Loading...
HomeMy WebLinkAboutContract 46936 Developer and Project Information Cover Sheet: Developer Company Name: Lennar Homes of Texas Land and Construction, Ltd. Address, State, Zip Code: 1707 Marketplace Blvd, Suite 100 Irving TX 75063 Phone,E-Mail: 469-587-5206, David.Aughinbaugh @Lennar.com Authorized Signatory/Title: Kim Nguyen /Authorized Agent Project Name and Brief Description: Water, Sewer, Paving, Drainage, Street Light, and Street Sign Improvements to serve Sendera Ranch East Phase 9 Project Location: North of intersection of Rancho Canyon Way and Salida Road Plat Case NO.:FP-001 Plat Name: Sendera Ranch East Mapsco: 6E Council District: 2 City Project No: 02566 CFA:20,5-a5a DOE: 7442 To be complete v staff r Received by: Date: OFYd" IUA��,. F'tiEJm O,')RD Combined CFA A Agreement Revised January � �a��l"'����� ,�r�"� ��� �i�P�lll�N4'r� � �t� k COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TA NT § Contract No. WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as sendera Ranch East Ph.s ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the Project. NOW, THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section I1, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer acknowledges that t' ��"�'"""°,�'�'"" "°`......°""'".'� e said 01"FICFAL, RECORD acceptance process requires the Developer's contractor(s) to su mzt an CITY 1rECRE Pl A I,"f 2 fi ir,,, Vii" .)f lb I"Wp'"I i rx affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub-contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City- approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof Water (Al ✓ Sewer (A-I) ✓ Paving (B) ✓ Storm Drain (13-1 ) ✓ Street Lights & Signs (C). ✓ E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section 11, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section 11, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having Jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is corninenccd and to meet the requirements of Combined CFA Agreement—Revised January 2014 Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein, I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of arty utilities that are or may be in conflict with any of the 4 community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless fora inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. I.- The Developer further covenants and agrees to, and by these presents does hereby, My indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in, ")hole or in i2art, h the allkged ne Iience oLthe Cki OLFort Worth: its of Licers, servants, or einploLees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, its or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such inj uric,,v , death, or damyges are caused, in whole or in 7art by the alle-ged negli ence of"the City OLFort fforth, its officers, senwnts, oLYjMgLEEM Further, Developer will require its contractors to indemnify, and hold harmless the City foray losses, Combined CFA Agreement- Revised January 2014 damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its 6 agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Combined CFA Agreement—Revised January 2014 II: TESTIMONY Wit EREOF,the City ofFort Worth has caused this instrument to be executed in quadruplicate in its narne and on its behalf by its Assistant City Nfanager, attested by its City Secretary',with the corporate seal.of the City affixed,, and said Develop-r has executed this instrument in quadruplicate,affort Worth,Texas this -ay of ...............2 201 CITY OFFOWI' WORTH-Recommended by: Water Department Transportation&Public Works Department ..... ........... . ....... �abulal,1�1MBA.,.P.E. Dougi­a, Wiersig,.P.E. Wendy C h B Developtnent Engineering Manager DhvEo Aj?pro red as to.Form&Legwfityl• .4171�roved by Cily Adanager's Qf ice Douglas W.Black 7e- .......... A—P A" Assistant City Attorney Assistant City Manager M&C No. ...24 .................... Coo ATTEST: % X. Mary J. Kays c 4�i City S,4cretar ................ __.................................................................................................................................................—------ ATTEs,r: DEVELOPER: Lennar Homes ofTexas Land and Construction,Ltd. By:Le i -r Texas Holding("Olylpany,its greneral.partner ............... . ...... .... ...... igadture Signature "rint N 9 (Print)Name: Ir e� T am itle: 1j­UT;q �1, j A 6" rC OFFICIAL RECORD Combined CFA Agreement Revised January 201.4 CITY SECRE rARY I WORM '11111111( Cost Summary Sheet Project Name: 8codcruRanch East Phase CFA No.: DOE No.: An Engineer's Estimate of Probable Cost is emoephaLde Hovvever, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid prime and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1 Water Construction 146.941.80 o.Sewer Construction 148,224.50 Water and Sewer Construction Total $ 2e5,166.30 B. TpvvConstruction 1otmet 731.20.22 o. omm omm $ 231.227.00 u Street Lights Installed uvDeveloper 9*82000 npw'Construction Cost Total o 1.057.25u.22 Total Construction Cost(excluding the na"s): 13*24t652 Construction Fees: C. Water/Sewer Inspection Fee(om) $ o.00a.aa D. Water/Sewer Material Testing Fee(c%) 5e0133 Sub-Total for Water Construction Fees $ 11800a5 E. rpw Inspection Fee(4m) o 38.497.21 F. rpvv Material Testing(o%) m 19'240.60 G. Street Light mspsacn a uncos� m '79280 H. Street Signs Installation Cost 1,470-00 Sub-Total for npw Construction Fees o 63008a1 Total Construction Fees: 7481526 Choice Financial Guarantee Options,choose one Amount (ck one) Completion Agreement= 100%/Holds Plat $ 1,352,416.52 Cash Escrow Water/Sanita!y Sewer= 125% $ 368,957.88 Cash Escrow Paving/Storm Drain= 125% $ 1,321,562.78 Letter of Credit=125%w/2yr expiration period $ 1,690,520.66 8 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Q✓ Location Map ❑✓ Exhibit A: Water Improvements Q✓ Water Estimate ✓0 Exhibit A-1: Sewer Improvements []✓ Sewer Estimate ❑✓ Exhibit B: Paving Improvements 0✓ Paving Estimate ❑✓ Exhibit B-1: Storm Drain Improvements ✓n Storm Drain Estimate [] Exhibit C: Street Lights and Signs Improvements Q✓ Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 10 C4 08 LLJ to(o 0 LLI P, I V) wo 0-0 3:LU c):r LL_CL .. ................. ................... .... . ............. 0' 0 . .......... .- I. .... ..................... ........ ........................ .............. ............... ........................... .................. ...................... .................................. ............... -- ------ ------ ch ........ 8�1 JSVN8 'a 8 IWO r UJ CN ---) < 0 (-) 0 (> c.8 2 _j b C-r- 0 Jol z U) C> A- (i o CL L) LL < Z 0 :) --------------------- . .......................................... ............... ........... C, . ......................................... ........... ...................... - ----- ------------------------- .............................................................. . ......... uDpg !I!san Vjd Lr:t, gIOZ/C/9 'bmp-dori (I!U!O!A —VJ0\VJ3 —6 3SVHd7.1!q!4-3 QZL\aCVC) OOL\6OZ6-lX-4M\ODZ6'IXiM\OIS\:I i N�y WW gyp YI C14 z U, l C/S B � li C > o ~ 0— — Q - ® _ ins og tea: � �° r�u �` � � <, ca rs iz 0 a. � � ~o o o o 0 ► 0 e 0 Ln L a. ®.. I,aJ LuJ Lu.D Lo r w. �. . .�w 00 l -IT OD � CD I� \, c%4 ",1 t p t CIJ PA 00 00 a�1a " y" z F hg4'(( _. to rte. .. 1 gig C� C14 lo CD OD lo 1 14 UOPS 'RISOVi `V9d ZO:S SLOZ/4/9 `6MP'JOBDM —VJO\VSO 13SVHd\sl!q!4x3 9ZL\QUVO OOL\6OZe7XAM\OOZO'IXdM\O'IS\l C*4 w T— 00 0 (D w r- r 0 Z Pi (A C14 Li Lj uj I- 0 0 0 _j C-) Fo 0 -Z F- Li _T LJ C) LJ w < z Z V) 'r --.) m 6 < z ,Z P,it: U- w L;j < < U) >< V) < LU uj w U- (A (n 0 (D 0 0 CL a. IL cn 0 0 Ln 0 t ly x R R —E CL a- LA.) Lij ...................... ............................................................................................................................-7......71 . 7 < 1A, Q A to 4 tn �Cp C14 00 0) to 00 CD In c C C) 00 CO t-1 LO (D CN to 0", '(5 P,OAAD C14 0 00 b ,z� to 04 04 0 B" 00 V.) to 04 X J -------------- ------................ ......................... ............... A ... . ........................ ................. ............ . .............................. .- L- I UDPe 'WSaVl 'Nd K:* SiOZA/9 '6MP'JQ�DMaj�DM -VJO\V-40 ­6 3SVHd\rl!q!t4x3 9ZL\OaVO OOL\6OZ6-lX-4M\OOZ6-lX-4tA\MS\:I a � N C) l V I F+1 w h C d C7 9 rma N Nip '° � p�q 01- f1 ` � W QJC C LL h Z i3 C „an - ..—V7 N V).,.-j o W L W ) rfj C 0 it 7 W ..) C CL a-In 0L. q- 0 B x x 0 w 0 C C O_ Q-L M CL CL . ...... .... ....m.... _ .....__...--- _..._.y _m _ _ _ ..... .-. f f , r' r.� f \ \ / \ y rf j Ile ul K q^C .... �• �. 00 t C Y 00 .• Ln PO C14 (14 0 r- � co w. gb, CO LO c� P LO \ ��r�•�t 7 Rog A p �° Via; „ .� , ... 00 �.� Ln w C14 1 1 UDPB '!Vsavi 'Wd 6v* GLOZ/£'/S '6MP�BU!ADd —V-40\`dJO °°6 3SVHd\sl°9!4x3 9ZL\OOVJ OOL\6OZ6IXAM\OOZ6lxjm\11s\:i I NN I m LLa ;� 0 m '� LJ m (n -j - �`O p s u�. w m �'► Li 9 (n � v M a- . p xw cr.Q.- W LLJ 0 U..J Lli zi to It to CINI CN 36" y4 to CINI i F <.¢ r k ... w m � \ N ! m _a MPS '!1!rPW 44d K4, 9[OZ/€/9 'BMpr jojS —V3O\V ',) --6 3SVHd\s3!q!4x3 9ZL\®0VO OOL\60Z61X3M\OOZ6IXJM\OlS\:I E� No J vi w ~ = x ate°° Li Li W �W ui w p.�z V) EL z L,a uj ui0 0 0�_ 0 a....p 1— 0 w0 X0 0_ ..D OW :3 Jz r �M ..µµ. 1 ? �r , 3 � l t Lp LAIL 00 LO C r Ln �..5 �- U') N M - ,•"" " 1 r l' ,, c C14 c;p, co \NM LO `...." _ 00 u ' uD!d 'WSaW `Ad 01,:$, 91OZ/£/9 °6MP'St46!I 12GAS —VAD\`-40 --6 3SdHd\s3!4!4x3 9ZL\OO`d0 OOL\6OZ6IXdM\OOZ6IX3M\OIS\:I i N i � � Ui rZ rZ0 ui �= z u LlJ o0 a�T th 0 Zuj W a. ° rte_ Z ° ® � 0 Ul Zi fix. � 0- w V) In V) µ , f" 1 r'" N 4 # t u y � � d � 4 t co r In In ao co r 1 , ev co cn ... 1 ca In 04 04 cn co r (V CD � x �.µ.µ �µ, p u®!J '!IIsah 'rid 01,:* S IOZ/£/9 `6Mp•su61S 40-IS —dd3\V3a w6 3SVHd\sk".9!4x3 9ZL\OOY'J OOL\6OZ61X-iM\OOZ6lXdM\(nS\:I 004243 DAP-BID PROPOSAL Page I of6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Nqject Item Infonnation Bidder's Proposal UNIT 1:WATER IMPROV EMENTS 3311.0001 Ductile Iron Water Fittings w/Restraint 33 11 11 TON' 1.05 $3,000.00 $3,150.00 3311,0241 8"'Water Pipe 3311 12 1 F 2358 $30.661 $72,306.00 33123002 6"Gate Valve 331220 EA 2 $900.00 $1,800.00 3312.3003 8"Gate Valve 33 12 20 EA 5 $1,100.00 $5,500.00 3312,,0001 Fire Hydrant 33 12 40 EA 2 $2,700.00 $5,400.00 33122003 1""Water Service 33 12 10 EA 63 $850.00 $53,550.00 3312.0117 Connection to Existing 8"Water Main 33 12 25 EA 4 $500.00 $2,000.00 3305.0109 Trench Safety 330510 1...F 2358 $0.10 $235.80 9999.0001 City Bonds for all Water Improvements(Performance, 00 00 00 LS I Payment&Maintenance) $3,000.00 $3,000.00 TOTAL U,NIT 1:WATER IMPROVEMEt!TS $146,941-80 CITY OF FORTWOR'n I STANDARD CONSTRUCUON SPEC'MCAMN TX)0.RaN'1S-DEVELOPER AWARDED PROJECIS W4243 iNdhoom4 DAPxb Form Vasion April[2,20M 004243 DAR-BID PROPOSAL Page 2 of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Informadon Bidder's Proposal Bidlis Item Ekscription Specification Unit of' Bid Unit Price Bid Value, �Iqsol�=110m Section=NMeassu-re Quantity UNIT II:SANITARY SEWER IMPROVEMENTS 3331.4115 8"Sewer Pipe 3331 20 LF 1637 $38.00 $62,206.00 33391001 4'Manhole 33 39 10, EA 6 $2,800.00 $16,800.00 33 39 20 3339.1003 4'Extra Depth Manhole 33 39 10, VF 23,7 $165.00 $3,910.50 33 39 20 3339.1002 4'Drop Manhole 33 39 10, EA 1 $4,000.00 $4,000.00 33 39 20 3339.0001 Epoxy Manhole Liner 33 39 60 VF 20 $175.00 $3,500.00 3305.0113 Trench Water Stops 33 05 15 EA 5 $300.00 $1,500.00 33313101 4"Sewer Service 3331 50 EA 63 $600D0 $37,800.00 3311 10, 3331.4116 8"Sewer Pipe,CSS Backfill 3331 12, LF 140 $55.00 $7,700.00 3331 20 3305.0109 Trench Safety 33 05 10 LF 1777 $2.00 $3,554.00 3301.0101 Manhole Vacuum Testing 3301 30 EA 7 $100.00 $700.00 3301.0002 Post-CCTV inspection 3301 31 LF 1777 $2.00 $3,554.00 9999.0002 City Bonds for all Sanitary Sewer Improvements 00 00 00 LS 1 $3,000.00 (Performance,Payment&Maintenance) $3,000.00 TOTAL UNIT 11-SANITARY SEWER IMPROVEMENTS $148,224.501 MY Or FORT WOR'.M STANDARD C'ONS TRUC,110N SPECTFICA TION DOCUNCNIS..DEV ELOPER AWARDED PROIECTS 00 42 43%dh-opassD DAP0,, Fam Vrr6on Apyd 2,20M W 42 43 DAY-BBD PROPOSAL Page 3 of 6 SECTION 00 42 43 Developer Awarded Projects PROPOSAL FORM UNIT PRICE BID Bidder's Application ProJect Item Ire fon-nation Bidder's Proposal Specific tion Unit o�f Bid Ur� it of ow Value 4 to. ti Bidli.st Item DesLiiption Sect-ion No. U Measure n UNIT III:DRAINAGE IMPROVEMENTS 3341.0201 21"RCP,Class 111 3341 10 '1 7-LF 235 $43.00 $10,105.00 3341.0205 24"RCP,Class 111 3441 10 LF 936 $48.00 $44,928.00 3341.0302 30"RCP,Class 111 3541 10 LF 234 $60.00 $14,040.00 3341.0309 36"RCP,Class 111 3641 10 LF 946 $77.00 $72,842.00 3349.5001 10'Curb Inlet 33 49 20 EA 8 $2,200,00 $17,600.00 3349,5002 15'Curb Inlet 34 49 20 EA 2 $3,800.00 $7,600.00 3349.5003 20'Curb Inlet 35 49 20 EA 2 $4,000.00 $8,000.00 3349.0001 4'Storm Junction Box 33 49 10 EA 6 $3,000.00 $18,000.00 3349.0002 5''Storm Junction Box 33 49 10 EA 3 $4,500.00 $13,500.00 0241.4401 Remove Headwall/SET 0241 14 EA 2 $1,000.00 $2,000.00 0241.3017 Remove 30"Storm Line 0241 14 LF 28 $20.00 $560.00 02413023 Remove 48"Storm Line 0241 14 LF 10 $25.00 $250.00 3349.1003 24"Flared Headwall,1 pipe(TxDOT CH-FW-0) 33 49 40 EA 2 $2,000.00 $4,000.00 3349.1005'30"'Flared Headwall,1 pipe(TxDOT CI-I-FW-0j 33 49 40 EA 1 $3,000.00 $3,000.00 3349.4111 42"SET,1 pipe 33 49 40 EA 1 $3,500.00 $3,500.00 3137.0101 Concrete Riprap 31 3700 SY 48 $75.00 $3,600.00 3305.0109 Trench Safety 33 05 10 LF 2351 $2.00 $4,702.00 9999.0003 City Bonds for all Storm Drain Improvements 00 00 00 LS 1 $3,000.00 $3,000,00 (Performance,Payment&Maintenance) TOTAL UNIT III:DRAINAGE IMPROVEMENTS- $231,227.00, MY OF FORT WORM SI'ANDARD CONSTRU,7110N SPECIFICATTON DCK.'UMENTS-DEVELOPER AWARDED PROTECTS 00 42 43.SW PmpoW D All Form Vcnkn ApTd 2,20M OD 42 43 DAR DID PROPOSAL Page 4 of 6 SECTION 00 42 43 Developer Awarded Pro* ts..PROPOSAL FORM UNIT PRICE BID Bidder's Application PTq ect heyn Infonnation Biddees Propowl S�xrcificatkm �n,�11., AEU Bidli,A item Descnption -"a,,,,-,n Q id I It 1,. M ; 'n� uan y J,,t Bid Value. t'ry Q UNIT IV:PAVING IMPROVEMENTS 3213.0101 6-Conc IPvntt 3213 13 SY 6555 $3300 $216,315.00 3213.0103 8"Cone Pvrnt 32 ,1313 SY 1230 $38.00 $46,740.00 3213.0105 10"Cone Pvrnt 32 13 13 SY 6217 $46.50 $289,090.50 3211.0501 6"Lime Treatment 32 11 29 SY 6974 $100 $20,922.00 3211.0 502 8"Lime Treatment 3211 29 SY 1733 $3,25 $25,132,25 3211,0400 Hydrated Il..i rre 3211 29 TON 351.76 $172.00 $60,502.72 3213,0501 Barrier Free Ramp,Type R 1 32 13 20 EA 8 $1,200.00 $9,600.00 3213.0502 Barrier Free Ramp,Type U 1 32 13 20 EA 4 $1,200.00 $4,300:00 3213.0301 4"Conn Sidewalk 32 12 20 SIF 9412 $300 $28,236.00 3217.2001 Raised Marker TY W 32 17 23 LF 1877 $5.00 $9,385.00 32172002 Raised Marker TY Y 32 17 23 LF 939 $5.25 $4,929.75 9999.0004 Standard FOR Barricade 00 00 00 EA 2 $600.00 $1,200.00 9999.0005 Pavement Header 00 00 00 LF 178 $25.00 $4,450.00 9999.0006 Remove&Relocate Standard FOR Barricade 00 00 00 EA 3 $300.00 $900r00 9999.,0007 City Bonds for all Paving trnprovements(Performance, 00 00 00 LS 1 Payment&Maintenance) $9,000.00 $9,000.00 TOTAL UNIT IV:PAVING IM PROVEMENTS1 $731,20122 CITY OF FORTWOR III STANDARD CONSTEUCTION SPEX.3FICA110N D0(1MNrS-DEVELOPER AWARDED PROIECTS Form Venian A,pvd 2,20M 004241,,TkdF1mpi:W DkPxh 00 42 43 DAP-BID PROPOSAL Page 5 of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid Description Unit Price Bid Value No. Section No. Measure Quantity UNIT V:STREET LIGHTING IMPROVEMENTS 34413001 Rdwy Ilium Assmbly Ty D25-6 3441 20 EA 9 $2,000.00 $18,000.00 3441.3201 LED Lighting Fixture(70W) 3541 20 EA 9 $500.00 $4,500.00 3441.3301 Rdwy Ilium Foundation TY 4 3441 20 EA 9 $1,000.00 $9,000.00 2605.3015 2"CONDT PVC SCH 80 26 05 33 LF 1785 $12.00 $21,420.00 3441.3401 6-6-6 Triplex Alum Elec Conductor 3441 20 LF 900 $3.00 $2,700.00 3441.3003 Rdwy Ilium Assmbly Ty D40-9 3441 20 EA 5 $3,200.00 $16,000.00 3441.3201 LED Lighting Fixture(137W) 3441 20 EA 5 $800.00 $4,000.00 3441.3302 Rdwy Ilium Foundation TY 5 3441 20 EA 5 $1,200.00 $6,000.00 3441.3404 2-2-2-4 Quadplex Alum Elec Conductor 3441 20 LF 800 $4.00 $3,200.00 3441.4006 Install Alum Sign Ground Mount(Stop Sign) 3441 30 EA 6 $500.00 $3,000.00 2605.0111 Furnish/Install Elec Sery Pedestal 26 05 00 EA 1 $4,500.00 $4,500.00 9999.0008 City Bonds for all Street Light Improvements 00 00 00 LS 1 (Performance,Payment&Maintenance) $2,500.00 $2,500.00 TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS $94,820.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS 00 42 43_Bid Proposal_DAP.xIs Form Version April 2,2014 00 42 43 DAP-BID PROPOSAL Page 6 of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM IT PRICE BID Bidder's lication Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid Description Unit Price Bid Value No. Section No. Measure Quantity Bid Summary UNIT I:WATER IMPROVEMENTS $146,941.80 UNIT It:SANITARY SEWER IMPROVEMENTS $148,224.50 UNIT III:DRAINAGE IMPROVEMENTS $231,227.00 UNIT IV:PAVING IMPROVEMENTS $731,203.22 UNIT V:STREET LIGHTING IMPROVEMENTS $94,820.00 Total Construction Bid $1,352,416.52 Contractor agrees to complete WORK for FINAL ACCEPTANCE within calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Fmm Version Apr 2.2014 00 4'_43_Bid Proposal_DAP.xB il