Loading...
HomeMy WebLinkAboutContract 44209-FP1 CITY SFCRETAW coMTl�►cT ao. � l Depart,n�ytl�iTPW Const.Services � DOE# ((�A%% lfDo Project Manager T p �,j Risk Management S.Cana < 1 WORTH, -yam D.O.E. Brotherton CFA Westerman/Scanned o The Proeeedin people lure been Cambered coaeernlag the mgom kTION AND PUBLIC WORM ror 6md p■ymemt&have mkned this prejut for weh payuemt PROJECT COMPLETION Clearance Conducted By Etta Bary D.O.E.N4: 6706 Regarding contract 44209 for CONSTRUCTION OF PENNSYLVANIA AVE as required by the WATER DEPARTMENT as approved by City Council on 02/19/2013 through M&C C-26104 the director of the WATER DEPARTMENT upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as conifilit Original Contract Prim: oul I 571,660.00 AUG 0 4 2015 : ' Amount of Approved Change Orders: 565,010.00 Nt 1,2 Revised Contract Amount: BY -�— $136,670.00 Total Cost Work Completed: $130,450.00 Less Deductions: Liquidated Damages: Days®S210.00/Day Pavement Deficiencies: Total Deduction Amount: $0.00 Total Coat Work Completed: $130,450.00 Leas Previous Payments: $123,927.50 Final Payment Dug, $6,522.50 recommended f-or Acceptance Date Asst. Director, TPW - Infrastructure Design and Construction Accepted [] e Asst. Director, WATER DEPARTME R&A— Asst. City Manager Date Comments: FUND,ACCT:WATER P253-6091701742/SEWER:PZS-709170174 OFFICIAL RECORD RECEIVED AUG 11.2015 CITY SECRETARY FT. WORTH, TX i FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name Construction of Pennsylmia Ave from Contract Limits Tenth St to West Cavnon St Project Type WATER&SEWER City Project Numbers 01742 DOE Number 6706 Estimate Number 33 Payment Number 33 For Period Ending 7/14/2015 CD City Secretary Contract Number 44209 Contract Time 43CD Contract Date 2/19/2013 Days Charged to Date 430 Project Manager Wilson Contract is 95-00 Complete Contractor McCLENDON CONSTRUCTION COMPANY,INC. P.O.BOX 999 BURLESON, TX 76097 Inspectors GREGORY / COLLIER Tuesday,July 14,2015 Page l of 5 it City Project Numbers 01742 DOE Number 6706 Contract Name Construction of Pennsylania Ave from Estimate Number 33 Contract Limits Tenth St to West Cannon St Payment Number 33 Project Type WATER&SEWER For Period Ending 7/14/2015 Project Funding Unit I-Water Improvements Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 0241.1102 6"Pressure Plug I EA $650.00 $650.00 1 $650.00 2 0241.1302 Remove 6"Water Valve 1 EA $350.00 $350.00 1 $350.00 3 0241.1510 Salvage Fire Hydrant 1 EA $450.00 $450.00 1 $450.00 4 3305.0108 Miscellaneous Structure I EA $3,100.00 $3,100.00 1 $3,100.00 5 3305.0111 Valve Box Adjustment 3 EA $400.00 $1,200.00 1 $400.00 6 3311,0001 Ductile Iron Water Fitt(CO#2) 0.5 TN $7,000.00 $3,500.00 0.46 $3,220.00 7 3311.0163 6"PVC Water Pipe,Sele 20 LF $45.00 $900.00 20 $900.00 8 3312.0001 Fire Hydrant 1 EA $3,150.00 $3,150.00 1 $3,150.00 9 3312.2001 V Water Service,Meter 2 EA $350.00 $700.00 2 $700.00 10 3312.2201 2"Water Service,Meter 1 EA $650.00 $650.00 1 $650.00 11 3312.3002 6"Gate Valve I EA $850.00 $850.00 1 $850.00 12 9999.0000 Install Gate Valve Stem I EA $250.00 $250.00 1 $250.00 13 3312.2003 1"Water Service(CO#2) 3 EA $1,650.00 $4,950.00 3 $4,950.00 14 3312.2203 2"Water Service 1 EA $3,300.00 $3,300.00 1 $3,300.00 15 36"Blind Flange(CO#1) 1 EA $8,400.00 $8,400.00 1 $8,400.00 16 Salvage 36"Gate Valve(CO#l) I EA $3,045.00 $3,045.00 1 $3,045.00 17 Salvage 24"Gate Valve(CO#1) 1 EA $3,045.00 $3,045.00 1 $3,045.00 18 Remove 10"Gate Valve(CO#1) 1 EA $630.00 $630.00 1 $630.00 19 Remove 36",30",10"Waterline(CO#1) 1 LS $9,030.00 $9,030.00 1 $9,030.00 20 Remove Gate Valve Vault(CO#1) t LS $2,205.00 $2,205.00 1 $2,205.00 21 Rework 36"Plug&Weld(CO#2) t LS $3,325.00 $3,325.00 1 $3,325.00 22 Concrete 36"Plug(CO#2) 10 CY $220.00 $2,200.00 10 $2,200.00 23 8"PVC WIL(CO#2) 210 LF $56.00 $11,760.00 210 $11,760.00 24 8"Gate Valve(CO#2) 2 EA $1,350.00 $2,700.00 2 $2,700.00 25 Connect to existing Wate Line(CO#2) 2 EA $2,230.00 $4,460.00 2 $4,460.00 26 Remobilization(CO#2) 1 LS $5,000.00 $5,000.00 1 $5,000.00 27 De-Hole Exisiting Services(CO 42) 3 EA $700.00 $2,100.00 3 $2,100.00 Sub-Total of Previous Unit $81,900.00 $80,820.00 -------------------------------------- Tuesday,July 14,2015 Page 2 of 5 City Project Numbers 01742 DOE Number 6706 Contract Name Construction of Pemisylania Ave from Estimate Number 33 Contract Limits Tenth St to West Cannon St Payment Number 33 Project Type WATER&SEWER For Period Ending 7/14/2015 Project Funding Unit 11-Sewer Improvements Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 0241.2013 Remove 8"Sewer Line 20 LF $11.00 $220.00 20 $220.00 2 0241.2103 8"Sewer Abandonment PI 2 EA $350.00 $700.00 2 $700.00 3 0241.2201 Remove 4'Sewer Manhole(CO#1) 3 EA $550.00 $1,650.00 3 $1,650.00 4 3201.0614 9"Cone Pvmt Repair 86 SY $55.00 $4,730.00 86 $4,730.00 5 3301.0001 Pre-CCTV Inspection 90 LF $6.00 $540.00 90 $540.00 6 3301.0101 Manhole Vacuum Testing 4 EA $150.00 $600.00 4 $600.00 7 3305.0106 Manhole Adjustment,Maj 1 EA $2,300.00 $2,300.00 1 $2,300.00 8 3305.0112 Concrete Collar 5 EA $100.00 $500.00 9 3305.0113 Clay Dams 1 EA $500.00 $500.00 1 $500.00 10 3331.4116 8"Sewer Pipe,CSS Back 40 LF $130.00 $5,200.00 40 $5,200.00 12 3339.0001 Epoxy Manhole Liner 29 VF $160.00 $4,640.00 13 3339.1001 4'Manhole(CO#3) 4 EA $2,950.00 $11,800.00 4 $11,800.00 14 3339.1002 4'Drop Manhole I EA $5,150.00 $5,150.00 1 $5,150.00 15 3331.20 196 LF $80.00 $15,680.00 196 $15,680.00 16 8"Sanitary Sewer Line(CO#1) 7 LF $80.00 $560.00 7 $560.00 Sub-Total of Previous Unit $54,770.00 $49,630.00 Tuesday,July 14,2015 Page 3 of 5 City Project Numbers 01742 DOE Number 6706 Contract Name Construction of Permsylania Ave from Estimate Number 33 Contract Limits Tenth St to West Cannon St Payment Number 33 Project Type WATER&SEWER For Period Ending 7/14/1015 Project Funding Contract Information Summary Original Contract Amount $71,660.00 Change Orders Change Order Number 1 $30,415.00 Change Order Number 2 $34,595.00 Total Contract Price $136,670.00 ffEate �� , Total Cost of Work Completed $130,450.00 Less %Retained $0.00 Net Earned $130,450.00 ate 7 -�� ins77 . 6r Earned This Period $6,522.50 Retainage This Period $0.00 Date ,��'� �S Less Liquidated Damages Project M Days aQ /Day $0.00 Date — LessPavement Deficiency $0.00 Asst ct P c esign • ate and onscon Las Penalty $0.00 Las Previous Payment $123,927.50 Director/Contracting en Plus Material on Hand Las 15% $0.00 Balance Due This Payment $6,522.50 Tuesday,July 14,2015 Page 4 of 5 rw— AUG 0 4 2015 C" S -'20q City Project Numbers 01742 DOE Number 6706 Contract Name Const vction of Pennsylan Estimate Number 33 Contract Limits Tenth St to West Cannon St Payment Number 33 Project Type WATER&SEWER For Period Ending 7/14/2015 Project Funding Project Manager Wilson City Secretary Contract Number 44209 Inspectors GREGORY / COLLIER Contract Date 2/19/2013 Contractor McCLENDON CONSTRUCTION COMPANY,INC. Contract Time 431 CD P.O.BOX 999 Days Charged to Date 430 CD BURLESON, TX 76097 Contract is •000000 Complete PO # CITY OF FORT WORTH MICE # 44&q- a-,;5SUMMARY OF CHARGES 4�= Line Fuad Account Center Amount Gross Retainage Net Funded ---------------------- 3-�x74�2 woo -fl' 4- 9 n4�-0--—1f,04.c� Total Cost of Work Completed $130,450.00 Less %Retained $0.00 Net Earned $130,450.00 Earned This Period $6,522.50 WATER DEPARTMENT Retainage This Period $0.00 ENGINEERING AND FISCAL SERVICES Less Liquidated Damages Con a Diggs-Ext.IW9 0 Days(9 50.00 /Day $0.00 t p %' Si u for. Lesspavement Deficiency $0.00 —Z ` Less Penalty $0.00 DEPARTMENT CHECK PICK-UP Y Less Previous Payment $123,927.50 Plus Material on Hand Leas 15% $0.00 Balance Due This Payment $6,522.50 Tuesday,July 14,2015 Page 5 of 5 N IAL RECORD SECRETARYWORTH, TX FORTWORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Pennsylvania Avenue Street extension PROJECT NUMBER: 1742 I DOE NUMBER: 6706 i WATER PIPE LAID SIZE TYPE OF PIPE LF 23+ zi 0 8" PVC 292.- Z:/C) �.a 10 VL zd FIRE HYDRANTS: 1 VALVES(16" OR LARGER) PIPE ABANDONED SIZE TYPE OF PIPE LF I I DENSITIES: yes NEW SERVICES: V copper 75 2" copper 15 I I SEWER PIPE LAID SIZE TYPE OF PIPE LF 47 8" PVC 47 PIPE ABANDONED SIZE TYPE OF PIPE LF 47 47 DENSITIES: YES NEW SERVICES: TRANSPORTATION AND PUBLIC WORKS j F The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 4 (817)392-7941 •Fax:(817)392-7845 I i i I AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me,the undersigned authority, a Notary Public in the state and county aforesaid, on this day personally appeared Dan McClendon, President of McClendon Construction Company,Incorporated, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said,- That aid;That all persons, firms, associations, corporations or other organizations furnishing labor and/or materials have been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Pennsylvania Ave. from Tenth St to West Cannon Street By U"DanMcC endon Subscribed and sworn before me on this / day of 20 / .►�" JUSTIN K GLAIR Notary Public in Tarrant *� WTARYM MUM V County, Texas ommood.� o2-Od-201 T Opt nc: CONSENT OF Archucct S11RE'I'Y CO\1PANY Conrrmlr 'TO FINAL, PAYMENT Soren AIA I)OCCIININ'I (;707 Uthcr PROJLC'T: Bond Number: X 04 13 ;nn:c,,nldress> Pennsylvania Avenue from Tenth Street to West Cannon Street,City Project#: 01742,Fort Worth,TX TO:(Owner) ARCHITECT'S PROJECTNO; City of Fort Worth,Texas 1000 Throckmorton Drive CONTR.-1CT FOR: Construction Fort Worth,TX 76108 CONTRACT AMOUNT: $781,128.74 CONTRACT DA'Z'E: CONTRACTOR: McClendon Construction Company,Inc. PO Bog 996 Burleson,TX 76097 In accordance W ith the provisions of the Contract between the Owner and the Contractor as indicated above,the Merchants Bonding Company 2100 Fleur Drive Des Moines,Iowa 50321 ,SLRETY COMPANY on bond of ihcrc insert nanic and o<Iclrt,-ss(o ct,ivacti:r) McClendon Construction Company,Inc. PO Box 996 Burleson,Texas 76097 CONTRACTOR, hereby approves of the final payment to the Contractor,and agrees that final payment to the Con(racror shall not relieve the Surety Conrpany of any of its obli.,alions t0(hc-c wscrt name and address of Ownee') City of Fort Worth,Texas 1000 Throckmorton Drive OWNER. FortWorth,Texas 76108 as set forth in the said SuretY Company's bond. IN WITNESS tir'HEKI UF. [lie Surety Company has hereunto set its hand this 14th day of July, 2015 Suret� C�omt)atry f Merchants Bonding CLpany,- Sf i)an:rc o1 Aulhoricii Rep esenlai e Betty J.Reeh-Attorney-In-Fact ice'•-�' `-v�-✓�-�'-' i it(r - — - NOTF.:'f ifs form is to be used as a companion dourncn(to AIA DOCUMFNT 6706,CONI RAC.7-)R'S AFFIDAVIT OF PAYNtLNT OF L)L•B fS ANr)(,i-ki ts,Cu,cnl Ldition VA UOCLINIFNT(707-CONSLN I OF SI JRFTY COMPAVY TO FINAL PAYNIE.NT•APRIL 1970 LIATION•ALVI ONL PAUL k;1970•T11FAMFRICANINS'I)'IUTE 0FARCHIILCIS. i7a5NEW YOIu.ANT.,K\F,`.\'A511INOTON,U.C.20006 MERCHANTS BONDING COMPANYu POWER OF ATTORNEY Know All Persons By These Presents,that MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING, INC.,both being corporations duly organized under the laws of the State of Iowa(herein collectively called the"Companies"), and that the Corrlpanies do hereby make,constitute and appoint,individually, Betty J Reeh; Bryan K Moore; Gary Wayne Wheatley; Michael D Hendrickson; Pat J Moore of San Antonio and State of Texas their true and lawful Attorney-in-Fact,with full power and authority hereby conferred in their name, place and stead,to sign, execute, acknowledge and deliver in their behalf as surety any and all bonds, undertakings, recognizances or other written obligations in the nature thereof, subject to the limitation that any such instrument shall not exceed the amount of: SEVEN MILLION FIVE HUNDRED THOUSAND($7,500,000.00)DOLLARS and to bind the Companies thereby as fully and to the same extent as if such bond or undertaking was signed by the duly authorized officers of the Companies,and all the acts of said Attorney-in-Fact, pursuant to the authority herein given,are hereby ratified and confirmed. This Power-of-Attorney is made and executed pursuant to and by authority of the following By-Laws adopted by the Board of Directors of the Merchants Bonding Company(Mutual)on April 23,2011 and adopted by the Board of Directors of Merchants National Bonding,Inc.,on October 24,2011. "The President,Secretary,Treasurer,or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Attorneys-in-Fact,and to authorize them to execute on behalf of the Company,and attach the seal of the Company thereto,bonds and undertakings,recognizances,contracts of indemnity and other writings obligatory in the nature thereof. The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking,recognizance, Of other suretyship obligations of the Company, and such signature and seal when so used shall have the same force and effect as though manually fixed." In Witness Whereof,the Companies have caused this instrument to be signed and sealed this 13thday of August , 2014. ,.„i111„rrrn, {101444.... '-., •••Q�tiG 0'11,0• MERCHANTS BONDING COMPANY(MUTUAL) C p �Rj Qd �° oQP�'9q'9y�. MERCHANTS NATIONAL BONDING, INC. .F.. G .C.) A'.t- = 2003 n: •Q. 1933 c; By STATE OF IOWA .�;,�''`�� COUNTY OF POLK ss. .rr'rr'."'"u� President On this 13thday of August 2014,before me appeared Larry Taylor,to me personally known,who being by me duly sworn did say that he is President of the MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING,INC.;and that the seals affixed to the foregoing instrument is the Corporate Seals of the Companies;and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. I In Testimony Whereof,I have hereunto set my hand and affixed my Official Seal at the City of Des Moines, Iowa,the day and year first above written. IPI.4A4 WENDY WOODY o Commission Number 784654 y My Commission Expires owP June 20, 2017 Notary Public,Polk County,Iowa STATE OF IOWA COUNTY OF POLK ss. I, William Warner,Jr.,Secretary of the MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING,INC., do hereby certify that the above and foregoing is a true and correct copy of the POWER-OF-ATTORNEY executed by said Companies, which is still in full force and effect and has not been amended or revoked. In Witness Whereof,I have hereunto set my hand and affixed the seal of the Companies on this (rfjda of +� � y �in;7 1933 :c; Secretary a� POA 0014 (7/14) ".�>' •... .•;rt��:` ••6',� .\�ac. ME KORAN IMPORTANT NOTICE To obtain information or make a complaint: You may contact your insurance agent at the telephone number provided by your insurance agent. You may call Merchants Bonding Company's toll-free telephone number for information or to make a complaint at: 1-800-678-8171 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance at: P. 0. Box 149104 Austin, TX 78714-9104 Fax: (512)475-1771 Web: http://www.tdi.state.tx.us E-mail: ConsumerProtection@tdi.state.tx.us PREMIUM AND CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the agent first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. 1 I SUP 0032 TX(1/09) FORTWORTHREV:02/20/07 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR 1) CONTRACTOR&PROJECT DATA Vain of Contractor Project Name McClendon Pennsylvania Avenue Street Extension DOE Inspector DOE Number Michael Collier 6706 DOE Inspector Project Manager Q Water Q Waste Water❑ Storm Drainage[ Pavement Leon wilson Initial Contract Amount Project Difficulty $71,660.00 0 Simple @) Routine 0 Complex Final Contract Amount Date $4- A0 13I e 70, D 07/17/2015 11)PERFORMANCE EVALUATION o-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE I Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 4 60 1 60 5 Work Performed 15 Y 3 60 45 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 3 60 45 8 Traffic Control Maintenance 15 Y 3 60 45 9 Dail'Clean Up 5 Y 4 20 20 10 Citizen's Complaint Resolution 5 Y 4 20 20 11 Property Restoration 5 Y 4 20 20 12 After Hours Response 5 Y 4 20 20 13 Project Completion 5 Y 3 20 15 TOTAL ELEMENT SCORE(A) 398 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 398 III)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating(ITS/MSS* 100%) 398 / 448 89% Performance Category Excellent <20016—Inadequate 20%to<40%=Deficient 40%to<60%—Standard 60%to<80%=Good >_80%—Ezcelient Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) r Signature DOE Inspector Si ature Contractor Signature DOE Inspector's Supervisor � . CONTRACTOR'S COMMENTS TRANSPORTATION:IND PUBLIC WORKS ; `' The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax:(817)392-7845 FORTWORTHREV:02/22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY I)PROJECT INFORMATION Date: 7/17/2015 ,Aonie of Contractor Project Name McClendon Penns lvaniaAvenue Street Extension G DOE Inspector Project Manager iMichael Collier Leon Wilson DOE Number Project Ditculty Type of Contract 6706 0 Simple Q Routine 0 Complex Q water El waste Water Storm Drainageo Pavement Initial Contract Amount Final Contract Amount 571,660.00 136, -49.oa (0) 11)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent ELEMENT RATING ELEMENT RATING (0-4) (0-4) ;INSPECTION EVALUATION PLANS&SPECIFICATIONS I Availability of Inspector 1 Accuracy of Plans to Existing Conditions 3 2 Knowledge of Inspector 2 Clarity&Sufficiency of Details 3 3 Accuracy of Measured Quantities 3 3 Applicability of Specifications ;4 Display Of Professionalism 3 14 Accuracy of Plan Quantities 15 Citizen Complaint Resolution j PROJECT MANAGER EVALUATION 1'}6 Performance-Setting up Valve Crews,Labs 3 1 Knowledge And/Or Problem Resolution !,.ADMINISTRATION 2 Availability of Project Manager I Change Order Processing Time 3 Communication i2 Timliness of Contractor Payments -5 4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timeframe III)COMMENTS&SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector J W— J,4 Signature DOE Inspector's Supervi -41 INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth-1000 Throckmorton Street-Fort Worth,TX 76012-6311 (817)392-7941-Fax:(817)392-7845 FORTWORTH nw 03/05/07 TRANSPORTATION&PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:33 NAME OF PROJECT: Consftuction of Pennsylvania Avenue Street Extension PROJECT NO.: 1273 CONTRACTOR: McClendon DOE NO.: 6706 PERIOD FROM:07/01/15 TO: 07/14/15 FINAL INSPECTION DATE: 21-May-15 WORK ORDER EFFECTIVE:3/12/2014 CONTRACT TIME: 431 • W10 CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11: 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS* DAYS TOTAL & HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS THIS 14 PERIOD PREVIOUS 45 PERIOD TOTALS TO DATE 59 430 489 *REMARKS: NTRACTOR DATE INSPECTOR DATE ENGINEERING DEPARTMENT 14CY The City of FortWorth•1000 Throckmorton Street•Fort Worth,TX7 66FAVIAL RECORD (817)392-7941 •Fax:(817)392-7845 CITY SECRETARY FT.WORTH, TX