SAS, the City of Fort Worth (CITY) and Halff Associates, Inc. ,
(ENGINEER) made and entered into City Secretary Contract No. 46224, (the
CONTRACT) which was administratively authorized on the 8th day of
December, 2014 in the amount of $ 18, 200; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
OPEN CHANNEL STUDIES TECHNICAL REVIEW, SWS-053; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
Article I of the CONTRACT is amended to include the additional
engineering services specified in a proposal dated July 7, 2015, a copy
of which is attached hereto and incorporated herein. The cost to City
for the additional design services to be performed by Engineer totals
$30, 700 .
L
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $48, 900 .
3 .
All other provisions of the Contract, which are not expressly
City of Fort Worth
Professional Services Aoreement Amendment Template OFFICIAL RECORD
Official Release 8/1/2012
Page I o 2 CITY SECRETARY
FT. WORTH, TX
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date last written by a signatory,
below.
APPROVED: ENGINEER
City of Fort Worth Halff Associates, Inc.
Terry M. Barr, P.E. , CFM
Assistant City Manager Authorized Aqent
DATE:' 3 —J-5' DATE: 17-7 07 / 21V 5
APPR VAL RECOMMENDED:
Li Lj
Doug W. Wi rsig, Ph. D. , P. E
Director, Transportation and Public
Works Department
APPROVED AS TO FORM AND LEGALITY: M&C:UZ�L
Date :
Douglas W. Black
Assistant City Attorney
ATTEST: OR
a
8
°
ay sed00
City Se retary
City of Fort Worth
Professional Services Agreement Amendment Template
PMO Official Release 8/1/2012 OFFICIAL RECORD
Page 2 of 2
CITY SECRETARY
FT. WORTH, TX
... HALFF'
July 7, 2015
Ms. Mary Hanna, P.E., CFM
City of Fort Worth
Storm Water Division
Transportation and Public Works
1000 Throckmorton
Fort Worth,TX 76102
RE: Contract Amendment for Open Channel Studies Technical Review
Dear Ms. Hanna:
Halff Associates is pleased to present this proposal for the above referenced project. This proposal
includes the following services and associated budget:
I. Review and Comments of 75% Reports and Data $ 5,700
II. Review and Comments of 90% Reports and Data $ 13,200
III. Review and Comments of 100% Reports and Data $ 7,600
IV. Review Meetings for 75%, 90%and 100%Submittals $4,200
TOTAL PROPOSED CONTRACT AMOUNT $30,700
Included is the standard Amendment to Engineering Contract form, Scope (Attachment "A"), Method of
Payment (Exhibit B-1), Professional Services Fee Summary (Exhibit B-3), and Level of Effort Estimate
(Exhibit B-4) to be considered. Thank you for the opportunity for us to continue assisting the City, if you
have any questions please feel free to call me at (817) 847-1422.
Sincerely,
HALFF ASSOCIATES, INC.
Terry M. Barr, PE, CFM
Project Manager
Cc: File
HALFF ASSOCIATES,INC.
4000 FOSSIL CREEK BOULEVARD TEL (817)847-1422 WWW.HALFF.COM
FORT WORTH,TX 76137-2720 FAX (817)232-9784
ATTACHMENT A
SCOPE OF WORK
OPEN CHANNEL STUDIES TECHNICAL REVIEW —AMENDMENT 1
CITY OF FORT WORTH STUDY SWS-053
Preface
The City is currently conducting open channel and neighborhood drainage
studies to review the current drainage conditions in multiple watersheds to
identify and evaluate potential improvements in various watersheds throughout
the City. Halff Associates' task will be to provide continuing assistance to the
City in the open channel program. Studies listed below are in addition to those
specified in the original contract dated December 8, 2014.
I. Review and Comments for 75% Reports and Data
a. Halff will perform a review of the existing conditions (75%) reports to
ensure that report format is being followed appropriately and that all
required data, including HEC-HMS and HEC-RAS models and GIS
information, has been provided. Detailed technical reviews of the reports,
models, and floodplain mapping will be prepared, and comments provided
to City staff. There are two (2) anticipated studies included in this task:
• SWS-021 Greenbriar Creek (dynamic modeling)
• SWS-024 Summerfields Creek
II. Review and Comments for 90% Reports and Data
a. Halff will perform a review of the revised existing conditions and proposed
mitigation alternatives (90%) reports to ensure that report format is being
followed appropriately and that all required data, including HEC-HMS and
HEC-RAS models and GIS information, has been provided. Detailed
technical reviews of the reports, models, and floodplain mapping will be
prepared. In addition, a review of the damage analysis and cost estimates
will be performed. Comments will be provided to City staff. There are
eight (8) anticipated studies included in this task will conduct review
meetings for the studies that meet the following conditions:
• SWS-007 Broadmoor Neighborhood Study (dynamic modeling)
• SWS-013 Upper Willow Creek
• SWS-021 Greenbriar Creek (dynamic modeling)
• SWS-022 Ridglea/Luther Creek (dynamic modeling)
• SWS-024 Summerfields Creek
• SWS-025 Glenwood Creek
• SWS-028 Overton Creeks
• SWS-046 Little Fossil Creek
1
ATTACHMENT A
SCOPE OF WORK
OPEN CHANNEL STUDIES TECHNICAL REVIEW— AMENDMENT 1
CITY OF FORT WORTH STUDY SWS-053
III. Review and Comments for 100% Reports and Data
a. Halff will perform a review of the final report (100%) reports to ensure that
report format is being followed appropriately and that all required data,
including HEC-HMS and HEC-RAS models, GIS information, and cost
estimates have been provided. No detailed technical reviews will be
performed. A brief overview of the damage analysis and cost estimates
will be performed to ensure 90% comments were addressed. Comments
will be provided to City staff. There are eight (8) anticipated studies
included in this task:
• SWS-007 Broadmoor Neighborhood Study (dynamic modeling)
• SWS-013 Upper Willow Creek
• SWS-021 Greenbriar Creek (dynamic modeling)
• SWS-022 Ridglea/Luther Creek (dynamic modeling)
• SWS-024 Summerfields Creek
• SWS-025 Glenwood Creek
• SWS-028 Overton Creeks
• SWS-046 Little Fossil Creek
IV. Study Review Meetings
a. Halff will conduct review meetings for the studies that are reviewed.
These include the following meetings:
1. Studies that are reviewed for the existing conditions (75%) submittal.
Two (2) studies are included:
• SWS-021 Greenbriar Creek
• SWS-024 Summerfields Creek
2. Studies reviewed for the proposed mitigation alternatives (90%)
submittal. Eight (8) studies are included:
• SWS-007 Broadmoor Neighborhood Study (dynamic modeling)
• SWS-013 Upper Willow Creek
• SWS-021 Greenbriar Creek (dynamic modeling)
• SWS-022 Ridglea/Luther Creek (dynamic modeling)
• SWS-024 Summerfields Creek
• SWS-025 Glenwood Creek
• SWS-028 Overton Creeks
• SWS-046 Little Fossil Creek
2
ATTACHMENT A
SCOPE OF WORK
OPEN CHANNEL STUDIES TECHNICAL REVIEW— AMENDMENT 1
CITY OF FORT WORTH STUDY SWS-053
3. Studies that have submitted a 100% (Final) report. It is not anticipated
that each 100% report will require a review meeting; however, Halff will
conduct up to three (3) meetings to discuss the final report and
address any questions or concerns regarding the submittals. These
meetings will be at the discretion of the City.
3
ATTACHMENT B
COMPENSATION
OPEN CHANNEL STUDIES TECHNICAL REVIEW
CITY OF FORT WORTH STUDY SWS-053
I. Compensation
A. The ENGINEER shall be compensated a total lump sum fee of $30,700 as
summarized in Exhibit B-1 — Engineer Invoice and Section IV—Summary of Total
Project Fees. The total lump sum fee shall be considered full compensation for
the services described in Attachment A, including all labor materials, supplies,
and equipment necessary to deliver the services.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
II. Method of Payment
A. Partial payment shall be made to the ENGINEER monthly upon City's approval of
an invoice prepared and submitted by the ENGINEER in the format and including
content as presented in Exhibit B-1, Progress Reports as required in item III of
this Attachment B.
B. The cumulative sum of such monthly partial fee payments shall not exceed the
total current project budget including all approved Amendments.
C. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Department of Transportation/ Public Works Storm Water Division monthly
progress reports and schedules in the format required by the City.
City of Fort Worth,Texas
Attachment B
PMO Official Release Date:8.09.2012
Page 1 of 3
B-1
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm Primary Responsibility Fee Amount %
Prime Consultant
Halff Associates, Inc. Technical Review of Open $30,700 100%
Channel Studies
Proposed MBE/SBE Sub-Consultants
Non-MBE/SBE Consultants
TOTAL $ 30,700 100%
Project Number& Name Total Fee MBE/SBE Fee MBE/SBE
Open Channel Studies Technical $ 30,700 $ 0 0 %
Review
City MBE/SBE Goal = 0 % Consultant Committed Goal = 0 %
City of Fort Worth,Texas
Attachment B
PMO Official Release Date:8.09.2012
Page 2 of 3
B-2
Halff Associates,Inc. I Invoice-T&PW
4000 Fossil Creek Boulevard Proj.Invoice No. 3-F19XXXX
Fort Worth, TX 76137 Invoice date: 7/10/2015
Tel.817-847-1422 Period (From-To) 6/01/2015-6/31/2015
Fax: 817-232-9784 Purchase Order No. PO-15-00086100
email:tbarr@halff.com T&PW Proj No. SWS-053
City Secy.Cont. No. 46224
COFW Project Manager Mary Hanna, PE,CFM
Consultant's Project Manager: Terry Barr, PE,CFM
Name of Project: Oen Channel Study Technical Review
Work Phase STORM DRAINAGE
Percent Revised Amt:incl.
Complete Orig.Amount Amendment
TA01 Review of Reports and Data 0% $ 7,800.00 $ 34,300.00
TA02 Review Meetings 0% $ 3,200.00 $ 7,400.00
TA03 Henderson Report 0% $ 71200.00 $ 7,200.00
CONTRACT AMOUNT 0% $ 18,200.00 $ 48,900.00
TOTAL CONTRACT AMOUNT $ 18,200.00
TOTAL CONTRACT AMOUNT TO DATE(including amendments) $ 48,900.00
STORM DRAINAGE
Work Phase TOTAL CONTRACT
No. DESCRIPTION OF WORK THIS INVOICE PREVIOUS AMT.
INVOICES REMAINING
TA01 Review of Reports and Data $ - $ - $ 7,800.00
TA02 Review Meetings $ - $ - $ 3,200.00
TA03 Henderson Report $ - $ - $ 7,200.00
$ - $ - $ 18,200.00
List all amendments to date
(Do not invoice for additional work until the related amendment has been executed by the city)
Amendment Description City Secy. Date Total Amount
No. Contract No. Executed by
1 Additional Studies for Review 46224-A1 XX/XX/XXXX $ 30,700.00
2 $ -
3 $ -
4 $ -
TOTALS $ 30,700.00
TOTAL THIS INVOICEF77 $0.001
Make all checks payable to
Halff Associates,Inc.
Submitted by:
Terry Barr,PE,CFM
Project Manager
Halff Associates,Inc.
4000 Fossil Creek Boulevard
Fort Worth,TX 76137
EXHIBIT "13-1"
(SUPPLEMENT TO ATTACHMENT B)
OPEN CHANNEL STUDIES TECHNICAL REVIEW
CITY OF FORT WORTH STUDY SWS-053
METHOD OF PAYMENT &
PROGRESS REPORT REQUIREMENTS
I. Method of Payment
Partial payment shall be made to the ENGINEER monthly upon City's approval of
an invoice from the ENGINEER outlining the current labor and expenses of the
total project. The aggregate of such monthly partial fee payments shall not exceed
the following:
Until satisfactory completion of Attachment "A", Task I, submittal and approval by
the City, a sum not to exceed 95 percent of the Task I fee.
Until satisfactory completion of Attachment "A", Task II, submittal and approval by
the City, a sum not to exceed 95 percent of the Task II fee.
Until satisfactory completion of Attachment "A", Task III, submittal and approval by
the City, a sum not to exceed 95 percent of the Task III fee.
Until satisfactory completion of Attachment "A", Task IV, submittal and approval by
the City, a sum not to exceed 95 percent of the Task IV fee.
The balance of fees, less previous payments, shall be payable after delivery of the
FINAL report and electronic files.
II. Progress Reports
A. The Engineer shall submit to the designated representative of Department of
Transportation/Public Works Stormwater Division monthly progress reports
covering all phases of the analysis in the format required by the City.
EXHIBIT"B-1"
Page 1 of 1
EXHIBIT "B-3"
(SUPPLEMENT TO ATTACHMENT B)
OPEN CHANNEL STUDIES TECHNICAL REVIEW
CITY OF FORT WORTH STUDY SWS-053
PROFESSIONAL SERVICES FEE SUMMARY
TASK FEE
Task 1: Review of 75% Reports and Data $5,700
Task 2: Review of 90% Reports and Data $13,200
Task 3: Review of 100% Reports and Data $7,600
Task 4: Study Review Meetings $4,200
SERVICE TOTAL $30,700
EXHIBIT"B-3"
Page 1 of 1
OPEN CHANNEL STUDIES TECHNICAL REVIEW (SWS-053)
LEVEL OF EFFORT ESTIMATE
EXHIBIT "B-4"
(SUPPLEMENT TO ATTACHMENT B)
T _
o ° IMm e R ° H
Project Phases and Tasks' c $ a c c
m w z m
W O a
$199.03 $159.23 1 $102.93 Hours
Task 1:75%Review and Comments(2)
SWS-021 Greenbriar Creek-Dynamic 4 8 12 $3,305.12 $3,310
SWS-024 Summerfields Creek-Standard 2 6 10 $2,382.74 $2,380
Subtotal Task 1 6 14 22 $5,688 $0 $5,700
Task 2:90%Review and Comments(8)
90%Review and Comments-Standard(5) 5 20 30 $7,267.65 $7,270
90%Review and Comments-Dynamic(3) 6 12 27 $5,884.05 $5,880
Subtotal Task 2 11 32 57 $13,152 $0 $13,200
Task 3:100%Report Comments
100%Review and Comments-Standard(5) 5 10 16 $4,234.33 $4,230-
100%Review and Comments-Dynamic(3) 3 6 18 $3,40521 $3,410
Subtotal Task 3 8 16 34 $7,640 $0 $7,600
Task 4:Review Meetings
75%Review Meeting(2) 4 $636.92 $10 $650;
90%Review Meetings(8) 16 $2,547.68 $40 $2,590
100%Review Meetings(3) 6 $955.38 $20 $980
Subtotal Task 4 0 26 0 $4,140 $20 $4,200
Pf�' E�T,.OTAL1 r3 $30&98 .. 7