HomeMy WebLinkAboutOrdinance 6974 ORDINANCE NO.
ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF MISSOURI STREET
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES
IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH
GIx.I1E , INC. FOR THE CONSTRUCTION OF
SAID IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE
ISSUANCE, EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF
SPECIAL ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS
HEREIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS;
DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE
BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY
COUNCIL OF FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE
IN APPROPRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN
EFFECTIVE DATE.
WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract
with GLADE, INC. , for the making and construction of
certain street improvements on the hereinafter described portions of streets, avenues and
public places in said City, to-wit:
UNIT 1: MISSOURI STREET From Irma Street to E. Rosedale Street, known
and designated as Unit 1, Project No. 104-
24000-226.
UNIT 2: IRMA STREET From South Freeway to Evans Avenue, known and
designated as Unit 2, Project No. 104-24000-226.
UNIT 3: WEST BUTLER STREET From South Adams to Laughton Street, known and
designated as Unit 3, Project No. 104-24000-226.
UNIT 4: WEST BUTLER STREET From Laughton Street to College Avenue, known and
designated as Unit 4, Project No. 104-24000-226.
UNIT 5: WEST DICKSON STREET From Wayside Street to Frazier Avenue, known and
designated as Unit 5, Project No. 104-24000-226.
1, 971
WHEREAS, by sundry proceedings heretofore passed by the City Council of the
City of Fort Worth, Texas, including Ordinance No. 6874 , a portion of the cost of
said improvements was levied and assessed against the respective properties abutting
on each of the above described portions of streets, avenues:,and public places and against
the real and true owners thereof; and,
WHEREAS, the City Council of the City of Fort Worth, Texas, has, upon review,
found and determined that, in some instances, in order to effect substantial justice
and equality, it is desirable and necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance No. 6874 , and
WHEREAS, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described,
and have been inspected and found to be in complete accordance with the contract therefor;
` NOW, THEREFORE,
BE IT ORDAINED BY THE ',CITY COUNCIL OF THE CITY OF FORT WORTH,,
TEXAS, THAT:
I.
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; and the contract with
reference thereto be, and it is hereby, found and declared fully completed and performed.
II.
The Mayor, be, and he is hereby, directed to issue and execute in the name
of the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance with
the proceedings relating to such improvements and assessments. The certificates shall be
numbered, shall describe the property against which the assessment has been levied, shall,
where known, state the name or names of the true owners of the respective parcels of pro-
perty assessed and shall be issued in an amount equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon. The
numbers of the certificates, with the property descriptions to be shown on'the respective
certificates, together with the names of the owners of said property, the principal amount
of the assessment, the respective credits, if any which are hereby authorized, granted and
allowed against the principal amount of some one or more of the assessments heretofore
levied, and the principal amount for which each certificate is to be issued after giving
effect to such credit, if any, are hereby enumerated and itemized as follows:
III.
When each of the certificates has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas,
and by filing the complete ordinance in the appropriate Ordinance Records of said City.
V.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
T.0
PASSED AND APPROVED THIS S day of
APPROVED AS TO FORM AND LEGALITY:
r
540 F044
City Attorney
PROJECT NO. 104-26000-226, UNIT 1: MISSOURI STREET FROM IRMA STREET TO EKST ROSEDALE STREET,
to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-
inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide
concrete gutter on a thirty foot roadway. Six-inch thick concrete driveways and five foot
wide concrete sidewalks will be constructed where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOM ASSESSMENT
Beginning at the northwest corner of Irma Street and Missouri Street.
WEST SIDE EVANS SOUTH ADDITION
Jessie Williams E73 S60-1 NE k-7 60' Pavement $3.04 $182.40
817 Irma Street Res. 60' Gutter only 1.73 103.80
76104 $286.20
Josephine Womack N30 S90-1 NE k-7 30' Pavement $3.04 $ 91.20
1222 Missouri St. Res. 30' Gutter only 1.73 51.90
76104 $143.10
Iva Brown N30 S120-1 NE k-7 30' Pavement $3.04 $ 91.20
1204 Missouri St. Res. 30' Gutter only 1.73 51.90
76104 $143.10
Iva Brown N30 S150-1 NE k-7 30' Pavement $3.04 $ 91.20
1204 Missouri St. Res. 30' Gutter only 1.73 51.90
76104 $143.10
J. D. Jackson N61-1 HE k-7 61' Pavement $3.04 $185.44
1200 Missouri St. Res. 61' Gutter only 1.73 105.53
76104 $290.97
John Lillie Jr. S1/3-50L 5 36.3' Pavement $3.04 $110.35
956 E. Marion 51-52 Res. 36.3' Gutter only 1.73 62.80
76104 $173.15
1.
ZROJECT NO. 104-24000-226, UNIT I: MISSOURI STREET, CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE EVANS SOUTH ADDITION
Hamilton Hughes M1/3-50- 5 36.3' Pavement $3.04 $110.35
112 E. Rosedale 51-52 Res. 36.3' Gutter only 1.73 62.80
76104 $173.15
Ottie Conner N1/3-50- 5 36.3' Pavement $3.04 $110.35
1900 Amanda 51-52 Res. 36.3' Gutter only 1.73 62.80
76105 $173.15
Commenco Corp. 33 5 110' Frontage
P.O. Box 13331 Comm. 80' Pavement $6.77 $541.60
Louisville, Ky. $541.60
40213
EAST ROS, TNTERSErTS EVANS SOUTH ADDITION
EAST SIDE
J. C. Llewellyn S40-31 5 40' Pavement $6.77 $270.80
3537 West 7th Comm. 40' Curb & Gutter 3.46 138.40
76107 $409.20
J. C. Llewellyn 56 5 50' Pavement $6.77 $338.50
3537 West 7th Comm. 30' Curb & Gutter 3.46 103.80
76107 195 Sq.Ft. Driveway 1.33 259.35
$701.65
City of Fort Worth 55 5 50' Frontage No Assessment
Comm.
2.
PROJECT NO. 104-24000-226, UNIT 1: MISSOURI STREET, CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
FAST SIDE EVANS SOUTH ADDITION
Celine Zenon 54 5 50' Pavement $6.77 $338.50
4210 Linn St. Comm. 39' Curb & Gutter 3.46 134.94
Houston, Texas 176 Sq. Ft. Drive 1.33 234.08
77026 $707.52
Roger Hughes Nk-2 NE -7 52.5' Pavement $6.77 $355.43
1109 Galveston Comm. 52.5' Curb & Gutter 3.46 181.65
76104 63 SF Driveway 1.33 83.79
$620.87
Versa Williams Sj Nk-2 NE -7 58.5' Pavement $6.77 $396.05
221 Paradise Comm. 5' Curb and Gutter 3.46 17.30
76111 $413.35
City of Fort Worth N6 E100 SJ-2 NEI-7 6' Frontage No Assessment
Roger Hughes W47-Sk-2 NE -7 100' Pavement $6.77 $677.00
1109 Galveston Comm. 85' Curb & Gutter 3.46 294.10
76104 63 Sq.Ft. Drive 1.33 83.79
$1,054.89
TOTAL COST TO PROPERTY OWNERS.. ...... ...... .$ 5,975.00
TOTAL COST TO CITY OF FORT WORTH..... ... ... .$ 4,933.64
TOTAL CONSTRUCTION COST.. ... . ... . .. .... . ....$10,908.64
3.
PROJECT NO. 104-24000-226, UNIT II: IRMA STREET FROM SOUTH FREEWAY TO EVANS AVENUE, to be
improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch
thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide
concrete gutter on a twenty-six foot roadway. Six-inch thick concrete driveways and five
foot wide sidewalks will be constructed where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
Beginning at the northeast corner of South Freeway and Irma Street
NORTH SIDE EVANS SOUTH ADDITION
Annie M. Bradford E37.85-4 NW 4-7 37.8' Pavement $5.80 $219.24
Estate Comm. 37.8' Curb & Gtr. 3.46 130.79
c/o O.B. Craddock $350.03
1107 Burk Burnett Bldg.
76102
C. H. McBrayer 5 NW -7 50' Pavement $5.80 $290.00
3510 East Lancaster Comm. 50' Curb & Gtr. 3.46 173.00
76103 $463.00
WINDER STREET INTERSECTS
Sanford Norris W81 S60-1 NE 4-7 81' Pavement $3.04 $246.24
815 Irma Res. 81' Gutter only 1.73 140.13
76104 104 Sq.Ft. Drive 1.33 138.32
$524.69
Jessie Williams E73 S60-1 NEk-7 73' Pavement $3.04 $221.92
817 Irma Res. 73' Gutter only 1.73 126.29
76104 63 Sq.Ft. Drive 1.33 83.79
$432.00
MISSOURI AVENUE INTERSECTS
Roger Hughes 1447 S' -2 NE k-7 47' Pavement $5.80 $272.60
1109 Galveston Comm. 47' Gutter only 1.73 81.31
76104 88 Sq. Ft. Drive 1.33 117.04
$470.95
4.
PROJECT NO. 104-24000-226, UNIT II: IRM& STREET, CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE EVANS SOUTH ADDITION
Y. C. Shambles S56 E100-2 NE -7 100' Pavement $5.80 $580.00
925 Boaz Comm. 100' Gutter only 1.73 173.00
76107 132 Sq. Ft. Driveway 1.33 175.56
$928.56
EVANS AVENUE INTERSECTS
SOUTH SIDE
Herman Penigar 1 S�-1/7 58' Pavement $5.80 $336.40
5521 Donnelly Comm. 25' Curb & Gutter 3.46 86.50
76107
$422.90
Herman Penigar 2 S'k-1/7 50' Pavement
$5.80
5521 Donnelly Comm. 50' Curb & Gutter 3.46 $173.00
76107
$463.00
Roger Hughes E40-3 S' -1/7 40' Pavement $3.04 $121.60
1109 Galveston Res. 40' Gutter only 1.73 69.20
76104
$190.80
Roger Hughes W10-3 E30-4 S'k-1/7 40' Pavement $3.04 $121.60
1109 Galveston Res. 40' Gutter only 1.73 69.20
76104
$190.80
Ruth Shaw W20-4 E20-5 SZ-1/7 40' Pavement $3.04
$121.60
112 Paradise Res. 40' Gutter only 1.73 69.20
76111
$190.80
5.
PROJECT NO. 104-24000-226, UNIT II: IRMA STREET, CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
SOUTH SIDE EVANS SOUTH ADDITION
Frances McKenzie W30-5 E10-6 S'k-1/7 40' Pavement $3.04 $121.60
816 Irma Res. 40' Gutter only 1.73 69.20
76104 $190.80
Rufus Bowie Biggs W40-6 A-1/7 40' Pavement $3.04 $121.60
810 Irma Res. 40' Gutter only 1.73 69.20
76104 $190.80
Steve Murrin 7 S'k-1 7 50' Pavement $3.04 $152.00
Route 5, Box 284 Res. 50' Gutter only 1.73 86.50
76116 $238.50
Steve Murrin 8 S'k-1/7 50' Pavement $3.04 $152.00
Route 5, Box 284 Res. 50' Gutter only 1.73 86.50
76116 $238.50
Steve Murrin 9E14-10 S�-1/7 64' Pavement $3.04 $194.56
Route 5, Box 284 Res. 64' Gutter only 1.73 110.72
$305.28
76116
TOTAL COST TO PROPERTY OWNERS. . . .. .. . . . . ... .. .$ 5,791.41
TOTAL COST TO CITY OF FORT WORTH. . . .. . . . . . . . ..$ 9,640.62
TOTALCONSTRUCTION COST. . . .. . . . .. . . . . . .. . . . . . .$15,432.03
6.
PROJECT NO. 104-24000-226, UNIT III: WEST BUTLER STREET FROM SOUTH ADAMS TO LAUGHTON STREET,
to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-
inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide
concrete gutter on a twenty-six foot roadway. Six inch thick concrete driveways will be con-
structed where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
Beginning at the northeast corner of South Adams and West Butler.
NORTH SIDE SILVER LAKE ADDITION
J. E. Kerr S50 Wk 48 107.5' Side lot adjusted to
3641 S. Adams Res. 100' Pavement $3.04 $304.00
76110 100' Curb & Gutter 3.46 346.00
68 Sq. Ft. Driveway 1.33 90.44
$740.44
Frank Laguna S50 E' 48 107.5' Side lot adjusted to
5509 Odessa Res. 100' Pavement $3.04 $304.00
76133 100' Curb & Gutter 3.46 346.00
$650.00
LAUGHTON STREET
SOUTH SIDE
John L. Wortman N� Ek 49 107.5' Side lot adjusted to
3700 Laughton Res. 100' Pavement $3.04 $304.00
76110 100' Curb & Gutter 3.46 $346.00
41 Sq. Ft. Driveway 1.33 54.53
$704.53
Calvary United Wk Nk 49 107.5' Side lot adjusted to
Pentecostal Church Res. 100' Pavement $3.04 $304.00
3725 S. Adams 100' Curb & Gutter 3.46 346.00
76110 49 Sq. Ft. Driveway 1.33 65.17
$715.17
TOTAL COST TO PROPERTY OWNERS. . . . . . . . . . . .. . . ... .$2,810.14
TOTAL COST TO CITY OF FORT WORTH. . . . . . . . .. .. . . . .$2,994.40
TOTAL CONSTRUCTION COST. .. . . . . . .. . . . . . . . .. . . . .. .$5,804.54
7.
PROJECT NO " 104-24000-226 UNIT IV: WEST BUTLER FROM LAUGHTON STREET TO COLLEGE AVENUE, to be
improved by constructing a six-inch thick of-mix asphaltic concrete pavement on a six-inch thick
lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter
on a twenty-six foot roadway. Six-inch thick concrete driveways and five foot wide concrete side-
walks will be constructed where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT_ ASSESSMENT
Beginning at the northeast corner of Laughton Street and West Butler.
NORTH SIDE SILVER LAKE ADDITION
Margaret Scaggs S50 A 56 115' Side lot adjusted to
3641 Laughton Res. 100' Pavement $3.04 $304.00
76110 100' Curb & Gutter 3.46 346.00
30 Sq. Ft. Driveway 1.33 39.90
$689.90
E. G. McCoy S50 Ek 56 115' Side lot adjusted to
3644 College Res. 100' Pavement $3.04 $304.00
76110 60' Curb & Gutter 3.46 207.60
$511.60
COLLEGE AVENUE INTERSECTS
SOLE
Dale E. Britton N50 Ek 55 115' Side lot adjusted to
3700 College Res. 100' Pavement $3.04
$304.00
76110 100' Curb & Gutter 3.46 346.00
$650.00
John L. Wortman S50 A 55 115' Side lot adjusted to
3700 Laughton Res. 100' Pavement $3.04 $304.00
76110 100' Gutter only 1.73 173.00
$477.00
TOTAL COST TO PROPERTY OWNERS...................$2,328.50
TOTAL COST TO CITY OF FORT WORTH. . ...... .... .m..$3,703.12
TOTALCONSTRUCTION COST.. ...... .... . ... .... . ....$6,031.62
8.
PROJECT NO, 104-24000-226, UNIT V: WEST DICKSON FROM WAYSIDE TO FRAZIER, to be improved by
constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime
stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter
on a thirty foot roadway. Six-inch thick concrete driveways will be constructed where
specified.
BLOCK
MMER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
Beginning at the northeast corner of Wayside Street and West Dickson.
NORTH SIDE HOMELAND ADDITION
Harry McDougal 9 17 142' Side lot adjusted to
3729 Wayside Res. 100' Pavement $3.04 $304.00
76110 100' Curb and Gutter 3.46 346.00
194 Sq. Ft. Driveway 1.33 258.02
$908.02
Domingo J. Villegas 8 17 142' Side lot adjusted to
3728 Frazier Res. 100' Pavement $3.04 $304.00
76110 100' Curb & Gutter 3.46 346.00
114 Sq. Ft. Driveway 1.33 151.62
$801.62
FRAZIER AVENUE INTERSECTS
SOUTH SIDE
Manuel Govea, Jr. 1 24 142' Side lot adjusted to
1309 Park Ave. Res. 100' Pavement $3.04 $304.00
76106 100' Curb & Gutter 3.46 346.00
97 Sq. Ft. Driveway 1.33 129.01
$779.01
Arthur Lee Hickman 16 24 142' Side lot adjusted to
3751 Wayside Res. 100' Pavement $3.04 $304.00
76110 100' Curb & Gutter 3.46 346.00
194 Sq. Ft. Driveway 1.33 258.02
$908.02
TOTAL COST TO PROPERTY OWNERS. . . .. . ... . . .. . . .$3,396.67
TOTAL COST TO CITY OF FORT WORTH. . ... . . . . . . . .$7,571.32
TOTAL CONSTRUCTION COST. . . . . . . . . . . . . . ... .. . . $10,967.99
9.
PROJECT NO. 104-24000-226, UNIT V: WEST DICKSON FROM WAYSIDE TO FRAZIER, CONTINUED:
TOTAL COST TO PROPERTY OWNERS...... ... . . .. . .. . . .$20,301.72
TOTAL COST TO CITY OF FORT WORTH.. . .... .. . . . ... .$28,843.10
TOTALCONSTRUCTION COST. . .. . . .... . . . . .. ... . . ... .$49,144.82
10.
.City of Fort Worth, Texas
UNE
GA,UFF Mayor and Council Communication
DATE REFERENCE SUBJECT: Final Payment - Assessment Paving PAGE
3/25/74 NUMBER at Five Locations on the South 1of 2
FP-1005 Side
Final Council action on the Project described below is requested.
Project Description
Name: Assessment Paving at Five Locations on the South Side
Contractor; Glade, Inc.
Contract Awarded: June 25, 1973 (M&C C-2549)
Work Order Issued: October 30, 1973
Work Order Effective: November 12, 1973
Work Began: November 6, 1973
Date of Final Inspection and Approval: January 29, 1974
Working Time Bid: 62 Working Days
Working Time Used: 38 Working Days
Project Cost and Financing
Original Bid Price: $47,005.55
Final Contract Cost: $44,677.11
Partial Payments Previously Made: 3 Amount: $40,177.09
Final Payment Due: $4,500.02
Deviation from Bid Price: The final contract cost of this project is $2,328.44
under the bid price. The cost difference resulted due to deviations between
quantities estimated in the contract documents and quantities measured and used
at the job site.
The engineering, administration and other miscellaneous charges to the account
exceeded the amount estimated by approximately.$5,698 due to preliminary engineer-
ing performed on three additional locations. After a repoll of the projects was
taken, only five locations were finally designed and constructed, In addition,
three additional double driveways were constructed for a cost of $469.93 as re-
quested by property owners. Additional funds are requested as outlined below:
Compliance with Specifications
Tests made during construction show that material used and required thicknesses
were in compliance with contract specifications.
Recommendations
It is recommended that:
1) The following bond fund tranfers be approved:
From To Amount Reason
1. Assessment Paving Assessment Paving $2,900 To provide additional
Streets Unspecified 5 Locations South funds for engineering,
104-24000-901 Side, 104-24000-226 administration and other
miscellaneous costs.
DATE REFERENCE SUBJECT: Final Payment - Assessment Paving PAGE
NUMBER
'3725%74 FP-1005 at Five Locations on the South 2 of 2
Side
From To Amount Reason
_
2. Revolving Fund, Revolving Fund, 5 $ 469.93 To provide funds for
Unspecified Locations South Side construction of three
042-09724-901 042-10424-226 additional double drive-
ways,
riveways.
2) The project described be accepted by the adoption of an ordinance and final
payment of $4,500.02 be made to Glade, Inc.