Loading...
HomeMy WebLinkAboutOrdinance 6303 ORDINANCE NO- AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST OF IMPROVE- MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A PORTION OF CHENAULT AVENUE AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; FIXING TIME AND PLACE FOR HEARING TO THE OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING THE CITY SECRETARY TO GIVE NOTICE OF SUCH HEARING; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILLING THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Fort Worth, Texas, has heretofore ordered that each of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, be im- proved by raising, grading and filling same and by constructing thereon the following, to-wit: UNIT 1: : CHENAULT AVENUE From Paradise Street to Baurline Street, known and designated as Unit 1, Project No. 104-24000-207, to be improved by con- structing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways and four-foot wide concrete sidewalk where specified. UNIT 2: VAN HORN STREET From Riverside Drive to 200' East, known and designated as Unit 2, Project No. 104- 24000-207, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. UNIT 3: CHENAULT AVENUE From De Costa Street to Beach Street, known and designated as Unit 3, Project No, 104- 24000-207, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. together with concrete curbs, gutters, driveways and incidentals to such improvements on proper grade and line where same are not already so constructed, together with storm sewers and drains and other necessary incidentals and appurtenances; all of said im- provements to be constructed as and where shown on the Plans and in strict accordance with the Plans and Specifications therefor; contract therefore has been made and entered into with Austin Road Company and WHEREAS, the City Council of the City of Fort Worth, Texas, has caused the Public Works Director to prepare and file estimates of the cost of such improvements and estimates of the amount per front foot proposed to be assessed against abutting property and the owners thereof, and such estimates have been examined, NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. Such estimates be, and they are hereby adopted and approved. II. It is hereby found and determined that the cost of improvements on each portion of streets, avenues, and public places hereinafter described, with the amount or amounts per front foot proposed to be assessed for such improvements against abutting pro- perty and the owners thereof, are as follows, to-wit: Unit 1: Chenault Avenue From Paradise Street to Baurline Street, known and designated as Unit 1, Project No. 104-24000-207. The estimated cost of improvements is the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.65 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 5.73 the estimated amount per front foot to be assessed against abutting property and the owners thereof for _. 4 foot wide concrete sidewalk is $ 2.71 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for six-inch thick concrete driveway is $ .77 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 11.09 plus the cost incurred for concrete driveway construction where specified. III A hearing be given and held by and before the City Council of the City of Fort Worth, Texas, to all awning or claiming any property abutting upon said portions of highways, streets, avenues and public places, as well as to all owning or claiming any interest in any such property. Such hearing shall be given and held on the 22nd day of June 19 70 at 9:30 A.M. in the Council Chamber intheCity Hall inthe City of Fort Worth, Texas, and the City Secretary is hereby directed to give or cause to be given notice of the time and place of such hearing and of other matters and facts in accordance with the to and provisions of an Act passed at the First Called Session of the Fortieth Legislature of the State of Texas, and known as Chapter 106 of the Acts of said Session, now being known as Article 1105b of Vernon's' Texas Civil Statutes as amended by Acts 1967, 60th Legislature, Page 365, Chapter. 176, Section 1, emergency effective May 12, 1967. Such notice shall be by advertisement inserted at least three (3) times in a newspaper published in the City of Fort Worth, Texas, the first publication to be made at least twenty-one (21) days before the date of said hearing. Said notice shall comply with and be in accordance with the terms and provisions of said Act as amended. The City Secretary is further directed to give or cause to be given personal notice of the time and place of such hearing to all owning or claiming any property abutting on said portions of highways, streets, avenues and public places , as well as to all owning or claiming any interest in any such property. Such personal notice shall be in writing and shall be given or caused to be given by the City Secretary by depositing such written notice in the United States it at least fourteen (14) days before the date of the hearing, postage prepaid, in envelopes addressed to all persons owning or claiming any interest in the respective properties abutting the high- ways, streets, avenues and public places or portions thereof to be improved, as the names of such persons are shown on the current rendered tax rolls of the City of Fort Worth and at the addresses so shown, or if the name of such respective owners do not appear on such rendered tax rolls, then address to such owners as their names are shown on the current unrendered tax rolls of the City of Fort Worth at the addresses shown thereon. In those cases in which an owner of property abutting a highway, street, avenue or public place or portion or portions there- of which is to be improved is listed as "unknown" on the then current City of Fort Worth tax rolls, or the name of an owner is shown on the City of Fort Worth tax rolls but no address for such owner is shown, no notice need be mailed. In those cases where the owner is shown to be an estate, the mailed notice may be addressed to such estate. In this connection, the City Secretary shall prepare and file or cause to be prepared and filed with these proceedings a list of the properties to be assessed, the names of those persons owning or claiming any interest in said properties to whom the notice was mailed, together with the last known addresses determined as aforesaid of the respective owners and those per.- sons owning or claiming any interest in said property. The City Secretary shall certify that each of the parties in said list whose address is shown on the then current rendered or unrendered tax rolls of the City of Fort Worth was mailed a copy of the notice of hearing and shall further certify the date or dates on which said notice was mailed. A copy of each notice shall be attached to such certificate. The certificate of the City Secretary will be con-, clusive evidence of the facts therein recited, IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council and by filing the complete ordinance in the appropriate Ordinance Records of this City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. Passed and approved this day o , 19 APPROVED AS TO FORM AND LEGALITY:05 . city ttorney Unit 2: Van Horn Street From Riverside Drive to 2001 East, known and designated as Unit 2, Project No. 104-24000-207. The estimated cost of improvements is $___6,899.93 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.65 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 5.77 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .77 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 8.42 plus the cost incurred for concrete driveway con- struction where specified. Unit 3: Cheanult Avenue From De Costa Street to Beach Street, known and designated as Unit 3, Project No. 104-24000-207. The estimated cost of improvements is $ 21,586.95 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.65 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 5.77 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .77 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 8.42 plus the cost incurred for concrete driveway con- struction where specified. Unit 4: Baurline Street From Ennis Street to CRI & P Railroad, known and designated as Unit 4, Project No. 104-24000-207. The estimated cost of improvements is $ 8,195.61 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.65 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 5.73; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .77 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ g,38 plus the cost incurred for concrete driveway con- struction where specified. Unit 5: La Salle Street From Baurline Street to Retta Avenue, known and designated as Unit 5, Project No. 104-24000-207. The estimated cost of improvements is $ 35,185.43 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.65 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 5.73 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ 2.71 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .77 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 11.09 , plus the cost incurred for concrete driveway con- struction where specified. Unit 6: Finley Street From Sylvania Avenue to Baurline Street, known and designated as Unit 6, Project No. 104-24000-207. The estimated cost of improvements is $ 21,145.36 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.65 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $4.87 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .77 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 7.52 plus the cost incurred for concrete driveway con- struction where specified. The estimated cost of improvements is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for wide concrete sidewalk is $ ; the .estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ plus the cost incurred for concrete driveway con- struction where specified. UNIT 4: BAURLINE STREET From Ennis Street to CRI&P Railroad, known and designated as Unit 4, Project No. 104- 24000-207, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabil- ized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. UNIT 5: LA SALLE STREET From Baurline Street to Retta Avenue, known and designated as Unit 5, Project No. 104- 24000-207, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways and four-foot wide concrete side- walk where specified. UNIT 6: FINLEY STREET From Sylvania Avenue to Baurline Street, known and designated as Unit 6, Project No. 104-24000-207, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be twenty-six feet wide and by constructing six-inch thick driveways where specified. wftv^�" City of Fort Worth, Texas LINE IORPHIS Mayor and Council Communication ,.&Br DATE REFERENCE SUBJECT: Award of Contract. - Assessment PAGE iRANAM • NUMSER Paving at 6 Locations on the Northeast 3 5/25/70 C-1742: Side 1 o City Council action is requested on the project described below. Project Description Nature of Work: Assessment Paving at 6 Locations on the Northeast Side Roadway Unit Street Limits Width R.O.W. 1 Chenault Avenue From Paradise Street 30 Feet 60 Feet to Baurline Street 2 Van Horn Street From Riverside Drive 30 Feet 60 Feet to 200 feet east 3 Chenault Avenue From DeCosta Street 30 Feet 40 to 45 to Beach Street Feet 4 Baurline Street From Ennis Street 30 Feet 60 Feet to CRI&P Railroad 5 La Salle Street From Baurline Street 30 Feet 39.4 Feet to Retta Street 6 Finley Street From Sylvania Avenue 26 Feet 36 Feet to Baurline Street Petitions were submitted for paving on all units. Submission of Bids The following bids have been recei.ied: Bidder Amount of Bid Austin Road Company $ 94,328.35 Ernest Loyd 97,391.05 L. Grimes & Co. , Incorporated 99 ,134.41 Texas Bitulithic Company 106,561.25 S.R.O. Asphalt, Inc. 118,228.25 Bids Received: April 30, 1970 Working Days Allotted: 90 Sidewalks Sidewalks are included on Units 1 (Chenault Avenue) and 5 (La Salle Street) of this project for the following reasons: DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE NUMBER 5/25/70 C-1742 Paving at 6 Locations on the Northeast 2 of 3 Side Unit 1, Chenault Avenue: Sidewalks are included on the north side of the street only to serve the Paradise Baptist Church and parsonage. Unit 5, La Salle Street: Sidewalks are included to tie in with exist- ing sidewalks and to serve the Versia L. Williams Elementary School, located within (southwest corner) this block. Sidewalks on this unit will be constructed adjacent to the curb , due to the street only having a five foot parkway. Project Cost and Financing Based on the low bid, approximately $35,876.24 will be assessed against the abutting property owners. The cost to the City-at-large will be approximately $68,005.97, including engineering expense. Funds in the amount of approxi- mately $2,000 remain in the project account from preliminary design engineering funds to help finance the City's cost. Recommendations It is recommended that: 1) The following Bond Fund Transfers be approved: Amount From To Reason $35,876.24 Revolving Fund 6 Locations on the Property Owners ' Portion 042-09724-901 Northeast Side of Construction Cost. 042-10424-207 $66,000.00 Unspecified 6 Locations on the City's Portion of Construc- 104-24000-901 Northeast Side tion, Inspection, Engineer- 104-24000-207 ing and Miscellaneous Costs. 2) An Ordinance be adopted: a) Declaring the necessity for and ordering the improvements; b) Making provision for levying assessments; c) Directing the Public Works Director to prepare estimates of costs and amounts to be assessed; d) Awarding the contract to Austin Road Company in the amount of $94,328. 35; and e) Making appropriations to cover the indebtedness thereby incurred for improvements as described above. DATE REFERENCE SUBJECT: NUMBER Award of Contract - Assessment PAGE 5/25/70 C-1742 Paving at 6 Locations on the Northeast Side 3 or 3 3) An Ordinance be adopted: a) Approving the estimates of costs and amounts to be assessed; and, b) Setting June 22, 1970, as the date of the Benefit Hearing. HDM:ms Attachments: "A" - Resume of Project "B" - Location Maps and Engineers ' Preliminary Rolls SUBMITTED BY: DISPOSITIO COUNCIL: ❑ OTHER (DESCRIBE) APPROVED PRO ESSED BY � Adopted Ordinance No. 6-�OZDeclaring CITY SECRETARY Necessity and Ordering Paving and Ordinance DATE CITY MANAGER No. 0 Setting Date of Benefit Hearing 5/25/70 13 f' 7 12 /4 /s /� / W , CE L L,. 1J a ii .Iz u 12-P 11-R 1.:. L I7 ZC v NA 9 29 H 30 3/ 32 P 10` N .N M .%J 3d J• R •1� Van Horn S ; 12 1� -ri I 12 R N ' . r4 37 Ca • �� 10 - 3 10 c0PQ I I Unit l: CHENAULT AVE, Unit 2: VAN HORN ST. W 8 I I I 1�3 I i C a 4 II I I I en — 2 - arii z _ I s• I 1 I s• �• ec fo s• �i` j Y J ? 3 PIS no .Jb .. .. .. .. .. .. So fo S 50 _ 4�` ('` 1 z a s 6 a 9 la rr ? 1 Z 3 4 6 9 8 7 112 i/ /c �® O so Sa E �V 14X13 ,4 is 16 18 r Ennis $t. N � A Unit 3• CHENAULT AVE, Unit 4: Baurline St. S I I I I I I A bA JA 31,4 1 Af f I I I I I / 2 3 I J I s I 1 I B 9 is ii 12 ii /,0 is c j I 158 I c _ s ss I I I cl i i I I 1 f1 /•o J• f0 LM I �_M 6. Sn zSJ `ca , Y I61. )J J+ 3s JJ as � /f! S• J� Jn RIVEITSsSv A I •a I ' I '/ ' e i 3 i "ZZ EL EM. 11 ADAMS NE/RS S6 61 G a ti Unit 5: LA SALLE ST. Unit 4 FINLEY ST, Project No. 104-24000-207 6 LOCATIONS ON THE NORTHEAST SIDE OI'L'Y OF FORT WORTH PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION ASSESSMENT PAVING b LOCATIONS AT THE NORTHEAST SIDE PROJECT NO. 104-24000-207 A Neighborhood Hearing was conducted by the Engineering Division of the Public Works Depart- ment at the Ver,sia Lo Williams Elementary School on May 11, 1970, for the Assessment Paving of 6 Locations at the Northeast Side. Procedures concerning owner participation in the cost, method and policies determining assessments,) street construction standards 9 and methods of payment were explained by Mr. Odell Ho Schmidt to the 23 persons attending. 'The meeting was then opened for a question and answer period Unit i, Ohenaullt Avenue. No questions Unit 2, Vann Horn Street., Mara Edgar Wo Hopkins, 3200 Van Horn, owner of ]dot 36, carver's Place, said he thought his assessment was too high. Mr. Schmidt, told him that his property was zoned 'Dight industrial and that he had been given owner occupied credit. Unit 39 0henauult -Avenue, No questions Unit 49 Eauarlli,ne Street, Mr. Thomas M. Evans, Euless, 'Texas, owner of Lot 11,29 & 3, Block 829 riverside Addition, list Filling said he thought his assessment was rather high. Mro Schmidt told him that; his property was also zoned Might industrial and as he didn't hive on the property he would not be entitled to owner occupied credit. Unit. 59 La Salle Street. Mr. Ola Mace Davis, 709 Eau rlin,e9 owner of Lot 29 Block O, Adams Heirs Subdivision asked why her assessment was so high, She was told that she had been given side lot credit and was only being assessed for 1100' of her 1125° of abutting property. Mr. Frazier G uydeun, 2813 La Sallie„ owner of Lot 1, Block C, Adams Heirs Subdivision stated that when he signi.ed the petition, sidewalks were not included. Mr. Schmidt explained to him about. the City's :Sidewalk Policy, Unit 6, Pinney Street: Mr. A. Eo Brown, owner of Wo 1187011° of Lot 58, asked Mr. Schmidt if the six-inch HMAC pavement would hold up under commercial use. He was told that the matter would be checked. Mr. Schmidt questioned the Engianeering, Sections and was told due to the soil structure the proposed pavement would be strong enough for commercial traffic, He cashed Mr. Brown and relayed the message. Mr. Joe A. Weisberg, 26271 Finney asked about driveways. He was told he wound have to consult Traffic Engineering for more driveways because his property is zoned Might industrial. After a short general discussion, the meeting was adjourned. FORT WORTH, TEXAS 19 TO THE HONORABLE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, Gentlemen: In accordance with the proceedings of your Honorable Body, I have prepared estimates of the cost of street improvements as shown below! Estimates of the total cost of improvements on a portion of -CH-ENAULT AVENUE and portions of sundry other streets, avenues and public places in the City of Fort Worth, Texas, and estimated amounts per front foot to be assessed against abutting property and the owners thereof, on each portion of street, avenue and public place are as follows, to-wit: PROJECT NO. 104-24000-207, UNIT 1, CHENAULT AVENUE from PARADISE STREET TO RAURLINE STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways and four-foot wide concrete sidewalk where specified. The following assessment rates have been established: Six-inch thick HMAC pavement (Residential Zoning) . . . . . . . . . $2.75/ L.F. Seven-inch curb and eighteen inch gutter . . . . . . . . . 2.65/ L.F. Eighteen inch gutter only . . . . . . . . . . . . . . . . . 1.33/ L.F. Four-foot wide concrete sidewalk. . . . . . . . . . . . . . 2.71/ L.F. Six-inch thick concrete driveway . . . . . . . . . . . . . .77/ Sq. Ft. The assessment result in the following division of costs: Total Cost to Property Owners . . . . . . . . . . . .$ 2,643.92 Total Cost to City of Fort Worth . . . . . . . . . . 8,226.01 Total Estimated Construction Cost . . . . . . . . . .$10,869.93 .......---------------- PROJECT NO, 104-24000-207, UNIT 2. DAN HORN STREET, FROM RIVERSIDE DRIVE TO 200° EAST9 to be r, improved by constructing a six-inch thick hot-mix asphaltic concrete pavement dun a sins-inch thick cement stabilized subgrade, seven-inch high concrete Curb and eighteen inch wide concrete gutter, so that finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. The following assessment rates have been established: Six-inch thick HMAC pavement (Industrial Zoning) o o , , , o , , ,$5077/ L.F. (Industrial .Zoning less owner occupied credit) 4.26/ L.F. Seven-inch curb and eighteen inch gutter o 0 0 , „ 0 2,65/ L.F. Six-inch thick concrete driveways , o , o , o , , 077/ Sq. Ft; . The assessments result -in the following division of costs- Total Cost to Property .Owner o o , 4 0 0 , o 0 0 $4,253020 Total Cost to City of Fort Worth , < , , a o 0 0 2,645073 Total Estimated Construction Costo o , o , , e o $6,898093 PROJECT NO, 10424000-207 �YN1LT 3 CHENAHLT A�IEI�E nROiri 8De COSTA STREET TO BEACH STREET, to beAmproved by constructing a six-inch thick hot-mix asphaltic concrete. pavement on a sixmingh thick ,cement stabilized subgrade, seven-inch high concrete curb and eighteen inch wide concrete gutter, so. that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. The following assessment raises have been established- Six-inch. thick HMAC pavement (Residential Zoning) a , o , , $2,75/ L.F. (Residential Zipning less 27c% credit existing penetration) o 0 0 0 2,48/ L.F. Seven-inch curb.and eighteen inch gutter , o o , , , , 0 2065/ LoF. Eighteen inch gutter only o , , , , o 0 0 0 0 , o o , , 1033/ D. Six-inch thick concrete driveways , , a o a , o , , , , o .77/ Sq. Ft. The assessments result in the following division of costs- Total Cost to Property Owners o , a o o 0 0 ,$ 7,921087 Total Cost to City of Fort Worth., , , o o , o 0 13,665.08 Total Estimated Construction Cost , , o , , ,$21,586,95 PROJECT NO, 104-24000-20/7, UNIT 4, BAURLINE STREET FROM ENNIS STREET TO CRTC&P RAILROAIID, to be improved by constructing a six-inch thick .knot-mix asphaltic concrete pavement on a six- inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. The following assessment :rates have been established- Six-inch thick HMAC pavement (Industrial Zonings , , , , , o , , ,$5,73/ L.F. .(Residential Zoning) „ y , G G , U p 2075/ L.F. Seven-inch curb and eighteen inch gutter , , , , , , , , , 2,65/ L.Fc Six-inch thick concrete driveways , d , , , , , , , , , , 4 ,77/ Sq, Ft. The assessments result in the following division of costs; Total Cost to Property Owners , , , , , , , m , ,$3,369052 Total Cost to City of Fort North, , , , , , , , , 4,826.09 Total Estimated Construction Cost , , , , , , , ,$8,195,61 PROJECT NO, 104®24000®207, UNIT 5, La SALLE STREET FROM BAURLINE STREET 'i'u RETTA AVENUE, to be improved by constructing a six-inch .thick hot-mix asphaltic corLc_i-(­ javement :on a six-inch thick cement stabilized subgrade, seve"tk-inch high concrete L,, u auj eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways and four-foot wide conciete sidewalk where specified. The following assessment rates have been established Six-inch thick HMAC pavement (Residential Zoning) , , , , , , , , $2,75/ L.F. Seven-inch curb and eighteen inch gutter, , , , , , , , o 2,65/ L.F. Eighteen inch gutter only , , , , , , , , , , , , , , , , , 1,3:3/ L.F. Four-foot wide concrete sidewalk, , , , , , , , , , , , , 2.71/ L.F. Six-inch thick concrete driveways , , , , , , , , , , , , , .77/ Sq, Ft. The assessments result in the following division of costs: Total Cost to Property Owners , o , , , , , , , ,$ 8,447,42 Total Cost- to City of Fort Forth, , , , , , , , , 26,738,01 Total Estimated Construction Cost , , , , , , , ,$35,185,43 PROJECT NQ, 104 4Q00--207 UNIT 6. FINLEY STREET FROM SYLVANIA AVENUE TO BAUI RUNE STREET, to be improved by constructing a six-inch thick Knot-mix asphaltic concrete pavement on a six-inch thick cemenset stabilized snnbgrrade seven-inch high concrete gutter, so that the finished roadway will be twenty-six feet wide and by constructing six-inch thick driveways where specified The following assessment rates have been established: Six-inch thick &M.AC pavement (Industrial Zoning) . . . . . . . . .$4.87/ L.F. (Industrial Zoning ]less owner occupied credit) . 3.811/ L.F. (Residential Zoning) . . . . . . . . . 2.75/ L.F. Seven-inch curb and eighteen inch gutter . . . . . . . . . 2.65/ L.F. Eighteen inch gutter only . . . . . . . . . . . . . . . . . l o 33/ L.F. Six-inch thick concrete driveways . . . . . . . . . . . . . .77/ Sq. Ft. The assessments result in the following division of costs* Total, Cost to Property Owners . . . . . . . . . .$ 9,165.87 Total dost to City of Fort Worth. . . . . . . . . 1 .12979.49 Total Estimated Construction uctioun Cost . . . . . . . .$21,1145.36 PROVE IC NO. 104�24000� ;d7iFN]C"� It Ok NABBl�°� AVENUE FRC14 PARADISE STREET SCO BAIIUR>LINE STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade with seven-inch high concrete curb and eighteen inch wide concrete gutter, so that the, fiunished roadway will be thirty feet wide and by con- structing six-inch thick, concrete driveways and four foot. wide concrete sidewalk where specified, OWNER LOT ZONING FRONTAGE RATE 'AMOUNT ASSESSMENT BEGINNING AT THE NORTHEAST CORNER OF PARADISE STREET AND CHENAULT AVENUE NORTH SIDE OF STREET RIVE951DE ADDITION Paradise Baptist (church 9 2 _ 140' Adjusted to 120 Baurline 76111 Res. 100' Pavement $2.75 $275.00 100' Curb & Gutter 2.65 265.00 100' Sidewalk 2.71 271.00 $ 811000 Paradise Baptist Church 10 2 140' Adjusted to 121 Paradise 76111 Rev. 100' Pavement $2.75 $275.00 1.00' Curb & Gutter 2.65 265.00 100° 5,idewalk 2.71 271.00 $ 811.00 BAURLINE STREET INTERSECTS SOUTH SIDE OF STREET Fred Duncan 12 27— 140' Adjusted to 200 Baurliune Street. 761111 Res. 100' Pavement $2.75 $275.00 100` Gutter only 1.33 133.00 $ 408.00 John D. Wesley 1 27 140' Adjusted to 561.7 Mateo Lane 76112 Res. 100° Pavement $2.75 $275.00 .100' Curb & Gutter 2.65 265.00 96 8q. ]fit. Driveway .77 73.92 $ 613.92 TOTAL COST TO. PROPERTY OWNERS . . . . . . . . . . . $ 2,643.92 TOTAL COST TO (CITY OF FORT WORTH . . . . . . . . . . 8.226.01 TOTAL ESTIMATED CONSTRUCTION O08T . . . . . . . . . $109869.93 1 PaOJECT 0 j I04-_24000':'207'__UNIT i;RSIDE DRIVE To 200' EASTI HORN STREET F'Q0 to be _tL_RIVF improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concret:� gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified , BLOCK OWNEF, Q01 ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHEAST CORNER OF RIVERYDE DRIVE AND VAN HORN STREET NORTU SIDE OF STREET CARVER'S PLACE ADDITION Bearing Bldg. Corp, 29 96" Adjusted to 1.015 Piverside Drive Indo 80' Pavement $5.77 $46130 76111 80' Curb & Gutter 245 MEN 271 Sq, Ft. Driveway .77 208.67 88207 Jefferson Brown 30 & 31 .... 100' Pavement $406 $42600 3205 Van Horn St. Ind. 100' Curb & Gutter 205 26500 76111 85 Sq� Ft. Driveway .77 65:45 $ 756.45 Harvey Rockwell 32 50' Pavement $5. 77 $28830 3224 Todd Street Ind, 50' Curb & Gutter 2.65 MAO 76110 $ 421.00 SOUTH SIDE OF STREET EG. Van Dyke 33 620 Pavement $5.77 $357.74 6112 Cliffside Ind. 62° Curb & Gutter 2.65 164.30 76134 85 Sq� Ft. Driveway .77 65.45 $ 587.49 011ie Lee 34 62' Pavement $406 $264,12 3208 Van Horn Ind. 62° Curb & Gutter 2065 16400 76111 85 Sq. Ft. Driveway .77 65045 $ 49307 Lena N. lel le,� 35, 62' Pavement $4.26 $264.12 7204 Van Horn OF 62' Curb & Cutter 2.65 16400 76111 85 Sqc Ft. Driveway . 77 6545 49327 2 PROJECT NO. 104-24000-207, UNIT 2: VAN BORN STREET - CONTINUED BLOCK OWNER LOT .ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET CARVER'S PLACE ADDITION Edgar W. . Hopkins 36 80' Pavement $4.26 $340.80 3200 Van Horn Ind. 80' Curb & Gutter 2.65 212.00 761.11 85' Sq. Ft. Driveway .77 65045 $ 618.25 TOTAL COST TO PROPERTY OWNERS . . . . . . . . . . . . . $411253.20 TOTAL COST TO CITY OF FORT WORTH. . . . . . . . . . . . 23645.73 `T'OT'AL ESTIMATED CONSTRUCTION COST . . . . . . . . . . . $6,898.93 3 PROJECT NO, 104-24000-207-UNIT 3.-,. , CHENAULT AVENUE FROM DE COSTA STREET TO BEACH STREETS to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHEAST CORNER OF DE COSTA STREET AND CHENAULT STREET NORTH SIDE OF, STREET PAGE COMPANY EAST SIDE ADDITION, FIRST FILING J. R. Epps W. 50' of 1 50' Pavement $2.48 $124.00 3924 Ryan Place Dr. 13 Res.- 50' Curb & Gutter 2065 132.50 30 Sq. Ft. Driveway .77 23.10 $ 279.60 Co J. Headrick E. 50' of W.1 50' Pavement $2.48 $124.00 3905 Chenault 100' - 13 Res. 50' Curb & Gutter 2.65 132.50 30 Sq. Ft. Driveway .77 23.10 $ 279.60 Mrs. Estelle Huddleston W. 50' 1 50' Pavement $2.48 $124.00 c/o C. W, Hutchison of E. 300' Res, 50' Curb & Gutter 2065 132.50 801 N.P. Anderson Bldg, - 13 $ 256.50 Co R. Mitchell "W. 50' of E. 1 50' Pavement $2.48 $124.00 3913 Chenault 250' - 13 Res. 50' Curb & Gutter 2.65 132.50 30 Sqo Ft. Driveway .77 23.10 279.,60 Audie C, Cottrell W. 100" of 1 100' Pavement $2.48 $248.00 3917 Chenault E. 2001 - Res. 100' Curb & Gutter 2.65 265.00 13 30 Sq. Ft. Driveway .77 23.10 536.10 H. W. Bounds W. 50' of 1 50' Pavement $2.75 $137.50 3921 Chenault Ec 100' - Res. 50' Curb & Gutter 2.65 132.50 13 30 Sq. Ft. Driveway .77 23.10 293.10 4 PROJECT NO. 104®24000-207, UNIT 3s CHENAULT AVENUE - CONTINUED BLOCK OWNER LOT 20NING F'RONT'AGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET PAGE COMPANY EAST SIDE ADDITION, FIRST FILING Mrs. Ray S. Whitefield Eo 50° 1 50° Pavement $2.75 $137.50 San Angelo Rotate of 13 Res. 50° Curb & Gutter 2.65 132.50 Eola, Texas 76937 $ 270.00 HARPER STREET INTERSECTS PAGE COMPANY EAST SIDE ADDITION, SECONID PILING Willis H. Owens 4 1_-- 60° Pavement $2,75 $165.00 3933 Chenault Res, 60" Curb & Gutter 2.65 159.00 $ 324.00 Carl Erwin 5 1 60° Pavement $2.75 $165.00 3935 Chenault Res. 60° Curb & Gutter 2065 159000 30 Sq, Ft. Driveway .77 23.10 $ 347.10 Paul Daffern 6 1 60' Pavement $2.75 $165.00 3947 Chenault Res. 60° Curb & Gutter 2.65 159.00 $ 324.00 GROSS STREET INTERSECTS -Joe G. Cox 4 2 60° Pavement $2.75 $165.00 4001 Chenault Res. 60° Curb & Gutter 2.65 159.00 $ 32-4.0®. Roy Enoch White 5 2 60' Pavement $2.75 $165.00 4005 Chenault Res. 60° Gutter Only 1.33 79.80 $ 2440 80 L. H. Tyler 6 2 60° Pavement $2075 $165.00 4009 Chenault Res, 50° Curb & Gutter 2.65 132,50 74 Sq. Ft. Driveway .77 56.98 $ 354.48 5 PROJECT NO, 104-24000-2079 UNIT 3- CHENAULT A17SNUE - CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSNE NT SOUTH SIDE OF STREET PAGE COMPANY EAST SIDE ADDITION, SECOND FILING BEACH STREET INTERSECTS Jo So Masters 1 thru 6 18704° Pavement $2075 $515,35 4000 Chenault 4 187.48 Gutter only 1,33 249.24 $ 764.59 GROSS STREET INTERSECTS Edger C. Brown 11 5 50' Pavement $2.75 $137050 730 Hughes Res o 50' Gutter Only 1 a 33 66.50 $ 204.00 A. B. Batchelor 10 5 508 Pavement $2075 $137.50 3936 Chenault Res. 50' Curb & Gutter 2065 132,50 30 Sq. Ft. Driveway .77 23.10 $ 293.10 Ida Jane Vaughn 9 5 508 Pavement $2075 $137050 3934 Chenault Res. 50' Curb & Gutter 2.65 132.50 30 Sega Ft. Driveway 977 23010 $ 293.10 Eugene Co Doyle, Jr. 8 5 508 Pavement $2075 $137050 3928 Chenault Res, 508 Curb & Gutter 2.65 132.50 30 Sq, Ft, Driveway .77 23010 $ 293, 0 John To McCraw 6 & 7 5 100" Pavement $2,75 $275000 2219 Skylark Res. 100° Curb & Gutters 2,65 265000 60 Sq. Ft, Driveway .77 46,20 $ 586,20 Jim Lee Gunther 5 5 508 Pavement $2,48 $124.00 3916 Chenault Res, 508 Curb & Gutter 2.65 132,50 30 Seg, Ft. Driveway o77 23010 $ 279,60 6 PROJECT NO. 104-24000-207 UNIT 3; CHENAULT AVENUE - CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET PAGE COMPANY EAST SIDE ADDITION, SECOND FILING T. 0. Fulcher 3 & 4 5 100° Pavement $2.48 $248.00 3908 Chenault Rea, 100° Curb & Gutter 2.65 265.00 30 Sqa Ft. Driveway .77 23.10 $ 536. 10 S. A. Dwight 2 5 50' Pavement $2.48 $124.00 6520 Allena Lane Rego 50' Curb & Gutter 2.65 132.50 30 Sq. Ft. Driveway .77 23,10 $ 279.60 Elmer L. Sh®af 1 5 50° Pavement. $2.48 $124.00 3900 Chenault Rea. 50' Curb & Gutter 2.65 11.32.50 30 Sq. Ft. Driveway .77 23.10 $ 279.60 TOTAL COST TO PROPERTY OWNERS. o . a . e . . . . o . e $ 7,921x87 TOTAL COST TO CITY OF FORT WORTH . . . . . . . . . . . . 13,665.08 TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . .$21,586.95 7 PROJECT NO. 104-24000-207, UNIT 4. BAUUIINF STREET FROM ENNIS STREET TO CRI&P RAILROAD, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen- inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHWEST CORNER OF, ENNIS AVENUE' W. 0 BA LINE STREET WEST SIDE OF STREET RIVERSIDE ADDITION IST FILING Curtis Session, Jr. 7 83 140' Adjusted to 2317 12th Avenue Res. 100' Pavement $2.75 $275.00 Los Angeles, Calif. 100' Curb & Gutter 2.65 265.00 540.00 Curtis Session, Sr. 6 83 110' Adjusted to 2723 Finley Ind. 90' Pavement $5.73 *515.70 76111 90' Curb & Gutter 2.65 238.50 118' Sq. Ft. Driveway .77 90.86 845.06 EAST SIDE OF STREET Thomas M. Evans 1, 2 & 3 82 129' Pavement $5.73 $739.17 Rt. 1, Box 393 Yn—d. 129' Curb & Gutter 2.65 341.85 Euless, Texas 76064 354 Sq. Ft. Driveway .77 272.58 41,353.60 Julius Harris 12 82 140' Adjusted to 2801 Ennis Res. 100' Pavement $2.75 $275.00 76111 100' Curb & Gutter 2.65 265.00 118 Sq. Ft. Drive-way .77 90.86 $ 630.86 TOTAL COST TO PRGPER1Y OWNERS o 3,369.52 TOTAL COST TO CITY OF FORT WORTH. . . . . . . . . . . . TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . . . . . $ 8,,195.61 8 ............ PR®JROT NO. 104-24000-207,, UNIT j s LA SAIIE STREET FROM B,'i L1NE STREET TO _RETTA AVEN9 to be improved by constructing a six-inch OWN asphaltic concrete pavement an a six-inch thio, cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the MUM roadway will be thirty feet aide and by constructing six-inch thick concrete driveways and four-fort wide sidewalk where specified. BLOCK OWNER LUIT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHEAST CORNER OF BA0L.1 INR STREET AND LA SAILS STREET NORTH! SIDE OF STREET ADAMS HEIRS SUBDIVIS112MN 01a Mae Davis 2 C 125 Side lot Adjusted to 709 8aurlinne Res. 100° Pavement $2.75 $275.00 76111 100' Curb & Gutter 2.65 265.00 100° Sidewalk 2.71 271.00 8711.00 Frazier Ouaydean I C 531 Pavement $2.75 4151.25 2813 Yea Salle Res. 55` Curb & Gutter 2.65 145.75 76111 441 Sidewalk 2.71 119.24 30 Sq. Ft. Driveway 77 23.10 439.34 Mrs. E. M . Posey H C 100° Pavement $2.75 $275.00 404 N. Hickory Res. 100' Curb & Gutter 2.65 265.00 Sapulpa, Okla. 89° Sidewalk 2.771 241.19 74066 30 Sq. Ft. Driveway .77 23.10 804.29 Lucille O. Smith G O 10° Pavement $2.75 $137.50 2907 La Salle Res. 50° Curb & Gutter 2.65 132.50 76111 39° Sidewalk 2®71 105.69 30 Sia Ft. Driveway .77 23.10 398.79 Robert W. Nelson F C 50' Pavement $2.75 $137.50 2909 Iia Salle Res. 50° Curb & Gutter 2.65 132.50 39° Sidewalk 2.71 105.69 30 Sq. Ft. Driveway .77 23.10 398.79 9 PROJECT NO. 104-24000-207=n HYET 5.- 'LA ,SALLE ST'REFE. ' - coNTINUED. BLOC. OWNER LOQ' ZONING 1'R�2C��CG�_ RATE AMOUNT ASSESS-KENT NORTH SIDE OF, STREET A-Z)A IS H:EERS SU311J1V1.S7ION Paul Edward stay E C 64° Paveument $2.75 $176.00 2911 La Salle Res. 64° Curb & Gutter 2.65 169.60 76111 53° Sidewalk 2.71 143.63 30 Silo Ftp. Driveway .77 23.10 512.33 Charles Albert D C 51.4° Pavement $2.75 $141.35 2915 La Salle Res. 51.4° Curb & Gutter er 2.65 136.21 40.4° Sidewalk 2.71 109.45 - 357.04 Fannie B. Lee Estate C C 64' Pavement $2.75 $176.00 3625 Hatcher Rc��. 64' (curb & Gutter 2.6.5 169.601 76119 641 Eidcowalk 2.71 173044 519.04 Oevora. Breedlove B 50° Pavement $2.75 $137.50 2909 Van Horn ���. 50, curb & c'uttar 2.65 132.50 76111 50' Sidewalk 2.71 135.50 405.50 Mammie Wright, Est. (A) C 150° Side Lot Adjusted to C/o Masmie Crowder Rea. 100° Pavement. $2.75 $275.00 1225 Mansfield 100' Curb 6 Gutter 2.65 20.5.00 100° Sidewalk 2.71 271.00 30 Sq.. Ft.. Driveway .77 23.10 534.10 RETTAAIENUE INTERSECTS BUBAR SUBDIVISION Church of God in Czarist 6 E 100° Favement $2.75 $275.00 c/o C. D. Clark des. 100' Cutter ter Orly 1.33 133.00 1604 Stalcuup Rd. $ 405.00 76112 City of Port Worth E.501 E 50° No Assessment of 5 Rei. 000 10 PROJECT' NO, 104-24000-207 NIT 5?, LA S�,LLE STREET CONTINUED, BLOCK OWNER LOT 20NINC FRONTACE RATE AMOUNT ASSESSMLNl NORTH SIDE OF STREET Bt�B_AR SUBDIVISION Fort Worth Indo School 192939 E 25519' Pavement $2075 $703073 District 4 & Wm 50°Res. 255.91 Gutter Only 1033 340035 3210 W. Lancaster of 5 $19044,08 76107 AVIAMS HEIRS SUBDIVISION Fort Worth Ind, School F _ 364'' Pavement $2075 $1,3011,00 District Re ' 364' Gutter Only 133 484 12 3210 We Lancaster $1.. 485.12 76107 TOTAL COST TO PROPERTY OWNERS Q o 0 0 0 o o a o o $ 89447.42 TOTAL COST TO CITY OF FORT WORTH a _26_9_738.01 TOTAL ESTIMATED CONSTRUCTION COST a a , o , o a , o e , $35,185.43 1Il PRQJ td�F� 71 T2 0���2®7� 1G� 6° �d � 1 � :1b`'i'A ,A y��f1 � �A �'1 EET to be a s - mn�fln_ itfla. c� eenraemnletta �� ed �u16 +�ade9 �ev�e �� � fln . l<� �.� > � � .vc�(f� �aa� vc �� inch ��de ��tta��ete �antttte�„ �o tt�aa� ��ae ��¢n��)<ne� d�ay �'�� 6e end by c¢��.���u��ian� BLOCK OWNER LOT ZONL G FFRO N'AGE RATS, 140U NT A11-ISD (E M1, BEGINNING AT THE NORTHEAST CORNER OF SY1ti'VANIA AVENUE NU AND F&?tvEY STREET NORTH SIDE OF STREP �`i�11�A�'!�tA 1�.�%:���l1E �;iF;`CO�'D F L7,NG Brown Heating & W. 187' of 187' Pavement 1087 $91111.18 Air r Co ndit ionning & 347° of indo 1187" Curd & Gutter 2065 495162 ch Arthur; Em Brown 58 83 SqPita Driveway 171 63,911 909 So Sylvania $11,47091. 761111 . Jane Am Weisberg ]�o 150, 1150" Pavement $4.87 $73050 26211. Finley of 58 InK 11500 Curb & Gutter 2065 .397.50 76111111 66 Sq. Ft. Driveway 077 50.82 %117802 T. Ca Thomas 21 & 22 _ _ 11.5" Pavement $2.75 $316025 27115 Finley Res. 65' Curb & Gutter 2.65 172,25 76111111 50' Gutter only 1.33 66.50 $ 55%G0 Effie Webb 20 350° pavement $2.75 51137050 27117 Finley Res.' 50' Gutter Only 1.33 66050 76111 Joe Carbi n 19 3 _ 50° Pavement $2.75 $137.50 252q.Lawnwood Reno, 501 Curb &. Gutter 2065 1132050 76111 30 - Sq. Ft. Driveway 077 23.10 293M Curtis Sessions, Sr® b8 3 50° Pavement $2.75 41137050 2723 Finley Res. 50° Gunter Only 1.33 66050 76111 204.00 12 PROJECT NO. 104-2 D®��2�7fl �N1� 60 1�1�E� �� ��' �R� ��VANIA AVENUE TO BAURLINE STREET CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET SYLVANI A ADDITION,, SECOND F LING Carl 0m Jackson 17 3--- 50' Pavement $2.75 X137 050 2725 Finley Res. 50' Curb & Gutter 2.65 132a501 76111 30 Bq, Ft. Driveway .77 23.10 � 293e1� MARS'I[NDA L,E ADD IC`s ION Ao .Guuery 116 3 55° Pavement $20775 $151025 912 .Bauurline Res. 55' Curb & Gutter 2.65 145075 7611111 $ 297000 BAUR LINE STREET INTERSECTS SOUTH SIDE Or, ST&ERT Richard Hill 3 t hruu 7 4 255' Pavement $2.75 $701.25 1000 Bauirli ne Res. 255° (curb & Gutter 2.65 6750775 76111 60" sqFt. Drive .77 46.20 $1,423020 Ar niece McKinney 2 4 _ 50' Pavement $2.75 $13L50 50J 2716 Finley Rei 0 50' Curb & Gutter 2.65 132.50 76111 30 Sq. Ft. Driveway .717 23010 293,10 Richard Hill 1 4 65° Pavement $2075 $178075 1000 Bauarli ne Res. 65° Curb & G uitter 2065 1.72025 76111 30 Sq. "Ft. Driveway .77 23,110 374. 10 SYLVANIA ADDITION SECOND FILING Mable Thorpe Wright Eo 50" 50' Pavement $4.87 4243.50 1912 Belcresttd Drive of Eo 1001 Lund. 50° Curb & Gutter 2065 1.32050 Greensboro, N.C. of 57 376.001 Jo E. Winters W. 50' ®f 50' Pavement $4.87 $243.50 Tarrant Co. Criminal E. 100' 50' Cuurib, & Gutter 2.65 1.32050 Court Bldg. of 57 376.00 76102 13 PROJECT NO. 104-24000-20ENUE TO BAURLINE, STREET CONTINUED BLOC OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET SY VANIA AVENU FILING Jimmie Mae B7luuitt W. 5016f 50" Pavement $3.851 $7190.50 2608 Finley B. 5150, -fn-d. 50' Curb & Ganger 2.65 132.50 7611 ®f 57 30 Sq. Ftp. Driveway .717 23.10 346.510 Susie Byers W. 65' of 65' Pavement $4.87 $3516.55 Address Unknown B. 2515° of UT . 65° Curb & Gutter 2.65 172.25 57 489.80 J. B. Winters W. 5165° less _ 5132° Pavement $4.87 $642.84 Tarrant Co. CriminalR.0.w. of nd. 1132' Curb & Gutter 2.65 349.80 Curt Bldg, 57 � 992.64 76 ,02 TOTAL COS` ' TO PROPERTY OWNERS. . . . . . . . . . . . . . $ 9,165.87 `DOTAL COST TO CITY OF FORT WORTH . . . . . . . . . . . . 171n979.49 TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . . . 14