Loading...
HomeMy WebLinkAboutContract 46490-FP2 - - CITY SEC F T LVA Department of TP Vd Const.Services CtNITRACT NO. L DOE# e r Project Manager • - tT W0 RT y Risk Management J.P e �...�3 D.O.E. Brotherton CFA Tb P,oa � , me request ror anal TION AND PUBLIC WORKS M F PROJECT COMPLETION GSfi �4 SRO Clearance Conducted B�t Shameka Kennedy D.O.E.JVD: 7118 A--g—.u%..uuaxa uiva for SANTA FE TRAILS PHASE 3 as required by the WATER DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the WATER DEPARTMENT upon the recommendation of the Assistant Director of the T tion&Public Works Department has accepted the project as complete _ f"= Original contract Prim5323,11735 on AUG 0 4 2013 Amount of Approved Change i Na Revised Contract Amount: By— Total Cost Work Completed: 5323,11735 Less Deductions: Liquidated Damages: Days 8$210.00/Day Pavement Deficiencies: i Total Deduction Amount: Total Cat Work Completed: 5323,11735 Less Previous Payments: $0.00 I mal Payor 5323,117.36 Reco ended f6r Acceptance Asst. Director,TPW-Infrastructure Design and Construction Directors WATER DEPART X0121�1`/ IDTi�� City Manager Date Comments: P265-541200-602150217383,P275-541200-702130217353 OFFICIAL RECORD RECEIVED AUG 0 5 2015 CITY SECRETARY FT. WORTH, TX FORTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name SANTE FE TRAILS PHASE 3 Contract Limits Project Type WATER do SEWER City Project Numbers 02173 DOE Number 7118 Estimate Number 1 Payment Number 1 For Period Ending 8/18/2014 CD City Secretary Contract Number 117118 Contract Time 3ED Contract Date Days Charged to Date 210 Project Manager Buckley Contract is .000000 Complete Contractor RKM UTILITY SERVICES,INC. 1604 BLUEBANK ROAD DALLAS, TX 75229-3102 Inspectors LAYER / ODEN Monday,August 18,2014 Page 1 of 4 City Project Numbers 02173 DOE Number 7118 Contract Name SANTE FE TRAILS PHASE 3 Estimate Number I Contract Limits Payment Number I Project Type WATER&SEWER For Period Ending 8/18/2014 Project Funding WATER Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. --__- Quanity Total Quanity Total 1 8"PVC WATER LINE 2703 LF $21.00 $56,763.00 2703 $56,763.00 2 8"GATE VALVE&BOX 9 EA $1,150.00 $10,350.00 9 $10,350.00 3 FIRE HYDRANT W/6"GATE VALVE 4 EA $3,575.00 $14,300.00 4 $14,300.00 4 1.5"IRRIGATION SERVICE&METER BOX 3 EA $1,375.00 $4,125.00 3 $4,125.00 5 1"IRRIGATION SERVICE&METER BOX 1 EA $475.00 $475.00 1 $475.00 6 DUCTILE IRON Ffl-ZINGS 1.9 TN $1,850.00 $3,515.00 1.9 $3,515.00 7 CONCRETE BLOCKING TYPE-B 4.1 CY $110.00 $451.00 4.1 $451.00 8 WATER SERVICE P TAP TO MAIN W/METER 81 EA $475.00 $38,475.00 81 $38,475.00 BOX 9 WATER SERVICE I"LINE 2196 LF $5.40 $11,858.40 2196 $11,858.40 10 CONNECTION TO EXISTING 8"WATER MAIN 2 EA $600.00 $1,200.00 2 $1,200.00 11 CONNECTION TO EXISTING 16"WATER MAIN 1 EA $3,400.00 $3,400.00 1 $3,400.00 12 CONCRETE ENCASEMENT FOR UTILITY PIPES 3 CY $150.00 $450.00 3 $450.00 13 TRENCH SAFETY 2703 LF $0.05 $135.15 2703 $135.15 Sub-Total of Previous Unit $145,497.55 $145,497.55 SEWER Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 8"SANITARY SEWER MAIN 3828 LF $24.50 $93,786.00 3828 $93,786.00 2 8"SANITARY SEWER MAIN 330 LF $35.00 $11,550.00 330 $11,550.00 3 MANHOLE STD 4'DIA 12 EA $2,650.00 $31,800.00 12 $31,800.00 4 MANHOLE VACUUM TEST 12 EA $100.00 $1,200.00 12 $1,200.00 5 SEWER SERVICE 4"TAP 81 EA $315.00 $25,515.00 81 $25,515.00 6 4"SEWER SERVICE WITH CLEANOUTS 3540 LF $3.10 $10,974.00 3540 $10,974.00 7 CONNECTION TO EXISTING 1 EA $300.00 $300.00 1 $300.00 8 TRENCH SAFETY 4158 LF $0.05 $207.90 4158 $207.90 9 POST CONSTRUCTION CCTV 4158 LF $0.55 $2,286.90 4158 $2,286.90 Sub-Total of Previous Unit $177,619.80 $177,619.80 Monday,August 18,2014 Page 2 of 4 AUG 0 4 2015 P "o z-)3 City Project Numbers 02173 By DOE Number 7118 Contract Name SANTE FE TRAILS PHASE 3 Estimate Number 1 Contract Limits Payment Number 1 Project Type WATER&SEWER For Period Ending 8/18/2014 Project Funding Project Manager Buckley City Secretary Contract Number 117118 Inspectors LAYER / ODEN Contract Date Contractor RKM UTILITY SERVICES,INC. Contract Time 35 CD 1604 BLUEBANK ROAD Days Charged to Date 210 CD DALLAS, TX 75229-3102 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded —————————————————————————————————————— Total Cost of Work Completed $323,117.35 Leas %Retained $0.00 Net Earned $323,117.35 Earned This Period $323,11735 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Leas Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0,00 Balance Due This Payment $323,117.35 Monday,August 18,2014 Pap 4 of 4 FORTWORTH rev 03/05/07 TRANSPORTATION& PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:1 NAME OF PROJECT: Santa Fe Trails Pb#3 PROJECT NO.: 02173 CONTRACTOR: RKM DOE NO.: 7118 PERIOD FROM:01/06/14 TO: 08/06/14 FINAL INSPECTION DATE:10-Aug-14 WORK ORDER EFFECTIVE:1/6/2014 CONTRACT TIME: 35 0 m DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED DURING CREDITED MONTH CHARGED DURING CREDITED 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES * DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS OTHERS CHARGED DAYS THIS 0 0 0 0 210 210 PERIOD PREVIOUS 0 0 0 0 0 0 PERIOD TOTALS 0 0 0 0 210 210 TO DATE *REMARKS: CONTRACTOR DATE INSPECTOR DATE ENGINEERING DEPARTMENT la The City of Fort Worth-1000 Throckmorton Street-Fort Worth,TX 76012-6311 (817)392-7941-Fax:(817)392-7845 FORT WORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Santa Fe Trails Phase#3 PROJECT NUMBER: 02173 DOE NUMBER: 7188 WATER PIPE LAID SIZE TYPE OF PIPE LF Water 8in PVC SDR-14 2703 FIRE HYDRANTS: 4 VALVES(16"OR LARGER) PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: yes NEW SERVICES: lin copper 2196 SEWER PIPE LAID SIZE TYPE OF PIPE LF Sewer 8in PVC-SDR-26 3828 Sewer 8in PVC-SDR-26 330 PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: yes NEW SERVICES: 4in PVC SDR-26 3540 TRANSPORTATION AND PUBLIC WORKS , = The City of Fort Worth- 1000 Throckmorton Street-Fort Worth,TX 76012-6311 (817)392-7941 -Fax:(817)392-7845 FORTWV RT H REV:02/20/07 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR CONTRACTOR&PROJECT DATA Name of Contractor Project Name RKM Santa Fe Trails PH#3 DOE Inspector DOE Number We n Oden 7118 DOE Inspector Project Manager 0 Water 21 Waste Water❑ Storm Drainage0 Pavement Pat Buckle Initial Contract Amount Project Difficulty $323,117.35 O Simple QQ Routine O Complex Final Contract Amount Date $323,117.35 8/20/2014 II)PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE I Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 3 20 15 4 Field Supervision 15 Y 3 60 45 5 Work Performed IS Y 4 60 60 6 Finished Product 15 Y 4 60 1 60 7 Job Site Safety 15 Y 3 60 45 8 Traffic Control Maintenance 15 Y 4 60 60 9 Daily Clean Up 5 Y 4 20 20 10 Citizen's Complaint Resolution 5 Y 4 20 20 11 Property Restoration 5 Y 4 20 20 12 After Hours Response 5 Y 3 20 15 13 Project Completion 5 Y 3 20 15 TOTAL ELEMENT SCORE(A) 403 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 403 III)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating(ITS/MS]*100%) 403 / 448 = 90% Performance Category Excellent <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Signature DOE Inspector (,(v (D f Signature Contractor i� Signature DOE Inspector's Su rvisor CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS . �' The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fag:(817)392-7845 FORTWORTH REV:02/22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY 1 PROJECT INFORMATION Date: 8/20/2014 Name of Contractor Project Name RKM Santa Fe Trails Ph#3 :DOE Inspector ;Project Manager Weyman Oden ;Pat Bu �_ckle ._.._. f DOE Number 'Project Dif tculty Type of Contract '7118 J'U Simple Routine Complex i�,] Water 0 Waste Water Storm Drainage Pavement Initial Contract Amount lFinal Contract Amount 5323,117.35 1$323,117.35 II)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent ELEMENT RATING ]ELEMENT i RATING (0-4) _ INSPECTION EVALUATION (PLANS&SPECIFICATIONS 'I Availability of Inspector 4 �l 1 Accuracy of Plans to Existing Conditions I �2 Knowledge of Inspector "`�/ 2 Clarity&Sufficiency of Details y _ i3 Accuracy of Measured Quantities — — '3 Applicability of Specifications �M ] "_ 4 Display Of essio Professionalism I4 Accuracy of Plan Quantities _ y. _ 5 Citizen Complaint Resolution ] !PROJECT MANAGER EVALUATION _ 6 Performance Settings Valve Crews,Labs 11 Knowledge And/Or Problem Resolution ADMINISTRATION 12 Availabili of Project Mafia er 1 Change Order Processing Time 3 Communication { 2 Timlmess of Contractor Payments 4 Resolution of Utility Conflicts j L 3 Bid Opening to Pre-Con Meeting Timeframe --L- 111) COMMENTS&SIGNATURES COMMENTS Signature Contractor _ Signature DOE Inspector Signature DOE Inspector's Supervisors INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS =` The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,"I`K 76012-6311 (817)392-7941 •Fax:(817)392-7845 fl-R•HORION ® NYSE August 25,2014 City of Fort Worth Weyman Oden CFW Inspector 8851 Camp Bowie West Fort Worth,TX 76116 RE: Santa Fe Santa Fe Trails Phase 3—DOE#7118 Mr.Oden: This letter is to serve notice that D.R. Horton will not charge any liquidated damages to RKM Utility Services,Inc.on the above referenced project. Sincerely, r Terry Tice Land Develop en Project Manager D. R. Horton, Inc.—DFW West, Midland/Odessa 6751 North Freeway Fort Worth,Texas 76131 Office: 817 230 0800 Cell: 817 320 1139 6751 North Freeway • Fort Forth,TX 76131 (817) 230.0800 CONSENT OF SURETY OWNER o TO FINAL PAYMENT AW-MTRCT D AIA Document G707 CONTRACTOR O SURIs fY U Bond No. PB00317400068 OTMM p TO OWNER: ARCHITECT'S PROJECT NO.: ffibm-wWnA r=0 D.R. Horton-Texas, Ltd., c/o City of Fort Worth CONTRACT FOR Construction 1000 Throckmorton St. Fort Worth ,TX 76102 PROJRCT.- CONTRACT DATED: (M""0W0rt*"V Water, Sanitary Sewer and Storm Drain Improvements to Serve Santa Fe Trails Phase 3 In aeootdance with the provWoms of the Contrxt between the Owner and the Cont mor as Indicated above,the (/wa[==e*Wad A eacfSorwy) Philadelphia Indemnity Insurance Company One Bala Plaza,Suite 100 Bala Cynwyd, PA 19004-1403 SURM Y, on bond of (bent n&W aW idia�tQrQxdn+darj RKM Utility Services, Inc. 1805 Royal Lane Suite 107 Dallas,TX 75229 CONTRACTOR hereby approves of the&W payment to the Contractor,and agrees that Ana[payment to the Contractor shat)nex retkve the Surety of any of Im dliptfow to (Manmwandmd*=vf w &o D.R. Horton-Texas, Ltd., Go City of Fort Worth 1000 Throckmorton St. Fort Worth ,TX 76102 OWNER, as set forth In said Surety's bond. IN WTINESS WHMOF,the Surety has hereunto set Its hand on#his dace: August 25,2014 fNawl anlr►1dgRa0rtnontb16rfarMdb,Nbrmsmr(soburaied�sm:1 Philadelphia Indemnity Insurance Company (S�+rKun�gJf.Mbo.�A+ap+s�w,Mrlir� (Z Brett A.Tisdale Attomey-in-Fact 4eatheres (q yftdimnwavdd*) G707--1994 731 PHILADELPHIA INDEMNITY INSURANCE COMPANY One Bala Plaza,Suite 100 Bala Cynwyd,PA 19004 Power of Attorney KNOW ALL PERSONS BY THESE PRESENTS: that PHILADELPHIA INDEMNITY INSURANCE COMPANY(the Company),a corporation organized and existing ander the laws of the Commonweshh of Pennsylvania,does hereby constitute and appoint Edward G.Britt,Jr.,David G.Mklette,David T.Mkiette, Barry K.McCord,Robert C.Davis,Krbd Lovett,Ashley Britt Russell,Joni Bowen,Heather Noles,Brett A.Tisdale,and Rita G.Gulim of Bowen,Micle to& Britt Insurance Agency,LLC of Houston,Te=as. its true and lawfid Attomey(s)in fad with full authority to execute on its behalf bonds,undertakings,recognizances and other contracts of indemnity and writings obligatory in the nature thereof;issued in the coarse of its business and to bind the Company thereby,in an amount not to exceed 525.000.000 This Power of Attorney is granted and is signed and sealed by facsimile wader and by the authority of the 6olkwmg Resolution adopted by the Board of Directors of PHILADELPHIA INDEMNITY INSURANCE COMPANY at a mating doily called the 1'day of July,2011. RESOLVED: That the Board of Directors hereby authorizes the President or any Vice President of the Company to:(1)Appoint Attorneys)in Fad and authorize the Attorneys)in Fad to execute on behalf of the Company bands and undertakings,conuacta of inde®ity and other writings obligatory in the nature thereof and to attach the sea]of the Company thereto; and (2) to remove, at say time, say such Attoruey-m-Fact and revoke the authority given. And,be it FURTHER RESOLVED: That the signatures of such officers and the seal of the Compmy may be affixed to any such Power of Attorney or certificate relating thereto by facsimile,and any such Power of Attorney so executed and certified by facsimile signatures and facsimile seal shall be valid and biding upon the Company in the future with the respect to any bond or undertaking to which it is attached. IN TESTIMONY WHEREOF,PHILADELPHIA INDEMNITY INSURANCE COMPANY HAS CAUSED THIS INSTRUMENT TO BE SIGNED AND ITS CORPORATE SEALTO BE AFFIXED BY ITS AUTHORUED OFFICE THIS T'H DAY OF FEBRUARY 2013. �\��yNITY�sO W r Robert D.O'iary Jr.,President&CEO Philadelphia Indemnity Irm:ance Campmy On the Ta dry of February 2013,before me came the individual who executed the preceding instrument,to me personally(mown,and being by me duly sworn said that he is the therem described and notborized officer of the PHILADELPHIA INDEMNITY INSURANCE COMPANY;that the seal affixed to said instrument is the Corporate sea]of said Company;that the said Corporate Seal and his signature were duly affixed. eros NMR1N W&. DAIif3lE PORk1HPu 20 tnemMtdwT couaro tea Notary Public: residing at Bak Cvnwvd PA (Notary Seal) My commission expires: March 22.2[116 1,Craig P.Keller,Executive Vice President,Chief Financial Officer and Secretary of PHILADELPHIA INDEMNITY INSURANCE COMPANY,do herby ear*that the foregoing resolution of the Board of Directors and this Power of Attorney issued puamant thereto are true and correct and are still in full force and effect I do further cer*that Robert D.O'Leary Jr.,Am executed the Power of Atto mey as President,was on the date of execution of the attached Power of Attorney the duly elected President of PHILADELPHIA INDEMNITY INSURANCE COMPANY, In Testimony Whereof I have subscribed my name and affixed the facsimile seal of each Company thisatS_�day of # 20_.Lff oE�NI'Tr •.ry'µ�� y�S Craig P.Keller,Executive Via President,Chief Financial Officer&Secretary PHILADELPHIA INDEMNITY INSURANCE COMPANY .... 'TT444...yo .. .. ya. AFFIDAVIT STATE OF Texas COUNTY OF Dallas Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Ryan Dowdy, President Of RKM Utility Services, Inc., known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Santa Fe Ph 3 -Underground utilities BY y-- Ryan Dowdy -President Subscribed and sworn before me on this date 17 of October,2014. `e`eeeaeeuatR•..�. ` ''NOfi-'RfS9�Q :G o�pFA�Io'ar blic s Dallas, TX 2018 ,.°�•