Loading...
HomeMy WebLinkAboutContract 29110-CO4A8 CITY SECRETARY City of Fort Worth CONTRACT N0.eQq I10 Change Order Request Chader'No, Date TPW Project No. Funding(FAC) FE 72 531200 020543008000 4 (Four) 7/22/15 FE 72 539120 020543009000 GG04 536040 0240600 Facility and Project Description City Secretary Contract No. Energy Savings Performance Contract— JCI VII 29110-A8 ORIGINAL CONTRACT AMOUNT................................................................ $10,955,452 EXTRAS TO DATE..................................................................... $ 238,057 CREDITS TO DATE.................................................................... $ 0 CONTRACT COST TO DATE.................................................................................................. $ 11,193,509 AMOUNT OF PROPOSED CHANGE ORDER............................................................................ $ 152,300 REVISED CONTRACT AMOUNT............................................................................................. $ 11,345,809 ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS............................................................ $ 100,000 REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS......................................................... $ 32,757 ADDITIONAL FUNDING (IF NECESSARY)................................................................................ $ 323,114 IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: Provide all labor and materials as per attached Proposed Change Requests: The revised scope includes enhancements to equipment, distribution, and controls of the HVAC systems at several City facilities. add $ 152,300 ------------------------------------------------------------------------------------------------------------------------------ TOTAL ADD $ 152,300 It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order Contractor's Name Johnson Controls Inc. Original Contract Time Additional Approved Time To Date Approved Contract Time To Date Additional Time For This Change Order 610 cd Ocd 610 cd 0 cd Contra -Johnson Co tro Inc Date Construcljpn Manage Date 7 la- Arc "ectural Seryices M a er Date Direct r, Property Manag ent Date ?� ! G4 Project Architect Date Assis alvanager Date 7-�0 . Ass i t tt Date Council Action(If Required) C ® Approved Disapproved T Q ID-VlACL W, �—�`�7 El Other %9 o Distributior ~g FcUFMIAILaRECiORD 8 � ry b $° ° ° cSECRETARY FT. WORTH, TX Property Management Departm t ser, City Se Johnson Controls,Inc. J� p' Rich Airports,Freeway �`�/ Richland Hills,Texas 76118 Johnson TeL:(817)548-2200(Office) Controls (817)548-2201 (Fax) March 5, 2015 Mr. Sam Gunderson City of Fort Worth Transportation & Public Works 401 W 13th Street Fort Worth, TX 76102 Ref: JCI ESPC Phase VII Subject: WRMC / FWCC Power Factor Correction Improvements Dear Sam, JCI has developed the following scope of work for City consideration: Scope of Work I Cost New Power Factor Correction Equipment—Three 3 Meters 1 $56,550 Estimated annual electric savings for this work is $19,442 resulting in a simple payback of 2_9 years. Scope of Work: • Furnish and install the necessary power factor capacitance at the following service address and ESI ID account to maintain a minimum power factor of ninety-five percent (95%). • Capacitors will run continuously. • Capacitors will be installed in a location that will not hinder the day to day efforts of facility maintenance personnel. • New capacitor sizes based on 30% design. Additional measurements & engineering will be required to finalize sizing of new capacitors. WRMC 3301 W Lancaster ESI# 10443720005581535 • Replace two (2) existing 140 kvar capacitors which have failed • Install two (2) new additional 140 kvar capacitors WRMC 1408 Rip Johnson Dr ESI# 10443720005581504 0 Install one (1) new additional 150 kvar capacitor FWCC 1208 Commerce St ES1# 10443720002955676 • Install one (1) new additional 125 kvar capacitor Benefits: • Eliminate power factor penalty cost • Electric cost savings If you have any questions, please give me a call at 817-480-6953. Regards, %�-' Q-- I— Harry Romine, P.E. Account Manager Johnson Controls, Inc. Page 2 Johnson Controls_Inc. 7461 Airport Frec\cay Richland hills_ texas 761 IS Johnson Icl (817)548-2200(Office) Controls (817)S48-2201 `Fax) April 22, 2015 Mr. Sam Gunderson City of Fort Worth Property Management 401 W 13th Street Fort Worth, TX 76102 Ref: JCI ESPC Phase 7 Subject: Additional Facility Improvements Dear Sam, JCI has developed the following scope of work for City consideration.- Facility onsideration:Facility Area Equipment Scope of Work Cost City Hall Utility Level AHU 100-4 Eliminate return air restriction $ 707 City Hall Utility Level HW Piping Repair/replace HW piping expansion supports $ 4,115 City Hall Lower Level SA Diffusers Relocate t-stats in eight(8) locations & modify suppy air $ 13,306 & 2nd Floor ductwork in twelve (12) office areas Remove existing fire/smoke dampers & seal access City Hall 3rd Floor AHU 100-8,9,10 openings. For AHU 100-8, replace flex connection. For $ 5,421 AHU 100-10, remove restrictive turning vanes. City Hall Central Plant Chiller#2 Chiller repairs $ 10,468 SWR.Library Facility CHW/HW Systems Install 4 air vents at high-points of piping systems. Reset $ 3,153 expansion tank. Purge air from systems including coils. Southside SC Facility AHU-1 Install P/T tap on cooling coil $ 720 PMD-onlyFacilities Metas s Upgrade Metas s software to Version 7.0 $ 8,322 10th St.Annex Facility 1-MZU & 3-DXUs Install AHU controls & DX monitoring 5,980 FWCC WRMC Facilities Metas s Upgrade Metas s software to Version 7.0 $ 8,322 CH Annex Facility Chiller Re-engineering of new air-cooled chiller $ 6,500 City Hall Lower Level AHU 100-7 Disconnect power to AHU 100-7 & cap off ductwork. $ 23,276 Modify ductwork for existing reheat zones. City Hall Lower Level IT Room Re-enRineering of IT Room HVAC u rades $ 5,460 Totals $ 95,750 Exclusions: 0 Asbestos abatement If you have any questions, please give me a call at 817-480-6953. Regards, V--�—1 Q1-- I— Harry Romine, P.E. Account Manager Johnson Controls, Inc. Page 2 M&C Review Page 1 of 2 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA FoR TII COUNCIL ACTION: Approved on 7/21/2015 -Ordinance No. 21796-07-2015 DATE: 7/21/2015 REFERENCE NO.: **C-27375 LOG NAME: 21ESPC7CO4 CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Change Order No. 4 to City Secretary Contract No. 29110-A8 with Johnson Controls, Inc., in the Amount of$152,300.00 for a Revised Total Contract Amount of$11,345,809.00 for Improvements to Building Mechanical and Electrical Systems Affecting Over 100 City Facilities and Adopt Appropriation Ordinance (ALL COUNCIL DISTRICTS) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Special Trust Fund in the amount of$95,750.00 from available funds; and 2. Authorize the execution of Change Order No. 4 to City Secretary Contract No. 29110-A8 with Johnson Controls, Inc., in the amount of$152,300.00 for improvements to building mechanical and electrical systems affecting 100 City facilities for a revised total energy savings performance contract Phase 7 amount of$11,345,809.00. DISCUSSION: This Change Order No. 4 will improve building air conditioning and electrical distribution systems at facilities under the City's energy savings performance contract (ESPC)with Johnson Controls, Inc., enhancing facility operations and increasing resource efficiency. Upgrades to these building systems were included in the base contract and focused on energy savings that could be used to fund building system efficiency improvements. On May 21, 2013, M&C C-26273 approved the original ESPC Phase 7 project as a consolidation of previous Phases 1, 2, 3, 4, and 6b to include the following City facility improvements totaling $10,955,452.00: lighting, air conditioning and controls, retro-commissioning, window film and sealing, water conservation and power factor correction. The original scope of work was expanded to include the following, previously approved change orders: Change Order No.1 includes $26,000.00 for additional lighting fixtures and retro-commissioning at the Southside Service Center, Change Order No. 2 includes $36,857.00 for increased air conditioning system capacity for the audio-visual control and rooms adjacent to Council Chambers at City Hall, Change Order No. 3 includes $175,200.00 for increased air conditioning system capacity at the Chuck Silcox Animal Care and Control Center. All of this previously approved work is at or near completion at project facilities. With City Council approval of this $152,300.00 Change Order No. 4, the revised total contract amount will be $11,345,809.00. The additional improvements recommended herein resulted from retro-commissioning and performance reporting during construction of the project. The revised scope includes building air conditioning system improvements to cooling equipment, hot- and chill-water piping, air handling ductwork and automation controls, as well as electrical distribution system improvements to existing power factor capacitance equipment. M/WBE OFFICE-A waiver of the goal for MBE/SBE subcontracting requirements was requested by the Department and approved by the M/WBE Office, in accordance with the BDE Ordinance, because the purchase of goods or service(s) from sources where subcontracting or supplier opportunities are http://apps.cfwnet.org/council_packet/mc—review.asp?ID=2112 Mcouncildate=7/21/2015 7/22/2015 M&C Review Page 2 of 2 negligible. The facilities impacted by this are located in ALL COUNCIL DISTRICTS. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the current capital and operating budgets, as appropriated, of the Special Trust Fund and the Culture and Tourism Fund. TO Fund/Account/Centers FROM Fund/Account/Centers 1) FE72 531200 020543008000 $41.243.00 2) FE72 531200 020543008000 $41,243.00 1) FE72 539120 020543009000 $54,507.00 2) FE72 539120 020543009000 $54,507.00 1) FE72 488302 020543008000 $41,243.00 2) GG04 536040 0240600 $56,550.00 1) FE72 488302 020543009000 $54.507.00 Submitted for City Manager's Office by: Fernando Costa (6122) Originating Department Head: Wayne Corum (5118) Additional Information Contact: Glenn Balog (2028) ATTACHMENTS 21 ESPC7C04 FE72 AO.docx http://apps.cfwnet.org/council_packet/mc—review.asp?ID=21121&councildate=7/21/2015 7/22/2015