Loading...
HomeMy WebLinkAboutOrdinance 6805 ORDINANCE NO. ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF WEST TUCKER STREET AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; DECLARING TIM CONTRACT WITH GLADE, INC- FOR THE CONSTRUCTION OF SAID IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE, EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING TIM CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPROPRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE DATE, WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract with GLADE INC. , for the making and construction of certain street improvements on the hereinafter described portions of streets, avenues and public places in said City, to-wit: UNIT 1: WEST TUCKER STREET From May Street to St. Louis Avenue,known and designated as Unit 1, Project No. 104- 24000-216. UNIT 2: ANNIE STREET From Bryan Street to 150' east of Calhoun Street, known and designated as Unit 2, Project No. 104-24000-216. UNIT 3• LOGAN AVENUE From Elmwood Avenue to Maddox Avenue, known and designated as Unit 3, Project No. 104- 24000-216. UNIT 4• DUVAL STREET From East Arlington Avenue to Poly Freeway, known and designated as Unit 4, Project No. 104-24000-216. UNIT 5: ST. LOUIS AVENUE From Cantey Street to Capps Street, known and designated as Unit 5, Project No. 104-24000-216. DELETED BY COUNCIL ACTION UNIT 6• RIPY STREET From Townsend Drive to Gordon Avenue, known and designated as Unit 6, Project No. 104- 24000-216. UNIT 7• BOYCE STREET At Hemphill (Paving Skip) , kno;•n and designated as Unit 7, Project No. 104-24000-216. WHMMS, by sundry proceedings heretofore passed by the City Council of the City of Fort Worth, Texas, including Ordinance No. 6656 , a portion of the cost of said improvements was levied and assessed against the respective properties abutting on each of the above described portions of streets, avenues and public places and against the real and true owners thereof; and, WHFRE.4S, the City Council of the City of Fort Worth, Texas, has, upon re- view, found and determined that, in some instances, in order to effect substantial justice and equality, it is desirable and necessary to grant and issue certain credits against some one or more of the assessments levied by Ordinance No. 6656 , and 'AHMAS, the street improvements hereinabove mentioned have been completed upon each of the portions of streets, avenues and public places hereinabove described, and have been inspected and found to be in complete accordance with the contract therefor; NOW, TH EFORE, BE IT ORDAI_73D BY TIME CITY COUNCIL OF THE CITY OF FOFcT WORTH, TEXAS, THAT: I. The improvements on each of the portions of streets, avenues and public places hereinabove described be, and they are hereby, accepted; and the contract with re- ference thereto be, and it is hereby, found and declared fully completed and performed. II. The Mayor, be, and he is hereby, directed to issue and execute in the name of the City, certificates in evidence of the special assessments levied against abutting property and the owner thereof for such improvements, and the City Secretary is directed to attest same and impress thereon the corporate seal of the City, all in accordance with the proceedings relating to such improvements and assessments. The certificates shall be numbered, shall describe the property against which the assessment has been levied, shall, where known, state the name or names of the true owners of the respective parcels of pro- perty assessed and shall be issued in an amount equal to the difference between the principal amount of the assessment and the amounts of any credit issued thereon. The numbers of the certificates, with the property descriptions to be shown on the respective certifi- cates, toFether with the names of the owners of said property, the principal amount of the assessment, the respective credits, if any which are hereby authorized, granted and allowed against the principal amount of some one or more of the assessments heretofore levied, and the principal amount for which each certificate is to be issued after giving effect to such credit, if any, are hereby enumerated and itemized as follows: III. When each of the certifiactes has been duly executed as hereinabove provided, same shall be delivered to the Tax Assessor-Collector as part payment of the contract price. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas, and by filing the complete ordinance in the appropriate Ordinance Records of said City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. PASSED AMID APPROVED THIS day of a 19�. APPROVED AS TO FORM AMID LEGALITY., City Attorney PROJECT NO. 104-24000-216, UNIT 1: '':7EST TUCKER STREET FROM MAY STREET TO SAINT LOUIS AVENUE, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, on a thirty foot roadway and by constructing six-inch thick concrete driveways and four-foot wide concrete sidewalk where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT Beginning at the intersection of May Street and West Tucker Street. NORTH SIDE TUCKERS' ADDITION Martha E Fannin D 100' Pavement 7.02 702.00 4709 Crestway Drive S50-W3; Apt. 100' Curb & gutter. 2.92 292.00 $994.00 Austin, Texas J. L. Williams E 7 100' Pavement 5.30 530.00 462 St. Louis S50-EZ Apt 100' Curb & gutter 2.92 292.00 $822.00 76104 ST. LOUIS AVENUE INTERSECTS SOUTH SIDE Mrs. C. W. Rogers H 10 100' Pavement 5.30 530.00 500 St. Louis N50-EZ Apt. 100' Curb & gutter 2.92 292.00 $822.00 76104 Denzel Terry A 10 100' Pavement 5.30 530.00 503 May Street N50-W2 Apt. 100' Curb & gutter 2.92 292.00 76104 30 Sq. Ft Driveway 1.06 31.80 $853.80 TOTAL COST TO PROPERTY OWNERS - ASSESSMENTS $3,491.80 TOTAL COST TO CITY OF FORT WORTH 4,782.71 TOTAL CONSTRUCTION COST- UNIT 1 $8,274.51 PROJECT NO. 104-24000-216, iUNIT 20 ANNIE STREET FROM BRYAN STREET TO 150' EAST OF CALHOUN STREET, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six- inch thick lime 'Stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gut£ei"66 a thirty foot roadway and by constructing six-inch thick concrete drive- ways and four-foot wide concrete sidewalk where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE INTERSECTION OF ANNIE STREET AND BRYAN AVENUE NORTH SIDE OF STREET TUCKERS' ADDITION Lula Hill S k-5 34 60' Pavement $6.38 $382.80 201 S. -Brighton Road Comm. 85 Sq. Ft. Drive 1.06 90.10 Dallas, Texas $472.90 75208 Ruth Shoemake W. 50' 34 50' Pavement $6.38 $319.00 1957 W. Sixth St. of 6 Comm. 50' Gutter Only 1.38 69.00 Los Angeles, Calif. $388.00 Corinne'Steele E. 30' 34 30' Pavement $6.38 $191040 1012 NW. Loraine of 6 Comm, 30' Gutter Only 1.38 41040 76106 $232.80 S.V.W. Enterprises, 7 34 60' Pavement $6.38 $382.80 Inc. Comm. 60' Gutter Only 1.38 82.80 1608 W. Jefferson $465.60 76110 CRAWFORD STREET INTERSECTS Ben Ward W. 55 43 55' Pavement $6.38 $350.90 1401 E. Jefferson S, A Comm. 55' Gutter Only 1.38 75.90 76104 SW. ' $426.80 2 PROJECT NO, 104-24000-216, UNIT 20 ANNIE STREET FROM BRYAN STREET TO 150° EAST OF CALHOUN STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSHENT NORTH SIDE OF STREET TUCKERS' ADDITION Joe Brown E: 45° 43 45° Pavement $4.52 $203.40 305 E. Annie S. "k Comm. 45' Gutter 1.38 62.10 76104 SW. ' $265.50 Hortense Pollard W; 43 47.5° Pavement $4.52 $214.70 307 E. Annie 5. 'k Comm. 47.5° Gutter 1.38 65.55 76104 SE. $280.25 Travis Dixaon Ea 43 47.5° Pavement $4.52 $214.70 311 E. Annie 5. 'h Ind. 47.5° Gutter 1.38 65.55 76104 SE. $280.25 CALHOUN STREET INTERSECTS Jack Neal 44 43;5° Pavement $6038 $277.53 Union Bank Bldg. W. 43k Ind. 43.5° Curb & Gutter 2.75 119.63 76102 S. k SW. k $397.16 D. W. Hollie 44 31° Pavement $6.38 $197.78 508 Luxton E, 31 Ind. 31° Curb & Gtro 2.75 85.25 76104 W' 74.5 $283.03 S. h SW. k Eddie Brinkley 44 30° Pavement $6038 $191.40 508 Luxton E. 31 Ind. 30° Curb & Gutter 2, 75 82.50 76104 S. h SW. ' $273.90 PROJECT NO. 104-24000-216, UNIT 2: ANNIE STREET- CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE TUCKERS ' ADDITION Benny C. High W 3/4 45 150' Pavement 6.38 957.00 4504 Blue Lake Court Ind. 150' Curb & gutter 2.75 412.00 $1,359.50 76103 6AERWN-STREET INTERSECTS Mose Harris N50-F-5n 42 50' Pavement 4.52 226.00 600 S. Calhoun Ind. 50' Gutter 1.38 69.00 $ 295.00 76104 James Leitm N!2-SE'k 42 50' Pavement 4.52 226.00 3616 Jeanette Ind, 50' Gutter 1.38 69.00 $ 295.00 76109 Lula Jones E -NW'k 42 50' Pavement 4.52 226.00 1218 Leslie Comm. 50' Gutter 1.38 69.00 76105 30 Sq. Ft. Driveway 1.06 31.80 $ 326.80 Elijah Johnson W32-NWk 42 50' Pavement 6.38 315.00 5524 DeCory Road Comm 50' Gutter 1.38 69.00 $ 385.00 76134 CRAWFORD STREET INTERSECTS PROJECT NO. 104-24000-216, UNIT 2: ANNIE STREET- CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE TUCKERS' ADDITION Nancy Young Lyons E2-NE4 35 50' Pavement 6.38 319.00 3303 Willing Comm. 50' Gutter 1.38 69.00 $ 388.00 76110 Willie Wilson W32--NE4 35 50' Pavement 4.52 226.00 3225 Todd Street Comm. 50' Gutter 1.38 69.00 $ 295.00 76110 Mary Brown E;-NW4 35 50' Pavement 4.52 226.00 204 E. Annie Comm 50' Gutter 1.38 69.00 $ 295.00 76104 Mrs. Joe Grayson W3-2-NW4 35 50' Pavement 6.38 31900 3020 S. Adams Comm. 50' Gutter 1.38 69.00 $ 388.00 76110 TOTAL COST TO PROPERTY OWNERS - ASSESSMENTS $ 7,806.49 TOTAL COST TO CITY OF FORT WORTH 12,019.43 TOTAL CONSTRUCTION COST UNIT 2 $19,825.92 PROJECT NO. 104-24000-216, UNIT 3: LOGAN AVENUE FROM ELMWOOD AVENUE TO MADDOX AVENUE, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stab- ilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty foot roadway and by costructi.ng six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT Beginning at the intersection of Logan Street and Elmwood Avenue. WEST SIDE GRAHAM PARK ADDITION United Gab Company 23 thru 44 4 565' Pavement 6.06 3,423.90 of Fort Worth Ind. 565' Curb & gutter 3.08 1,740.20 P.O.Box 21 620 Sq. Ft. Driveway 1.06 657.20 $5,821.30 76101 EAST MADDOX INTERSECTS EAST SIDE Texas Electric 5 & 6 5 65' Pavement 3.42 222.30 Service Co. Res. 65' Curb & gutter 3.08 200.20 $ 422.50 P.O.Box 970 761.01 R. T. Bennett 3,4,7 & 8 5 150' Pavement 3.42 513.00 820 E. Mulkey Res. 150' Curb & gutter 3.08 462.00 76104 248 Sq Ft. Driveway 1.06 262.88 $1,397.97 Maddox Enterprises, Inc. 9 5 25' Pavement 3.42 85.50 820 E. Mulkey Res. 25' Curb & Gutter 3.08 77.00 $ 162.50 76104 l ♦ f C •n + 1 A • •n n 1 • PROJECT NO. 104-24000-216, UNIT 3: LOGAN AVENUE - CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE GRAHAM PARK ADDITION Jesse Zamora 10 & 11 5 50' Pavement 3.42 171.00 213 N. Lexington Res. 50' Curb & gutter 3.08 154.00 $ 325.00 76102 Maddox Enterprises, Inc. 12 thru 5 275' Pavement 3.42 940. 50 820 E. Mulkey 22 Res. 275' Curb & gutter 3.08 847.00 $1,787.50 76104 TOTAL COST TO PROPERTY OWNERS - ASSESSMENTS $ 9,756.13 TOTAL COST TO CITY OF FORT WORTH 5,332.82 TOTAL CONSTRUCTION COST UNIT 3 $15,088.95 PROJECT NO. 104-24000-216, UNIT 4: DUVAL STREET FROM EAST ARLINGTON AVENUE TO POLY FREEWAY, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade ,seven-inch high concrete curb and eighteen-inch wide concrete gutter on athirty foot roadway, and by constructing six-inch thick concrete driveways where specified BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT Beginning at the NW property line of Lot 25, Block 26, Graham Park Addition. WEST SIDE GRAHAM PARK ADDITION J. E. Maxwell 25 thru 45 26 450' Pavement 6.03 2,713.50 2525 Ridgmar Ind. 450' Curb & gutter 2.75 1,237.50 76116 1,350 Sq. Ft. Driveway 1.06 1,431.00 $5,382.00 POLY FREEWAY SERVICE ROAD INTERSECTS EAST SIDE P=,rk & Recreation 1 thru 10 27 365' adjusted to Department Res. 300' Pavement 2.65 795.00 City of Fort Worth 300' Curb & gutter 2.75 825.00 $1,620.00 TOTAL COST TO PROPERTY OWNERS - ASSESSMENTS $ 7,002.00 TOTAL COST TO CITY OF FORT WORTH 4,931.68 TOTAL CONSTRUCTION COST UNIT 4 $11,933.68 PROJECT NO. 104-24000-216, UNIT 6' RIPY STREET FROM TOWNSEND DRIVE TO GORDON AVENUE, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade,' seven-inch high concrete curb and eighteen-inch wide concrete gutter, on a thirty foot roadway and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE INTERSECTION OF RIPY STREET AND TOWNSEND DRIVE NORTH SIDE OF STREET HOAEILAND ADDITION John Wallace 9 9 142° Adjusted to 3579 Townsend Dr. Res. 100° Pavement ' $2.42 $242.00 76110 100` Curb & Gtr. 2.98 298.00 118 Sed. Ft. Drive 1.06 125.08 $ 665.08 Gideon Baptist Church 8 9 142° Adjusted to P.O. Box 9456 Res. 100° Pavement $2.42 $242.00 76107 $ 242.00 GORDON STREET INTERSECTS SOUTH SIDE OF STREET Edward A. Wright 1 12 142` Adjusted to 3600 Gordon Res, 100` Pavement $2.42 $242.00 76110 $ 242,00 J. P. Lowrey 16 12 142° Adjusted to 3601 Townsend Dr. Res. 100` Pavement ' $2.42 $242.00 76110 100` Curb & Gtr, 2.98 298.00 $ 540.00 12 PROJECT NO. 104-24000-216, unit 6: RIPY STREET - CONTINUED TOTAL COST TO PROPERTY OWNERS - ASSESSNENTS $1,689.08 TOTAL COST TO CITY OF FORT WORTH 4,619.42 TOTAL CONSTRUCTION COST UNIT 6 $6,308.50 PROJECT NO. 104-24000-216, UNIT 7: BOYCE STREET AT HEMPHILL (PAVING SKIP) , to be "mproved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and two-foot wide concrete gutter on a thirty foot roadway and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT Beginning at the NW corner of Lot 15, Block 32, South Side Addition. NORTH SIDE SOUTH SIDE ADDITION Jerry Dalton Cook 20 29 125' Existing facilities No Assessment 4571 Hemphill St. Res. SOUTH SIDE John R. Bechtel 15 32 125' adjusted to P.O.Box 2123 Res. 100' Pavement 3.28 328.00 76101 100' Curb & gutter 3.22 322.00 140 Sq. Ft. Driveway 1.06 110.24 $760.24 TOTAL COST TO PROPERTY OWNERS - ASSESSMENTS $ 760.24 TOTAL COST TO CITY OF FORT WORTH 1.2560.32 TOTAL CONSTRUCTION COST UNIT 7 $2,320.56 TOTAL COST TO PROPERTY OWNERS (ALL UNITS) $30,505.74 TOTAL COST TO CITY OF FORT WORTH (ALL UNITS) 33,246.38 TOTAL CONSTRUCTION COST (ALL UNITS) $63,752.12 'WINE City of Fort Worth, Texas "sell Mayor and Council Communication IRA"" R, & DATE REFERENCE SUBJECT: Final Payment - Assessment PAGE NUMBER _ Paving at 7 Locations on the 1 3/5/73 FP-928 South Side for Final Council action on the project described below is requested. Project Description Name: Assessment Paving at 7 Locations on the South Side, 104-24000-216 Contractor: Glade, Inc. Contract Awarded: March 13, 1972 (MSC C-2188) Work Order Issued: June 1, 1972 Rork Order Effective: June 15, 1972 Work Began: June 21, 1972 Date of Final Inspection and Approval: December 1, 1972 Working Time Bid: 114 Working Days Working Time Used: 65 Working Days Project Cost and Financing Original Bid Price: $105,673.75 Change Order No. 1: - 45,301.55 (Deletion of paving of St.Louis Avenue) Revised Bid Price: $ 60,372.20 Final Contract Cost: $ 57,956.47 Partial Payments Previously Made: 5, Amount: $52,1'60.82 Final Payment Due: $ 5,795.65 Sufficient funds are available for the final payment to be made from Project Number 104-24000-216. Deviation from Bid Price: The final contract cost of this project is $2,415.73 or 4% under the revised bid price. A major portion of the savings, $2,300 was realized because 6" metal pipe sub drain was found to be unnecessary at time of construction. The remaining cost difference is attributed to minor variation between quantities estimated in the contract and quantities measured and used at the job site. Compliance with Specifications Tests made during construction show that materials used and required thicknesses were in compliance with contract specifications. Recommendations It is recommended that the project be accepted by the adoption of an ordinance and final payment of $5,795.65 be made to Glade, Inc. SUBMITTED BY: DISPOSITION BY COUNCIL: PSBY ---M APPROVED ❑ OTHER (DESCRIBE) Mb Adopted Ordinance No. &900- CITY SECRETARY DATE CITY MANAGER