schedule of partial submittals for review will be based on the Project Schedule Attachment "D" and is as follows: Proiect Phase Estimated Completion Date Root Cause Analysis March 2015 Final Drainage Manual Revisions April 2015 Internal Training Course April 2015 External Stakeholder Training June 2015 Customer Sat Survey May 2015 Implementation ATTACHMENT"B" Page 1 of 1 EXHIBIT "13-1" (SUPPLEMENT TO ATTACHMENT B) EVALUATION OF STORMWATER DEVELOPMENT REVIEW POLICIES AMENDMENT NO. 2 CITY PROJECT NO. METHOD OF PAYMENT PROGRESS REPORT REQUIREMENTS I. Method of Payment Partial payment shall be made to the Engineer monthly based on hours actually worked, upon City's approval of an invoice from the Engineer outlining the current labor and expenses of the total project. The balance of fees for the time and materials expended on the project, less previous payments, shall be payable after delivery of the FINAL report and electronic files. II. Progress Reports A. The Engineer shall submit to the designated representative of the Director of the Department of Transportation/Public Works monthly progress reports covering all phases of the analysis in the format required by the City. B. Periodic reports concerning MWBE participation shall be submitted as required by the MWBE Office. EXHIBIT"B-1" Page 1 of 1 EXHIBIT "B-2" (SUPPLEMENT TO ATTACHMENT B) EVALUATION OF STORMWATER DEVELOPMENT REVIEW POLICIEES AMENDMENT NO. 2 HOURLY RATE SHEDULES A summary of current hourly billing rates is provided below: CAD Technician/Designer- 1 91 CAD Technician/Designer-2 117 CAD Technician/Designer- 3 145 Construction Manager- 1 85 Construction Manager-2 111 Construction Manager- 3 131 Construction Manager-4 164 Corporate Project Support- 1 87 Corporate Project Support-2 105 Corporate Project Support-3 139 Intern/Coop 53 Professional - 1 110 Professional -2 110 Professional -3 130 Professional -4 165 Professional -5 165 Professional -6 165 Technology Charge 8.50 EXHIBIT"B-2" Page 1 of 1 EXHIBIT "B-3" (SUPPLEMENT TO ATTACHMENT B) EVALUATION OF STORMWATER DEVELOPMENT REVIEW POLICIES AMENDMENT NO. 2 PROFESSIONAL SERVICES FEE SUMMARY Task Description Fee 1 In-House Review $16,658 2 Drainage Manual Implementation $26,156 3 Internal Best Practices Training $3,916 4 External Stakeholder Training $26,206 5 Customer Satisfaction Survey Implementation $2,776 Total Fee $75,712 EXHIBIT"B-3" Page 1 of 1 EXHIBIT "B-3A" (SUPPLEMENT TO ATTACHMENT B) EVALUATION OF STORMWATER DEVELOPMENT REVIEW POLICIES AMENDMENT NO. 2 SUMMARY OF TOTAL PROJECT FEES Consulting Firm Prime Responsibility Amount Percent PRIME ENGINEER: Freese and Nichols, Inc. Engineering and Project Mgmt. $64,312 85.00% Total •r Professional Services11' . SUB ENGINEERS shall participate in performing portions of the following Tasks: Project Description Scope of Services Total Fee MWBE Fee Percent External Stakeholder Training 75,712 5,900 7.8% Stormwater Criteria Manual Figures 75,712 5,500 7.2% Non-MWBE Participation Scope of Services Total Fee Non-MWBE Fee Percent N/A N/A N/A N/A N/A EXHIBIT"B-3A" Page 1 of 1 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 7/21/2016 DATE: Tuesday, July 21, 2015 REFERENCE NO.: **C-27373 LOG NAME: 20SWMDESIGNSTANDARDREVIEWAMD2 SUBJECT: Authorize Execution of Amendment No. 2 to a Professional Services Agreement with Freese and Nichols, Inc., in an Amount Not to Exceed $75,712.00 to Review and Improve the City's Drainage Design Standards and Review Process for a Total Agreement Amount of$288,424.00 (ALL COUNCIL DISTRICTS) RECOMMENDATION: It is recommended that the City Council authorize the execution of Amendment No. 2 to a Professional Services Agreement with Freese and Nichols, Inc., in the amount not to exceed $75,712.00 to review and improve the City's drainage design standards and review process. DISCUSSION: The purpose of the amendment recommended by this Mayor and Council Communication (M&C) is to provide additional services associated with the review and improvement of drainage design standards and the associated process for evaluating new development projects for compliance with the standards. The revisions implemented as a result of the initial improvement initiative were found to be insufficient to adjust the process and standards to the degree needed. The work under Amendment No. 2 will complete this improvement initiative and establish standards and a review process that satisfactorily balances the needs to both: (1) protect the community from drainage problems created by new development and (2) not to hamper new and re-development with an unnecessarily time-consuming and expensive review process. The scope of work of this amendment includes: conduct an audit of projects reviewed to identify opportunities for improvement, finalize revisions to the City of Fort Worth's (City) iSWM manual and publish the revised manual, develop and conduct training for City reviewers and the private development community on the improved process and standards and develop a customer satisfaction survey tool and process that can be used to monitor the effectiveness of the review process. Freese and Nichols, Inc., was engaged in July 2013 (M&C C-26322) to work with the City and the private development community to clarify and revise the standards as appropriate and to identify and implement improvements to the design review process. Amendment No. 1 to the Agreement in the amount of $48,341.00 was administratively executed in January of 2014 for large scale revisions to the iSWM manual, a need identified during the conduct of the scope of the basic Agreement. M/ BE Office: Freese and Nichols, Inc., is in compliance with the City's BDE Ordinance by committing to 15 percent SBE participation on this Amendment No. 2. The City's goal on this Amendment is 15 percent. This project is located in ALL COUNCIL DISTRICTS. Logname- 20SWMDESIGNSTANDARDREVIEWAMD2 Pase I of 2 FISCAL INFORMATION /CERTIFICATION: The Financial Management Services Director certifies that funds will be available in the current operating budget, as appropriated, for the Stormwater Utility Fund and that prior to an expenditure being made, the Stormwater Utility Fund has the responsibility to validate the availability of funds without exceeding existing appropriations. The Stormwater Fiscal Year 2015 operating budget includes appropriations of$1,100,000.00 in the Floodplain Management section of the Stormwater Utility Fund for the Consultant and Professional Services account and as of June 2, 2015, the amount of$609,880.20 has been expended. FUND CENTERS: TO Fund/AccounVCenters FROM Fund/AccounVCenters PE69 531200 0209207 $75.712.00 CERTIFICATIONS: Submitted for City Manager's Office by: Fernando Costa (6122) Originating Department Head: Douglas W. Wiersig (7801) Additional Information Contact: Gregory Simmons (7801) ATTACHMENNc 1. Compliance Memo-SWMDESIGNSTANDARDREVIEWAMD2.pdf (CFW Intemal) 2. PE69 531200.pdf (CFW Internal) T.nonnmP• 70RWMT)F.RTrYMRTAT*MARDRFVTFWAKMI paoP 7 nf7